Loading...
HomeMy WebLinkAboutCouncil Resolutions 1446RESOLUTION NO. j 44(,, A RESOLUTION AFFIRMING THE PLANNING COMMISSION DECISION ADOPTED AS RESOLU'T'ION NO. 827 APPROVINGA CONDITIONAL USE PERMIT FOR DEVELOPMENT OF A COSTCO WHOLESALE MEMBERSHIP WAREHOUSE AND FUEL. FACILITY ON 18.28 ACRES WITHIN THE M-1 ZONING DISTRICT - APPELLANT MARTIN (File No: 15022) WHEREAS, on February 2, 2016 the Planning Commission approved an application for a Conditional Use Permit ("CUP") application for development of a Costco Wholesale membership warehouse on 18.28 acres in the M -I zone; WHEREAS, on February 16, 2016, the City of Central Point received from L. Calvin Marlin a timely appeal of the Planning Commission's decision to approve the CUP application. The appeal alleged that the Planning Commission erred in its approval of the application based on several issues related to land use, traffic and the City's Statement of Values for Growth; WHEREAS, on March 10, 2016, after conducting a duly noticed public hearing, the City of Central Point City Council considered the issues raised on appeal and heard testimony and comments on the appeal; WHEREAS, Costco Wholesale is a Membership Warehouse Club, a conditional use in the M-1 zone per Planning Commission Resolution No. 764 and City Council Resolution No. 1217; WHEREAS, the Planning Commission's decision to approve of the Costco Wholesale CUP was based on the standards and criteria applicable to Conditional Use Permits set forth in Section 17.76.040 of the Central Point Municipal Code and written and oral testimony received by the City; and, WIIEREAS, after duly considering the appeal and the evidence in the record, the City Council found that there was substantial evidence in the record to affirm the Planning Commission Decision and that the Planning Commission did not err as a matter of law and, per a duly seconded motion, directed staff to prepare a final resolution and findings affirming the Planning Commission Decision adopted as Resolution No. 827 per the Staff Report dated March 10, 2016 and specifically including Attachments "A", `B," and "C-2" therein. NOW 'THEREFORE BE IT RESOLVED, The City of Central Point City Council affirms the Planning Commission Decision adopted as Resolution No. 827. This decision is based on the Council's determination that there was evidence in the record to approve the CUP application and that the Planning Commission did not err as a matter of law and is supported by the evidence in the record, the findings attached hereto as Exhibit "A — City Council Findings of Fact and Conclusions of Law," incorporated herein by reference, and Exhibit `B— Staff Report dated March 10, 2016" including Attachments "A" and "B" and "C-2" incorporated herein by reference PASSED by the City Council and signed by me in authentication of its passage this 24's day of March, 2016. Mayor Hank Williams ATTES City Representative Approved by me this 4�w4day of (TIUA, 2016. Mayor Hank Williams City Council Findings of Fact & Conclusions of Law Costco Wholesale Conditional Use Permit Appellant: L. Calvin Martin P.O. Box 442 Jacksonville, OR 97530 File No. 15022 March 24, 2016 PART 1 — INTRODUCTION EXHIBIT "A" Findings of Fact and Conclusions of Law On February 2, 2016, the Planning Commission in accordance with CPMC 17.76 approved a Conditional Use Permit authorizing the development of a Costco Wholesale membership warehouse and fuel facility on 18.28 acres within the M-1 zoning district ("Costco Application"). The project site is located on the eastern edge of Central Point city limits at the southwest comer of I lamrick andable Rock road. The site also has frontage on Federal Way, a local street. Surrounding properties include developed and undeveloped industrial lands, including the M-1 and M-2 zoning districts. On February 16, 2016, L. Calvin Martin filed an appeal contesting the Planning Commission's decision on the basis that the City of Central Point Planning Department and Planning Commission committed an error when approving the Conditional Use Permit for the Costco Store (`Martin Appeal"). The Martin Appeal addressed several issues that focused on legitimacy of a commercial/retail use in the M-1 zone and traffic related concerns, which are addressed below. The Council's scope of review on this appeal is limited to the issues and evidence presented in the record before the Planning Commission as per CPMC. 17.1 5.400(F)(3). As this appeal is on the record the City Council may not consider new evidence or issues that were not preserved in the record below. Council review is limited to determining whether there is substantial evidence in the record to support the findings of the Planning Commission: or whether errors of law were committed. Membership warehouses are permitted as a conditional use per the City`s 2009 similar use determination under CPMC 17.48.020(W) and 17.60.140, which was adopted by the Planning Commission as Resolution No.764, and affirmed by the Council on Appeal as Resolution No. 1217. The applicable approval criteria for a Conditional Use Permit are set forth under CPMC 17.76.040, Findings and Conditions for Conditional Use Pcrmits. Page l of 11 PART 2 — APPEAL ISSUES "I here were seventeen (17) issues raised in the Martin Appeal. 'Though some of these issues overlap, staff has attempted to lay each issue out separately for Council consideration. The following is a summary of each issue presented in the Martin Appeal including the draft findings and conclusion pertinent to each issue. 1. Planning Commission Abuse of Discretion. "'Ihe City Planning Commission has abused their discretion in allowing such a use in the industrial one and at this location." Finding I: Membership warehouses, per Section 17.48.020(W) and 1760.140, are allowed as a conditional use in the W I district per Planning Commission Resolution No 764 and City Council Resolution No. 1217. As such, the Planning Commission considered and approved the Costco Conditional Use Permit (CUP) application in accordance with the conditional use permit .standards and criteria .cel forth in CPMC 17.76. Pcr the Applicant's 1,indings ("Applicant's Findings" and the Planning Department Supplemental 1, indings ("Supplemental Findings') and testimony provided in the record evidence was submitted into the record as to each criterion under 17.76.040 and was found to comply with all such standards and criteria. Conclusion 1: The Council concludes that the Planning Commission did not err in finding that membership warehouses arc permitted subject to a conditional use application under CPMC 17.76 and/or that there was substantial evidence in the record to find that all such standards and criteria were met under 17.76.040.. 2. Traffic Impacts. Traffic generated by Costco on a daily basis is substantially more than is generated by the entire Rogue Valley Mall. Finding 2: The Applicant submitted a lraffic impact analysis ("TIA ") into the record prepared by Kittelson and Associates for the subject property. City staffreviewed the TIA and there is testimony in the record as to the substance of TIA. No other traffic reports or analysis were prepared or submitted into the record by traffic engineers or other traffic experts. 7estimony from opponents was limited to opinions as to the amount of traffic that would be generated by the subject application There was no other traffic analysis in the record to contradict the Applicant's TIA, nor does the record contain any traffic analysis as to the amount of traffic at the Rogue Palley Mall.. Conclusion 2: The Council conclude, there is not substantial evidence in the record to find that traffic at the Rogue Valley Mall is relevant to this application, n or is there sufficient evidence in the record to substantiate the amount of traffic generated by the mall. 3. Development Ordinance. —"You are required to follow the rules laid out in your development ordinance when approving such an application." Finding 3: The Planning Commission's considered the .subject application as a CUP under the City's authorization of membership warehouses as a conditional use in the M-1 zone as discussed Page 2 of 11 in Finding l above, and Finding 17.48.040(A) of the Planning Department Supplemental Findings in the record. The Planning Commission considered and approved the Conditional Use Permit for Costco Wholesale based on the application's demonstrated compliance with the standards and criteria for conditional use permits per CPMC 1776 as .set forth in the Applicant's Findings and the Planning Department Supplemental Findings (See Resolution No_ 827 and attachments thereto). Conclusion 3. the Council concludes that there is .substantial evidence in the record to find that the Planning Commission applied the relevant standards and criteria under Resolution Nos. 764 and 1217, and CPMC 17.76 to approve a membership warehouse and fuel facility and applied the evidence in the record to find such standards and criteria were met. 4. Statement of Values. - "Your STATEMENT OF VALUES regarding gross th... stated that. "We value planned growth that will retain our small town atmosphere. 'Phis project does not fit that statement." Finding 4: In considering the Conditional Use Application for the proposed Membership Warehouse and fuel facility, the Planning Commission was required to render a decision based on the proposal's demonstrated compliance with Standards and Criteria for Conditional Use Permits set forth in Central Point Municipal Code Chapter 17.76. Conclusion 4: The mission statement is not part of the Municipal Code nor Comprehensive Plan. It does not serve as a standard or criteria and is merely aspirational language under the City's general Mission .Statement The Council finds the Planning Commission did not err applying the Standards and Criteria at CPMC 1776. 5. Accessory Use. —"One ofthe issues is that the zone that the store is to be located in is Industrial. -Phe reason that retail/commercial activities are allowed in those zones with restrictions, and not outright, and that they go through the Conditional Use Permit process is that they are not the primary use but an accessory use to the primary." Finding 5: the Planning Commissionfound that membership warehouses were adopted by the City as conditional uses in 2009 as set forth in Finding 17.48.040(A) of the Planning Department Supplemental Findings adopted by the Planning Commission. The Planning Commission found that as a result of the similar use determination, membership warehouses are not considered accessory uses but are permitted subject to the standards and criteria for Conditional Use Permits per CPMC 17.76. Conclusion 5: The Council concludes that the Planning Commission's consideration of membership warehouses as a conditional use and not as an accessory use is in conformance with the City's similar rine authorization per CPMC 17.48.020(W) and CPMC 17.60.140. See also Planning Commission Resolution 764 and City Council Resolution 1217. Page 3 of I 1 Semantics. —"When a store like Costco is placed in that zone you have to play, and indeed did so, a very significant semantic game with what you call the store. In calling it a warehouse store the project might just seem like a Fit. With that said, it is certain that the management of Costco is under no illusions, whatsoever, that they are the largest retailer in the area." Finding le The Planning Commission's consideration of the Costco CUP to develop a membership warehouse andfuel facility is based on the City's similar use authorization for membership warehouses in the M zoning districtper Finding 17 48 040(A) in the Planning Department Supplemental Findings and Finding I above_ Conclusion 6: Membership warehouse clubs, such as Costco Wholesale, are allowed in the M-1 district subject to the standards and criteria set forth in CPMC 17. 76, Conditional Use Permit Not a Fit in the Zone. —"As I previously stated, Costco generates more traffic than the Rogue Valley Mall and they are about one fifth of their building footprint. lust consider the number of parking spaces that they are illustrating in their plan. It is obvious that they don't In this one. They are not a complimentary service and supply provider that is allowed in this zone. A store of this size and magnitude should not he in an industrial zone. If they are allowed to develop on this site it will become a traffic disaster." Finding 7: As noted in findings 5 and 6, membership warehouses were approved in 2009 as a conditional use in the M zone. With regard to trek, CPMC 17.76 requires consideration of the following: A. That the site for the proposed use is adequate in size and shape to accommodate the use and to meet all other development and lot requirements of the subject zoning district and all other provisions of this code; R. That the site has adequate access to a public street or highway and that the street or highway is adequate in size and condition to effectively accommodate the traffic that is expected to be generated by the proposed use; C. That the proposed use will have no significant adverse effect on abutting property or the permitted use thereof. In making this determination, the commission shall consider the proposed location of improvements on the site; vehicular ingress, egress and internal circulation; setbacks; height of buildings and structures; walls and fences; landscaping; outdoor lighting; and signs; D. That the establishment, maintenance or operation of the use applied for will comply with local, slate and federal health and safety regulations and therefore will not be detrimental to the health, safety or general welfare of persons residing or working in the surrounding neighborhoods and will not be detrimental or injurious to the property and improvements in the neighborhood or to the general welfare of the community based on the review of those factors listed in subsection C of this section; Pegc 4 of I I E. 7 hat any conditions required for approval a the permit are deemed necessary to protect the public health, safety and general welfare and may include: 2. Increasing street widths, modifications in street designs or addition of street signs or traffic signals to accommodate the traff-ic generated by the proposed use, 3. Adjustments to oil -street parking requirements in accordance with any unique characteristics of the proposed use, 4. Regulation of points of vehicular ingress and egress, 11. Such other conditions that are found to be necessary to protect the public health, safety and general welfare, The findings adopted by the Planning Commission reviewed the criteria for Conditional Use Permits set forth in CPMC 17.76 and made findings that the .site is adequate in .size and shape to accommodate the use, the site has adequate access to a public street or highway; the proposed use will not have adverse effects to abutting properties or permitted uses thereof that the use will not be detrimental to the health safely or general welfare ofpersons residing or working in the surrounding area or the community,- and that the conditions imposed are deemed necessary and .sufficient to protect the public health, safety and general welfare. Seethe Supplemental and Applicant's findings in the record below_ More particularly, the only traffic impact analysis or other expert evidence submitted into the record is the TIA submitted by the Applicant, and comments from the City of Central Point Public Works Department, City of Medford OD07'and the.lackson County Roads. The Planning Commission imposed conditions ofapproval pursuant to the TIA and comments from other jurisdictions for traffic impact mitigation No expert testimony was received into the record countering the 77A or agency recommendenion.s for traffic impact mitigations. (See Finding 2 addressing traffic generated by Costco compared to the Rogue Valley Mall)_ All other evidence as to traffic was conjecture or speculation. As demonstrated in Finding 17.76.040(C) in the record below, the Planning Commission considered the proposal's impacts to abutting properties, including an evaluation of the location of proposed site improvement, vehicular ingress, egress and internal circulation, .setbacks; building height; walls and fences; landscaping; outdoor lighting and signs. the Planning Commission found that the proposed project is typical of site development within the M -I zone and that the site development standards for permitted uses in combination with the conditions of approval relative to ingress and egress per finding 17.76.040(/3) in the record below are sufficient to avoid adverse impacts to abutting properties or permitted uses thereof. As demonstrated in finding 17.70 0400) in the record below, the Planning Commission considered the issue of safety and found that there is sufficient evidence in the Applicant's Page 5 of 11 findings to demonstrate, in conjunction with the building code and fire district regulations, that the proposed use will comply with local, state andfederal health and .safety regulations and therefore not be a detriment to the health, safety and general welfare of the community or persons residing or working in the surrounding neighborhoods_ COnClasion 7. The proposed membership warehouse and fuelfacility was evaluated against the standards and criteria for conditional use permits and found to comply. There is substantial evidence in the record for the Planning commission to find that the use is compatible with the zone. 8. "Traffic Effects Par Reaching. "The traffic issues have far reaching effects of congestion and cost on Central Point, Jackson County, and the City of Medford as well as the Oregon Department of I raneportation. Of course, that means the tax payers who support those entities. In other words, all of us will be paying a huge price for the location of a store that is not an appropriate 131. It is not a code fit and it is not a size and traffic fit all in one. Once Costco goes in there will be no way to fix this problem." Finding R: Per the TIA, the proposed Costco Wholesale andfuel facility is expected to generate 10,670 new daily trips. Heavy vehicles were evaluated in the TIA and no problems were identified with the mix of light and heavy vehicles based on volume and impacts to LOS/VC. On the day of opening traffic impacts were identified at four (4) intersections: 1) Interstate 5 Northbound Off Rump, 2) Table Rock and Hamrick Road, 3) Table Rock and Airport Road, and 4) Airport and Riddle Road. Although not identified in the TIA, the City of Medford provided crash data and comments in a letter dated January 5, 2016 indicating that traffic generated by Costco would negatively impact the intersection of Table Rock Road and Morningside Street .south of the project site. In accordance with the TIA and comments received from affected agencies, the planning Commission imposed conditions of approval requiring mitigation of the traffic impacts caused by the proposed Casten if holesale (See Table 1). Interstate 5 NB Volume to Capacity (v/c) Enter into a Cooperative Prior to Off -Ramp Ratio is exceeded. Improvement Agreement building with ODOT and the City to permit develop and construct dual issuance right turn lanes per IAMP Protect No 9. Table Intersection Failure due to Construct center turn lane Prior to Rock/Ilamrick left turn delays and refuge within existing certificate of Road Tahle Rock Road right -of- occupancy. uscis at Hamrick Road. Table Existing left turn delays cause Jackson County has Jackson Rack/Airport the intersection to operate at funding to construct County Table Road a Level ofService (LOS) F. improvements on Table Rock Road The existing status is Rock Road that includes Improvement Page 6 of I l As demonstrated in the Applicant's Findings and the Planning Department Findings, the Planning Commission found the project as conditioned is adequate to accommodate the use (See Planning Commission Y'indings for 1776.040 in the record below)_ Conclusion 8: There is substantial evidence in the record for the Planning Commission to find that as conditioned, the application complies with CPMC 17.76 and that traffic impacts from the project will funded or constructed at the time of development. 9. 11 cavy Vchicle Conflicts. - "I rafftc congestion around the Costco store will be a mix of heavy trucks and light vehicles. Table Rock Road will see the bulk of traffic and the measures that have been suggested will only assist but not solve the problems related to this location." Finding 9: The Council incorporates Finding Has iffullysel forth herein. Conclusion 9: There is substantial evidence in the record for the Planning Commission to find traffic mitigation required by this project has been satisfied as conditioned. 10. Additional Traffic Impacts on Table Rock Road. - "Additional traffic on'[ able Rock Road will soon find that it is not designed to handle the load further south of this store and people will soon move their preferred approach to Biddle Road and Table Rock Road north of the site. They will start using the freeway to enter Central Point from the North and the South. This will add congestion on the freeway off ramps north and south and a loading on Pine Street all the way to the intersection with I lamrick and Pine and Table Rock Road and Pine/Biddle Road." Page 7 of I 1 aggravated by additional traffic generated by the proposed use. signalization of the intersection. The County has indicated that construction of the improvements will begin in 2017; therefore, no interim mitigation is necessary_ Project commences in 2017. Airport/Biddle Traffic generated by Costco Per the City of Medford in Proof of Road causes left turn delays which a letter dated.tanuary 5, payment results in a decline in the 2016, the applicant .shall prior to LOS from C to E. contribute its pro -rata building .share Inward construction permit of a signal at the issuance. intersection. Table Rock Road Traffic generated by Costco Per the City of Medford in Proof of at Morningside aggravates an existing left a letter dated January 5, payment Street turn delay at the intersection. 2016, the applicant. shall prior to contribute its pro -rata building .share toward construction permit of a center left turn lane issuance and refuge on Table Rock Road at Mornin .side .Street As demonstrated in the Applicant's Findings and the Planning Department Findings, the Planning Commission found the project as conditioned is adequate to accommodate the use (See Planning Commission Y'indings for 1776.040 in the record below)_ Conclusion 8: There is substantial evidence in the record for the Planning Commission to find that as conditioned, the application complies with CPMC 17.76 and that traffic impacts from the project will funded or constructed at the time of development. 9. 11 cavy Vchicle Conflicts. - "I rafftc congestion around the Costco store will be a mix of heavy trucks and light vehicles. Table Rock Road will see the bulk of traffic and the measures that have been suggested will only assist but not solve the problems related to this location." Finding 9: The Council incorporates Finding Has iffullysel forth herein. Conclusion 9: There is substantial evidence in the record for the Planning Commission to find traffic mitigation required by this project has been satisfied as conditioned. 10. Additional Traffic Impacts on Table Rock Road. - "Additional traffic on'[ able Rock Road will soon find that it is not designed to handle the load further south of this store and people will soon move their preferred approach to Biddle Road and Table Rock Road north of the site. They will start using the freeway to enter Central Point from the North and the South. This will add congestion on the freeway off ramps north and south and a loading on Pine Street all the way to the intersection with I lamrick and Pine and Table Rock Road and Pine/Biddle Road." Page 7 of I 1 Finding 10: The TIA did not identify any issues south of the project site on Table Rock Road. Although not identified in the TIA, the City of Medford submitted comments on December 24, 2016 and January 5, 2016 indicating that the intersection of Table Rock Road at Morningside Street would be adversely impacted due to left turn delays and associated safety concerns. Per the City ofMedford :s request, the Planning Commission imposed a condition requiring financial contribution far the applicant's proportional share of traffic mitigation to the intersection prior to building permit issuance. Conclusion 10: There is substantial evidence in the record for the planning Commission to find that the Applicant will improve, or make financial contributions toward traffic mitigation, that is roughly proportional to the impacts of this development. 11. Improvement Timing. - "The improvements required in the Traffic Impact Study indicate a resultant congestion from construction that is not to be completed for as much as two years. In reality, some of these items, such as an 1-5 off -ramp improvement, are not scheduled by 0D0'I until 2023. There is no definitive evidence that the schedule has been modified. ']'here are no engineering studies or drawings that would support a timely upgrade of that facility. There is no indication, other than verbal at the hearing of January 6". 2016 that some concession might be made. There is no evidence that the improvements alongable Rock Read are funded or that the requisite imminent domain takings of additional land for widening and intersections have been done." Finding ll: There was evidence in the record that identifies traffic impacts and mitigation measures and the feasibility of imposing conditions for such traffic mitigation which includes the TIA prepared by Kinelson & Associates, as well as comments received from affected agencies, including the Oregon Department of Transportation (ODOT), Jackson County Roads, City of Central Point Public Works Department, and City of Medford Evidence in the record addressing traffic impacts and the timing of improvements is as follows: - Table Rock Road Improvement Project. The traffic impact analysis prepared by Kittelson & Associates took into account planned roadway improvements, including the Jackson County Table Rock Road Improvement project, which is .scheduled to be constructed in 2017 (See TIA, Page 32) - Interstate 5 Northbound Off -Ramp, Exit 33 Improvements. Asconditioned, Costco will be required to enter into a Cooperative Improvement Agreement with ODOT and pay its proportional share of the improvement cost prior to building permit issuance (See Revised Public Works Staff Report dated January 5, 2016, Condition No. I). Evidence in the record establishes that the improvements are planned to be czpedited such that they will be constructed as close to opening day of the subject development as possible: a. The Revised Public Works Sialf Report dated January 5, 2016 states that, "Per ODOT, construction will commence at the earliest possible date." (.See Traffic Impacts and Page 8 of l l Mitigation Item Vo 4) b_ During staff's presentation of the January 5, 2016 Planning Commission Meeting, during a discussion of tragic impacts and mitigation (26:05), staff slated that ODOT agreed to expedite construction ofthe off -ramp improvements as close to opening day as possible. Don Morehouse, ODOT Planner, concurred with the staffpresentation and slated that he had nothingfurlher to add (Audio Recording_ at 126'15). Conclusion 11: There is substantial evidence in the record to support the Planning Commission's decision as to the feasibility and timing of traffic mitigation conditions. 12. Biddle Road and Airport Road Intersection. - "the intersection of Siddle Road and Airport Road has not been Cully vetted. 'Phis intersection is important for travelers using the airport. Congestion will create difficulties for them." Finding 12: The applicant's TIA indicates that the westbound approach of Airport and Biddle Road exceeds the level of.service .standard for the City ofMedford Ina letter dated January 5, 2016, the City ofMedford requested a condition that requires the developer to pay a proportional share toward afuture traffic signal at this intersection. The estimated project cost is 5450,000, including design, construction and inspection. Per the TIA, Costco contributes 10% of the traffic at this intersection. As conditioned, Costco .shall provide evidence it has contributed its proportionate share ofthe construction of'signalization improvements in an amount not to exceed 545,000, which shall be payable to the City of Medford prior to building permit issuance. Conclusion 12: As conditioned, facility adequacy at this intersection is met by the Planning Commission's requirement that the Applicant contribute its pro rata share ofthe signalization improvements per the City of Medford Comments dated January 5, 2016 13. Traffic Impacts not Easily Solved, if at all. - -1 he impact on all these roads is significant and not easily solved if at all." Finding 13: Traffic impacts and mitigations are identified in the TIA and by the City ofMedford, ODOT relative to the intersections ofliiddle and Airport Road and Table Rock and Morningside Street The Planning Commission's decision to approve the CUP is subject to conditions of approval assuring timely completion ofthe mitigation actions outlined in the TIA and requested by the affected agencies See also Finding 8 incorporated herein by reference. Conclusion 13: There is substantial evidence in the record that as conditioned, the project will mitigate its proportionate traffic impacts caused by this project and that such conditions are feasible. 14. Cost of Improvements. - "The costs for all of the improvements needed to place this major retailer in an industrial zone along Table Rock Road more than eclipses the cost ofthe store itself by a factor offer. Estimates for the widening ofthe freeway overpass on Table Rock Road Page 9 of 1 I exceeds 20 million dollars. Further south of the overpass are single family residences that need to back out onto Table rock Road to exit their properties. The estimate for acquiring these properties for road widening docs not exist, but would be very high." Finding 14. There is no evidence in the recordfrom affected agencies or traffic experts or engineers to demonstrate that the Interstate 5 overpass on Table Rock Read warrants replacement or that Table Rock Road improvements .south of'lnter5ave 5 are required, other than required mitigation at the intersection of Table Rock Road and Morningside Street, which was addressed See also Finding No. $ incorporated herein by reference. Conclusion 14: There is .substantial evidence in the record for the Planning Commission to find traffic mitigation required by this project has been satisfied as conditioned and that .such conditions are feasible 15. Prcighl Route, I rafGe Conflicts. - "Table Rock Road is designated as a freight route in the overall traffic master plan and this enormous retailer with its accompanying vehicle traffic is not an appropriate mix with the truck traffic in that area." Finding l5: Heavy vehicle impacts were evaluated in the TIA and no problems were identified with the mix of light and heavy vehicles based an volume and LOSIVC ratios (See Synchro Reports in the 77A Appendices). No other expert nolimony was presented as to the mix of vehicle traffic. Conclusion 15: There is substantial evidence in the record for the Planning Commission to find that the mix of light and heavy vehicles does not create problems that would warrant further traffic mitigation or denial of this application. 16. Vehicle and Truck Accidents. - "Vehicle and truck accidents will undoubtedly increase and serious injuries will occur when Coster's large number of senior drivers are forced to mix with large truck traffic." Finding l6: Heavy vehicle impacts were evaluated in the TIA and no problems were identified with the mix of light and heavy vehicles based on volume (See Synchro Reports in the 774 Appendices) nor was there evidence in the record from experts as to the "large number of senior drivers " Conclusion 16: There is substantial evidence in the recordfor the Planning Commission to find (raffic mitigation required by this project has been satisfied as conditioned and .safety concerns do not exist as a result of this project 17. Vilas and Crater Lake Highway. - "The intersection of Vilas and Crater Lake I lighway has been the scene of horrendous accidents and many deaths and this location and traffic load creates at least four intersections with that type of potential." Page 10 of 11 Finding 14: A crash analysis was conducted as part ofthe TIA at all study area intersections (I!A Page 28) to document crash types, trends and severity. The TlAfound that there were no fatality crashes and the most common crashes were turning movement and rear -end crashes accounting for approximately 82% of all crashes. There is no expert evidence in the record substantiating this allegation. Conclusion T4: There is substantial evidence in the record for the Planning Commission to find traffic mitigation required by this project has been satisfied as conditioned and saiety concerns do not exist as a result of this project. PART 3 — SUMMARY CONCLUSION Council has reviewed the evidence and issues in the record and the issues raised in the Martin appeal. The Council concludes that there was substantial evidence in the record for the Planning Commission to approve the application, and the Commission did not commit errors of law. This Conclusion is based upon the findings herein, and the evidence in the record including the Applicant's findings and the Planning Staff Supplemental Findings of Fact and Conclusions of Law. Page 11 of 11 Ak EXHIBIT "B" CENTRAL Community Development STAFF REPORT POINT Tom Humphrey, AICP Ureyon Community Development Director STAFF REPORT March 10, 2016 ITEM Consideration of a Conditional Use Permit application for the construction of a 161,992 square foot Costco membership warehouse and fuel facility on an 18.28 acre site at the southwest corner of I lamrick and 'I'able Rack Road. The project site is within the Federal Way Business Park subdivision in the Industrial (M-1) zoning district, and is identified on the Jackson County Assessor's map as 37S 2W 12B, 9$x Lots 213, 214, 215, and 216. Applicant: Costco Wholesale; Agent: Steve Bullock, MG2 STAFF SOURCE Stephanie Holtey, Community Planner II BACKGROUND In 2009, based on the authority for similar use authorizations provided in CPMC 17.48.020(W) and 17.60.140, the Planning Commission approved membership warehouse clubs, such as Costco Wholesale, as similar to other uses permitted in the M-1 zone and approved such uses as conditional uses (Planning Commission Resolution No. 764). As a conditional use, the City has more discretion in determining the compatibility of the use with other permitted uses. Upon appeal, the City Council affirmed the Planning Commissions similar use determination and authorization ofinembership warehouse clubs as a conditional use (City Council Resolution No. 1217). In 2015, Costco Wholesale submitted a Conditional Use Permit application to develop a membership warehouse and fuel facility on 18.28 acres in the M-1 zone (Attachment "A"). On February 2, 2016, the Planning Commission, in accordance with CPMC 17.76, approved the CCP application (Resolution No. 827). The Planning Commission's decision considered testimony received by the applicants, proponents and opponents at the January 5, 2016 Planning Commission hearing, including the period that the record was left open (Attachment "B"). After the final decision, appeals were filed by L. Calvin Martin ("Martin Appeal" - Attachment "C -I") and David J. Smith ("Smith Appeal" — Attachment D-1 ") on February 16, 2016. The Martin Appeal and the Smith Appeal raise similar issues alleging the Planning Commission erred in approving the application based upon the following issues which are summarized as follows: • The use is not compatible; • The Traffic Impact Analysis submitted by the Applicant is flawed; • The use will generate significate traffic; and • The decision conflicts with the City's Statement of Values for Growth and Transportation. Upon appeal, the Council's consideration is based upon the evidence and issues presented in the record before the Planning Commission. Based upon that record, the Council must determine whether there is substantial evidence in the record to support the Planning Commission's decision, or whether the Planning Commission erred as a matter of law. Staff has reviewed the issues raised in the Martin Appeal and the Smith Appeal and the evidence in the record in the context of the standards and criteria that apply to Conditional Use Permits per CPMC 17.76. There arc no issues raised that have not already been addressed by the Planning Commission as evidenced in the Findings of Fact and Conclusions of Law for the Martin Appeal (Attachment "C-2) and the Smith Appeal (Attachment "D-2' COUNCIL OPTIONS In an appeal of aype III land use decision. the Council has four options: I) Affirm the decision of the Planning Commission. If the Council does so, it must specify the basis for its decision; 2) Reverse the Decision of the Planning Commission. If the Council does so, it must specify the reasons for the reversal; 3) Modify the decision of the Planning Commission and specify the reasons for the modification; or 4) Remand the decision back to the Planning Commission with an explanation of the error and the action necessary to recti fy the error. Given the constraints of the 120 -day rule, this is not an option unless the applicant concurs and agrees to extend the 120 -day limit. STAFF RECOMMENDATIONS There are two appeals before Council. Though the hearings have been consolidated, the Council will need to make separate motions as to each appeal at the close of the public hearing. With regard to each appeal: Martin Appeal: Staff recommends the Council affirm the decision of the Planning Commission on the basis that there is substantial evidence in the record to find that the application complies with the Conditional Use Permit criteria in CPMC 17.76. Attached hereto as Exhibit C-2 are draft Findings of Facts and Conclusions of Law the Council may adopt in its motion to affirm the Planning Commission. Smith Appeal: Staff recommends the Council affirm the decision of the Planning Commission on the basis that there is substantial evidence in the record to find that the application complies with the Conditional Use Permit criteria in CPMC 17.76. Attached hereto as I',xhibit D-2 are draft Findings of Facts and Conclusions of Law the Council may adopt in its motion to affirm the Planning Commission. A'T'TACHMENTS Attachment "A" — Planning Commission Resolution No. 827 including all exhibits thereto Attachment `B"— Staff Report dated February 2, 2016 (with Exhibits 1 —14; Exhibit 15 is the Revised Staff Report dated January 5, 2016 included in Attachment "A") Attachment "C -I" - Notice of Appeal — L. Calvin Martin dated February 16, 2016 Attachment "C-2" — Draft Findings of fact & Conclusions of law, Martin Appeal Attachment "D-1"—Notice of Appeal David J. Smith dated February 16, 2016 Attachment "D-2" — Draft Findings of Fact & Conclusions of Law, Smith Appeal ACTION Consider the appeals of the Planning Commission's decision to approve the Conditional Use Permit allowing development of a membership warehouse and fuel facility on 18.28 acres within the M -I zoning district and 1) affirm the decision; 2) modify the decision; 3) reverse the decision; or 4) remand the decision to take further action. RECOMMENDATION — SUGGESTED MOTION Martin Anneal I move to affirm the Planning Commission Decision adopted as Resolution 827 and direct Staff to prepare a resolution approving the application for a Costco Wholesale Membership Warehouse and fuel facility on 18.28 acres within the M-1 zoning district as per the staff reports at Exhibits A and B hereto and the draft findings at exhibit C-2 attached hereto, for the Council's next meeting on March 24, 2016. Smith Anneal: I move to affirm the Planning Commission Decision adopted as Resolution 827 and direct Staff to prepare a resolution approving the application for a Costco Wholesale Membership Warehouse and fuel facility on 18.28 acres within the M-1 zoning district as per the staff reports at Exhibits A and B hereto and the draft findings at exhibit D-2 attached hereto, for the Council's next meeting on March 24, 2016. ATTACHMENT "A" PLANNING COMMISSION RESOLUTION NO. 827 A RESOLUTION OF THE PLANNING COMMISSION APPROVING A CONDITIONAL USE PERMIT FOR DEVELOPMENT OF A COSTCO WHOLESALE MEMBERSHIP WAREHOUSE AND FUEL FACILITY ON PROPERTY WITHIN THE M-1 ZONING DISTRICT (File No: 15022) WHEREAS, the City, by Planning Commission Resolution No. 764 and City Council Resolution No. 1217, determined that membership warehouses are a commercial use compatible with and closely related to permitted uses in the M-1, Industrial zone and therefore authorized them as a conditional use. WHEREAS, the applicant submitted an application for a Conditional Use Pumut to develop an 18.28 acre site within the M-1, Industrial Zone with a 161,992 sq. ft. Costco Wholesale membership warehouse and four (4) island fuel facility; and, WHEREAS, on January 5, 2016, the Central Point Planning Commission conducted a duly - noticed public hearing on the application, at which time it reviewed the City staff report and heard testimony and comments on the application; and WHEREAS, the Planning Commission's consideration of the application is based on the standards and criteria applicable to Conditional Use Permit section 17.76 of the Central Point Municipal code; and WHEREAS, after duly considering the proposed use, it is the Planning Commission's determination that, subject to compliance with conditions as set forth in the Revised Staff Report (Exhibit "A") dated January 5, 2016, the application does comply with applicable standards and criteria for approval of a conditional use permit. NOW THEREFORE BE IT RESOLVED, that the City of Central Point Planning Commission, by this Resolution No. 827, does hereby approve the Conditional Use Permit for Costeo Wholesale. This approval is based on Exhibit "A", the Planning Department Revised Staff Report dated January 5, 2016, including attachments incorporated herein by reference. PASSED by the Planning Commission and signed by me in authentication of its passage this 2°a day of February, 2016. I'larming Commission Chair ATTEST: / Cit§ Representative Planning Commission Resolution No. 827 (2/2/2016) AEXHIBIT A CENTRAL _ Community Development STAFF REPORT POINTC�amp�m _ Community Development Dlrcttor REVISED STAFF REPORT January 5, 2016 ITEM (File No. 15022) Consideration of a Conditional Use Permit application for the construction of a 161,992 square foot Costco membership warehouse and fuel facility on an 18.28 acre site at the southwest comer of Hamrick and '1'able Rock Road. The project site is within the Federal Way Business Park in the Industrial (M-1) zoning district, and is identified on the Jackson County Assessor's map as 375 2W 12B, Tax Lots 213, 214, 215, and 216. Applicant: Costco Wholesale; Agent: Steve Bullock, MC2. SOURCE: Stephanie Holley, BACKGROUND At this time Costco Wholesale ("Applicant") is requesting n Conditional Ilse Permit to construct n new membership warehouse and fuel Facility. The 18.28 acre project site is located on four (4) lots within the Federal Way Business Park Subdivision with frontage on Table Rock Road (Jackson County), llea rick Road (City of Central Point) and Federal Way (City of Central Point). land east oFthe site is located in the City of Medford. It's the Applicant's intent to relocate its existing operation on Crater Lake Highway to Central Point with a scheduled opening date of Pall 2016. Achievement of this objective requires approval of the CUP, as well as a Site Plan and Architectural Review (File No. 15028) and Class "C" Variance to the M-1 sign area standard (File No. 15032) (Agenda Items VI, B and C). General Project Description: Costco proposes to construct a 161,992 square foot membership warehouse located on the southwest site boundary north of the existing Fed Ex Distribution Facility (Attachment "A -Y). A total of 783 parking spaces are proposed along with perimeter and interior landscape improvements. Architecturally the proposed Costco will be a large metal building similar to industrial warehouses like the Fed Ex Distribution building adjacent to the project site. In this case the building design provides for variation in building materials and roof lines, as well as articulation and detailing around the main entrance canopy. The color palette is a blend of earth tones (brown, grey) with Costco red and blue on the proposed signage. According to the applicant's findings (Attachment "B") the warehouse will be open to rucmbers from 10 a.m. to 9 Fiat. on weekdays and until 5 p.m. or 6 p.m, on weekends. Deliveries for the warehouse typically occur between 3 a.m. and noon to minimize conflicts between large delivery trucks and Costco's members. A four (4) island fuel facility is proposed on the southeast site boundary to the west of the existing Fed Ex Distribution Facility (Attachment "A-3"). Fach island provides six (6) fuel dispensers and provides stacking for 10 cars. In total the fuel facility includes 24 fuel dispensers and provides stacking for 70 cars. A canopy will cover the fuel dispensers (Attachment "A-13"). The fuel facility will be open to members from Gain to l Opm daily. Depending on demand, fuel deliveries may occur multiple times per day. ISSLES The City has evaluated the proposed use and identified four (4) issues: 1. Traffic On opening day it is estimated that Costco will generate an additional 10,670 new daily trips. Due to the large volume of estimated traffic for the proposed use, the applicant prepared a Traffic Impact Analysis ('1'[A) based on input from affected agencies including the City of Central Point, Jackson County Roads and the Oregon Department of Transportation (ODOT). It should be noted that the City of Medford was invited to participate in developing the'FIA scope of work on June 2, 2015 and August 13, 2015, but no comments were received. The TIA identified impacts to four (4) intersections at opening day (Table], Items 1-4) and one (I) intersection in 2020 (Table 1, Item 5). Additionally, impacts to the intersection of Table Rock Road and Morningside Street were identified and mitigation recommended in a revised letter from the City of Medford dated January 5, 2016 (Attachment "l-1"). It should be noted that one year after the scheduled date of opening for Costco, the County will begin construction of the Table Rock Road project. The project will widen Table Rock Road between Biddle and Airport Road to include four travel lanes, a center tum lane, bike lanes and sidewalks and intersection signalization at Table Rock and Airport Road, Completion of the Table Rock Road project resolves traffic impacts of the proposed use on infrasmanne along Table Rock Road (i.e. Projects 2 and 3). A detailed summary of the traffic impacts and mitigation are set forth in the Revised Public Works Department Staff Report (Attachment "D"). Resolution: To assure timely completion of traffic mitigation measures relative to the day of opening for the proposed use, staffis recommending: a. NB 1-5 Off Ramp. Prior to building permit issuance, the applicant shall comply with the Oregon Department of Transportation (ODO1) requirement to contribute toward the constnmtion of dual Page 2 of 5 � 2015) 2016) 12030i NB 1-5 OH Ramp PM Peak C 0.61 OJ] 084 Mitltlay OCOT Park B 0.41 061 063 HITidel. Rock Roatl & Hamrick Road Jackson PM Peak C E C Mitltlay Cranny Peak B F B J Table Rock Road & Airport Road Jackson PM Peak F F C Midday County Peak C E B PM Peak C E F 4 Biddle Roatl& Airport Road City of Midday Medford Peak B - C - F - 5 Hamrick Road & East Pine Street City of Central Point, Jackson PM Peak C Midday - C D County Peak I B I I B B It should be noted that one year after the scheduled date of opening for Costco, the County will begin construction of the Table Rock Road project. The project will widen Table Rock Road between Biddle and Airport Road to include four travel lanes, a center tum lane, bike lanes and sidewalks and intersection signalization at Table Rock and Airport Road, Completion of the Table Rock Road project resolves traffic impacts of the proposed use on infrasmanne along Table Rock Road (i.e. Projects 2 and 3). A detailed summary of the traffic impacts and mitigation are set forth in the Revised Public Works Department Staff Report (Attachment "D"). Resolution: To assure timely completion of traffic mitigation measures relative to the day of opening for the proposed use, staffis recommending: a. NB 1-5 Off Ramp. Prior to building permit issuance, the applicant shall comply with the Oregon Department of Transportation (ODO1) requirement to contribute toward the constnmtion of dual Page 2 of 5 right tum lanes from the off -ramp to East fine Street (LAMP Project No. 9). The estimated project cost is $1.3M. Project cost sharing shall be as follows: ODOT: $9ag0oa Costco: $377,000 (Not to exceed) City: $123,000 (Not to exceed) Per ODOT, construction will commence at the earliest possible date, which is necessary to prevent failure of the northbound off -ramp_ It. Table Rock Road and Hamrick Road. Prior to certificate of occupancy, the applicant will be required to provide the following temporary improvements on Table Rock Road per Jackson County Roads: i. Construct median islands in front of the access drives on'I able Rock Road to limit movements to right-in/right-out; and, ii. Construct a center left Nm lane and refuge within the existing Table Rock Road right-of- way at Hamrick Road to ease left tum delays_ e. Table Rock Road at Airport Road. Per Jackson County Roads, no mitigation measures are recommended since operational deficiencies will be resolved upon completion of the Table Rook Road widening project. d. Biddle Road and Airport Road Currently this intersection operates at a LOS C. According to the applicant's TIA, the intersection will operate at LOS E on theday of opening. Per the Revised City of Medford letter dated January 5, 2016 (Attachment "i-1"), the applicant will be required to contribute toward construction of a signal at the intersection (See Condition No. 3). e. 'fabl_e Rock Road at Momineside Street. Per the Revised City of Medford staff report dated January 5, 2016 (Attachment "L-1"), the applicant shall be required to contribute toward construction of a left Nm lane at the intersection of Table Rack Road and Morningside Street (Condition No. 4). 2. Parking. The applicant's parking plan proposes 793 parking spaces for warehouse members. The maximum parking spaces allowed based on the allocation of uses is 699 spaces. In accordance with CPMC 17.64.040(8)(2), the applicant is requesting an adjustment to allow for the proposed increase in parking based on a parking demand analysis specific to Castro Wholesale operations in Oregon (.Attachment "C"). Resolution: The applicant's parking demand analysis recommends a minimum parking ratio of 4.5 i parking spaces per 1,000 s.f. of Gross Floor Area (GFA) to maintain a 90% utilization rate. According the Institute of Traffic Engineers (11 E) Parking Generation, 4" Edition, when more than 90% of the parking spaces in a parking lot are occupied, there is an increase in illegal puking and repeating circulation. Cmnco's parking plan provides slightly more puking than the minimum recommendation to accommodate typical peak periods as well as provide additional spaces for seasonal peaks. Staff Page 3 of 5 recommends that the requested increase in parking is warranted. 3. Signage. The applicant's signage plan includes wall signs that are proportional to scale and size of the building. Although none of the promised signs exceed 3.8% of the wall area on any elevation, they exceed the maximum sign area allowed in the M-1 zone. Resolution: Approval of the requested signage for the proposed use is subject to approval of a Class "C" Variance, which will be presented to the Planning Commission for consideration (File No. 15032, Agenda Item VI -C). Based on the applicant's proportionality rationale for the proposal, the variance request is deemed reasonable. However, if the variance is not approved, the applicant will be required to demonstrate compliance with the M-1 sign area standards prior to building permit issuance. 4. Lot Consolidation. The project site includes four (4) tots within the Federal Way Business Park Subdivision. Based on staffs evaluation of the lot dimensions and site plan, the proposed warehouse occupies three (3) of the existing lots. "I'he applicant has indicated it is their intent to consolidate the lots. Resolution: As a condition of approval, the lot consolidation must be completed prior to building permit issuance FINDINGS The Costco Wholesale Conditional Use Permit has been evaluated for compliance with the applicable Conditional Use Criteria set forth in CPMC 17.76 and found to comply as evidenced in the Planning Department Supplemental Findings (Attachment "I'), CONDITIONS OF APPROVAL 1. Prior to building permit issuance for the fear consolidated lots, a Subdivision Re -plat shall be prepared and recorded and a copy of the recorded Subdivision Re -plat and Deed provided to the City. 2. The applicant shall satisfy conditions as listed in the Revised Public Works Department Staff Report dated December 15, 2015 (Attachounit "D"). 3. Per Attachment `T-1 ", prior to issuance of a building permit, the applicant shall provide evidence that it has contributed toward the construction of signalization improvements at the intersection of Airport and Biddle Road. The applicant's share of the signalization improvement shall not exceed $45,000, which shall be payable to the City of Medford. 4. Per Attachment "Fl ", prior to issuance of a building permit, the applicant shall provide evidence that it has contributed toward the construction of left turn lane improvements at the intersection of Table Rock Road and Momingsidc Street. The applicant's share oflhe left tum lane improvernent Shall not exceed $60,000, which shall be payable to the City of Medford. 5. the applicant shall satisfy conditions as listed in the Rogue Valley Sewer Services Staff Report dated November 16, 2015 (Attaclrrrent "H"). Page 4 of 5 6. Prior to issuance of building permits for the proposed signage, the applicant shall either demonstrate compliance with the signage standards set forth in CPMC 17.48.080(A)(1) or receive a variance to the signage area standard. ATTACHMENTS Attachment "A-1"—Site Comparison Attachment "A-2"—Site Circulation Altachmnrt "A-3" —Concept Site Plan Attachment "A4" Central Point Costco Grading & Drainage Attachment "A-5" —Central Point Costco Utilities Attachment "A-6" -Preliminary Landscape Plan Attachment "A-7"—Concept Floor flan Attachment "A-8" —Concept Exterior Elevations Attachment "A-9" — Concept Elevations Attachment "A-10"—Entry View Attachment "A-11"—NW Comer View Attachment "A-12"—East View Attachment "A-13" Concept Fuel Facility Plan Attachment "A-14" — Concept Lighting Plan Attachment "E"—Applicant's Findings Attachment "C" - Traffic Impact Analysis Attachment "D" Revised Public Works Staff Report dated January 5, 2016 Attacluncnl "E" - Jackson County Roads Staff Report dated December 10, 2015 Attachment "F" —Oregon Department of Transportation Staff Report dated December 14, 2015 Attachment "G" — City of Medford Planning Department Comments dated December 3, 2015 Attachment "H" —Rogue Valley Sewer Services Staff Report dated November 16, 2015 Attachment "I-I"—Revised City of Medford Staff Report dated January 5, 2016 Attachment "1-2'—City of Medford Staff Report dated December 24, 2015 Attackuuent `7" -Planning Department Supplemental Findings Attachment "K" Resolution No. 827 ACTION Consider the Conditional Use Application and either: l) approve; 2) approve with modifications; or 3) deny the application. Approve the Conditional Use Permit for Costco Wholesale subject to the conditions of approval per the Revised Staff Report dated January 5, 2016. Page 5 of 5 444 •� 'lei �s � . �?'' '=i �• '�f .dRi =jyr n •1 �r pat l!{p •r..-"•�J 1. -� _ _ .� ,.�� �P - �. •*yam- a i .i Ilk _µ •a. L+ ZkX ,rte 4r ATTACHMENT "A-3" , � li• �S . i $e ° 3: � pig 1 �, 5 i ATTACHMENT "A-4" ATTACHMENT ) I i ". PNFLIYIWIY lI1NlNCME LEnolo n+a. e.�.:.�,Ai 1=0 so apagool Ike t ww; �.,. 11 1114 1V*Tl a Offam IRAN Vis. o 4 a� .r r I . =� .ice_ � a � o.,..iv.�.�.ma- u— � YVEIAIOHFSI(NC,NLYIF aO1B�14,N� COSTCO WHOLESALE PRELIMINARY LANDSCAPE PLAN L+-1 CENTRAL POINT. OREGON $EPTEY9ER P5. ]013 D D1 lit �T ITT _ T: � eel T ATTACHMENT 'A-7"((( � o 'dlNJd�kl,Zle ATTACHMENT "A -B" Bill, 0 e - P.! QJ �3 U P I` i Q_ IIOMIH ELEVATIdI SGLLE 1/16-1'8 EMIItY FIEVllnpl EAST ELEVAT SMTN ELEVATgX SCP,E 1116`=I, WEST ELEVATION S .1A, -I, 4r Lig! as az zots M1<059E CONCEPT ELEVATIONS CENTRAL POINT, OR --M � a him ATTACHMENT "A-10" v ul 9 ATTACHMENT "A-1 1" ol z 0 0 W 0 0 iZ 0 R ,+ au T 7 J IV, I � I i i nA I r 1l a I 1 m CONCEPT FUEL TRUCK ROUTE DETAIL SITE PLAN f, GMOIf PIDBISAIeEP B1�15v5 G411RtiLEP BKLO9)! Jee..r. F2IFRIXI ElEtl5T1OB3 V CONCEPT ELEVATIONS 1 F I F i ea A� Ilei STACKING PLAN • _ a.� CONCEPT FUEL FACILITY PLAN SEPTEMBER 16.2615 W ATTACHMENT "A-14" eef [rf[[eeer[... fr f e pe[r Y(r r 9.Y 1 ex f [Le vtlt (� f t YYI H YIR ���D [[rxfe(aef[+ C t Y hR�YrTIYf Y liam L �i ( (�yf�Cy�yY�[Q('(aYLryIC v e eTTTY'Y'Y4'+ (( r LLL<( r pail eniuw ullnwuYr eY eveeeYYvx flt-'�r��-�j$$�j¢¢.vi�i�aaj--e [[v tYeaf[�eYYe (([ef 11-7 _. e.< e-L'!�'� a av�us.r..e.'-e"T")•sss...��'s�-. _ �.[! '�l�qY TTTpTY7•�Tf�T[TT �w �7•!V• n'Ttl +Thf tT rYn-� v[f[ �=i L(�.1.t3_LLGS_L.L.LL11tt2 ° 1�' L1 _[_ F ® N611 FdQe tl��9C � LN.. he TO Central Point Land Use Permits Review Staff FROM Steve Bullock, MG2 and Costco CO ATTACHMENT"B" MEMO a... i ane OBTE 11 3.15 PROJECT New Costco Warehouse Central Point Table Rock 6 Hamrick PROJECT NUMBER 140393-01 RE I Land Use Applications for a near Camillo Warehouse in Central Paint OR Project Description Proposal: Costco is considering buying some property on the southwest Corner of the Table Rack Rd and Hamrick Rd Intersection that Is 18.28 acres In size. Their desire and intent would be to build a new Coated Warehouse (with a footprint of approximately 151,992 sq. ft.) and • Fuel Feclllry (4 islands) together with all required parking and landscaping. In this case, the parking area will accommodate 783 parking stalls. Currently the subject property is undeveloped Industrial land. Surrounding the property Is a and of developed and undeveloped industrial land with distribution and manufacturing facilities. T Colica Building R Sib Design; With over 30 years of building membership warehouse. Coatco has 686 warehouses worldwide. This exp hence has allowed Costco to develop a carefully thought out program for constructing now facilities. This program includes: the layout of the warehouse floor plan that most effectively allows for the stocking and merchandising of products; the use of materials that are sustainable, long-lasting and energy efficient; the layout of the site in a manner that provides for their parking and circulation need.; the Improvements to adjacent public Infrastructure to minimize and mitigate for any impacts they may create; the development of an attractive, functional facility that the entire community views as an asset. The final design solution for each of Coated's 600- lilies follows this program waiting in a unique solution that is tallow to the individual site, Its environment and the community It is located in. Coatco Operation Generally Costco'. warehouses am open to the public from 10am- 9pm. On the weekends they close s little earlier (5 or S pm). To avoid conflicts between their members and stocking the warehouse, deliveries are typically received between 3am and Ncon. This minimizes potential conflicts between the large delivery trucks and Coeco'. members. The gas station is typically open from Sam - 10pm. Fuel dellverlea can happen multiple time per day depending upon the demand. DATE 11.3.15 YEMO PROJECT New Costco Warehouse Central Paint PROJECT NUMBER 14-0393-01 DEVELOPMENT CODE COMPLIANCE. The following sections of this narrative identify the appllcable sections of the Central Point code and provide a response and drawing reference that describes how our proposed site and building design complles with the City's Development Codes, Chapter 17.48, 1 INDUSTRIAL DISTRICT 17.40.020 Permitted uses ...... ......... . _....__._.._ __.._.... .................. ................. The following uses and their accessory uses are permitted in an M1 district, subject to the limitations Imposed In Section 17.40.030: A. Warehousing; B. Storage and wholesaling of prepared or packaaged evrctmndlse; W. Other uses not listed In Nis cr any ottea dial Mthe planning commission finds them to be all to those listed above and compatible with other permitted uses and wgh the intent of the MI district. Response. Costco is a Wholesale Membership Club which has as their primary focus the sales of prepared or packaged merchandise to their members. City staff has further made us aware ofa decision made by the City Council insistent to Wholesale Nembarship Clubs in the 11i ziams which allows them subject to a conditional orae permit. This decision was appealed and confirmed In the Oregon Courts. 17.48.030 Standards Por.pHmitltM. All uses within the M1 district shall be subpet to the following conditions and stndards'. A. All raw materials, finished products, machinery and equipment, with the exception of automobiles and trucks normally used In the business, shall be stored within an entirely enclosed building or sight obscure , numpienced Mw net bas then six Mt In height; Response: With the exception of the Fuel Facl/lty, Coatco's normal opsntion happens entirely within their warehouse. B. The facility shall be in compliance with all applicable state and federal environmental, health and selety regulations; Response: Costco will obtsln all required state and federal ponsisHs as well as comply with all health and safety regulations. C, In any M1 district directly across a street from any residential (R) district, all outdoor poll loading or display areae shall be set back at bast to feel from the public right- of-way and this setback area shall be planted with tree appropriate for the neighborhood, ground covx or other landscaping nationals that am comitant with the general existing character of the ams, or that will establish a landscape guerre for other developments to fallow_ This setback and landscaping requirement shall also appy to Mi lots fronting on any street designated in the comprehensive pin as a major arsenal. DATE 11.3.15 MEMO PROJECT New Costco Warehouse Central Point P",3mm PROJECTRUMBER 14-0393-01 Response: This section does not apply In that there aro no residentially zoned properties adjacent to or across the street from the Costco property. 17.48-040 Conditional Uses. The following use, and their accessory uses maybe permitted in an Mt district when authorized in accordance with Chapter 17.76: A. Business, ofllces and commsrclal lass that are compatible with and closely related in their nature of business to permitted uses in the MI disstnct, or that would be established to serve primary, the uses, employees, or customers of the Mt dimiri. Response: As mentioned above, the City has determined that a Wholesale Membership Club requires a Conditional Use Permit to operate /a an M-1 zone. The last section of this narrative will go over In detail how Costco', proposed project complies with the Conditional Use Permit approval criteria. 17.48.050 Height Regulations. Maximum Might of any building erstmcture In an M1 district shall be sixty Not Response Costco's warehouse Is roughly 38' from finished grade to the highest point an the building, this Includes the parapet walls extending above the roof around the perimeter of the building. Light poles in the parking lot am roughly the same height, 35' tell pole on a 2.5' concrete base. See the included elevations and site lighting plan included in me drawing package. There ala no minimum alta area requirements in ere Mt d1alyd, except as neammor tc provide for laquired parking, loading and yard spaces. Response: Costco is proposing to build a warehouse having roughly 183,000 sq. ff. For a warehouse of this size Costco has discovered through their experience from building over 800 warshouses that 800 parking stalls (*/-) am needed to effectively handle the volume of members that use their facilities. The size of the property under consideration, about 18.28 acres, Is large enough to accommodate these improvements. 17.48.070 Yard Requirements. The following measurement indicate minimum yard requlrensente In an Mt district A. Front Yard. The front yard Mail be a minimum of twenty feet. (Also see Section 17.40.o30(C)). B. Side Yard. The side yard shall be a minimum of ten feet except when the side lot line is abutting a lot in any residential (R) district and than the side yard shall be a minimum of Menty feet and shall be Increased by orshalf foot for each feet by which the bullding height exceeds twenty Net. L DATE 11.3.15 MEMO PROJECT New Costoo Warehouse Central Point lecoxa, is PROJECT NUMBER 14-0393-01 C. Rear Yard. TM mar yard shall be a minimum often feet exoapt when the mar lot ine is abutting a lot In any residential (R) district and then the mar yard shall be a minimum of Wenty feet and shall be increased by one-half foot for each foal by which the building height exceeds twenty feel. D. Lal Cosemge. No requimmenm. Response Cosfeo's proposed she plan frees the drawing package) shows that the site fronts on throo roads (Federal Way to the west, Hamrick Rd to the north and Able Rock Rd to rhe wet). Of the three, only Table Rock Rd Is a Major Arterial. Our Assumption is that all thew frontages will require 20' Front Yard Setback. Our internal lot limes, to the south of the warehouse and wet of the fuel facility will be side or rear setbacks that am required to be f0'. The warehouse is at least 00' from all property lines and the feel facility and Its ancillary structure am at least 25' from all property ling. Tho proposed site plan complies with the City's required yards. 17.48.080 818ne. Signs within the M1 district snMl be limited to the following: t. Permitted signs shall contain not more than ores hundred square feet of surface ansa an any ares olds, or An Aggregate of two hundred square feat of surface on all sides which can be utilized for display purposes; 2. Lighted sgm shall be indirectly Illuminant and non -Bashing; 3. Idontifcation signs shall be permitted widnn any mall setback areas provided it does not extend Into or oserharg any pwWng area, sidewalk or other public rlgM-of- way; 4. Slgna located within vision clearance areas at intersections of streets shall canfomn W Section 17.60.11D. Response Coafco Is proposing wall mounted signage that is proportional to the size of their building. This mulls In signage that Is larger than the standard identified above. Further discussion of this and national for approval Is included In the Conditional Use portion of this narrative. All sign Illumination will be Indirectly Illuminated and non -flashing. No Freestanding Signage is proposed so no sight or other obstructions will be created. C. Signs in the M1 district shall be permitted and designed According W provisions of Chapter 15.24. Response: Costca will fully comply with all the requlnuirrenfa of Central Point Municipal Code Chep6r 15.24. DATE 11.3 15 MEMO PROJECT New Costco Warehouse Central Point a,c,sary PROJECTRUMBER 14-0393-01 Chapter 17.64, OFF-STREET PARKING AND LOADING 17.64.030 O(RStreat Loadlno. A. In all districts to each use for which a building is to he erected or structurally altered to the extent of increasing the floor area W equal the minimum floor area required to provide loading space and which will require the receipt or distribution of mal or merchandise by truck or similar vehicle, there shag be provided an-Atmat bading specs in accordance with the standard. sal In Table 17.61.01, Oh -street Loading Requlmments. TABLE 17.64.01 OFFSTREET LOADING REO UI REM ENTS Use Categories OR-SOcet Loading Berth Requirement (fractions rounded up W the closest wfula number) RETAIL, RESTAURANTS, HOSPITALS, AND OTHER GOODS HANDLING Sq. Ft. of Floor Area No. of Loading Berths Required Over 100,000 3 plus 1 for each Additional 80,000 sq. It B. A loading berth shall not be lass than len feel wide, thirty -live teat long and have a height clearance of twelve lien. Whore the vehicles generally used for loading and unloading exceed these dimensions, the required length at these berths shall be Increased_ C. ff loading apace has been provided In connection with An existing use or Is Added to an axis ing use, the boding apace shall not be eliminated nelimination would result In less apace than Is required to adequasoly meet the meds of the use. D. Off-street parking areas used to fulfil the requirements of this Me shall not counted As requlmd loading spaces and shall not be used for loading end unloading operations, except dining pe cods of the day when not required to meet parking needs. E. In no case shall any portion of a street or allay he counted as a pan of the requbed parking or loading spam, and such spaces shall be desigmd and located as to avoid undue interference with the public use of streets or alleys. Response. Costco provides for all their loading needs an site and will not have any of their deliveries or delivery trucks impact the public use of streets or alloys during their loading or unloading of product. In addition to the 4 dedicated elevated truck docks there are 3 other on-site loading areas for Nres and other smaller man local deliveries that can't use the elevated truck dock. This exceeds the 4loading berths required in Table 17.64.01 (excerpt abovel. 17.6...4...0..40 „l7ff,-9trNl.ParkInp_Rpulnm nb All uses Shell comply with the number of clf-street penning requirements iderdgled in... Table 17.64,02B, Nor -Residential Off Street Penang Requirements. For non-realden6al uses the off -Sloe[ parking requirements ase presented in tonne of bath minimum and maximum off. street padding required. The numbo of off-street parking paces in Table 17.64.028, Nan - Residential Off-Stra l Parking, may be reduced In Accordance with sumacuon B of this section, Adjustments to Off -Sime[ Vehicle Parking. DATE 11.3.15 MEMO PROJECT New Costco Warehouse Central Palest p,a.a oris PROJECTNUMBER 14-0393-01 TABLE 17.64.02B NON-RESIDENTIAL OFF-STREET PARKING REQUIREMENTS A. Calculation of Required OR -street Parking. ort -street parking facility requllwnenb sell: forth In ... Table 17.64.02B, Nonresidential Ort -street Parking Requirements, shall be applied es follows 1. Whoa the appllcadan of the schetlule results in a fractional requirement it shall be rounded dawn to the lowest who[. number. 2. For purposes of this chapter, groes floor area shall Pat Include enclosed or covered emu used for off-street panting or leading, or bicycle feailli 3. Whom uses or subv0lea subject to differing requirements are located in the came structure or on the same site, or are intended to be served by a common facility, the Ideal poking requirement shag be the sum at the requirements for each use or activity computed separately, except as adjusted through the site plan and architectures PI process under the provisions of subsection (B) at this notion. The community dow lopmnt director, when inning a pannii for multiple uses on a she, may restrict he houm of opwNion or piece other conditions an the multiple uses so that parking Mews do not overlap and may then modify !rte total parking requirement to be bond on the most intnw combination of uses at any ore cmc. 4. Where requirements em established on the base of Mats or person capeclty,the building regulations provisions applicable atthe time of determination shall he used to define capacity. 5. Where midentlal use is conducted taget er with or accessary to other permitted uses, applicable residential requirements shall apply In addition to other no moldentlal requirements. 6. Theprkingrequlramentsoutliredln... Table 17.64.029, Nonresidential OR -street Parking Requirements, include perking for handicapped pawns shall be provided pursuant to the requirements of subsection C of [his section, Accessible Parking Requirements. Response: Per fable 17.04.020 Costco will be required to provide not less than 070 perking stalls and nut mom than 670 perking afallr (134,004 sf) 200 sflstoll - 070 parking stills). As menfloded Mrlier in this narrative, through Costco's eaferfsive experience building these mmmhouaes around the United States the proposed warehouse will need approximately 800 parking 1114112 to accommodate the demand. This mquost will be addressed In mom detail both In our Parking Study and the Conditional Use Permit Discussion. Minimum and Maximum Vehicle Parking Requirement Use Categories (sections rounded down to the closest whole number) GENERAL COMMERCIAL Retail Slarea, Pereonal 1 apaare per each 200 square feet of net floor area Services (exclutlinq storage and other non -sats or non -display cries). A. Calculation of Required OR -street Parking. ort -street parking facility requllwnenb sell: forth In ... Table 17.64.02B, Nonresidential Ort -street Parking Requirements, shall be applied es follows 1. Whoa the appllcadan of the schetlule results in a fractional requirement it shall be rounded dawn to the lowest who[. number. 2. For purposes of this chapter, groes floor area shall Pat Include enclosed or covered emu used for off-street panting or leading, or bicycle feailli 3. Whom uses or subv0lea subject to differing requirements are located in the came structure or on the same site, or are intended to be served by a common facility, the Ideal poking requirement shag be the sum at the requirements for each use or activity computed separately, except as adjusted through the site plan and architectures PI process under the provisions of subsection (B) at this notion. The community dow lopmnt director, when inning a pannii for multiple uses on a she, may restrict he houm of opwNion or piece other conditions an the multiple uses so that parking Mews do not overlap and may then modify !rte total parking requirement to be bond on the most intnw combination of uses at any ore cmc. 4. Where requirements em established on the base of Mats or person capeclty,the building regulations provisions applicable atthe time of determination shall he used to define capacity. 5. Where midentlal use is conducted taget er with or accessary to other permitted uses, applicable residential requirements shall apply In addition to other no moldentlal requirements. 6. Theprkingrequlramentsoutliredln... Table 17.64.029, Nonresidential OR -street Parking Requirements, include perking for handicapped pawns shall be provided pursuant to the requirements of subsection C of [his section, Accessible Parking Requirements. Response: Per fable 17.04.020 Costco will be required to provide not less than 070 perking stalls and nut mom than 670 perking afallr (134,004 sf) 200 sflstoll - 070 parking stills). As menfloded Mrlier in this narrative, through Costco's eaferfsive experience building these mmmhouaes around the United States the proposed warehouse will need approximately 800 parking 1114112 to accommodate the demand. This mquost will be addressed In mom detail both In our Parking Study and the Conditional Use Permit Discussion. DATE 11.3.15 MEMO PROJECT New Costco Warehouse Central Point s.rons PROJECT NUMBER 14-0393-01 S. Adjustments to Non-msidential Off -sUret Vehicle ParkingTheo0-street parking requirements in Table 17.84.028, Nonresidential Oh -street Parking Requirements, may he reduced, or increased in any commercial (C) or industrial (M) district as follows: 1. Reductim e. The maximum o0 -street parking requirements may he reduced by no more than twenty percent. 2. Increases. The on -sweat parking requiremenla may be increased based on a parking demand analysis prepared by the applicant as pan of the site plan and architectural rmiew process. The parking demand analysis shall demonstrate and document jueti5ca0on for the proposed increase. Response See our submitted Parking Demand Analysis which describes Coast.. 'a need for around 800 puking atalls. C- Accessible Parking Requirements. Where parking is provided accessary to a building, acoossible packing shall be pmvlood, constructed, sloped, signed and maintained es required by ORS 447.233, and Section 1104 of the latest Oregon Structural Specialty Cade " set forth in this section. Response Costco will meet or exceed Contra] Points requited Accessible Parking Requirements. I. Bicycle Parking. Bicycle parking shall he provided In accordance with Table 17.94.04, Bicycle Parking Requirements, TABLE 17 64.04 BICYCLE PARKING REQUIREMENTS Land Use Minimum Requirement Covaretl M=d Cammarclal Retell Sales 0.33 speasePar 1,000 M. h. 60% Warehouse 0.1 spwwl.uoo .h. 1 100% Response. The .33 spaees11,000 sq. k. results In 07 bib spaces. Due to fM nature of their buslnars, Costco has found that bicycle fraAic to their warehouses Is rather limited. Some employees commute by bicycle, but vary few customers do. For that reason, they believe the Central Point's Bicycle Parking for Warehouse standard, which results in 10 b/lea stalls, the most appropriate for a Costco warehouse. We will address this in the CUP criteria es well If it is determined that this is another deviation from s standard. Chapter 17.72, SITE PLAN AND ARCHITECTURAL REVIEW 17.7220 -App 0licability , ,,,,,,,,,,,,, ._ .. .... .... ._ ............. .......................... No permit required under Title 15, Buildings and Construction, shall be issued for a majoror minor project, as defined in this section, unless an application for site plan and architectural review is submitted and approved, or approved with conditions, as act forth in this chapter. B. Major Projects. The following are amajor pmjeds" for the purposes athe site plan and architectural ml process and are subject to Typo 2 procedural requirements as set forth In Chapter 17.05, Applications and Type. of Revlaw Procedures: 1. New construction, including private and public projects, that: DATE 11.3.15 MEMO PROJECT New Costco Warehouse Central Point r.o.e.na PROJECT NUMBER 14-0393-01 a. Includes a new building or building addition of five thousand square feet or more; b. Includes the construction of a parking lot of ten or marc parking spaces; or c. Requires one or mora vadanosa or conditional use permits and, in the judgment of the director, will have a significant effect upon the aesthstic character of the city or the surrounding area; Response The proposed Costco warehouse will be a Ma/or Project and will go through the Site Plan and Architectural Review process. 17.72.040 ........ P.Isn.and_�rchkeetunl sfanderde. -..........._.........,_............._.............. _......._...._......._................................................... In approving, conditionally approving, or denying any site plan and architectural review application, the approving authority, shall base Ila decision on compliance with the following standards: A. Applicable side plan, landscaping, and arddtecture design standards as set forth In Chapter 17.75, Design and Development Standards; B. City of Central Point Department of Public Works Department Standard Specifications and Uniform Standard Delano for Public Warks Construction; C. Acceaaibility and sufficiency of firefighting facilities to such a standard as to provide for the reasonable safely of Its, limb and property, Including, but not limited to, suitable gates, access roads and fire lanes w that all buildings on Me premises are accessible to fire apparatus. Response: Costco will demonstrate compliance with each of these cdferke through the dewing package submitted with this application and subsequent construction permit applications. Chaphr,77.76e Dgalpn and Dewloprnent Standards, 17.73.031 General connectivity, circulation and attest standards. A. Streets and Utilities. The public aimed and ullllly standards satforth In the City of Central Point Department of Public Works Standard Specifications and Uniform Standard Details for Public Works Construction Mall apply to all development wthin the city. Response: Cosfco will comply with all the public street and utility standards required by the City of Central Point. B. Block Standards. The following block standards apply to all development 1. Black perimeters shall nal exceed two thousand feat measured along the public street right-of-way, or outside edges of access ways, or other acknowledged black boundary as described In subsection (BK4) of this section. 2 Block length. shall not exceed six hundred feel between through stress or pedestrian access ways, measured along street right-of-way, or the pedestrian access way. Blade dimensions are measured from right-of-way to rig hl -of -way along street frontages. A block's perimeter Is the sum of all sides. 3. Access ways or privi a/recall sheets may be used to meet the block length or pefineter standards of this section, provided they are designed in accordance with this section and ere open to the public st all times. DATE 11.3.15 MEMO PROJECT New Costco Warehouse Central Point os.oer rs PROJECTNUMBER 140393-01 4. The standards for block perimaters and lengths maybe modified to the minimum extent necessary based on written findings that compliance with Na standards are not reasonably practicable or appmpdat. due to: a. Topographic constraints; L Existing development prisms on abutting property which preclude His, logical connection of atresia or access ways; c. Major public facilities, abutting the property such as railroads and fineways', d. Traffic safety esncemla; o. Function of and operational reads W curate large commercial building(s); or f. Promotion of.igdiff..t natural ma.umes. Response: The surrounding existing roads together with Cosfco's infernal drives comply with mese requirements. C. Driveway and Property Access Standards. Vehicular access to properties shall be located and constructed in accordance with the standards eel forth In the City of Central Point Department of Public Works Slandered Speclications and Undone Standard Details for Public Works Con.huclion, Section 320.10.30, Driveway and Property Access. Resporell The submitted sib pion demonstrates compliance with this requirement. D. Pedestrian Circulation. Attractive access rautes for pedestrian travel shall be provided through the public sidewalk system, and where necessary supplemented through the use of pedestrian access ways es required to accomplish the fallowing: 1. Reducing distances between destinations or activity areas such as public sldswalks and building entrances; 2. Bridging across barriers and obstacles such as fragmanbd pathway systems, wide straeb, heavy vehicular tramc, and changes in oval by connecting pedestrian pathways with clearly marked crossings and Inviting sidewalk design; 3. Integrating signage and lighting system which offers Interest and salary for pedestrian.; 4. Connecting parking areas and destinations with retall streets or pedestrian some ways identified through use of distinctive paving materials, pavement sloping, grade separation, or landscaping. Response: Me submitted sib plan and landscape plan demonstrate compliance with this requirement. 77.75.0390ff-9trest Pmtllnp,OMsyn Anit Dewlopmgnt 8tanlierds. A. Connectivky. Psi lots for naw development shall be dasigrmd to provide vehicular and pedestrian connections to adjacent sites unties as a result of any of the following such connections am not possible: 1. Topographic constraints; 2. Existing development patterns on abutting property which preclude a logical connection; DATE 11.3.15 MEMO PROJECT New Costco Warehouse Central Point res. arc ons PROJECTNUMBER 140393-01 3. TreMCWfety concema; or 4. Protection of signMcant meoural macurces. Response This requirement does not apply to Coatpo'a development In that made ring the sib on three sides and then Is no need to provide connections to adjacent sibs. S. Parking Stall Minimum Dimensions. Standard pecking spews, shall conform to the fallowing standards and the dlmeosions in Figura 17.75.113 end Table 17.75.02. Response: As demonstrated In the Site Plan, Coatco's parking tat complies with these standards. C. Access. There shall be adequate provision for ingress and egress to all parking spaces. Response: Then is adequate provision for ingress and press to all parking specw and uses. D. Driveways. Driveavy width shell be measured 9 the driveway's nanowest point, Including the curb cut. The design and constructor at driveways shall be as set forth in the Standard Sperficatima and Public Work. Department Standards and Spoclflca0ons. Response Costi will comply or seared the City's minimum standards. E. Improvement of Parking Spaces. 1. When a concrete cum Is used as a whi stop, t may he placed within the parking spew up to two feat from the front of a paw. In such cases, the area between the wheal stop and landscaping tread not be paved, provided It is maintained with appropriate ground cover, or walkway. In no avant shall the pleceorent of wheel stops reduce the minimum landscape or walkway width requirements. 2. Al areas util for ollikr peeking, access and maneuvering of vehicles shall be paved and striped to the standards of the city of C"Im! Point for al -weather use and shall be adequately drained, including prevention of the flow of runoff water acmes sidewalks or other pedestrian areas. Required parking areas shall be designed with painted striping or other approved method of dellneating the individual spaces, with the escaption of lets containing singleJamily or two-family dwellings. 3. Parking spaces for uses other than ora and two trimly dwellhgs shall be designed W that no backlog movements or odrar maneuvering within a street or other public right-of-way, shall be necessary. 4. Any lighting used to Illuminate off-atrear parking or loading areas shall bear arranged as to reflect the light sway from adjacent slants or properties. 5. Sorbs drives shall have a minimum Wdon clearance area fomwd by the Intersection of the driveway wntedine, the street right-of-way line, and a straight fine joining gar liners through points twenty feet from their Intersection. 6. Parking spaces located Along the outer boundaries of a parking lot shall be contained by a cum or a bumpier mil so placed to prevent a motor will from extending over an adjacent prop" Ilne, a public street, public ddewalk, or a required landscaping area. 7. Parking, loading, or vehicle man ervedrg areas shall not be located Will the front yard area or aide yard area of a comer lot abutting a sheet in any residential (R) 0ATE 113.15 MEMO PROJECT New Costco Warehouse Central Point s.n ane PROJECTNUMBER 140393-01 district, nor within any portion of a sheet setback area that is required to be landscaped in any commercial (C) or induct it (M) dial Response: Costao Is site plan, site fighting plan and landscape plan all demonstrate compliance with these standards. F- Limitation on Use of Panting Areas. Required panting areas shall be used exclusively for vehicle parking in conjunction with a permitted use and shall not be reduced or encroached upon in any manna, The parking facilities shall be so designed and maintained as not to constitute a nuiwnce a! my time, sand Mall be used In such a manner that no hazard to persons or property, or unreasonable impediment to traffic, will meu3. Reponse: Costco agrees with and will comply with this requirement. G. Parking/Loading Facility Landscaping end Screening. Parking lot landscaping Nall be used to reinforce pedestrian and vehicular circulation, Including parking lot entries, pedestrian excess ways, and parking rants. To achieve this objective the fallowing minimum standards shall apply; However, edditonal landscaping may be recommended during the site plan and architectural motes, process (Chapter 17.72). All parting lots shell be landscaped In accordance with the following standards; 1. Perimeter and Stmet Frontage Landacaping Requirements. The parimratar and street frontage for all par lrg facilities shall be landarmad according to the standards set forth in Table 17.75.03. Response: Coil site plan and landscape plan demonstrate compliance with this requirement. 2. Terminal est Interior Mantis. For parking Iota in excess of Im space, all rows of parking spaces must provide terminal a minimum of six feel in width to protect parked vehloll provide Vil lily, confine traffic to aisles and driveways, and provide a minimum of five feel of space for landscaping. In addition, when tan or mem vehicles would be parked sols by -side in an abuhirg configuration, irnenor landscaped Islands a minimum of eight feet wide must be locant within the panting row. For parking lots greater than fifty panting spaces, the localion of interior landscape Island shall be allowed to be consolidated for plaming of large,tends at trees to break up to rale of the parking lot. The number of trees required in the interior landscape area shall be dependant upon the location of the parking loin real to the building and public right-of-way a. Where the parklrp Jot Is located between the building and the pull right-of-way, ars, tree for every four spews; b. Where the parking lot is located to the side of the building and partially abuts the public right-of-way, one Ince for every six spaces; a Where the parking lot is localad behind the building and is not Nalble from the public right-of-way, ons tree ter every eight spaces. Response: The provided landscape pion demonstrates compliance with this" parking /of landscape design criteria. 3, Biaswales. The use of bioswelee within peaking lots is encouraged and maybe braked within Iandsa gar @miss subject to lite plan and architectural review. The hes BATE 11.3.15 MEMO e PROJECT New Costco Warehouse Central Point PROJECT NUMBER 14-0383-01 planting standards may be reduced in areas dedicated to bioawalea subject to site plan and architectural review. Response: As shown In our alb plan, landscape plan and civil plans large bio-sweles an proposed along to northern edge of the alb. Costae Is not proposing to reduce Me free planting standards In Mose areas. H. Bicycle parking. The amount of bicycle parking shall be provided in Accordance with Section 17.64.040 and constructed in Accordance with the following standards: L Location of Bicycle Parking. Required bicycle parking fschfies shall he located onake in well lighted, secure bcagons within fifty feet of well used entrances and not farther from the entrance than the Gosset automobile parking spars. Sloycle parking anal have direct access to both the public dght-of-way and to a main entrance of the principal use. Bicycle parking may else he provided imide a building In suitable, secure and ecceseible locations. Bicycle parking for multiple uses (such as in a commercial center) may he clustered In one or several backbone. 2. Bicycle Parking Design Standards, All bicycle parking and maneuvering areas shall W constructed to the following minimum design standards: a. Surfacing. Outdoor bicycle parking facilities shall be surfaced in the same manner es a motor vehicle parking area or with s minimum of a three inch thickness of hard surfs I g (i.e.. What, concese, pavers or similar material). This surface, will ba maintained in a smooth, durable and well drelred condition. b. Parking Space Dimension Standard. Bicycle parking spares shall be a least six feet long and two Ml wide with minimum overhead cascara of seven (eat. c. Lighting. Lighting shall be provkled in a bicycle parking area so that all facilities are thoroughly illummaad and vielNe from adjacent sidewalks or motor vehicle parking lots dudrg al hours of use. d. Aisles. A five-foot aisle for bicycle maneuvering shall be provided and maintained beads or between an row of bicycle prolong. e. Signa. Whose bicycle parking iacllglea aro net dinscYty viable from the public dghtaM-way, entry and directional signs shall be provided to direct bicycles from the public right-of-ways to ger bicycle parking facility. Response: Costco will comply with Central Point's Bicycle standards. 17.75.043 Industrial Building Design Standards. Reserved. (Ord. 1916 (pert), 2011). Reopen": Although ton am no specific Design Standards In to Industrial soros of Cental Point, Costco balky" the plans, elevations and perspective drawings submitted demonstrate Costco's commitment to developing a high quality building and silo. 0117E 11.3.15 MEMO PROJECT New Castro Warehouse Central Point PROJECTNIIMBER 14-0393-01 17.76.040 Conditional Use Permit - Findings and Conditions. The planning commission in granting a conditional use permit shall fled as follows: A. That the site for the proposed use is adequate in size and shape to accommodate the use and to meet all other development and lot requirements of the subject zoning tlhtrict and all other provislons of this wtle; Response Costco believes they have demonstrated through the subminod plans and drawings that the proposed 19.73 stns site is adequate in sirs and shape to accommodate the proposed use and meet Ali the City's required standards. B_ That the site has adequate access to a public street or highway and they the street or highway Is adequate in size qd condition to dfsaively accommodate the traffic that b expected to be generated by the proposed use; Response The submitted Traffic Report indicates that adequate access to public streets will be provided. And the existing streets am or soon will be of adequate she and condition to effectively accommodate the traffic that Is pro/acted ra be generated by Costco. C. That the proposed use will hers no significant adverse affect on stall property or the pemnitted use thereof. In making this determination, the commission shall consider the proposed location of improvements on the its; Vehicular ingress, ogress and mmeal circulation; aethachs; Height of buildings and structures; Walls and fences, landscaping; Outdoor lighting; And signs; Response: The submitted plans, elevations, drawings and reports document that then will be no significant adverse effect on abutting properties. D. That the ealablisho ant, maintenance or operation of the use applied for will campy with local, stab and federal health and safety regulations and therefore will not be detrimental to the health, safety or general waken of parsons melding or working in the surrounding neighborhoods and will not be detrimental or injurious to the property and improvements In the neighborhood or to the general welfare of the community based on the review of goes factors listed in subsection C of this section; Response: Costco will with both the construction and operation of their proposed warehouse comply with all local, state and federal health and safety regulations. Thenfora, the proposed development will not be detrimental to the health safety or general welfare of prions residing or working in the surrounding neighborhoods. E. That any conditions mquired for approval of the penult are deemed necessary to protect the public health, safety and general wekare and may Include 1. Adjualmente to lot size or yam auras as resided to Mat accommodate the proposed use, provided the lab or yam arca. corlmm to ted stated minimum dimensions for the subject zoning district, unless a valance Is also gamed as provided for in Chapter 17.13. DATE 11.3 15 MEMO PROJECT Now Costca Warehouse Central Point P,q, ,a ons PROJECT NUMBER 14-0393-01 Response: Costco doss not belie" any adjustments to required yards am needed. 2. Increasing street widths, modlhcatlom in street designs or addition of street signs or traffic signals to accommodate the trshtc generated by the proposed use, Response: Cosfcc dome not be/lees any modifications are needed to the surrounding roads or the required Improvements to those roads. 3. Adjustments to e0-sbset perking requirements In accordance with any unique characteristics W the proposed use, Response: Control Point's parking requirement for • retail use, stated as a minhnum and a maximum, is 1 parking stall for eesry 200 of of not floor area. In Costco 'a case, the set floor area Is 134,000 sq R, which requires 070 parking stalls. Our current proposal is to provide 703 parking stalls which our Parking Demand Study supports. 4. Regulation ofpoints of vehicularingress and agrees, Response: Costco bull*~ Ingress and press points should be approval as submittad In the drawing package and no additional regulation should he required. 5. Requiring landscaping, irrigation systems, lighting and a property maintenance program, Response. Costao believes landscape and inigadon plans should he approved as submitted In the drawing package and no additional regulation should be required. 6. Regulation of signs lend their locations, Response: Castro Is proposing building mounted signage that is In excess of the standard permitted by code. For this reason Costco will be submitting a Chess C Exception to the siana0e standard door/bed In CPMC 17.48.010(A)(1). For background and context. Costco and fMlr design twat hon designed a sign package that /s Integra (ad Into the design of (be building and Is proportioned to match the scale end else of the building. rhe a/gns are not too small or too large In comparison to the seats of flit building but May am substantially Witter than whet Is allowed as standard in Me Industrial sone. The largest signs, which are proposed an three of the four sides, are 301 at.. However, this is In relationship with a wall hgade that is over 10,000 of on tile long side and over 10,000 sf on the short side. In other words, the sign coven less than 3.3% of the smallest wall of the warehouse. In total, including the slgnsge an the Fuel Facility which has a 31 of sign on "on side of the fuel canopy, the entire Costco site has 1,450 of of mounted on their buildings. For additional Information aes the black and white elevation drawing, DD31-01, for the building 0117E 11.3.15 MEMO - PROJECT New Costco Warehouse Central Paint PROJECTNUMBER 140393-01 mounted signs and the specific Fuel Facility sheat, OD41-01, for the gas canopy slgnage. 7. Requiring fences, berms, walls, landscaping or otherdevices of organic or artificial composition to eliminate or reduce the effects of noise, vibrations, odors, visual incompatibility or other undesirable all" on surrounding properties, Response: Cos too does not believe any additional measures to control noise, vibrations, odors, visual incompatibility or other undesirable effects are necessary. S. Regulation oftime ofoperatonsfor certain types of uses lfthelr operations may advarri alba privacy of sleep of persona reaioing nearby or otherwise conflict with other community or relghbons ad functions, Response. None headed. 9. Establish a time period within which the subject land use must be developed, Response: Nom heeded. 10. Requirement of a bond or other accounts asear anon within a specified period of time, Response: Nom needed. I f. Sure other conditions that are found W he necessary to protect the public health, safety and general welfare, Response None needed. Conclusion Wlih the drawings and background information that has bean submlited with this application we believe that the proposed Coatco development la consistent with the required findings that need to be made to approve this Development Permit application. Please feel free to contact Costco or MulvannyG2 should you have any questions or need further clarification. Thank you for your time, consideration and assistance In this matter. Respectfully: Steve Bullock, MG2 nA,atlnuu I..nzrud Ull 11"LIEert. am02 [men p0,denui204_ on.dlmianwp e.bmill. 1 {.o,.s. 2m x.1111 -ism Ik.a 1, n..,.o.. 1-H-ri 1m, ATTACHMENT "C" Transportation Impact Analysis Central Point Costco Development Central Point, Oregon October 2015 KITTELSON & ASSOCIATES, INC. TNA NOpONTATI ON ONOI Nee VINO/PLANNI NO Transportation Impact Analysis Central Point Costco Development Central Point, Oregon hq.rrr. o Wbft . •YY41w a"^ WAMONN Ow N>a snag Fla r.ror. ar�M�aM..Ma�e� 1al M�a1� tJrMd a�ira, M6 aK aeaMrranm Urn aeaaw lgRr�4�IAMIW%M RRoe t/"KMrYr�lrr II"l ~ MMt rWPP. W 0ftdwo1! Plannaid In-Pmms VPd0P,,knft ..... . . ..................................... ............. .. ........... ............ ....... .. ....... .. . ........... 33 ftfld Yk.r 120161 Bacapountl Trafflc C..dM.ru . . ........................................................ ..... ...... .... . ... ..... .. ......... 33 TABLE OF CONTENTS .. ........................ .. ............... - ]a ExecutiveSummary ....... — .................................... ....................... .......... ................ .. ....... .. .. 8 Introduction.,...._........ _... _......... . . ...... ....... ....... .............................. — ............. ....................... .... 14 Pmoloaacription..... . . ....... ....... .................... ..................... ... . ..... ...... . ............ . ... . ... 14 Sco,ak ofthe .................................. ................................................................... .. ..., .................. ... ........ .. . ......... 17 ExIstiragConditions .................... ....................................................................... .... ... ............ .... .... 29 I Site CondMans and Adji,art Lind USe,—.— ............ ........... ....... I ..................... ... . ...... 1-1-1 .......... 11 .................... .... . .19 Traird,nat., Willlan& ............................................... ....... .................. ............. ............... - ... - - . .. .. ..... 19 Rudy" MerwVn. ... .................. .... - . . ......... ..... ..... .......... ... ... ..... ..... .. I............................. 21 Inter.d.P 01"FI5Liandard, - ..... . ........ .......... . . .... ... .. ....... ........................................... . ........................ .... ..... . . 23 DILAIngPak How Traffic Cnndlflam .......... ...................... .............. ...................... ... 11.1 1 .......................... ............................ 25 5.1irt, Manor, ArkaiN . ... .......... ....... ... . . .... ..... ..... ................................ ......... . . ....... . . ................... ......... ............. 23 TransportationImpact Analysis. ........................................................... .............................................. 30 Plannaid In-Pmms VPd0P,,knft ..... . . ..................................... ............. .. ........... ............ ....... .. ....... .. . ........... 33 ftfld Yk.r 120161 Bacapountl Trafflc C..dM.ru . . ........................................................ ..... ...... .... . ... ..... .. ......... 33 Caeo Tdp 6enknkCon Oktabw.... .. ........................... .................... ........... . .. ......... .. ........................ .. ............... - ]a Coatco Trip (ionardlan Clanacae,1,110 .............. . . ............... . ... .. .... . ..... ... .. ....... ....... ... ...... ........................... 36 Trip DL9M6kd.n and TH, ftlin.Pt ............... ... .................... . ..... ................................. ......... ..... 37 ennAYor 11.1. T.l T,.Mr.ndft1T.n1- - .— ............ .................. .. ................... .................................. 41 luild-Year (2015) Mitflufflons.... .... . ..... ....... ...... .. ............. ...................... ....... ..... .... . ..... —_ —.— .. ............ ............ 46 TqbiaRMk acid A M ALumanIM.. ...... .. .... ... ........... ..................... ...................... ................ ... ....... .... ... 47 Futo,. Year 12=1 6acWaund TWc CPrftWn1 ............................ ............... ..... ................................................. .................. 51 Future Year (2030) T.Ul Tnrffla Undiftlon . . ...................................... ................ ...... ......... . ...... . ....... . ................ ... ... 54 FM.Y.130301 WtIptlon ......... ......... ....... .......................... .......... ........................... ......... ................. . ....... . .. ... .. ... .. 58 P.*4 A.rn.rd .............. .. .... ..... . ....... ..... . ..................... .................... ........................... .. ........ ....... 59 Conclusions& Findings ............................................ .......................................... ..................... .......... 62 Rpfprpnrpc- ................... ............................................................................... .............................. 681 A,Rw LIST OF FIGURES Figure 1. Central Point Costco Site Figure 2. Site 16 Figure 3. Study intersection and Lane Configurations ................................................ ........................ 22 Figure 4. Existing PM and Midday Peak Hour Traffic Conditions ......................................................... 27 Figure S. Build -Year (2016) Background Traffic Conditions ......... ......... ............................................. 35 Figure6. Trip Distribution ................ ......... ......................... ............................................................... 38 Figure 7. Site -Generated Trip Assignment ...................................... .......................................... ......... 39 Figure S. Sito-Generated Trip Assignment at the Site Accesses .......................................................... 40 Figure 9. Build -Year 12016) Total Traffic Conditions ............ .................... .................................. ....... 43 Figure 10. Build -Year (20161 Total Traffic Conditions at Site Accesses ............................................... 45 Figure 11. Future Year (20301 Background Traffic Conditions ............................................................. 52 Figure 22. Future Year (2030) Total Traffic Conditions ........................................................................ 55 Figure 13. Future Year (2030) Toul Traffic Conditions at Site Accesses .............................................57 v0isvv &baoc a— LIST OF TABLES Pm/¢,Wl cxwWrWon, Table 1. Existing Study Transportation facilities and Roadways ............... . . . ...... ..... .. .... ... .... . 19 Table 2. City of Central Point's Level of Service Standards .............................................. ................... 24 Table 3. Operational Standards for Existing Study Intersections ........................................................ 25 Table 4 Existing PM and Midday Peak Hour Traffic Operations ............................_...........................26 Table 5. Crash Type and Severity (2009 - 2013) at Study Intersections ..............................................28 Table 6. Build -Year (2015) Background Traffic Operation Results ...................................................... 34 Table 7. Central Point Costco Development Trip Generation Estimate ............................................. 36 Table B. Build -Year (2016) Total Traffic Conditions .......................................... ........................... ...... 42 Table 9. Build -Year (2016) Total Traffic Conditions a Site Accesses ............... 44 Table 10. Table Rack Road Access Alternative Com pa rlso n ............. ................ ............. ................... 48 Table 11. Table Rock Access Operations In 2017 ............ ................... ...... ........... ................. ........... 48 Table 12. Table Rock Road Access Predictive Safety Comparlso"..,.. . . ............................................50 Table 13. Future Year (2030) Background Traffic Operations.............................................................53 Table 14. Future Year (2030) Total Traffic Operation, ........................................................................ 56 Table 15. Future Year (2030) Total Traffic Operations at Site Accesses ....................... ......... ......... . 59 Table 16. Typical Peak Parking Demand at Other Costco Warehouses In Oregon r .... ................ 60 Table 17. Central Point Costco Recommended Parkirl Supply ......................................... ........ . . ... 60 vftmn as sxs W. 4mrN/aMf rarm a.abp�t EweNMSun�sr 1 APPENDICES Appendix A — FAisting Count Data Appendix B— Level of SeMm Desalption AppendixC— Existing Traffic Operation Worksheets Appendix D —Crash Dab at Study Intersections Appendix E — Bu lid -Year (1016) Background Traffic Opmtloo Worksheets Appendix r—Baas Year (2006) and Future Year (2038) 0.e81onal Travel Demand Model Appendix G—Bulld-Year (2016) Total Trafffc Opemi lon WorkMeets Appendix M— Build -Year (2016) Mkryated Traffic Operation Wonksheeb Appendix I — Future Year (2030) Background Traffic Operation Worksheets Appendix J — Future Year (20301 ToW Traffic Operation Worlohaats Appendix K— Future Year (2030) Wasted Traffic Operation Workslrett hywYlllMT acrans nsseeaarWAWNis .. Section 1 Executive Summary Een"PoMt rn n Wbpnent EY[ulM aummory EXECUTIVE SUMMARY Nos P,q'ttlXf IXbG,1p35 Costco Wholesale is proposing to develop a new warehouse and fuel station located station located In the southwest quadrant of the Table Rock Road/Hamrick Road intersection in Central Point, Oregon. This report summarizes the evaluation of the transportation impacts of the proposed development and provides recommended mitigation measures to accommodate its development. The analysis and evaluation completed for the Central Point Costco development resulted in the following findings: Project Description • Costco Wholesale is proposing to develop a new warehouse and fuel station located In the southwest quadrant of the Table Rock Road/Hamrick Road intersection In Central Point, Oregon. o The development plan includes a 160,000 square -foot Conco warehouse and a 24 fueling position Canon Gasoline fuel nation. This new Central Point Costco will replace the existing Medford Costco located at 3639 Crater Lake Hwy in Medford, Oregon. • The parcels of land that in which the proposed Costco would occupy arc zoned as M-1 (Industrial) which allows the development of the Costco warehouse and fuel nation with a conditional use permit (no land use or roning changes are required). • In order to best evaluate the anticipated transportation characteristics of the proposed Central Point Costco development, it was agreed that the Costco -specific data be used to most accurately represent the anticipated traffic characteristics of the unique development type. • The proposed Costco development is estimated to generate a total of approximately 10,670 net new trips on a daily basis, 900 net new trip ends during the weekday p.m. peak hour and approximately 1,365 net new trip ends during the weekend midday peak hour. • The distribution pattern for site generated trips was developed using zip code data from current memberships at the existing Costco warehouse located on OR 62 (Crater lake Highway) in Medford, Oregon, as well as from the existing trdRc patterns and major trip origin, and destinations within the studyarea and the regional travel demand model. Existing Conditions • The study evaluated 12 off site Intersections in addition to site access points. • The study evaluated two time periods for each evaluation scenario: weekday p.mpeak hour and weekend midday peak hour. pRlrmab[u[Ivtq M[. unwrrm•rcm•o cv..aP„ i.nr am.m•s,,,,i,••ry • Based on recent traffic taunts collected In May and July 2015, all of the study Intersections were found to operate at acceptable operating standards during the existing weekday p.m. and weekend midday peak hours except for the Table Rod Road/Airport Road Intersection during weekday p.m. peak. o The Table Rock Road/Airport Road Intersection is stop controlled in the westbound direction. Under existing conditions In the weekday p.m. peak hour, there is high delay forthe critical movement (westbound left -turn) resulting In LOS F. • Crash data the most recent five years (2009 — 2013) at all of the study intersections was reviewed to identify historical safety trends. o Turning movement and rear -end crashes were the most common crash type at the intersections, accounting for approximately 82% of all crashes. o There were no fablity crashes. o Four study Intersections were found to be In the 90th percentile and in compliance 0DOT's SP15:1-S Sa Ramps/E Pine Street, Table Rock Rood/W Was Road, OR 62 (Crater Lake Ilighway)/W Was Road, and Table Rock Road/OR 99. Build Year 2036 Analysis • The transportation impact analysis evaluated two different future yearscenarioa: year 2036, the assumed build out year of the development, and year 2030 a long-term planning year. • The 2016 build -year background traffic analysis (without Inclusion of the project traffic) found that all of the study intersections are forecast to operate at acceptable levels of service and volume-to-capac@y, ratios during the weekday p.m. and weekend midday peak hours except for the Table Rock Road/Alrport Road intersection during weekday p.m. peak hour. o As under existing conditions, during the weekday p.m. peak hour there is high delay for the critical movement (westbound left -turn) resulting in LOS F. In addition, the critical movement Is also operating with a volume-ta-capacity ratio of greater than 0.95 In the build year (2016) background conditions (with no traffic from the proposed Costco development). • The bulld-year )2016) total tralflc analysis (with Inclusion of the project traf l found that all study Intersections will continue to operate at acceptable levels of service during the weekday p.m. and weekend midday peak hours with the exception of: o 1-5 NB Ramps & East Pine Street exceeds COOT standards (lane group v/c ratio S 0.851 with the northbound right -turn lane group's v/c ratio of 0.87 during the weekday p.m. peak hour. The need for additional capacity for this northbound right - turn movement has been previously Identified in the Final Draft [AMP: Exit 33 study which ails for the widening of the 1-5 northbound off -ramp to add a second right - turn lane at the northbound approach to East Pine Street. ODOT and the City of X.4-a.Y fu, W, hntM VUPt rw'ho OeMopnren[ GervXr 5ummmy %gecielSoos L r2v,15 Central Point are currently in discussions to determine COstCn'a appropriate proportional fair share contribution to this improvement as Mitigation for the site generated trip Impacts. o Table Rock Road & Airport Road, as under existing and 2016 background conditions, continues to operate at a LOS F during the weekend p.m. peak hour. Improvements to the Table Rock Road/Airport Road intersection are scheduled in year 2017 as part of Table Rock Road widening and a signal will be added to the intersection. This Intersection is an existing deficiency; however, given that this improvement Is not currently scheduled until 2017, Jackson County and the City of Central Point are currently in discussions to determine an appropriate contribution to this Improvement as mitigation in the interim far the Costco project. o Biddle Road & Airport Road experiences a higher delay for the critical movement of the westbound approach, dropping from LOS C to E during the weekday p.m. peak period due to site-gernrated traffic. Even with the site generated traffic, the intersection is operating at a very low volume -to -capacity, ratio of 0.45 in the weekday p.m. peak hour and 0.141n the weekday midday peak hour. Site Access Anolysls • In the build year 2016 scenario, all site access intersections are projected to operate at acceptable levels -of -service and volume -to -capacity ratios during both the weekday p.m. and weekend midday peak hours, with the exception of the Table Rock Road/Northeast access. Note this is assuming this access is a full movement access and no Improvements to Table Rock Road are completed. Under this scenario, the critical eastbound left -tum movements at the Table Rock Road/Northeast access is projected to operate at LOS F during the weekday p.m. peak hour, however, It Is still projected to operate well under capacity and meet the County's operational standard. • Even though the build year (2016) analysis showed that all of the site accesses will be able to operate as proposed upon site opening before the Table Rock Road improvements are constructed, an evaluation of access afterrrtives for Table Rock Road was also completed to compare how temporary improvements would impact the access operations in the interim. The access scenarios compared were: o Build Year (2016) Total Traffic Conditions (i.e., Full Access to Table Rock Road) with No Table Rock Road Improvements (as summarised above) o Build Year (2016( Total Traffic Conditions with Temporary Table Rock Road Improvements (i.e.,temporary wldening of Table Rock Road along the site Nonage to provides center left -turn lane until the ultimate widening project is constructed) 10 .. a nwd.,, Inc ronmraomrm.rco n,.rop,oem F.rtmOM Summory Pm/R]e]Sert ame�mss o gulid-Year (2016) Total Traffic Conditions with Restricted Right-In/Right-Out Site Accesses (restrict Table Rock Road accessto rlght-in/right out only until the ultimate widening project is constructed) e The access alternatives evaluation found that: o Assuming full movement access and no improvements to Table Rock Road, the eastbound left -turns at the northeast access to Table Rack will experience relatively long delay (resulting in LOS F) but the access will still operate well under capacity and meet the County's operational standard during the critical time period. o Providing temporary widening along the site fmntageto provide atemporary center turn lane will allow all Table Rock Road accesses 10 operate acceptably as full movements until the ultimate Table Rock Road widening improvements are constructed in 2017. c Restricting the site's Table Rock Road accesses to right-in/right-out only will allow those accesses to operate at acceptable levels of service and volume-to-capachy ratios. However, It will add additional left -tum movements at the Table Rock Road/Hamrick Road intersection thus resulting in cver�ci p ldty and LOS F conditions at that location. This impact could be reduced by adding temporary widening around the Intersection to provide a northbound left -turn lane as well as a center refuge area north of Hamrick to allow vehicles turning left from Hamrick to make a two stage gap acceptance maneuver for the left -turn. o Once the ultimate Table Rock Road widening Improvement is constructed in 2017, all site accesses to Table Rock Road will operate a good levels of service (LOS C or better) and volume -to -capacity ratios (v/r--0.21 or better) during the peak hour periods assuming they are full access movements. • From a safety perspective, a predictive safety analysis bund that: o Providing full movement accesses to Table Rock Road in the near-term with its current two lane configuration shows the probability for 1.2 crashes per year to occur combined at the two access points. o If these were restricted to right-in/right-out only driveways, the safety prediction lowers to a probability of 0.83 crashes per year (about a 30% decrease in probability). o Rtemporary widening was provided In the interim for a two-way left -tum lane along the site's frontage, the probability would lower to 0.16 crashes per year (about a 30% decrease In probability). o The safety predlctive analysis also shows that once the ultimate Table Rock Road widening Improvements are In place the safety prediction lowers as well to 0.77 crashes per year even with maintaining full movement acceues at both locations. r/ , a auxeses., m[. cen4ol Poln,C r[a OevbFmenr F•KYXM 5Wn Future year 203OA0olysls PIoJtt[YIA]1a aeloan}015 • The future year (2030) background conditlons analysis (without the project traffic) found that all study Intersections will continue to operate at acceptable levels of service and volume -to -capacity ratios during the weekday p.m. and weekend midday peak hours with the following exceptions- o Hamrick Road & East Pine Street operates with a v/c ratio of >1.0 during the weekday p.m. peak hour o Biddle Road & Airport Road (as under the build year conditions) has a critical movement which operates at LOS F during the weekday p.m. peak hour although the movement is still operating under capacity with a v/c ratio of O.SS • The future year (2030) total traffic analysis (with the project traffic) found that the site - generated trips did not impact any study Intersections not previously Identified in the 2030 background scenario. • All of the proposed site accesses operate at acceptable levels of service during the weekday p.m. and weekend midday peak hours under the future year 2030 total traffic scenario. Because ofthe planned roadway improvements alone Table Rack Road, there Is a significant benefit to the traffic operations at the site accesses along Table Rock Road when compared to the build -year (2016) total traffic scenario. Parking Assessment • City of Central Point Municipal Code directs that a parking supply of 670 parking spaces be provided for the Costco development (assuming retail land use). • The project is proposing to provide a total of 782 parking spaces on site. • As part of this report, a parking demand analysis was completed to demonstrate and documents justKcation for the proposed Increase in parking supply. • Actual parking supply and demand data from other Costco sites in Oregon indicates that a minimum parking ratio of 4.71 spaces/1,000 sq -1t be provided in order to supply enough parking to meet Costco speck demands. • Applying the demonstrated minimum parking supply of 4,71 spaces/1,1100 sq -ft to the proposed Central Paint Costco development equates to a minimum recommended parking supply of 753 spaces. • This Indicates that the proposed parking supply of 782 is slightly higher thin this minimum amount but within a reasonable range and will provide an appropriate parking supply to accommodate typical peak periods as well as additional spaces for seasonal peaks as well. KMW4 aMr.,,.. Section 2 Introduction [mmol mint.,k Celelapmenr Pr.s-t,Jsxw6 Il,bvd-.l R r]ar,r INTRODUCTION Klttelson & Associates, Inc. (KAI) has conducted a Transportation Impact Study ITIS) per requirements of City of Central Point's Zoning Cade Section 17.05 900. The TIS examines the current transportation network and addresses the transportation Impacts of the proposed Costco Wholesale development In Central Point, Oregon. The scope, methodology, and key assumptions within the TIS were reviewed and agreed upon by the City of Central Point, Jackson County, and the Oregon Department of Transportation. In addition, the City of Medford was given the opportunity to review and comment an these elements (although no comments were received(. PROJECT DESCRIPTION Costco Wholesale Is proposing to develop a new warehouse and fuel station located roughly one mile southeast of the interstate 5 (1-5) & Pine Street interchange In Central Point, Oregon. The site is located in the south-west quadrant of the Table Rack Road/Hamrick Road Intersection. The development plan for the 18-acm site includes a 160,000 square -foot Costco warehouse and a 24 fueling position Costco Gasoline fuel station. Currently, the site is undeveloped. The development is planned to be completed and operational by October 2016. This new Central Paint Costco will replace the existing Medford Costco located at 3639 Crater cake Hwy in Medford, Oregon. The project site plan with access driveways to each of the bordering roadways Is illustrated in Figure 1. Project Location The proposed site is situated south of Hamrick Road between Table Rock Road and Federal Way as Illustrated in Figure 2 . Table Rack Road serves as the eastern boundary of the site. The property south of the site is currently owned and operated by FedEx Ground. The land use directly south, west and north of the site is designated as M-1 (industrial) and M-2 (Industrial General) as referenced in Central Point Comprehensive Land Use Plan 2008-7030 (Reference 1). The Costco development is an allowed use under the industrial zone designation with a conditions use permit. Costco Trip Generation Characteristics Before and after data from other comparable Castro sites was reviewed to determine a representative trip generation estimate for the development. eased on a 160,000 square foot warehouse and a 24 - position gasoline facility, the proposed warehouse and fuel statfon is estimated to generate 10,570 net new daily trips. Of those trips, 900 net new (445 Inbound, 455 outbound) trips and 1,365 net new (695 inbound, 670 outbound) trips are expected to occur during the weekday p,m. peak hour and weekend midday peak hour, respectively. aathon aavwft I- yr t ' -7_.=1_.• Km i�sox6A OQPTE]. We - - - PRO IFCT DATA y 11 m� m F � - - - PRO IFCT DATA y SITE PLAN FIGURE CENTRAL POINT COSTCO 1 CENTRAL POINT, OREGON Ca Ir lPohl Coslm lu ocAMe,zms KRr ELRON 6 P QnIMPdnr Grlcv Cevbpminr Mbulurtbn SCOPE OF THE REPORT This report evaluates the following transportation Issues: Pm1erN1W1a hmA,r]o14 • Existing roadway, land -use and transportation system conditions within the site vicinity during the weekday p.m. and weekend midday peak periods; • Planned developments and transportation Improtements for area surrounding Costco; • Build -year 2016 background (existing traffic counts plus background growth) traffic conditions during the weekday p.m. and weekend midday peak periods; • Costco trip generation, distribution and trip assignment estimates for the proposed development, • Build -year 2016 total (buildyearbackground plus she -generated trips) traffic conditions during the weekday p.m. and weekend midday peak periods; • Build -year 2016 mitigations to study intersectwns impacted by site;enersted trips during the weekday p.m. peak hour and weekend midday peak hour, • Future year 2030 background(build-year 2016 background plus 14years of regional growth) tralRc conditions duringthe weekday p.m. and weekend midday peak periods; • Future year 2030 tatsl (future year background plus sitegenersted trips) traffic conditions during the weekday p.m. and weekend midday peak periods; • Future year 2030 mitigations to study intersections Impacted by site-pnereted trips during the weekday p.mpeak hour and weekend midday peak hour, • Operational and witty assessment of the proposed site accesus (Including the Table Rack Road/Hamrick Road Intersection) during the weekday p.m, and weekend midday peak hours during build -year and future year total traBlc conditions. • Parking assessment for Costco site; and • Conclusions and findings, 11 xiewna Msarbw, liz Section 3 Existing Conditions Cenlnl POlnt ratm 0evelapnen[ PmfeR IXmberiltl5 'Aes ErIXInp Contlltlanr EXISTING CONDMONS The existing conditions analysis identifies the current site conditions and operational and geometric characteristics of the roadways within the study area. These conditions will he compared with build - year (2016) and future year (2030) cord itlons later In this report. KAI staff visited and inventoried the proposed Central Point Costco development site and surrounding study arca in May 2015. At that time, KAI collected information regarding site conditions, adjacent land uses, and transportation facilities in the study area In addition, existing traffic counts at the study Intersections were collected in May and July 1015. SITE CONDITIONS AND ADJACENT LAND USES The proposed site Is located roughly one mile southeast of the Interstate 5 (1-5) & Pine Street interchange In Central Point, Oregon. The land uses in the vicinity of the she arc light industrial to the immediately west and south of the site, general industrial immediately north of the site and tourist and office professional, as well as low and medium density residential, north of E Pine Street/Biddle Road. The parcels of land that in which the proposed Costco would occupy are zoned as M-1 (Industrial). The M-1 zoning designation allows the development of the Costco warehouse and fuel station with a conditional use permit. No land use or zoning changes are required for the Costco warehouse and gas station at the proposed site. TRANSPORTATION FACILITIES The transportation system inventory Identifies the current characteristics of roadways within the study area. Major roadways within the study area were Identified and catalogued. Table 1 provides a summary of the existing roadway facilities Included in this study. Takla 1. distil staidly Transportation Facilities and Roadways Nates -Par O00TTrwp15;-nahngwana miarparnaur xlNbon6xuodaly, hrc. No 1-5 "Ps Rural Imerni to 2 30-45 No No Pine St mi., MIMI 4 3545 Partlel Yu No Penn, Rd Mdor Callenar 2 25-30 PmW Yw No Hemda Rd Lacsi 2 30 portal No No Fed.W Wry Loral 2 30 W Na No TableRaa Rd Minor Arterial 2-4 3045 PM1.1 No PartW aidde Rd MlmrArtetlal 4 45 Padltl Ponca No V114a Rd Minor Mtatlal 2 45 Y. No No Airport Rd Loral 2 35 Parthl No Pamal Nates -Par O00TTrwp15;-nahngwana miarparnaur xlNbon6xuodaly, hrc. (mryol Pobt GfKo 0etebpmMt wma w,mnon< P,xe.1130*6 .enema Roadway Facilities The roadway network in the study area is comprised of an extensive street system made up of arterial, collector, and local roads. The roadway facilities within the study area are described below: • The 1-5 Northbound and Southbound Ramps provide entry and exit accesses to/from the Interstate. Interstate 5 extends from Southern California to the Washington -Canada border. The ramps provide access to Pine Street In both dlrectlons on the west side of the study area. • Pine Street -Biddle Road Is a five lane roadway running east/west through the center of the study area. The roadway is named Pine Street west of Hamrick Road with a name change to Biddle Road east of Hamrick Road. Both segments are classified as minor arterials. The roadway is a five lane road, including two lanes in each direction and a center turn throughout the study area. There is no on -street parking on either side of the street. Bike lanes extend from the 1-5 Southbound Ramp to Table Rock Road. The posted speed Is 35 miles per hour between Hamrick Road and 1-5 south ramp and 45 miles per hour between Hamrick Road and Airport Road. • Peninger Road is a Vane, major collector, serving as a frontage road running parallel to and on the east side of I.S. The facility serves a variety of commercial and recreational businesses. There are bike lanes both north and south of the Peninger Road/Pine Street Intersection and sidewalks south of the intersection. Northbound from the Intersection the roadway has a posted speed of 30 miles per hour and 25 miles per hour in the southbound direction. • Table Rock Road ranges from 2-5 lanes and runs north/south throughout the study area. The roadway has two lanes south of Biddle Road, and is a five lane road with a center turn lane north of Biddle Road. Bath segments of Table Rock Road are minor arterials. The only ou-street Perking Is provided mr the east tilde of the roadway for a 0.15 mile segment north of Airport Road. The segment north of Biddle Road has sidewalks on both sides of the roadway until Vilas Road. The pasted speed is 30 miles per hour between Airport Road and Hamrick Road, and 45 miles per hour north of Hamrick Road. • Hamrick Road rs a 2 -lane roadway that will service two Casino access driveways. Hamrick Road Is a local road providing access for industrial companies such as Reddaway and Knife River Materiels. There Is no on street parking or bike lanes, however there are segments of sidewalk on both the north/south and east/west sections of the road. The posted speed Is 30 miles per hour throughout the study area section. Directly north of the site, between Table Rack Road and Federal Way, the roadway consists of a 3 -lane crass section with a two-way median turn lane. • Federal Way Is a local road that currently serves FedEx Ground at the southern end of the roadway. There are two proposed access points along Federal Way. There is no posted speed sign an this segment, nor are there pedestrian or bicycle facilities. nmm�a awtbm, mr. [moa voinrrmso oewnopmenr /mJ.�rxssars rnaure [o�arcom o:raeerzms Airport Road is a local 2 -lane road, servicing both commercial and industrial businesses. Airport Road does not have on -street parking, or bike lanes, however there is a sidewalk on the north side of the roadway. Transit Facilities Rouge Valley Transportation District (RVTD) Is a public transportation service provider, providing paratransh and fixed -route bus service within Jackson County. RVTD's central bus station is located in downtown Medford, providing eight fixed -route bus routes servicing the cities of Ashland, Central Point, Jacksonville, Medford, Phoenix, Talent, and White City. RVTD's Route 40 provides weekday service between Medford and Central Point with stops along East Pine Street west of 1-5. However, Route 40 does not have any stops within the vicinity of the proposed Costco site. There are no fixed -bus routes or stops within the vicinity of the proposed site. STUDY AREA INTERSECTIONS The City of Central Point has completed several studies of transportation needs in partmiship with Jackson County and ODOT. The City of Central Point's 2030 Transportation System Plan (Reference 2) offers a comprehensive assessment of long-term transportation needs within Central Point. In addition, ODOT recently completed an Interchange Area Management Plan fli for the I-S/Eost Pine Street Interchange (Reference 31. In addition, the Jackson County TSP is currently being updated (expected adoption in October or November 2015). Recognizing the long-term transportation needs, this TIA focuses on the analysis of study Intersections within the site vicinity of the proposed Central Point Costco site. Based an knowledge of the transportation network within the site's vlclnfty and a previous coordination meeting with the City, County and OOOT, the following 12 study Intersections were Identified for inclusion In this report: 1. 1-5 SB Ramp & East Pine Street - (traffic signal) 2. 1-5 NB Ramp & East Pine Street- (traffic signal) 3. Porringer Road& East Pine Street -(traffic signal) 4. Hamrick Road & East Pine Street- (traffic signal) S. Federal Way &Hamrick Road - (unsignalized intersection) 6. Table Rack Road &East Was Road -(traffic signal( J. Table Rack Road &Biddle Road - (traffic signal) 8. Table Rock Road & Hamrick Road - (unsignalized intereectlon) 9. Table Rock Road & Airport Road- (unsignalized intersection) 10. Biddle Road & Airport Road - (unsignalized intersection) 11. Table Rock Road & OR 99 (North Pacific Coast Highway) - (signalized intersection) 12. OR 62 (Crater Lake Highway) & E Vilas Road - (signalized intersection) The study Intersections and their traffic control and lane configurations are Illustrated In Figure 3. .w-. .mod., mr. �-rns.Inlnm^Itul ■-66ww�wlvaEonot owwEtw6E.wvnton • ♦tli ♦h Ulr IdMp 0.W+8!l11�6f11EEr ratwnwnra Nrrncl R6.M TNIEIEFN Rda \ IMYI\Cw ROM l� h t TIKEtaCkNwlw V\MM16 • ' ql f ltir r TnGIE ttpd IAYOENgONIRYD • O i T r EMSTING LAW CONFIGUMTIONS fauRE CENTMLPOIWr,0AEGM 3 fsnfml PoFi[Gatta Gkwbpnenf Nlaftt'f N]9.]46 Ghtlna Cmtlabm IXNbn]OSS Data collection at these twelve intersections Included turning movement counts collected during typical weekday (Tuesday through Thursday) p.m. peak period (4:00 p.m. — 7A0 p.m.), and weekend midday (12:00 p.m. — 3:00 p.m.) peak period. In addition, existing lane geometry was documented, inciuding turn packet lengths, as well as pedestrian and bicycle facilities and the presence of transit and transit amenities. For signalised intersections, KAI obtained traffic signal timings from ODOT and the City of Central Point in order to correctly model and analyze each Intersection. Appendix A" includes the existing weekday p.m. peak period and weekend midday peak period counts at each of the study Intersections, In addition to analyzing the 12 study Intersections, the proposed site plan includes six new driveways to accessthe site, each of which will be analyzed in accordance to the roadveyjurisdictlon R is located. As shown In Figure 1, the six proposed site access Include: • Northern full -•cress driveway located on Federal Way; • Southern full -access driveway located an Federal Way; • Eastern Hamrick Road driveway right-In/right-out arms; • Western Hamrick Road driveway full -access (full access); • Northern full -access on Able Rock Road; and • Southern full -access on Table Rock Road. More information about the performance of these site accesses, as well as the assessment of access alternative scenarios, is provided later in this report. INTERSECTION OPERATING STANDARDS The Operating standards of four jurlsdictions were used to assess the operations of the 12 study Intersections based on their respective location. The four jurisdictions are: City of Central Point, City of Medford, Jackson County, and Oregon Department of Transportation. City of Central Point Operating Standards Central Paint uses performance standards based on level of service (LOS). All LOS analyses described In this report were performed in accordance with the procedures stated In the 1000 Highway Capacity Manual (HCM 2000) (Reference 4) as required by the Clry of Central Point's 2030 Tmnsportotion System Plan. HCM 1000 define, LOS as a quality measure describing operational conditions within a traffic stream, generally in terms such as speed and travel time, freedom to maneuver, trafllc Interruptions, and comfort and convenience. When analyzing traffic conditions, LOS Is used as a measure of performance (corresponding to delay) at an intersection with values ranging from LOS "A", Indicating good operations and law vehicle delay, to LOS "F", which Indicates an Intersection at, or over capacity with high vehicle delay. Table 2 provides the City of Central Point's LOS standards for signalized and unsignalized intersections. The CWs policies require intersections to operate at LOS O or better. A description of level of service and its criteria Is presented In Appendix -1I 23 r.k"•aau ..M.. C(r1hol POn[lofRV Oef<Fpnienf PmlrtfalSpK aurxa mmiaa,v oaax.zvts Table 2. City of Cenral Point's level of Servtm Standards A .0. -d. sza.<mdr B zo-zo.mmf co-z5..and. c zo-3s..M, 15-Z Mf 0 3s55.a�dv xs-ss.ana. E ss-so..om, 35-53..om. F M 1 -c.d. Jackson County Operating Standards The acceptable motor vehicle performance standard for signalized and unsignalized Intersections per Jackson County Transportation System Plan (Reference 5) is a volume -to -capacity ratio (V/C Ratio) no greater than 0.95 within the boundary of the Metropolitan Planning Organization and 0.85 outside of the MPO boundary. Each study intersection is within the Rogue Valley Metropolitan Planning Organization (RVMPO) boundary. Therefore, Intersections falling within the County's jurisdiction will be assessed assuming a V/C ratio standard of o.95. ODOT Operating Standards ODOT operates and maintains the study intersections for the ramp termini of 1-5. ODOT's operating standard for interchange ramps Is a maximum V/C ratio for the ramp terminal that Is more restrictive than the V/C ratio for the crossroad, or 0.95 as identified in the ODOT OHP Policy IF Revisions (Reference 61. For signalized Intersections on arterial roads under OOOTJurisdictlon, the V/C ratio must be no greater than 0.95. At intersections where one or more approaches is maintained by a city or ODOT, the more restrictive of the agency's performance standard will be applied as stated in the Jackson County Transportation System Plan. Intersections within the City of Central Point and the City of Medford limits will be assessed assuming ODOT operating standards must be met. Study intersections which have governing agencies for more thin ane approach Include OR 99/7able Rock Road and OR fit (Crater Wke Nwy)/East Villas Road intersections. Rased on the direction from the Jackson County Transportation System Plan, ODOT's operating standards will be applied when analyzing these locations. Table 3 summarizes the intersection operational standards and jurisdiction administering associated with the existing study Intersections. Central Point Street Jurisdiction Map (Reference 71 was used to determine the jurisdiction of each study intersection. 24 Aimv-aA.ulahx Irc. anmm mrovd... a..aap,rene a,aaa ema. Table 3. Operational Standards for Existing Study Intersections FmJ.txl9d46 or.herzus I '"a flar,,' a E pine St Mon SbmOmd 11rtp0upwC5o.r5 ] 1-5 na Ramy a E 1. 51 0. voW wC s V.. 3 9enIMer Rd a E P1 5r Coon, Counry sndlurd V/CSO.% 4 Harorld Ad a E pin it Counry. Cb ul pryallud Cern, C"Pd1 VIC s 6% " LOS o or better 5 federal WaVa Nvndd flJ cod", nH of sod,C."'.1an Cm,y pular FW.1 Wry V/C50.%md LO50or EeRr 6 Teck Rad Rd a E VII. Rd Counry SbnelkM wC 5095 t ❑blit Rad Rd a0ldtlle Ad Count, SIa.Rud VICIRae a Tilt. RV* Rd a MmrlQ Rd C -M SMp Cnn.11m Hamrick VIC, asS 9 Tebke Rork to A R✓port Rd Cod no, Cry or Stop control on Wort, polo A".n VrC OM wd LOS O d, WA , 30 altldle Ada AN nLY ofaledford Ter SMp L¢Soar aeRer ll table Rob Rda OR93 0T ,CVunry W.Hodd Vic: SO.% ll DRU(C rLoi Hw)a EV1.1d aXR. COVnty swmaW V/C Sass EXISTING PEAK HOUR TRAFFIC CONDITIONS Existing peak hour traffic operations were analyzed for a typical weekday (Tuesday — Thursday) P.M. peak period (4:00 p.m. to TOO p.m.) and a weekend midday (12:00 p.m. to 3:00 p.m.) peak period. Existing turning movement counts collected in May and July 2015 were used in determining the existing operating conditions at each of the study intersections per jurisdictional standards. Figure 4 provides the imersectlon turning movement counts and summarizes the Intersection operational results for the existing weekday p.m. and weekend midday peak hour traffic conditlum. As shown in Figure 4 and in Table 4, all of the study Intersections operate at acceptable operating standards during the existing conditions weekday p.m. and weekend midday peak hours except for the Table Rock Road/Airport Road intersection during weekday p.m. peak. The Table Rock Road/Airport Road intersection Is stop controlled in the westbound direction. Under existing conditions in the weekday p.m. peak hour, there is high delay for the critical movement (westbound left turn) resulting in L05 F. Appendix "C" Includes the traffic operation worksheets for the existing traffic conditions scenarios. xlmtron •d.ononu a[. rmnprvpmr rano Pv.x,mem fnemvicendmom Tabled. EP1911ng PM and Midday PmkHwr Trdlk OpKatlarl9 Pr�e[t M5W6 a.mbe.ivss 1.Id fRNmp OEnt Plne Shoe[ PM Pok • 12 936 ppi MIO PnR 0 ]0.3 pl1 aer NJ - 3. L5 NB RamPP F54nrt _ _ PM Pok C YL6 Ohl OCT I Ma`P _ _ 0 iF.4 _ O'n _ 3. PeNMr Rwd l Fmt Pln StmA fcyryy,gry Rlppok B 10.6 Ris I. Ham(rck Pod L fart Pine 51nft PMM10 C l60 0_A_ Cumry,tlly _ Mgllek B llti n6O S. hdmlNYy&HamMk Pwd PM Pok MunM1..d • RA nN Cgaily, pry MIO Mak I Wo16Wuntl A TS OAS 6 Ta*Ro ROW 6 VNa "d[wMy PM Pok C 3M__ MIO Pok C N.6 Oil Imka . Road li 0Aud PMP<ak C 3?6 0.14],T _ Cwnry MIOPeak C_ IIS OSa 6 ietle Rod PoedBNanOd Peed _ _ PM P.M fartbooM C k5 OAl Cdlp MIO Pok EaPFOUW 0 Lis 0ffi 9. Tabellak Ppad•App rtRmE PM1Va4 �kM/ F n.i l/ Ginty _ MWOnk WtlbvNM C 156 0.]O lO.0kk9eRPof•Mryrt Rotl QYOf PAfPok Wesmavd C ]i2 Medldd Mq M1aY WdW+id a 10.9 0.11 -0.13 Cdnh Mq Pnk C ]3D U8 f1. tM62i WNhl C _ __ CBOT' PMPoek O KS 0.51 Cmunry WOhak C 3¢0 0.R ylotes The allWl momeee[b I.N. 2W Wgllw%UprtPyksonutl,' LOS=lselMLnie; Calry b.epotlW N N[wds p<r vekklm V/C Falb k Yflrcd ai vdlklRmapaay n0O wTM oieVbns tlK nombn M Mkln dkNM he Ne aurae OI IM roa]wav/Inkrx[1bn AMRtlw pok 15 mMuka of tlW pok M1w; and aaYeIIRIPaFgatn an bimaxnon WmraM Oabssks jYlOd[rlml NndiMi }0 xmeWn •AvalOtm, m.. �i�R1YP8 \EPYEM�! 16N P4l6\E�rBi.FFT YFN MIC811ESWf EPNESipFtT N �H V�IW MM1YIW �vBYEwM1f W�YYMti1M WM1M1! WwY�MM,xv wr.e�Mf Cmbd/d1It CO6Ka D[YelaplliM( /iyY[.[/IA)I6 snaa cwmno�, amx,zoss SAFETY HISTORY ANALYSIS Crash data ova Mable for the most recent five years (2009 — 2013) at all of the study Intersections was provided by ROOT. Crash data was analyzed to document recent crash types and severity at study intersections and identify crash trends if applicable. In addition, study intersections were screened for compliance with ODOT's Safety Priority Index System (SPIS) and 90N percentile rates using the HCM prediction model. There were no reported crashes at the two of the study Intersections: • Federal Way & Hamrick Road • Table Rock Road & Hamrick Road In total, there were 192 crashes between all of the study Intersections within the five year study period. Table 5 provides the reported crash type and severity at each of the study intersections. Appendix "D" includes the five year summary of crash data at each of the study Intersections. Tai S. crash Type and SavwRy (2009 -1023) K Study IntraeRiam LH�aanea/IAaR e 6 a c 1 0 ] a ) o b ].I-saaae�a/[raPR > 33 0 1 1 a 1 a 15 0 II 1r•Mimm"Isi 3 6 0 1 0 0 0 < 6 0 ]0 laYeka M/e TnSr 2 23 0 3 0 0 a 0 0 0 SA Il 0 b S. r•rN aYrarYeYM a a o a a a (0, 0 CTM 1• 01,61 wWM 11 11 s 0 0 0 3 17 to 0 Si I.TtlS1aMMaWw l 3 o a a a o 5 5 a Is aTMr btxM/NaMrhxM 0 0 2 9 6 15 00 0 5 2 3 0 0 0 a 0 0 0 0 0 0 0 a a 9.TMMII•d M/Ntawtaa 3 3 0 3 2 0 S 20. aYnoswoo rM 0 0 5 a 0 a a.tYad M/4M ]O.TMrarra M/Qr S2 17 13 3 0 1 16 11 0 ]1 2 0 1 1 19 16 0 ■ }pel a O 11 0 5 1 a ar Is 0 19 Nolu: V00=Pronrte Amr•W.Iv: il•Penunal l0lury Turning movement and rear -end crashes were the most common crash type at the intersections, accounting for approximately 82% of all crashes. Roughly half of the reported crashes were injury crashes. There were no fatality crashes. Four study Intersections were found to be In the 90" percentile and in compliance ODOT's SPIS. The four intersections include: • 1.5 SD Rari Pine Street, • Table Rock Road/W Was Road, OR 52 (Crater Lake Highwayj/yv Was Road, and • Table Rock Road/OR 99. ze aenho�aa+m�nm, mr. Section 4 Transportation Impact Analysis (en Vd PaMICm KopwbpaPnr Irar,RX1.W0G rmna{orteMm �mrxtMwlyb IXmEerMts TRANSPORTATION IMPACT ANALYSIS The transportation impact analysis identifies how the study area's transportation system will operate under build -year (2016) and future year (2030) conditions without and with the proposed Costco development in place. The impact of traffic generated by the proposed Costco development during the typical weekday p.m. and weekend midday peak hours was examined as follows: • Other planned in -process developments and transportation improvements within the study area were documented; • General background growth in the area was estimated; • Project -generated trips were estimated for build -out ofthe project; • Project trip -distribution patterns were derived from Costco membership, data, existing traffic patterns, a region wide travel demand model and a select zone analysis within Central Point were evaluated; • Buildyear(2016) and future year (2030) conditions were analyzed with the addition of site - generated traffic at each of the study intersections and site -access points during the weekday p.m. and weekend midday peak hours; • Operational and safety assessments were completed at each of the proposed site accesses and the intersection of Table Rock Road/Hamrick Road build -year plus project, and future year plus project scenarios; and • On-site parking standards and proposed parking supply was evaluated. PLANNED ROADWAY IMPROVEMENTS This section provides a summary of transportation improvements that are planned and can be assumed to be completed under the two future year scenarios (per agency direction). These transportation improvements have been Identified by the City of Central Point, Jackson County, as well as OOOT and documented in the City of Central Print's 2030 Transportation System Plan, Final Draft IAMP: 1-5 Exit 33, and Rogue Valley Metropolitan Planning Organization's 2009 - 2034 Regional Transportation Plan (Reference g). Under the direction of the City of Central Point and OOOT, KAI has assumed the planned roadway improvements listed in the Final Oraft IAMP: 1.5 Exit 33 based an the year of estimated completion, as well as all Tier 1 improvements (within the site's vicinity) listed in the City of Central Paint's 2030 Transportation System Plan. Tier 1 improvements have been defined as financially constrained projects that can be reasonably funded within the next twenty years. These Improvements have been classified as either short (2008-2012), medium (2013 - 2017) or long-term (2018 - 2030) Improvements. 30 aimeam a 4uodvtn, Ar. [entml Pogt Cosku 4velogmnt Tmiuportotlon hrpoctAnoly+tr Final Draft TAMP: 1-5 Exit 33 Planned Improvements P,o,MIl.G1I5 araser:oss The Oregon Department of Transportation and City of Central Point have identified and prioritized roadway improvements at and around the I-5/East Pine Street interchange. Based on the findings from the most recent Final Draft /AMP: 1-5 Exit 33 completed in May 2015 the following planned roadway improvements will be assumed. • 1-5 Southbaund On -Ramp: The description of the planned project includes widening East Pine Street beginning at the west end of the freeway overpass to add a second westbound left turn lane with up to 200 feet of additional storage. This project Includes the widening of the southbound on-ramp to create two receiving lanes that merge to a single lane. The estimated cost of the project is $1.7 million and has been designated as low to medium priority, therefore this project will be included the future year (2030) scenarios ofthis TIA. • 1-5 Northbound Ramp Terminal: The description of the planned project includes widening the 1-5 northbound off -ramp to add a second right turn lana at the northbound approach to East Pine Street. The second turn lane world provide an additional 350 feet of storage for to manage Queuing on the off -ramp that cannot be managed with igrul timing. The estimated cost of the project is $1.3 million and has been designated as low to medium priority, therefore this project will be included the future year (2030) scenarios of this TIA. • East Pine Street at Hamrick Road: The study verifies and calls for the implementation of Central Point TSP Tler I Project #216, which widens the west and north approaches to add a dual left -turn lane and mcand receiving lane. Central Point Transportation System Plan Planned Improvements The planned transportation improvement program prioritized roadway improvement projects between 2008 and 2030. There was no Tier I short term (2009 — 2012) projects that occurred an the study roadways within the site's vicinity. Listed below are the Tier I roadway improvement projects that will be included in future (year 2030) analyses. • Tier I Project # 213 — Table Rock Road & South Hamrick Road Intersection: Although the City's current TSP calls for a signal at the Table Rack Road/Hamrick Road, discussions with City of Central Point and Jackson County Staff have Indicated this is no longer a planned or desired improvement. As such, no signal at the Intersection of Table Roc* Road/sNmrick Rand has been assumed In fhb otwlyeh. • Tier I Project R 216 — East Pine Street & Hamrick Road: The project description includes widening the west and north approaches In order to add a second eastbound left -turn lane and second receiving lane. The project also includes restriping the northbound approach to Include dual left -turns and a single through -shared -right turn Is", In addition, the project includes restriping the southbound approach to include a left -turn, through and exclusive right -turn lanes. Identified as a medium priority, this project will be Included in the future year (2030) scenarios. a.. a 4mrloler, Mc. renno/vdn[<mko Gk ✓ebpmene Trvnlprtalipn lmpatt NNlyif PrynYplTI6 IXbErr }NS • Tier I Project a 218 — East Pine Street & Table Rock Road: The project description includes widening the west approach to add a second eastbound left -turn lane to help reduce queuing and minimize delay at the intersection. The project has been identified as a long- term project and will be included in the future year (2030) scenarios. • Tier I Project is 219 —Table Rack Road & West Vitas Road: The project description includes widening to Increase capacity by adding an eastbound lane and shared through -right turn movement. The project has been identified as a long-term project and will he included in the future year (2030) scenarios. RVMPO 2009-2034 Regional Transportation Plan Planned Improvements Table Rock Road Improvements: RVMPO, the City of Central Point, and Jackson County have identified significant capacity improvements to Table Rock Road between the 1-5 overpass and Biddle Road. Under Projects 821, Table Rack Road is schedule to be widened from a two lane crass section to four lanes and a continuous center turn lane, with bike lanes and sidewalks on both sides of the roadway from Biddle Road to Airport Road. South of Airport Road, Table Rock Road will be widened to a three lane cross section with bike lanes and sidewalks on both sides of the roadway continuing to the 1-5 overpass. Currently, this project is scheduled to he constructed in 2017. The project will also include the signalization ofthe Table Rock Road/Alrport Road intersection. Federal Way Extension: Federal Way is currently only accessible via Hamrick Road and terminates just south of the FedEx Ground height facility entrance. The City of Cenral Point Transportation System Plan shows the potential for a future connection of Federal Way to tie into the future signalized intersection it Table Rock Road/Airport Road. While the timing of the Federal Way connection has not been determined, the signalization the Table Rock Road/Airport Road Intersection will occur in 1017 with completion of the Table Rock Road widening. The extension of Federal Waywill be included in the future year (2030) scenarios. OR 62: 1-5 to Dutton Road Planned Roadway Improvement: Currently, OR 62 (Crater lake Highway) exceeds capacity standards. ODOT and the RVMPO has completed the necessary studies to begin the Oregon 62 Expressway project, which is a multimodal solution that will increase capacity and Improve safety along the corridor, a critical business connection for freight, tourism and commuters (Reference 9). The 4.5 mile project will run on the east side of the Medford Airport, parallel to Crater lake Highway, beginning at Whittle Avenue bypassing Commerce Drive, Coker Butte Road and Vilas Road before connecting back with OR 62 just north of Carey Road. The project is projected to begin construction In late fall 2016. For the purpose of this study, KAI has Incorporated the charge In travel patterns and growth based on the regional travel demand model for both future year )2030) background and total traffic scenarios. Based an the travel demand models, vehicular growth at the study intersection of OR 62/W Was Road will not experience growth in the northbound and southbound direction to and from OR 62 between the build -year )20161 and future year umsa�a,wpnom, �•r. cmvm vmnrm+rco c.vrmpment honepv,mttan lmprct Mw}'+h eyarauore Oc 4'Aus (2030) background scenarios as northbound and southbound traffic shifts to the OR62 Expressway upon completion. PLANNED IN -PROCESS DEVELOPMENTS In -process development plans were obtained from the City of Central Point. The in -process develapments to be assumed in this study Include the approved residential development for White Hawk. This development includes apartments, duplexes, and a 5.5 acre city park at the Intersection of Beebe Road and Gebhard Road. The project was granted approval in 2014 and has a design year of 2017. Site -generated trips and trip distribution information from this project was derived from the White Hawk Development Traffic Impact Analysis (Reference 30). BUILD -YEAR (2016) BACKGROUND TRAFFIC CONDITIONS The build -year (2016) background scenario analyzed haw the study area's transportation system will operate without the site -generated traffic In year 2016. Build -year background traffic conditions were analyzed for both the weekday p.m. and weekend midday peak hours. Background Growth Pates Traffic growth within the study area is expected to fallowthe trends adopted In the Final Draft IAMP: I- 5 Exit 33. The growth described in the TAMP used models prepared by ODOT's Transportation Planning Analysis Unit (TPAU). In conjunction with the forecasted growth of households, population and employment, a base year 2006 and future year 2038 travel demand model were provided by 000T. After review of the study area'3 model and previous studies a 2.0% annual growth rate was determined and agreed upon to he applied to existing turning movement counts collected at the study Intersections. Traffic Volumes The traffic volumes developed for the build -year (2016) background scenario reflect existing traffic counts plus one year of annual background growth and in -process development traffic. Level of Service Analysis As mentioned previously, all level of service analyses described in this section were performed in accordance with the procedures stated In the 2000 Highway Capacity Manual as required by the city of Central Point 2030 Transportation Systems Plan. Operating standards at the study Intersections were assessed based on the jurisdiction In which the study intersection is located. 33 xnM a,1vv[lab, W. O drb'CoaYa L' A000d n! rmnagrtuXon ImRerMgysla Intersection Operations Pro)taY19C16 O[Nhr X115 Figure 5 presents the build -year (2016( background traffic volumes and operations results at each of the study intersections. As under existing conditions, the results of the build -year background traffic analysis indicate that all of the study intersections arc forecast to operate at acceptable levels of seMce and volume -to -capacity ratios during the weekday p.m. and weekend midday peak hours except for the Table Rack Road/Airport Road intersection during weekday p.m. peak hour. The Table Rock Road/Airport Road intersection is stop controlled in the westbound direction. As under existing conditions, during the weekday p.m. peak hour there is high delay for the critical movement (westbound left -turn) resulting in LOS F. in addition, the critical movement Is also operating with a volume -to -capacity ratio of greater than 0.95 in the build year (1016) background conditions (with no traffic from the proposed Costco development). Appendix "6" contains the build-yeor (1016) background traffic operation worksheets. Table a. 111 Yat4Rt (1016) Background Traffic Operation Rawlb 1.1-5 Y Ren, a Mol Plne!i.. "a a 0!9 Conn MIO hY R Incc 6 .63 115 Na RNnp \ Rini PYn 9Me WOT pMgN C 111 0 11.63 RryO r01 a 15.1 11.41 3. Penlnaer RM a E.0 Plne Street Wim' Cwnty, FM NA a SIA o.fl WOhak a IT.I 113/ /.Wmrld Roatl\East Plre StrteC Co-ty'aryRD: a iaa a% A 8.6 0.56 S. FadnlWw\NenMA Roaa Cwnly.ahMboW A 5.9 M01 wrodund A 21 OM C 3]A o® R lo.0 664i Tad. Rock Pok aRlI RoM county f fO2 nl5 R 191 U]l S. table Roo RaaEa WmE4 Rwd County PM PerR EMbmod left C Shc bay MIO Peak Eutbolm]wk R 13,7 n41 S TRW Rod Road ANr, Iftad County M~+ ally/ a ~a UJIF MIO Pea; Wal c 16.a T2 all lO. Biddle Roel\alrpoRRoed Riot MaMord W6Round C 125 0.17 MIJ Pak WetlWund 0 1311 MIO 0.10 11. TagR Rook Road ■OR 59 Door, cbun "Moak_ C 16.I 0.73 moPak C AA o.62 U. OR 61 a UAW. R.W OOor, Co.. PM Pak O 48.4 on MIOYRd C 324 ,73 s rayu—u ...o.nR^nim nnnm.rvn. roar u n m.0 _"'"—,.•..— . pRRy ft dpdrt/d In wo.nds per h[dl;' VIC Radb H donned a v01d. bopactty nolo ROI dl.iRdl 1118 b., of yaNda dMdad byy'ha .MIW of the nodvnv/Indy Slondu01. thl RA 15 r,mltn p1 Nl pyM haur',aN Sold IN W.ldl.W, en Mtlrxabn bpl.N belt. lO fVllldkdlmradodwda. dmnnn A Som.' 4c. INMflN:K POnO! E %NESTTEET 'MYaWM1Yb _-.x.gRr FEI'Ef41 W1Y6 WHxq{ flab -q�WWM1� Yu.uYglr T.W£ MCN PDM f W N/i5 XCMO YY�YyWIYIW w�umw-q na i TAKE RCG IgMAEW2MMD N6eMWBq E PM5l7 IBM RYWse E P,1 4E2T a61MEP YCAo6tYWE nRB, gIiYYNtiY waYN NVegM�Wb Yux WY WYYgMM1Ywu NYxm� M1Y w�•YyWrrxv w I MTT 'hawole PDAO RUPR'wr w'Ino TnalE nou PDAnA ORx INMflN:K POnO! E %NESTTEET 'MYaWM1Yb _-.x.gRr FEI'Ef41 W1Y6 WHxq{ flab -q�WWM1� Yu.uYglr T.W£ MCN PDM f W N/i5 XCMO YY�YyWIYIW w�umw-q na i TAKE RCG IgMAEW2MMD TAlS 0.ZN fAW 6MMgCX PIIb TA&E RSJ(11pN0 {AIRCrtI(N➢ q'wYW iYMV W, WUF Wu�Iwa gIiYYNtiY waYN wwM1VWWr mY�ewb�•+ . • . w I MTT 'hawole PDAO RUPR'wr w'Ino TnalE nou PDAnA ORx onxnwv—Rs Y.YOY WPrw wwxaw�M1Y Y..wMr.Yw W+I.+xwq�r .. w. "N JIM js =r.Y "'a BUILD-VEARJZOIB)aMXGROUNDTRAFFICCONDMONS FIGURE WEEKDAY PM AND WEEKEND MIDDAY PEAK NOURS 5 =...d== CENTRAL POINT, OPPGDN [rnwl Point C.I. lXNop,en[ hgkvLlANb TrmpoRRlon lm4utt Malik ORNer IDtS COSTCO TRIP GENERATION DATABASE For the past 15 years, KAI has maintained a database of traffic data and travel characteristics for Costco Wholesale. The database contains transportation information such as trip rates, this type percentages, and parking demand for Costco locations In the United States, as well as Canada and Mexico. A large portion of the data Is from existing Costco sites In the Pacific Northwest. The data base Is updated and refined each time new Costco traffic counts or information become available to KAI. In order to best evaluate the anticipated transportation characteristics of the proposed Central Paint Costco development, it was agreed that the Costco database information he used In this TIS since it provides use -specific data that most accurately represents the anticipated traffic characteristics of the unique development type. Costco has Invested significant effort Into developing this site-specific trip generation database for both their warehouses and their fuel stations because of the unique cha racterustics of Costco customer travel that exists due to membership requirements and the nature of Costco sales. Them unique elements apply to the trip generation and distribution for Costco warehouses, Costco Gasoline fuel stations, and the interaction of trips between the two. COSTCO TRIP GENERATION CHARACTERISTICS The date collected at existing Costco developments in Oregon and Washington indicates the trip generation characteristics summarized In Table 7Including total trip ends as well as pass -0y trips ends from the surrounding street systems. Generally, trip generation characteristics of Costco warehouses also Include diverted trips, however, due to the location of the proposed site and In distance from I -S, OR 62 (Crater lake Highway) and other major facilities, h was agreed with the agencies that diverted trips would essentially be considered new trips through the outlined study intersections. Therefore, a specific diverted trip reduction was not applied in this study. In addition, the pass -by trip rates used in this study are significantly lower than thou found at most Castro locations. Surveys at existing Costco sites typlally demonstrate pass -by rates in the range of 30-35% during the weekday and weekend peak hours. However, again due W the relatively low volumes currently on the adjacent streets to the site, pass -by trips were constrained to no more than 15% of the adjacent street volume thus resulting In pass -by rates of only 7-15%. Tabh 7. Central stint Cortes gavelolmesi t Trip generation Estimate Toth Trip Doiyy]p 80ro 6,070 11053 in 335 1,465 las no 163s6rnavo Endsl Ppu-DY VM Frdr PM -0,Ia! -las -135 -155 ]5 d7 IlA i0 _V0, 1511 IM, air"Q) ev MrTMeq. I lana am s,]ss 1 m I W 1 4" 1 IAa I ea M 30 xHhkon 4.3Ya M'lor. trnNVl Vwfi[Cun[eMwlopnenr PyMNliVi6 Trwn{a rtOtlorilmµc[MoryYi 0.Yab,]0]5 As shown in Table 7, the proposed Costco development is estimated to generate a total of approximately 10,670 net new trips on a dally basis, 90C net new trip ends during the weekday p.m. peak hour and approximately 1,365 net new trip ends during the weekend midday peak hour. Pass -by Trips A key trip characteristic considered was that of pas by trip capture. Pass -by trips represent trips that are currently traveling on the surrounding street network for some other primary purpose (such as a trip from home W work) and stop into the site en route during their normal travel. As such, pass -by trips do not result In a net increase in traffic an the surrounding transportation system and, typically, their only effect occurs at the site driveways where they become turning movements. Again, based an existing traffic volumes on Table Rack Road and Hamrick Road, the pens -by trip reduction has been reduced to a maximum of 15% of existing weekday p.m. and weekend midday peak hour volumes along these roadways. This Is compared to the 30-35% pass -by rate documented from surveys at existing Costco developments. We believe this represents a very conservative but defensible approach to the trip generrtion analysis. TRIP DISTRIBUTION AND TRIP ASSIGNMENT The trip distribution pattern for site generated trips was developed using zip code data from current memberships at the existing Costco warehouse located on OR fit (Crater Lake Highway) in Medford, Oregon, as well as from the existing traffic patterns and major trip origins and destinations within the study area. Localized trip routing through the study intersections was assessed based on the land use, traffic counts completed at the study intersections, and general patterns in the site vicinity. Additionally, ODOT provided KAI with a base year (2006) and future year (2038) regional travel demand model, as well as a select zone analysts fur dw traffic analysis zone that the site will occupy. The models and select zone analysis verified the trip distribution patterns and site -generated trip assignment for the proposed Costco warehouse and fueling station. Figure 6 illustrates the trip distribution throughout the she's vicinity. Baud on the trip distribution throughout the study area, Figure 7 and Figure 8 present the site -generated turning movement counts at each of the study Intersections and site accesses for the weekday p.m. and weekend midday peak hours to and from the proposed Costco slte. Appendix "F" Includes the boar year (2006) and future year (2038) regional travel demand models, as well as the nlect zone analph provided by OOOT. Olalhan a,luo 1m lrc. camniv,"cuse.. IM o�roaa.zas Ik se Pus¢ n¢ wrE sneer w.uww M1aw. w..�r�r.� 3 S' Vii. I Isre PMW¢e ¢PUEs�T wr..a.wwaa,a ..,....s... Yexwnen PNonEnxEsrPrfT •-w w.e,..a. M1MIPMK PdLEEryMEaTRFf RGExAL WdYk11.W11KK PND TknLEfWCKPMO dYINlMN1D w.eyw M1nuw waw.f�W r.a wwaxa w.+arYWawa wWgwpap. .Wars I • •w • �1 \ +enLC PocKxNoneKaat ww ran=Poe mr,ok wxpcKPMD neLEPocKPNDk uPwm no.o w.xww M1a,w. n.�ewr..P va...wM1. w. wxw M1a w+n wM1nro, w.-xxe,M1- eioaErowePxwr�Tlaw Tk¢LE Poe Poe➢��MW wun wvusaoo wryrx M1wx.. wmr waw wM1wl� .Lun... wanvr•warod ..wxwM1a •� i I • ili II\ ` • $ITE-GEMEMTEGIRIPS FIGURE WEEKDAY PM MIO WEEKEND MIDDAY PEA[ H UI CENTRAL POW, MGCM 7 WEBi NAM KIpM dWKMY�CKR6rY FASfMW11GI RY.O [WY6YM11IGK MYO WY.r'PY MV NY YgrPrb M1Y NtiY'PYI�t Nv tlrYYUYPoi RDW,LWAY.ACgTI.Y uYprY r�uuv re+rvsrr f@igp W.Y. iyJIIM[9i DWY �1F Yu wv Wrr� nu •1- ! j J TMIE IgLY IOIy a MAl1 EA4I pWy wrwrrYv�xar WYwiYdrnn TAMEN41to.� xrAsrwrr SITEGENERATED TRIPS AT SMgCLES5B l EIG8DFE WEEKDAY PM AND WEEKEND MIDDAYPEAKND QNTM MINT, DREWN �7 1 f@igp W.Y. iyJIIM[9i DWY �1F Yu wv Wrr� nu •1- ! j J TMIE IgLY IOIy a MAl1 EA4I pWy wrwrrYv�xar WYwiYdrnn TAMEN41to.� xrAsrwrr SITEGENERATED TRIPS AT SMgCLES5B l EIG8DFE WEEKDAY PM AND WEEKEND MIDDAYPEAKND QNTM MINT, DREWN cn,uwxonn rcrtro unmp,�.m a,yRrassurs ra�,nm.mao� imw,rn„aN.h aroee.zass BUILD -YEAR (2016) TOTAL TRAFFIC CONDITIONS The hulld-year (2016) total traffic scenario analyzed how the study area's transportation system will operate with the site -generated traffic of the proposed Costco development. Any impacts due to site - generated traffic will be documented and mitigations will he identified at the impacted study Interjections. Traffic Volumes Site -generated traffic volumes (shown in Figure 7 and Figure 8) were added to the build -year (2016) background traffic volumes for the weekday p.m. and weekend midday peak hours (shown in Figure 5) to arrive at the build -year (2016) totaltoffc conditions shown in Figure 9. Intersection Operations Figure 9 also summarizes the intersection operations analysis far the build -year (2016) total traffic scenario. The build -year (2016; total traffic scenario Identified two additional Intersections as not meeting operational standards compared to those not previously Identified in the buildyear(2016) background scenario. Table 6 also presents the build -year (2016) total traffic operation results at each of the study intersections. All of the study intersections operate at acceptable levels of service during the weekday p.m. and weekend midday peak hours with the exception of-. • 1-5 Ng Ramps i East Pine Street exceeds ODOT standards (lane group v/c ratio 10.85) with the northbound right -turn lane group's v/c ratio of 0.87 during the weekday p.m. peak hour. Table Rock Road 6 Airport Rood, as under existing and 2016 background conditions, continues to operate at a LOS F during the weekend p.m. peak hour. However, delay at the Intersection Increases due to trips accessing Table Rock Read, During the weekend midday peak hour, site -generated traffic causes delay to increase by approximately 31 seconds, causing the level of service to drop from LOS C to LOS E. Riddle Road f Airport Road experiences a higher delay for the critical movement of the westbound approach, dropping from LOS C to E during the weekday p.m. peak period due to site -generated traffic. While no site -generated traffic is expected to be coming from the westbound approach, the delay increases because of the amount of vehicles making the northbound left at the umlgnaliaad intersection. Even with the site generated traffic, the intersection Is operating at a very low volume -to -opacity ratio of 0.451n the weekday p.m. peak hour and 0.14 m the weekday midday peak hour. Kati a bKK., Mc 4ntlW Pdnf CWHe IXVelognent P/o/atN 15O<6 ]rtnfpaROXon ImpxtAnalyps IXbM/3%5 T6hk 4 Guild -Year, (1U16) TOM Traffic Condilitapl 9.6 Lal 1.453B,4mpi F+R PIne 3]nR OWI PMPak MID Pnk 9 a 9.6 Lal all am _ 1.45 xe Ramp 6Ees[PIne 3[rM m0~ C 110 0.n pWT Map PeaX C llb Q6} 3. PenanRer RoW 6 U. Pin Areet Cmm[y.11tu MUPnk C__ C _ 11b_ llU 074 0. I. NemlURoediFaA PMe Sbee[ PMPR✓1 C ml ml all Ulm, otY Mp Pok a alp S.RdmIWaY6 HamrkXPoad lva. R.nun and a IQ9 all tbum], llq _ Mlp Peak Wm kmd B ]]➢ a15 _ fi.Tabla Rauk Rui YNW Rad mA PakF C 31.9 aM Cweq MIp PNk C nD am ]. TW. RN MRI I MI Rwd 10'3 C 559 Oil coaly — C V3 ao a.hbk Ru.4Nall HamhYRnd PMM1A FasabaMtela E ei{ GA Coxrty Mlp Pnk nRblad leR C liV 0.35 9. Table Rcd MWnkkpurt"d M00� �� P a]�.0 al.M Cwnry r MpPtlR lyplboeN E Q.! all 1a. aldNeRwtl OglmwlR�d C MEEkM C ]a3 yelpuol < Modlwad Pnk W all. 31 TagIeRM Ravdlol93 _ LUpI, PMPmk lm 0]5 Cwnty _MNPok _._____ [ L1 _ ]]. glfile Fial Mksgad �1' /RIlbY p 51 1 1 am CuaM MNPei 3i3 Mp.]5 n Xmes: lire pRlol monrnen[hrtpaled faratl ublNa4ed FkroftlMs6+ledm lM ]0.tl NlpfixvP (epa'M Mnrnr: toi'leMmSenb: IINY k r+porltl In nealdl per nNOe: rVIC Ra[M b {IM o RMktsoywllY fab Mialr obiR+a 1M nuaYr N aMY[ks de1dN by Ne okecM d Me rwdrnYAnfYrockbn durm6 dlupeak ss minem daepok Iv.: w.d 6ekl �RRb ltlaa+an I.anwmon grweux h.bw i[s prrlaeklbn•smnda.do ,a xleeRon s A,amrpm, Inr. CeMrv/ Pots, C+srcu OrvelnP^<nI P.N .r A ,,tp Mllcn hr c,fnolY[I[ IXhd111a15 Site Access Operations There are six proposed driveways accessing the Central Point Costco site, two on each of the site's bordering frontage roads. On the west side of the site, two full accesses are proposed with movements accessible to northbound and southbound on Federal Way. A full access (closest to Federal Way) and right-in/right out access (closest to Table Rock Road) are proposed on the north side of the site with access to and from Hamrick Road. Finally, there are two full accesses proposed on along Table Rock Road, The southern -most driveway on Table Rock Road would be the primary access for vehicles to access the Costco Gasoline fuel station. Table 9 presents the traffic operations at the proposed site accesses. The governing agency s standard is determined by the roadway in which the site access Is located. Figure 10 also illustrates the build -year (2016) total traffic conditions at each of the proposed site access during the weekday p.m. and weekend midday peak hour. Appendix °G' contains the buildyear(20161 total traffic operation worksheets. Table 9. Wlld-Veer(20161 Total Tref c Candlpane 0 Siq Accsmel 11R,eM1lWryalloMeak DrreWry all [e.12., PMrpk Mla Pesk waWuuM WaIEWnO 0. I k.l I P! am 014 14 Ward wit Is Off., Cllyor Centel PoR, IMM. WatouN a1 on Mla Peak WWom! ad Q..15. Wee, Ho,"k Hoed LMewry a Pomdck Road ONO Cants Paint PM 11151k NnxOctxe lel: a9 0.11 Mla PMk WoUrt—xi lo3 PA OH 11. EM Haolk Ro. Rentlrot1k,W oul"on'ckRoad sand Orn'nl Paint Mats NonaWunC [ 9.1 010 MloPak NortM1awndi t 93 01s 17.iable Rock R� a Norreaat De Jackson Cc.t, PM Pak kaR4ound MR YS] 051 No Pak Paetaoundlaa M3 01. is 11,1. Roc Rosi k tooth -act UN., Lada- faun PM PM eaabound 116 adl MlaPeak Doti c "A Ou ,rwcnna�movemenm eeponee.ar ni unq�nunu nnu>awmn recv vn.ue.......nen..s.y���r •^"••^ou_.a......... I—, -- reported lo,econdo per e.Hd.. ' V1CRaao Is deRmd u,er,lrk-iawic y aRo wN[h uim4tes tie number or Mldes dluided by the op fly or the medweyPril e.obn dutlnk not peek 15 .1,c. cf the peak hour; eM bN wM aaMa Indlaln en IMttser.,Mn olwetlnR below iu Julndidlad, reneere, As can be seen from the table and figure, a of the site access intersections are projected to operate at acceptable levels -of -service and volume -to -capacity ratios during both the weekday p.m. and weekend midday peak hours, with the exception of the Table Rock Road/Northeast access. Note this is assuming this access is a full movement access and no improvements to Table Rock Road are completed. Under this scenario, the critical eastbound left -turn movements at the Table Rock Road/Northeast access is projected to operate at LOS F during the weekday p.m. peak hour, however, It Is still projected to operate well under capacity and meet the County's operational standard with a volume -to -opacity ratio of 0.52. This means that while drivers wishing to make a left -turn out of this location will experience delay, they will still be able to find sufficient gaps In the traffic flow along Table Rock Road to complete the turn. Again, this Is a near-term scenario for the first year of opening of the Costco development befare the Table Rock Road widening improvements are constructed in 2017. WoMix,anaormm, W. WETINMIYf1GCLMb�IN'wEKFYO 6V4f WYMY(xPV R'WY bNR KP.Mo / W�Y�w M1EMb MYy M1b M�1wtitiNv� YYb wi A •;;= �� J • ,,_, ,_ !, l( if I.. � wwb9K WAV 110'TMFJPPYY � www. ww.aewWlw i• � .'�;� r5 R �4 1ANRRm�RowawRlwasrowr I\ � I✓ 1 I �° K � I xd� ' �\ \ gpfxNWAVA �Towr �l i / .` wWYyw1MFW MICw M T 1 i I BUILD-YEAR(20161TOTAL TRAFFIC CONDITIONS ATSfTEACCEiRES FIGURE I m WEEKDAY PM AND WEM=MIDDAY PEAK NOUM 10 ����� CENTULPOINT, OREGON CenfM Poln/ Wno 0•wlopmen[ PmJe[tN1.MN6 Trynap[RM. on bn(vctl MlY+I[ 0.'6ar/]O15 BUILD -YEAR (2016) MITIGATIONS This section provides a discuss In non mitigations for the impacted intersections under build year (2016) total traffic conditions. As outlined above, the build year (1036) scenario Identified two additional intersections as not meeting operational standards compared to those not previously identified in the build -year (2016) background scenario: the 1-5 NB Ramp/E Pine Street and Table Bock Road/Airport Road intersections. Mitigations for both these locations have already been identified through previous planning efforts by the City of Central Point, Jackson County, and ODOT. These are discussed below. Appeadix'H" contains the build-yeor (2016) mitigated traffic operation worksheets for the intersections outlined below. 1-5 NS Ramp 6 East Pine Street M111401an 5Re-generated trips increase the northbound right -turn lane's v/c ratio by 2% during the weekday p.m. peak hour, resulting in a v/c ratio for the lane group of 0.87. This is greater than ODOPs standard of a maximum v/c of 0.85 for each lane groups at a ramp interchange. The need far additional capacity for this northbound right -turn movement has been previously Identified in the Final Draft TAMP: Exit 33 study which calls for the widening ofthe 1-5 northbound off -ramp to add a second right -turn lane at the northbound approach to East Pine StreetThesecond turn lane would provide an additions 1350 feet of storage to manage queuing on the off ramp that cannot be managed with signal timing. Based an the assumed parameters of the project, this project would have the following benefit at the 1-5 NB Off - Ramp intersection: • The northbound right -turn lane group would operate with a v/c ratio of 0.49 In the build - year (2016) total tnffic scenario during the p.m. peak hour with the proposed improvements stated in the Final Draft TAMP: Exit 33. COOT and the City of Central Point are currently in discussions to determine Costco's appropriate proportional fair share contribution to this improvement as mitigation for the site generated trip impacts. Table Rork Road 6 Airport Road Intersertlrla Improvements to the Table Rock Road/Airport Road intersection are scheduled in year 2017 is part of Table Rock Road widening. In addition to widening Table Rock Road at the intersection, a signal will be added to the Intersection. The details of the signalized intersection have not yet been finalized; therefore, mitigated amumptians were based on the project description of Project# 821 in the RVMPO RTP. The signalized Intersection has the following impact: With the addition of a signal, the level of service and delay improves signlBcantly during both the weekday p.m. and weekend midday peak hour. Based on a 60 second cycle length the Intersection operates at l05 A with an average delay of 9.7 seconds per vehicle and a v/c ratio of 0.51 during the weekday p.m. peak hour. wl RlMhana.t/otlo b, Irc. 4nVaI PoMr Cn,rtn0Mopmen[ PryeerllA'K irviuGartonm Mpurra,wMY omnraass • The westbound approach Improves to a LOS B with an approach delay of 15.4 seconds per vehicle with the signal, compared to LOS F and an approach delay over 100 seconds without a signal during the weekday p.m. peak hour under build -year (2016) total traffic conditions. This intersection is an existing deficiency; however, given that this Improvement is not currently scheduled until 2017, Jackson County and the City of Central Point are currently in discussions to determine an appropriate contribution to this Improvement as mitigation in the Interim for the Costco project. TABLE ROCK ROAD ACCESS ALTERNATIVES Even though the build year 12016) analysis showed that all of the site accesses will be ableto operate as proposed upon site opening before the Table Rock Road Improvements are constructed, an evaluation of access alternatives for Table Rack Road was also completed to compare how temporary Improvements would Impact the access operations In the imerim until the Table Rock Road widening Is completed in 2017. The accessacenarlos compared were: • Build Year (2016) Total Traffic Conditions (i.e., Full Accessto Table Rock Road) with Notable Rock Road Improvements as summarized above) • Build -Year (2016) Total Traffic Canditlons with Temporary Table Rock Road Improvements (i.e., temporary widening of Table Rack Road along the site frontage to provide a center left - turn lane until the uhimate widening project is constructed) • Build -Year (2016) Total Traffic Conditions with Restricted Right-In/Right-Out Site Accesses (restrict Table Rock Road access to right-In/right-out only until the ultimate widening project Is constructed) Operational Comparison Table 10 compares the access operational results for these three scenarios. Also Included for comparison are the operational results for the Table Rack Road/Hamrick Road intersection which does change depending an how the site's Table Rock Road accesses are configured. 47 vff,h-4 auutlum. mr. Cenrrol Po/rat U+KO Mrebpment Pr%srF19016 Imrnprtatlon prpoctlnvlyrl> arml rias Table 10. Table Rock Road Access; Alternative Comparison nda a Hasdd to Aloes vdida Iu—dg bae from r. .. la make atraosaw gap arvparn mMaavar far Na kGNanaUi imps.e opueora m LO9 & 33.]h'uh and vloOSa N Mwaddrypm. peak FwrMW LO3 P, x7.0 a/wM1, Mya-0.Apin M>radwd siddrypak Mw. The following mnciwions can he drawn from the comparison in Table 10: • Assuming full movement access and no improvements to Table Rock Road, the eastbound left - turns at the northeast access to Table Rock will experience relatively long delay (resulting In LOS F) but the access will still operate well under capacity and meet the County's operational standard with a volume -to -capacity ratio of 0.5; during the critical time period. • providing temporary widening along the site frontage to provide a temporary center turn lane will allow all Table Rock Road accesses to operate acceptably as full movements until the ultimate Table Rock Road widening Improvements are constructed in 1017. • Restricting the site's Table Rock Road accesses to right-in/right-aut only will allow those accesses to operate at acceptable levels of service and volume40-capacity ratios. However, R will add additional left -turn movements at the Table Rock Road/Hamrick Road Intersection thus resulting in over -capacity and LOS F conditions at that location. This Impact could be reduced by adding temporary widening around the Intersection to provide a northbound left -turn lane as well as a center refuge area north of Hamrick to allow vehicles tuming left from Hamrick to make a two stage gap acceptance maneuver for the left -turn (will Improve operations to LOS E and v/o0.58 in the weekday p.m. peak hour and LOS F and v/c=0.80 in the weekend midday peak hour. N Wdx da Pv,Ad•A IM. Pax M1PeounduJt a 414 am A. TaCY RucYAOW aXamrkk MadJsVmi CwMy MID Pa•k raa@PunaW C na 0.35 1]?age Ao[k Aaadf NONent /arkmn PMPNk baMounalrt r 71.1 all [_. MIO Pnk Fatlkound Inde a Y3 am to iabb Rork Aoa0f5ouNnd luwdn FMMk FaaMund c 0.5 C12 miww C ROD, k sadboudd c 13.0 0.12 lduon FMP•ak pMcu•dlde c 13.7 0.0 a. Tanta Auk Awd f Hamrldt Road Q.q MIO Fuk eadamuiMllt a lU OSI 17.1Mback"da NorNUR Itlaon FM Mak 4alleuMlR C me due crM1 U^ MID Peak Faaakowd bR c 195 a, la Tlale Aad Poada SoutM1wt LWN rMM tuaadund c 131 0.0 Or C•uM "DFn1 radaowd 6 13A 0.]0 aTMAwkbadf NamrMRwtl' kande. FMMk fink UR F >N.0 >to Caw kb Pelf baMMN F a!L >1.0 17.T2laaod Radf No .W Moen PM IaaA W!Sg ldt C 1. 093 IM Cou MNFaw PnMurdkaft I A9 a.3a Sa Tab, A¢k Aotl A SMhaaat Mwn PMMII Maurd I Mk I O.la adw•ed Cw2Y I MNPaak I etldudd I a 1 13.0 1 00 No: I Ndt Adding bmvon wldcLv arwnd M jr Ton to Vrd eafiM and leRtum km uadi 0 a at M aafiwe area nda a Hasdd to Aloes vdida Iu—dg bae from r. .. la make atraosaw gap arvparn mMaavar far Na kGNanaUi imps.e opueora m LO9 & 33.]h'uh and vloOSa N Mwaddrypm. peak FwrMW LO3 P, x7.0 a/wM1, Mya-0.Apin M>radwd siddrypak Mw. The following mnciwions can he drawn from the comparison in Table 10: • Assuming full movement access and no improvements to Table Rock Road, the eastbound left - turns at the northeast access to Table Rock will experience relatively long delay (resulting In LOS F) but the access will still operate well under capacity and meet the County's operational standard with a volume -to -capacity ratio of 0.5; during the critical time period. • providing temporary widening along the site frontage to provide a temporary center turn lane will allow all Table Rock Road accesses to operate acceptably as full movements until the ultimate Table Rock Road widening Improvements are constructed in 1017. • Restricting the site's Table Rock Road accesses to right-in/right-aut only will allow those accesses to operate at acceptable levels of service and volume40-capacity ratios. However, R will add additional left -turn movements at the Table Rock Road/Hamrick Road Intersection thus resulting in over -capacity and LOS F conditions at that location. This Impact could be reduced by adding temporary widening around the Intersection to provide a northbound left -turn lane as well as a center refuge area north of Hamrick to allow vehicles tuming left from Hamrick to make a two stage gap acceptance maneuver for the left -turn (will Improve operations to LOS E and v/o0.58 in the weekday p.m. peak hour and LOS F and v/c=0.80 in the weekend midday peak hour. N Wdx da Pv,Ad•A IM. Ce.rypl Polnf (gKOOMIoPmmt TwJportvtlon AnWa MurYs6 P"a'za046 0.YoEn]WS As requested by the City of Central Point, the operations of the site accesses to Table Rack Road in the year 2017 once the Table Rack Road widening improvements are constructed were also evaluated. These were evaluated to compare operations with the accesses as full movement accesses and as right- In/right-out only accesses. Table 11 summarizes the operations of the Table Rock Road site accesses in the year 2017 once the Table Rock Road Improvements are In place. Table 11. Table Rod Road access Operadons In 1017 a.iW.natlN•4aN•mNd.nora Mme• caste MM aWilWy n.N c Iso o]a aeDPnw vM r.w Bawwrlalt rrrwal.N a c 13a W" DL av Ir. T.el.Mneneaxna..n DwWliv .soar 17 mTbkawaA D,aw cw,xi m MIDPW I ftM a ll2 O.Dt a. T4tla MCRRRMaNir'A.Ilwd MdYan Caunl � Fddwad LLn D 35.0 D!4 mftA FWW,If Y r Safi _ 0A I7. Tile Me,Rwaa C41wi N lM[ a 114 0]4 MDw EuE.WfM a 11.9 017 I1T" RRRal afawie wkewn Mian Cann PM rwl fl0owd • f1] am WDvnR radaanw 9 107 00 The following conclusions can be drawn from the comparison in Table 11: • Once the ultimate Table Rock Road widening improvement is constructed In 2017, all site accesses to Table Rack Road will operate a good levels of service (LOS C or better] and volume-to-apschy ratios (v/x0.21 or better) during the peak hour periods assuming they are full access movements • The accesses will also operate acceptably as right-in/right-out only accesses once the ultimate Table Rack Road improvements are constructed, however, restricting those access will add additional left -turn movements at the Table Rock Road/Hamrick Road intersection. The additional left -turn demand will cause the critical eastbound left -turn movement to go from LOS C and v/c = 0.18 to LOS D and vis = 0.54 In the weekday p.m. peak hour and LOS B and v/c = 021 to LOS F and v/c = 0.75 in the weekend midday peak hour. Safely Comparison In addition to the access operations comparison outlined above, the predicted safety performance of the accesses under the various alternatives was reviewed. A safety analysis was performed for the Table Rack Road accesses using the predictive crash methodology from Chapter 12 of the Highway Safety Manual, with adjusted crash calibration factors from ODOT's, Calibrating the Highway Safety Manual Predictive Methods for Oregon Highways. The accesses were evaluated as unsignalbed Intersections (since no specific safety predictive functions are provided for accesses). The analysis looked at five scenarios: ro awlnn a.u.aaw, rM, lnruralouon lmpo[tAMV+6 • Table Rock Road as Two Lanes with Full Movement Access • Table Rock Road as Two La nes with Rl/RO Only Access • Table Rack Road as Three lanes with Full Movement Access • Table Rock Road as Five lanes with Full Movement Access • Table Rock Road as Five Lanes with Rl/RO Only Access vmxePlsv4s ax•drmss In order to predict crashes at right-in/right-out intersections, head-on collisions and angle crashes were omitted from the prediction methodology to represent RIRO driveway. Table 12 summarizes the results of this evaluation and safety comparison. Table 12. Table Rack Road Aetaa Predictive Safety Canpadsan rb paPaawaoN.wa oas a.0 on Tatl•Iba buTs•! 0.16 oA3 OA9 TwP.wbrero-.r�. T•M•Poo RuNTb�wne o.a O.la oal 03T am 053 r.aYPaansl/aauaw•n 010 0.10 030 TOW AnnurlMAnaM fiwlw 0.a• 05a as nbY nod PadMaraaa 0wr 0.16 0,31 VAN l.d•PahA /]ouMurt OM' O.nl a.la .As realannwawaieriwrw Tb4 and vs, 0% 0.16 0..0 053 0.16 0.41 taaY Pao flo•a(SoulPe•R0W 0.11 011 0.18 nW am�.regelarurl. irhb PaaA 21.a on 0.11 ave 014 an 056 TMI•Pad Potllsouaurt0 0.01 W. 020 iw•I annue lNlOM 6wMr 0.111 as as Interpretation of the predictive safety results is complex. These are not absolute numbers and Instead represent more of the probability for crashes to occur. In addition, the agencies must weigh the results of the safety predictive results with those of the traffic operational results as there are tradeoffs, to each. so Nrwhan a.W afx'l¢. amorroim av¢o a..mxme�r tymxtsws no,,.x,,,tma�.mpxr�norya. ozme�zozs Providing full movement accesses to Table Rock Road in the near-term with its current two lane configuration shows the probability for 1.2 crashes per year to occur comhined at the two access points. If these were restricted to rlght-in/right-nut only driveways, the safety prediction lowers to a probability of 0.93 crashes per year (about a 30% decrease In probability). If temporary widening was provided in the interim for a two-way left -tum lane along the site's frontage, the probability would lowerto 0.76 crashes peryear )about a 3016 decrease In probability) The safety predictive analysis also shows that once the ultimate Table Rock Road widening improvements are in place the safety, prediction lowers as well to 0.77 crashes per year even with maintaining full movement accesses at both locations. FUTURE YEAR (2030) BACKGROUND TRAFFIC CONDITIONS The future year (2030) background scenario analyzed how the study area's transportation system will operate without the site -generated traffic in year 2030, representing a 15 year long-term future condition at the study Intersections. Future yar traffic conditions were analyzed for both the weekday p.m. and weekend midday peak hours. The future year (2030) background scenario includes the planned roadway Improvements and land use developments previously mentioned for the build year as well as other planned Improvements that are expected to be in piece by the year 2030 such u the Table Rack Road widening and the Table Rock Road/Airport Road inlersectlon signal. Appendix "I" contains the future year (7030) background traffic operation worksheets for the intersections outlined below. Traffic Volumes The 2030 background traffic volumes reflect existing traffic taunts plus 15 years of annual background grawth and In -process development traffic. Volumes along and accessing to and from OR 62 (Crater Lake Highway) were not grown by the annual growth rate due to the expected completlan ofthe OR 62 Expressway project, The future year (2038) model provided by ODOT shows that daily volumes along OR 62 do not increase when compared to the base year (2006) volumes. The 2030 background conditions traffic volumes are summarized in Figure 11. x elva awnnm rrc. lass vAuvs iE vME sTNan 'MwkMPYip\Nu W�MYgps .'xsgiY m D a � M ( 'IIWI�L1/ 1 �a rve Awvs E E m�smEEr WiMq MtMW WanYleib r.e vsMurica Aowo e c FMEsiA�� Wnury sxwWv .. • m1' Y�wpl nv n44 e1MAAIGi flOI➢6EPIMM �i �Ef P.�Fw iFIEP.LL W.tY i1WIRQ.NM W+),PYPw+v wWYmp� w .'xsgiY m D a � M �E AaY flan s elov.E roan areYwn\w� w.enYYpr,\ • D �A M It / .t .. D T.., � roa ronoe nwuwrx rmno WY\gwP.+,r wYmaYrv.. r..<EA�AaoeoAoo • .. D iPdE flQT roes 5 NIWA{AOW Y. Y... W�Yb WYy nY FUTURE YEAR ("M) RACKGROUNDTRAFFIC CONDITIONS vlcuflE WEEKDAY PM AND WEEKEND MIDDAY PEAK HOURS 11 CENTRAL POINT, OREGON cv,".1 soft tbarco Wwlopmen[ Pryrtta ROM nonapartan1.lulme.]o intersectlon Operations Figure 11 and Table 13 present the future year (2030) background conditions operational results at each study intersection. All of study intersections operate at acceptable levels of service and volume -to - capacity ratios during the weekday p.m. and weekend midday peak hours with the following exceptions: It Hamrick Road A Ent Pirie Street operates with a v/c ratio of >1D during the weekday p.m. peak hour w fiddle Road At Alrpart Road (as under the build year conditions) has a critical movement which operates at LOS F during the weekday p.m. peak hour although the movement is still operating under capacity with a v/c ratio of 0,55 TOW 13, FD7•R Yam (7030) BUIWwnd Tr•IRc OPaewtorr 1.1-556MIPa Pat Plne street coon PMlrek Mlohat • 103 an' • Il5 D.H L fS Be A.mOa[.none wat P"w" C 5D3 -D'm Door wopei Is 173 — ask 3.1WIrya Pet6a EeRPlne Area anon � PM NO e D3 0.A ctv,,'r+ry rMIO PPi IN1ai _ _ ___ C O lit all WS 6.WTNk APeta far Plna SVeR CulutY. mV MIDPei __ B til 0.A a" _ s.F .i M,a HamM KaJ PM Pak NaMMtea A 13 Dq9 _ rcuaY•np MIDPeM1 NwNCwntl • 73 0-01 6. T.W. Rak new a vW Pwd Counn, _fM VKk 1 ived . L_ C _ c _ ]aA M3 _ ass 0.65 -_. -- 1. Table Pak PwJe PIEEIeRaE P. Table PakR.Ma Wmrkk RUJ PMPaak I D 35.1 06 Cwrny MIOPeak ._ _ _ _ c _ ll_A PM Pk EaaMunB IM B 11.0_ _ _. O.Do _ county MIDP.ek FaBaeuN tee a 11A aa al 9.fiNe Peck Reals Nrp.R goatl Cwmy PM POI I)J 0.1Dm _B vale n 10.8hldleewd&Prport P.ed rxY of MaOlocd Parwi MIDM1+k _ wrear _ w stbourd � f a !li las AN ez _ _ 11. Table gorh gwda DR99 0Wr' U114 FMPale D 38.1 0.0 _ M10Pwk PM Pak _ c _ D 305_ ans _ 076 Vsl 11, 618EaAYl ea Poetl OP Dorm County MIOPak _ - E 39.9 d]3 Notes: iAe Pdllgl movementBr.WneJfa all onflBnalhaJ lnnrteNon[baaetl on Ne]PAHl96wq C.paey Mwwl''LP level MSeMa: Olay IP fep"d In+ecoM+ pet vlhlde' V/C Role V ae rate to; vehkletboP.M mea when alwkta the numbs N vMIIM JMid by LM up ut, or the medW.Yllnten[cllnn durbe the wile 0 minuaa of Oe pak hour: and bid wa Nana FdMas on INONNon ppetktlry ham w I.IWIM.&I AvId.rds. Onih- a.W.0Na 1- Gnrml Mn[rmrco Mwlopmnt hofR[I]Sb16 TmmOaRrMcn Impottandph 4n+4[HJSS FUTURE YEAR (2030) TOTAL TRAFFIC CONDITIONS The future year (2030) total traffic scenarlo analyzed how the study area's transportatlan system will operate with Costco's site -generated trips in year 2030, representing a 15 year future condition with the addition of sftegenerated traffic at each of the study intersections. Future year traffic conditions were analyzed for both the weekday p.m. and weekend midday peak hours. The future year 12030) total scenario also includes the planned roadway improvements and land use developments previously mentioned. Appendix J" contains the future year (2030) total traffic operation worksheets for the intersections outlined below. Traffic Volumes Traffic volumes for the future year (2030) total traffic scenarlo reflect the 2030 background scenario volumes plus the addition of site generated traffic. The future year 2030 total traffic volumes are summarized In Figure 12 for the offsite Rudy intersections. Intersection Operations The Intersection operations for the 2030 total traffic scenario are also summarized in Figure 12 and in Table 14. As can be seen from the figure and table, the future year (2030) total scenarlo determined that site -generated trips did not impact any study intersections not previously identified in the future year (2030) background scenario. As in the 2030 background scenario, the Hamrick Road/Fait Pine Street Intersection operates with a v/c ratio of a1.0 during the weekday p.m, peak hour and the critical movement at the Biddle Road/Airport Road operates at LOS F during the weekday p.m. peak hour. M V.trb akxkb In[. .................... _......... ZL N093ND'1NIOd Wb3J 6 nOHNV34Atl GNON3F33MONYWEAWIB3M ]un�H SNDWONOJ JIiitlL13`1101 �9£OZ)tltl3A 3klllfli ��eC.p ,;; w ', �� wwu.9...mxo� o+wouumu mvi wa,aaan9arwTM�aw�+ JAA w.w.eoMr.9wa��ari a.ou unuwm 9vAY u�a s+wi v.cu �ooievwau+�ou Hari Mrw \...moo,-e�1./'I\ ../rw.. a.�• Ogtl9Y+�M+wWM'JOh 31fiY1 wCU YMYTMYAYM TMMi1 1iY19 MIM 394Y011 %9tlTM L}y{B3XN ] 99Jnb ®91 r - i 1�N15 aM13 f OvW ![i•}P19tl L}y{B3XN ] 99Jnb ®91 r - i Cenbel on., .. LYaxbplllnl P'.f lI" Tl.nw.odon&naa<IAn t. conn,,' 15 Table 14. Future Year (1030( Tatal Trftlllc Operetlon9 IIA L PS SR pampa Fart Plnl Strtet M! a IIA 0.A DODr —PM MID Mak B -11 as, 1.Id NBNmpkr. M.S0xet Dppr PM Peak c c 30a3 aY MIO Peak _ 3. PeplryeTgoal\EYt Pine S[rM COOr' Countr. [Ilv _PMPeak MIf)Pa4 _ _ _ C c _ a! O. NamIS RwdkFaR PIIre gYee[ _ _ U CwiRr, Clty - MMI PlEeralWryaNamrld Rand 019S. CbmM1W Ory am axan- 6. Tad. Rib Rmtla Meng1 (Qea{t. cm MID PUR C 21.7 a1 _ I. TaNe pmRRad\eiddk goad PMMk 0 1l1 LLSa CaunF MID MY c _ act _I a.TaOleflMRW •NamNaRM fnmhn RY MMk Cutmu�M left C ]13 173 all MID P.ak_ FaattauM ltl! B f.A am 9. Table Roe[R tklLpartflaaf couft PMPM _ C ]M 0.83 an MIDPuk a IIS 0.k] Io. wdN.e RoedaNmortRv.tl Carof MMkad IN1Yf YCfaM 1111rl�/ _ waeYawl I I' PafIC fL NIO _ 11 S1. TatlalNd MaIkU93 �r M1PM 0 b9 0.91 Cowry MIDPeek C 31.7Pho al9 ]3 -OR 6Ea Fv[Vlb Roatl ��— D li0 493 _ CauMV MIDIDPeA C Notrs"TMvlUolmwement b no orted W411 unYanal4ed In4nwdpn[ kutl on the WRnhaseneP CapzA M9nWC' lQi sMNI OnuM e.' dry le eepurted In [emNa pr reNNe; [ V/[ IYfb If YIIrM areNtlPmmpetlty w16MYA abMe 01e w[abv of rhtles fkNN YY Ne npJar of Ne mlaWstttlon dW ry the ped IS mhwtes vrlM pwk hour, aM W eYaaao adkates en hbrwClon apenYna kekVa N µn,dkum; [ mn.IdlmreP Year 2030 51te Access Operations Figure 13 and Table 15 presents the year 2030 traffic conditions at each of the Site accesses. All of the proposed site accesses operate at acceptable levels of service during the weekday p.m. and weekend midday peak hours. Because of the planned roadway Improvements along Table Rock Road, there Is a Significant benefit to the traffic operations at the site accesses along Table Rock Road when compared to the bulld year (2016) total traffic scenario. 0a Rlmhcn a odone' Inc. / wmr,urcx,mowrRwrn�lm N YM�YMAV M•', IWa�,IY�YFt a \f =' I'E HGIMLWAY •NpRWM9f PWI 7i SITE RGf ML WAY � lq�1NWB1 CNY \ � x'nurtir„n w Wn \ E kms,.>1 11`I X'1 I 1 I� I EM' wrwx Ro/u wv a�Nwwc�c Now �,rl,V q�NL YYy W� TKIENOCN aN�P��S 9TOIW r�yaHt • W60l�TCIStvm rW„u l � B I / � u TIGIEFlOfY. NPw� r�yaHt • W60l�TCIStvm rW„u l � B I FUTURE YEAR (3030) TOTAL TRAFFIC CONDRIONS AT SITE ACCESSES I NIOun[ WEEKDAY PM ANO W EEKENO MIOOAY PEAR NOURS 13 CENTRAL POINT. OREGON carinal Polnrrmmo [tnkpmenr Pr.kaPlaud irwmp.rc.lan lmPactalaMN amxrt.,s Table 15. Future Vast (30301 Tatil Traffic Operations at Site Accesses Wry a xnnMV Crlwway Cayof CotrAl Point aM PaH .10 "k Wnaawld Vnanund a A PP PP n10 0.19 l Wry a SoutbweY Crlwwry C"4 C. n1W%I. PM PEN WeFNiund A a.9 001 MIC Pak We_A.unel A .9 a.01 IM1m lick flood OrFeway a POW Clly of Cmtnl Paint PM"k Wr Wh WbR a _ _ 0.1} MKI po`AnI Wit a 195 119 EmrkM Raid lathtin/kiai mnckaotl LT� Clry of Cent!Voint YMVwk wOlNbo4rd A A3 013 ptsPak NnrthbouMRYi A 9A 0.15 R.n# RoadaNaMnst IEEuon Cnonly PM Pok EalWMdlaR C MA a2o .MPnk EE#MUA WR C 30.3 019 Ri MM a SouPnit Iwck CmAy PM PtIk F1tGouM a 13.0 0.09 W.0 Eutbouod 9 11.7 aDo No4t' lW a9kilmmenWntu lyMMdbrall unejnaapolnnnEmlona Wins an ale la:a MPr1A Y(<P.rIMMPnud; tai•WWIofSmlm; N1, a rcrond kriecondt per y W,l ;'v/C Rato 9 deflr Eti!A,l roc frill. wMCM1 uku'Etu NE number ofiehii dIAdW W flu ..do .ftM raEdway/InbIUC11o0 dvry ru RM 15 minis dtne p-lhor, Md IMI walSlkslndlrY in rn—.1on oiwnliq Wo-lu wnaamnrcenawd. FUTURE YEAR (2030) MITIGATIONS This section includes the mitigations to the Intersections identified as not meeting operational standards In the year 2030. As outlined previously, there are two locations found to not meet standards in the year 2030 background conditions. The additional of she generated traffic did not trigger any additional locations to not meet standards in the year 2030 scenarios. The two locations found to not meet standards in the year 2030 background conditions are: • Hamrick Road & East Pine E Biddle Road & Airport Road The mitigated result for each impacted intersection is outlined below. Appendix *K" Contains the future year (2030) mitigated traffic operation worksheets for the intersections outiinedbelow. tkmrfck Road A East Pine Street Mitigations The Intersection of Hamrick Road/East Pine Street experiences a heavy volume of vehicles making a southbound right -turn at the intersection, with a vfc ratio for that movement of above 1.0 during the p.m. peak hour of the future year (2030) background traffic conditions. There have no improvements identified beyond Project #216 stated In the City Central Point's transportation system plan. In order to mitigate the intersection, there are several options: • The addition of a southbound right -turn lane would improve intersection operations to LOS C with an overall v/c ratio of 0.76 and average delay of 25.2 seconds per vehicle. The v/c ratio of the southbound right -turn movement would decrease from 1.27 to 0.70 with the addition of an additional turn lane. as .rmen.n a w,ovMA ln. Gnfml Idnr Gurtu Rrclopmen[ Im/r[t YlID16 Tm,u�rl•rlon Anpa[A,wFyA, C,lolerMrS • The addition of a second eastbound left -turn lane would also mitigate the Intersection to a volume -to -capacity ratio of s0.95 (currently under review as one option in the Jackson County TSP) • The conversion ofthe intersection to a roundabout would also mitigate the intersection to a volume -to -capacity ratio of c0.95 currently under review as one option in the lackson County TSP) piddle Road i Airport Road Mitigations This Intersection operates at LOS F during troth the 2030 background and 2030 total traffic conditions. The project is not adding any traffic to the critical westbound approach. There are no knows pians for improvements at this location by the City of Medford but the head for mitigation is not triggered by the project. PARKING ASSESSMENT City of Central Point Municipal Code 17.64.010 states that all land uses shall comply with the number off-street parking requirements. These requirements for non-residential land uses see stated In Table 17,64.026. Retail store was assumed as the general commercial use for the proposed Costco development. This use states that no more and no less than 1 parking space per 200 square -het of net floor area (excluding storage and other non -sales or non -display areas) be provided. Based on the proposed 160,000 square -foot warehouse, of which 134,000 is usable sales space, this would equate to a minimum and maximum requirement of 670 parking spaces for the Costco development. Municipal Code 17.64 040.8.2 states that the off-street requirements may be Increased based on a parking demand analysis prepared bythe applicant as part ufthe site plan and architectural review. The parking demand analysis shall demonstrate and documents justlflcetlon for the proposed Increase. Parking Demand Analysis The proposed site plan as illustrated in Figure 1 provides a total of 782 parking skates which is 30% more spaces then the maximum allowed bund on Central Point's Munlcipal Code. Based on the nature of Costco sales and operations, the proposed parking has been carefully considered and is proposed given known parking demand characteristics for Costco sites. Costco is a unique use that demonstrates the need for a particular amount of parking to accommodate typical and peak demands. In fact, one of the reasons for relocating the existing Medford Costco to Central Paint Is to build on a site that can provide sufficient parking supply. Table 16 provides a summary of the documented parking supply and demand at existing Costco warehouses in Oregon (including the current Medford location). sit xmeva• a,�mmec e,r. a„rmr vomrcmrm o�eapm."e vgearxas r,w.rortono�Mw�rn�arnx amx.�oss Table 16. Typical Peak Parking Demand at 00rar Corteo WerM sorsa In Oregon As shown in Table 16, these three other Costco locations demonstrate atypical peak parking demand of 4.24 spaces/1,000 sq -ft. Guidelines from the Institute of Transportation Engineer's Parking Generation, 4th Edition (Reference 11) recommend that users perceive a parking lot to be "full" once utilization reaches 90% of capacity, noting that Increases in illegal Parking and repeating circulation occur beyond this level. Given this guidance, our recommendation is to provide sufficient parking to maintain a utilization of below 90% during the typical peak periods. Table 16 shawl that, Weed on data from other Costco developments, the parking ratio required to maintain 90% utilization during the peak or less is a minimum of 4.71 spaces/1,000 sq-tt. Applying the demonstrated minimum parking supply of 4.71 spaces/1,000 sq -ft to the proposed Central Point Costco development equates to a minimum recommended parking supply as summarized In Table 17. table 17. Central Point Coateu Racammended Parking Supply The table shows that a minimum of 753 parking spaces should be supplied in order to provide sufficient capacity for the likely parking demand on site. This indicates that the proposed parking supply of 7821s slightly higher than this minimum amount but within a reasonable range and will provide an appropriate parking supply to accommodate typical peak periods as well as additional spaces for seasonal peaks as well. In addition to parking space totals, accessible parking requirements are presented In Table 17.64.03 of the City's Municipal Code. For land uses providing a total number of parking spaces between 501 and 1,000, which applies the proposed Central Point Costco site, 2% of total parking provided is required to be accessible. Costco has planned to Include approximately 2.2% or 17 of Its total parking spaces to be accessible parking, based on total parking spaces equaling 782. The site plan shows that this requirement is being met. xxof—A av ,,rW.. Section 5 Conclusions & Findings rM hol pdnl Cw Tv 4relopmen[ 6nM,Wnaa rMElny CONCLUSIONS & FINDINGS ht 2.5 The analysis and evaluation completed for the Central Point Costco development resulted In the fallowing conclusions and findings: Project Description Costco Wholesale is proposing to develop a new warehouse and fuel station located in the southwest quadrant of the Table Rock Road/Hamrick Road intersection in Central Paint, Oregon. o The development plan includes a 160,000 square -foot Costco warehouse and a 24 fueling position Costco Gasoline fuel station. This new Central Point Costco will replace the existing Medford Costco located at 3639 Crater lake Hwy in Medford, Oregon. The parcels of land that in which the proposed Castro would occupy are zoned as M-1 (industrial) which allows the development of the Costco warehouse and fuel station with a conditional use permit (no land use or coning charges are required). In order to best evaluate the anticipated transportation characteristics of the proposed Central Point Costco development, it was agreed that the Costco-specrflc data be used to most accurately represent the anticipated traffic characteristics of the unique development type. • The proposed Costco development is estimated to generate a total of approximately 10,670 net nawtrips on a daily basis, 900 net new trip ends during the weekday p.m. peak hourand approximately 1,365 net new trip ends during the weekend midday peak hour. • The distribution pattern for site generated trips was developed using zip code data from current memberships at the existing Costco warehouse located on OR 62 (Crater lake Highway) in Medford, Oregon, as well as from the existing traffic patterns and major trip origins and destinations within the study area and the regional travel demand model. Existing Conditions The study evaluated 12 off site Intersections In addltlon to site access points. • The study evaluated two time periods for each evaluation scenario: weekday p.m. peak hour and weekend midday peak hour. • Based on recent tri fgc counts collected in May and July 2015, all of the study intersections were found to operate at acceptable operating standards during the existing weekday p.m, and weekend midday peak hours except for the Table Rock Ro4d/Airport Road intersection during weekday p.m. peak. uwmo� s a•amax nK. Cenlml Vdnt maho OMkpm¢nt [o Rlu4omaflndNrps I,gnYalNa6 aneer�oss o The Table Rack Road/Airport Road intersection is stop controlled in the westbound direction. Under existing conditions In the weekday p.m. peak hour, there is hlgh delay for the critical movement (westbound left -turn) resulting in LOS F. • Crash data the most recent five years (2009 — 2013) at all of the study Intersections was reviewed to Identify historical safety trends. o Turning movement and rear -end crashes were the most common crash type at the Intersections, accounting for approximately 62% of all crashes. o There were no fatality crashes. o Four study intersections were found to be In the 90th percentile and in compliance OOOT's SPIS: I -S SR Ramps/E Pine Street, Table Rock Road/iii Was Road, OR fit (Crater Lake Highway)/W Was Road, and Table Rock Road/OR 99. Mdtd Year 5016 Analysis • The transportation lm pact analysis eval uated two clifenent future year scenarios: year 2016, the assumed build out year of the development, and year 2030 a long-term planning year. • The 2016 build -year background traffic analysis (wRhout inclusion of the project traffic) found that all of the study Intersections are forecost to operate at acceptable levels of service and volume -to -capacity ratios during the weekday p.m. and weekend midday peak hours except for the Table Rock Road/Airport Road intersection during weekday p.m. peak hour. o As under existing conditions, during the weekday p.m. peak hour there is high delay for the critical movement (westbound left -turn) resulting in LOS P. In addition, the critical movement Is also operating with a volume -to -capacity ratio of greater than 0.95 in the build year (2016) background conditions (with no traffic from the proposed Costco development). • The build-year(2016) total traffic analysis (with inclusion of the project traffic)found that all study intersections will continue to operate at acceptable levels of service during the weekday p.m. and weekend midday peak hours with the exception of: 0 1-5 Ng Ramps 6 East Pine Street exceeds OOOT standards (lane group v/c ratio s 0.851 with the northbound right -turn lane group's v/c ratio of 0.87 during the weekday p.m. peak hour. The need for additional opacity for this northbound right - tum movement has been previously identified In the Final Draft IAMP: Exit 33 study which cells for the widening of the I-5 northbound off -ramp to add a second right - turn lane at the northbound approach to East Pine Street. COOT and the City of Central Point are currently in discussions to determine Costco's appropriate proportional fair share contribution to this Improvement as mitigation for the she generated trip Impacts. Ma -15 xmdoW mc. [oMushnsa MHlnw "gY ff Axm Mwher2ois c Table Rack Road & Airport Road, as under existing and 2016 background conditions, continues to operate at a LOS F during the weekend p.m. peak hour. Improvements to the Table Rack Road/Airport Road Intersection are scheduled in year 2017 as part of Table Rock Road widening and a signal will he added to the intersection. This Intersection b in existing deficiency; however, given that this improvement is not currently scheduled until 2017, Jackson County and the City of Central Point are currently in discusslons to determine an appropriate contribution to this improvement as mitigation In the interim for the Costco project. o Biddle Road & Airport Road experiences a higher delay for the critial movement of the westbound approach, dropping from LOS C to E during the weekday p.m. peak period due to site -generated traffic. Even with the site generated traffic, the Intersection is operating at a very low volume -to -capacity ratio of 0.45 in the weekday p.m. peak hour and 014 in the weekday midday peak hour. Site Access Anatysd • In the build year 2016 scenario, all site access intersections are projected to operate at acceptable level"f-service and volume -to -opacity ratios during both the weekday p.m. and weekend midday peak hours, with the exception of the Table Rack Road/Northeast access. Note this Is assuming this access is a full movement access and no Improvements to Table Rock Road are completed. Under this scenario, the critical eastbound left -turn movements atthe Table Rack Road/Northeast access is projected to operate at LOS F during the weekday p.m. peak hour, however, it is still projected to operate well under capacity and meet the County's operational standard. • Even though the build year (2016) analysis showed that all of the site accesses will be able to operate as proposed upon site opening before the Table Rock Road Improvements are constructed, an evaluation of access alternatives for Table Rock Road was also completed to compare how temporary improvements would Impact the access operations In the interim. • The access scenarios compared were: a Build Year (2016) Total Traffic Conditions (i.e., Full Access to Table Rock Road) with No Table Rack Road Improvements (as summarized above) o Build -Year (2016) Total Traffic Conditions with Temporary Table Rock Road Improvements (i.e., temporary widening of Table Rock Road along the site frontage to provide a center left -turn lane until the ultimate widening project is constructed) o Bulld-Year (2016) Total Traffic Conditions with Restricted Right-In/Right-Out Site Accesses (restrict Table Rock Road access to right-in/right-out only until the ultimate widening project is constructed) The access alternatives evaluation found that: a ua.ua, saew•b, �k. �mr poar m.rco o.wavmenr ra7,avaera nmm�s• vm*raf909a amevzoss o Assuming full movement access and no improvements to Table Rock Road, the eastbound left -turns at the northeast access to Table Rock will experience relatively long delay (resulting in LOS F) but the access will still operate well under capacity and meet the County's operational standard during the critical time period. o Providing temporary widening along the sbefrontage to provide a temporarycenter turn lane will allow ell Table Rock Road accesses to operate acceptably as full movements until the ultimate Table Rock Road widening improvements are constructed in 2017. o Restricting the site's Table Rock Road accesses to rot-in/right-out only will allow thane accesses to operate at acceptable levels of service and volume -to -cepa city ratios. However, It will add additional left -turn movements at the Table Rock Road/Hamrick Road Intersection thus resulting in over -opacity and L05 F conditions at that location. This Impact could be reduced by adding temporary widening around the Intersection to provide a northbound left -turn low as well as a center refuge area north of Hamrick to allow vehicles turning left from Hamrick to make a two stage gap scoeptanre maneuver for the left -turn. o Once the ultimate Table Rock Road widening improvement is constructed In 2017, all site accesses to Table Rack Road will operate a good levels of service (LOS C or better) end volume -to -capacity, ratios (v/x0.21 or better( during the peak hour perlads assuming they are full access movements. From aim" perspective, a predictive safety analysis found that: o Providing full movement accesses to Table Rock Road in the rear -term with its current two lane configuration shows the probability far 1.2 crashes per year to occur combined at the two access points. o H these were restricted to right-in/right-out only driveways, the safety predlction lowers to a probability of 0.03 crashes per year (about a 30% decrease in probability). o If temporary widening was provided in the Interim for a two-way left -turn lane along the site's frontage, the pmbahllity would lower to 0.76 crashes per year (about a 30% decrease In probability). o The safety predictive analysis also shows that once the ultimate Table Rock Road widening Improvements are In place the safety prediction lowers as well to 077 crashes per year even with maintaining full movement accesses at both Iecations. ss xnrmv„aa,o<rvre,, rn<. couaiaanr corm wwmpm�c mo.n.ron.e vmemm Future Year2030 Analysis nq.•e stsws am,e..zau The future year (1030) background conditions analysis (without the project traffic) found that all study intersections will continue to operate at acceptable levels of service and volume -to -capacity ratios during the weekday p.m. and weekend midday peak hours with the following exceptions: o Hamrick Road & East Pine Street operates with a v/c ratio of >1A during the weekday p.m. peak hour o Biddle Road & Airport Road (as under the build year conditions) has a critical movement which operates at LDS F during the weekday p.m. peak hour although the movement is still operating under capacity with a w/o ratio of 0.55 • The future year (2030) total traffic analysis (with the project traffic( found that the all generated trips did not impact any study intersections not previously identified in the 2030 background scenario. • All of the proposed site accesses operate at acceptable levels of service during the weekday p.m. and weekend midday peak hours under the future year 2030 total traffic scenario. Because of the planned roadway improvements along Table Rock Road, there is a significant benefit to the traffic operations at the site accesses along Table Rock Road when compared to the build year (2016) total traffic scenario. Parking Asrerrment • City of Central Point Municipal Code directs that a parking supply of 670 parking spaces be provided for Che Costco development (assuming retail land use). • The project is proposing to provide a total of 7gl parkingspaces on site. • As part of this report, a parking demand analysis was completed to demonstrate and documents justification for the proposed Increase in parking supply. • Actual parking supply and demand data from other Costco sites in Oregon indicates that a minimum parking ratio of 4.71 spaces/1p00 sq -ft be provided In order to supply enough parking to meet Costco specific demands. • Applying the demonstrated minimum parking supply of 4.71 spaces/1,000 sq -ft to the proposed Central Point Costco development equates to a minimum recommended parking supply of 753 spaces. • This indicates that the proposed parking supply of 792 is slightly higher than this minimum amount but within a reasonable range and will provide an appropriate parking supply to accommodate typical peak periods as well as additional spaces for seasonal peaks as well, ad ..tuna N.w['ulq ln[. Section 6 References om.�l vola m,m. a.�mav�,ime aheenm REFERENCES Pmle.tl tAba ame�.zars 1. City of Central Point. Central Point Comprehensive Land Use Pion 1008-1030, Central Point, Oregon, May 2013. 2. City of Central Point. City of Central Point Transportation System Plan 1030, Implemented by Ordinance #1922, Central Point, Oregon, December 18, 2008. 3, David Evans and Associates, Inc. Final Draft TAMP: i-5 Exit 33 (Central Paint), Oregon Department of Transportation, Salem, Oregon, May 2015. 4. Transportation Research Board. Highway Capacity Manual 2000, Transportation Research Board of the National Academies of Science, Washington, D.C., 2000. S. Kittelson & Associates, Inc. Jackson County Transportation System Plan, Ordinance No. 2005-3, White City, Oregon, March 16, 2005. 6. Oregon Transportation Commission. OHP Policy IF Revisions, 1999 Oregon Highway Plan, Salem, Oregon, December 21, 2011. 7. City of Central Point GIS. Street Jurisdiction Mop, Jackson County Smar map, Central Point, Oregon, January 2014, 8. Rogue Valley Metropolitan Planning Organization. 1009-2034 Rogue Valley Regional Transportation Plan, Central Point, Oregon, April 27, 2009. 9. Oregon Department of Transportation. OR 61: 1-5 to Dutton Road, Oregon department of Transportation, httpV/www.omgon.gov/ODOT/HWY/REGION3/pages/hwy62_indes.aspa, April 2013. 30. Southern Oregon Transportation Engineering. White Hawk Development Traffic Impact Analysis, Medford, Oregon, July 2q 2014. 11. Institute of Transportation Engineers. Parking Generation, 4" Edition, Institute of Transportation Engineers, Washington, D.C., 2010. RlaiNon a 4m/eley In e. KITTELSON & ASSOCIATES, INC. TRANSPORTATION DR. lir MENIN0 I PIAN MING 101 9 Captol aouai DOW MI. Do". ID 83702 209.3383633. 208338.2838 MEMORANDUM Data November 10, 2015 m. Mr. Matt Samitore City of Central Point 140 South Third Street Central Point, Oregon 97502 Prorn: Brett Korporaal, Julia Kuhn and Sonia Daleiden Project Centra l Point Costco TIA Subject: Response to Comments— Central Point Costco TIA ProNi,t a'. 19046.0 This memorandum responds to comments submitted by staff from the City of Central Point (via Southern Oregon Transportation Engineering, LLC), related to the Central Point Costco Transportation Impact Analysis (TIA). Each comment Is summarized below followed by our response. COMMENT 1— SUBMITTED BY CITY OF CENTRAL POINT "Page 30 of the study in the last paragraph, KAI assumes that planned roadways In the IAMP as well as Tier 1 Improvements listed In the City's TSP have been financially constrained and can he reasonably funded within the neat twenty years. Many of the projects and/or improvements identified are nonfunded and there is no current mechanism for funding at this time. These include: • Widening East Pine Street to add a second WBL and widening the I-5 SB on-ramp for two receiving lanes ($1.7 million) • Widening the 1-5 NB off ramp at East Pine Street to include an additional NBR ($1.3 million) • Widening west and north approaches at Hamrick/Pine Street Intersection • Widening to include a dual eastbound left at Table Rock/Biddle Road intersection" KAI RESPONSE As part of the scalping process, KAI received confirmation from each of the jurisdictions that the Tier 1 projects identified in the IAMP and RVMPO's RTP should be included in the TIA analyses. As communicated in an email from Wei Wang, OOOT, on Thursday, July 2, 2015, "Page a of TIA, Planned Transportation Improvements — This should reference the RVMPO RTP Tier 1 projects and also RLEN,IME: H. JMXRLE1150r6 -CENTRAL Po Ao/CQSItY) r1AIREPoR)1£MAL R£SPI)i To CONMENT11191016_CEAVTI PoIhT macr oo 714 RESRCA6F To COMMENT 5_ FrO L Lqa' re"nol Vaim aysrc TIA eb11tta;190060 .-.bo 16, "IS e"9e 2 consider improvements/mitigations identified in TAMP 33. It is possible that some of them could be triggered earlier or may by mitigation for this development. Please review the Interchange Area Management Plan 1-5 Exit 33 (IAMP 33). The proposed Costco TIA should be consistent with IAMP 33." Based on this email, we submitted a "Scoping Memo Response to Comment" memorandum to the City of Central Point, Jackson County and COOT that stated, "We will include any planned transportation improvements referenced In RVMPO RTP Tier 1 and LAMP 33 that will be completed during or prior to the proposed build out of the site." Additionally, on Tuesday, September 29, 2015 KAI held a telephone conference with representing members from each agencyto review and discuss the initial findings from the TIA. During this call, we verified with agency staff the funded Tier 1 projects from the RTP and IAMP to include in our analyses. Our TIA is consistent with all of our previous correspondences from staff. We are unclear as to the change in direction about those projects to include in the analyses and would appreciate additional insights from agency staff. COMMENT 2 — SUBMITTED BY CITY OF CENTRAL POINT "The TIS doesn't include a queuing analysis, which is a requirement in the scoping letter. A queuing analysis should be performed in SimTraffic and follow the methodology outlined in ODOT's Analysis Procedures Manual (APM)." KAI RESPONSE 2 KAI analyzed queuing for all site access points, the 1-5 NB Ramps/E Pine Street and Table Rock Road/Hamrick Road intersections based on scoping direction from the City, County, and ODOT. Queuing was reviewed for the impact of the site -generated trips on 95th percentile queue lengths. Per the TIA, queues were calculated for the 2016 and 2030 scenarios during the weekday p.m. and weekend mid-day peak hours. For comparison purposes, the buildyear(2016( total scenario also identifies queues lengths assuming an interim three lane configuration along Table Rock Road. The 2030 scenario provides the queuing assuming the planned and programed Improvements to Table Rock Road are in place. The queuing analysis was completed using SinnTraffic within Synchro 9 software, which implements the 2000 Highway Capacity Manual methodology and is in compliance with ODOT's APIA. In order to provide a conservative analysis and reflect the worst-case conditions, queues were reported for a peak 15 -minute analysis. Vehicle queue lengths were rounded to the next 25d' foot (assuming 25 -feet of storage per vehicle). M.1.,, a Malo.. Inc. sant, Idaho rentvi Paint COS UP PA P.I Ital w iUrnier 1,, 2.1 PWe3 guild -Year /2016) total Traffic Condition Queue Lengths Table 1 presents the queue lengths for the build -year (2015) total traffic scenario. As documented in the TIA, the northbound right -turn at the 1-5 NB Ramps/E Pine Street intersection exceeds capacity with the inclusion of site -generated trips. With the Inclusion of site -generated trips, the queue lengths increase from approximately 125 feet under background conditions to 350 feet under total conditions. However, with site -generated trips the queue Is still maintained within the right -turn lane storage and does not spillback into deceleration area of the northbound off -ramp during the weekday p.m. peak hour. No queueing impacts were identified at the other intersections analyzed. In addition, a three -lane roadway along Table Rock Road does not change the estimated queue lengths northbound and southbound. However, it is important to note that the absence of a left -turn lane can cause delays to through travelers along Table Rock Road. Further, the absence of a left -turn lane also Increases queue lengths and delay for vehicles making left -turns out of the site. The Table Rock Road widening is completed in year 2017 and will provide their( tsto the overall transportation system. Table 1. %th Percemlle Queuing -1016 Conditions 3.1-5 NB Rampal Pine St 51Oraee Lenalh' 150 265 335 380 PM Peak 35 3CU zoo 350 MIOPeak 50 150 125 335 S. Table Rock Rd/Homrlak Rd Storvre La"r, 160 PM Peak 75 35 35 0 MID Peak Pbl Peak 5o n _ 0_ 35 25 0 25 0 13FederalWay/Northnest Day MID Peak 0 P5 0 15 0 le. Federel Wry/southwert Day PM Peak 0 0 0 25 MID Peak 0 0 0 35 D 15. Wert Har Rd DaamrlR. y/HRd lck PM Peak_ 0 25 25 15 _ MID Peak 0 1S 35 35 15. Bast Haas" Rd I11119010wy/Hamrld Rd PM Peak 0 - II MID Peak 0 35 11. Table Rack RdNorthaan 0wy PM Peak 75 50 25 0 MID Peak 50 50 sp I I 0 Ia. Tabs Rock Rd/soutMast Day B. Tab'e Rock Whir rld Rd Peak ZS 0 25 o IIrs MIPeak 25 0 25 Stora La th 150 0 PM Peak 25 25 35 0 MID Peak 35 2s 35 0 I Table Rod Rd/Northeast DW PM Peak 't 50 35 0 MIO Peak 35 5o 25 0 SB. Table Rock U/Sourteast bay PM Peak 35 0 25 0 MID Peak 25 0 25 D Nates: is perro lle suave lengths basebeenmunded to the rxR125 dont, one h1c. represent 25 feet ofsmel Storage local were reported where ippliabl, at [M1e respetllee InblR¢tlon. Stomas lanes for left and rill dinner into the SHe ee not fnduded In the build.... (2016) toM swrwlp With the eacepdpn of the Wall Hedrick Rd Owy/HeTHd Rd Ide amss where there Is Presently a mo -way Itft-burnIrrlA two-way left -tum brae would be encoded III Table Rock RI for ecce.. Into and of tr. site drlwww/s; 11I IAlartes 95'" peor.le queues tactless, stones length .1,P, a MU'ri e,, or !blas, rdnhn [mewl Fuld, eosr[o rra Project Or .16.0 ld.mt., lO,}015 Po9ee Future year (2030) Total Traffic Condition Queue Lengths Table presents queue lengths for the future (2030) total traffic scenario. As shown, all estimated queues can be accommodated within the storage provided during both peak hours analyzed. Table 2.95th Percentile Queuing —2030 Conditions reported where app kaele 0 the respeale¢ mtersedron. sten.. tastes and, Table Pock Read will be Includes In the tan-w.y let -mm lane when In. Table Pack Road Improvements are mmplaW rn yev 2012 At the West Hamrick Rd PxyMwnrkk Rd @e eoza there R presently a hand -way lett turn lane. Fuvure year rzeRI does not "mci hide atonae lanes to pates., the ede on Fetleral Way beouse of low volume of eraai. and W ming movements into and out of the site; liohl Indlsatca 95" percentile gl.eued arce.ding storage length. COMMENT 3 —SUBMITTED BY CITY OF CENTRAL POINT "If multiple access points are being proposed on Table Rock Road and S Har lck Road then City and County access spacing standards should be taken into consideration and shown to be in compliance or otherwise justified." KAI RESPONSE The Cites Transportation System Plan (TSP) Identifies Table Rock Road as a major arterial. Based on Table 5.2 in Central Point's TSP a minimum spacing standard of 500 feet applies given the 45 mph posted speed. The Table Rock Road/Northeast Driveway is approximately 420 feet south of the Table Rock Road/S Hamrick Road unsignaliaed intersection. This driveway serves as the site's main driveway. The Table Rock Road/Southeast Driveway is located at the very southern edge of the site boundary. The spacing between the two site driveways is 500 feet, meeting City access management standards. Although distance between the main driveway and the S Hamrick Road intersection does not meet the City's standards, there are no queue conflicts or operational issues associated with the spacing. xlnelbn a 6m[lond, Inc. Is., found Smraaela. h 1,I5NB Pampa/E one S[ Peak P1 50 s]5 3A5 ]a ll Mo Peak 35 :At 1511 ]50 a M1 B. Tilde Rack Pd/Nan'rl[Y Nd PM Fuel B 25 25 0 MIO Peak 15 is 25 0 end 0 0 25 13, Federal Way/Northaaat Oaey MID z Peak o 25 a ]s o 0 M 'M Peak 0 0 0 0 25 14, Federal Way/southwest play Pane 35 0 0 25 0 FRI PM Paak 0 33 ]5 35 ]S. Well Hamrld Rd play/Hamrl[k Id In Peak 0 a5 25 25 PM Peak 0 25 16. fast Hamrlak Rd(PIRO) Ow,/Hamrick Rd MIO Peak 0 25 PM Peak 25 s0 50 0 17. Ta hie Rock Rd/NmtMast Owy MIOPnk 25 so s0 0 PM PeN 25 0 25 a 1e. Tahle Polk Palsoum.aatbwy MIDPeak zs a zs O Nags: 9s p cmtla Queue lerutb hall been rounded to the nen 25 .rpoe. on. Winds remesent 251.1 of .e: Stamp.lenalbs ware reported where app kaele 0 the respeale¢ mtersedron. sten.. tastes and, Table Pock Read will be Includes In the tan-w.y let -mm lane when In. Table Pack Road Improvements are mmplaW rn yev 2012 At the West Hamrick Rd PxyMwnrkk Rd @e eoza there R presently a hand -way lett turn lane. Fuvure year rzeRI does not "mci hide atonae lanes to pates., the ede on Fetleral Way beouse of low volume of eraai. and W ming movements into and out of the site; liohl Indlsatca 95" percentile gl.eued arce.ding storage length. COMMENT 3 —SUBMITTED BY CITY OF CENTRAL POINT "If multiple access points are being proposed on Table Rock Road and S Har lck Road then City and County access spacing standards should be taken into consideration and shown to be in compliance or otherwise justified." KAI RESPONSE The Cites Transportation System Plan (TSP) Identifies Table Rock Road as a major arterial. Based on Table 5.2 in Central Point's TSP a minimum spacing standard of 500 feet applies given the 45 mph posted speed. The Table Rock Road/Northeast Driveway is approximately 420 feet south of the Table Rock Road/S Hamrick Road unsignaliaed intersection. This driveway serves as the site's main driveway. The Table Rock Road/Southeast Driveway is located at the very southern edge of the site boundary. The spacing between the two site driveways is 500 feet, meeting City access management standards. Although distance between the main driveway and the S Hamrick Road intersection does not meet the City's standards, there are no queue conflicts or operational issues associated with the spacing. xlnelbn a 6m[lond, Inc. Is., found h ml NowmMrlo, 3Fr10, 20KO TIA YmjGtt1: ]9p16s 025 ✓a9e Further, we have worked with the project team to maximize the spacing of access points and to optimize internal circulation for both the warehouse and fuel station. We can work with the City to seek a design exception to the 500 feet standard between the main driveway and 5 Hamrick Road intersection with Table Rack Road. Per Table 5.2 of the TSP, the applicable access spacing standard along S Hamrick Road is 300 feet. The East Hamrick Road Driveway/5 Hamrick Road site access meets the spacing requirement between the driveway and the unslgnalized Intersection of Table Rock Rood/S Hamrick Road Intersection. The distance between the west and east driveways along 5 Hamrick Road is roughly 520 feet, also meeting the City's access spacing standards. The West Hamrick Road Driveway/S Hamrick Road site access is located approximately 200 feet west of the Hamrick Road/Federal Way unsignalind intersection, not meeting the City's spacing guidelines. While the spacing does not meet City guidelines, our analyses demonstrated that no operational or queuing conflicts are anticipated between this driveway and the S Hamrick Road/Federal Way unsignalized intersection. We will also work with City staff to seek a design exception for the spacing between the west driveway and the 5 Hamrick Road/Federal Way Intersection. COMMENT 4 — SUBMITTED BY CITY OF CENTRAL POINT "The proportional share for impacts to facilities such as the 1-5 Ng off ramp can be determined by a volume comparison. The 2016 no -build right turn volume is 310 PM trips. Proposed development in 2016 adds 90 PM trips. Adding 90 trips is approximately a 23% impact. The same methodology can be used for other facilities." KAI RESPONSE Thank you for clarifying the applicable methodology for proportionate share impacts. We will work with Costco and the agencies in determining the proportional share for projects which Castro will be responsible based on feedback from the agencies. K1 e11 n R Mmd.. mc. AW., 1[ 14. HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA @: Table Rock Rd & Hamrick Rd RuildYear (Mitigated) Weekday PM Peak Hour 1 1 f ♦ J Lane Configurations M P h T t. Volume Imhrfn) 71 79 t9 404 569 26 Sign Control Stop Free Free Grade 0% 0% 0.4 Peak Hour Facer 0.92 0.92 0.92 0,92 0,92 0.92 Hourly flow rate(vph( 17 00 21 526 619 20 Pedestrians 1 Lena Mob (ft) 12,0 Walking Speed (Ne) 3,5 Percent3lockage 0 Right tum flan, (seh) Meclan type TWLTL TWLTL Median eere9e van) 2 2 Cpsaaenl signal (n) 1076 elcplatoonunblocked 0.70 070 0.70 VC, con"ng Y*M 1201 IIA 040 VC1, stage 1 conywl 634 42, Mega 2'.:xI 067 vCu, unblocked Vol 1075 260 260 [C. all & (6) 64 6:2 4.3 lC, 2 stage (e) 5.4 IF (s) 3.5 3:3 2.4 PO queue free % 01 04 97 cManedb(w m) 415 016 624 VdfifirieTdGl.._... —77-__,gg__..$1_._, Volume Len 77 0 21 0 0 volume Not .0 104 A D 28 cSH 416 545 624 1700 1700 Volume to Capecny 0,19 0:10 0.03 0.31 0.36 Ouem Length 9511h (ft) 17 14 2 0 0 Conlydl Delay (a) 15.7 12:0 111 0.0 0.0 L" LOS C 0 A Approach DOW (a) 14,2 OA 0,0 Approach LOS 0 Average Delay 10 mteneCOdn"C"ity, U911ta6sn 461% 9LWalwdtwm tl Analysis Pwiod(min) 16 loittelson 5 Assoclates, Inc. Synchs 0 Report 111121015 Paget HCM Unsignallzed Intersection Capacity Analysis Central Point Costco TIA 17Table Rock Rd & Northeast Dwy SvildYeer (Mitigated) Weekday PM Peek Hour 1 1 1 T 1 Vcluma(whT) 50 141 161 453 576 72 Slpn Conlml Stop Free Free Grade 0% 0% 0% Peak Hour factor 0,92 0.92 0.92 0.92 0.92 0.92 Houdy Bae wde(wh) 54 153 175 492 826 78 PMuMana 1 Iml 111) 12.0 WalMq Speed (M) 3.5 pamrlt 9lodmilm 0 kin hen flare (Ah) viedbn type TWLTL TWLTL MWI atarage men) 2 2 UpeeeMd Ill (h) p%, plabon unBlodued yC, wnikdq voNmM 1509 868 705 YCl, stspel wnf vol 688 rC2, ateee 2 mfwl B42 YOU, a Vocked wl 1509 BBB 705 IC, all (a) 8:4 8.2 4.3 tC, 2 Mage (1) 5,4 IF (e) 3.5 3.3 2.4 PO queue ON % 81 67 78 detupl4M (wli4il seg 462- :510 vAuTiiYTofet _ _ N - . ,176 792' Volume Leh 54 0 175 0 0 Volume ft& 0 153 0 0 78 cSH 289 462 810 1700 1700 Voluiee m Cepadly 0.19 0.33 0:22 0:29 041 Qieue Lanplh 95M (8) 17 30 20 0 0 canw(wa p) 20:0 166 10.7 0,0 0.0 Lane LOS C C 6 Awowh OMaY(a) 17.6 2.0 0.0 Appmwh LOS C xuua1111e7aMee Kitlelsan B Aasaciatee, Inc Synchra 8 Repoli 11112015 Page 2 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 18- Table Rork Rd & SoiAhP.ast_ pwv 3ulldVeer (Mitigated) Weekday PM Peek Hour ♦ , t i Lane Conngurefllons 1 4 1. Vol"(vehm) 5 29 50 609 688 29 Sign Control Slop Free Free Grade 0% 0% 0% Peek Hour Factor 0,92 0.92 0.92 0.92 0.92 0.92 Hourly now rate(vph) 5 32 64 662 748 32 Pedesulans 1 Lane Width (0) 12,0 Walking Speed (e!s) 3.5 Percent Blockage 0 Right tum flan (wh) Medan type TWLTL TWLTL Medan storage wh) 2 2 Upsarw signal (ft) 726 p%, pllaon unblocked 0.60 VC, wMllolhp volume 1535 765 710 Vol, stage 1 coni vol 765 42, saps 2 wn1 vol 771 vCu, unblocked vol 1544 765 780 IC, einpe (s) 6.4 6.2 4.3 UG, 2 stage (a) 5.4 tF(a) 3.5 3.3 2A p0 queue hes % g8 92 93 amcepetM(vshm) 315 406 758 VolumeTolel 31 54 682 779 Volume Left 5 54 0 0 Volume Right 32 0 0 32 cSH 390 758 1700 1700 Volume to capaity 0.09 0.07 839 0.40 Queue Lengm 951h (t) 8 6 0 0 Cadrol Way is) 15.2 10.1 0.0 O.O Lane LOS C a Appwsch.0aay(a) 15.2 0.8 00 Approach LOS C Average Dela) 0.7 InteneWal Capacity Wirsion 55,1% ICI)L$Wofovdm • Analysis Penod (min) 15 Kiftelsan 8 Associates, 'nc. Synchn 8 Report 1111 2 /2 01 5 Page 3 Queuing and Blocking Report BuildYear (Mitigated) Weekday PM Peak Hour 1102015 Intersection: 8: Table Rack Rd & Hamrick Rd Directions Seared L R L Minimum Queue (N 130 Ti 65 Am" Queue (it) 43 34 6 65th Queue (8) 33 57 37 Link Dletance(6) 8 243 58 Upstream D Time (%) 142 57 31 Queuing Penalty (vahl 161 161 SNmpeft Dl8lm 160 Upleaei66kTimiAt k) 15D Skxap Blk Tkm (%) 0 Queuing Pemlty,(veh) 0 Intersection: 17: Table Rock Rd & Northeast D Dkecllam Swed L R L T TR Madmum QOM '(3) 74 32 216 173 50 Avarep Queue(it) 33 44 87 8 8 aft Qi I N',(8) 58 76 142 57 31 Link DMi (3) 161 161 671 364 Upleaei66kTimiAt k) 8lorap 3k The M) Queuing Penalty (on) SNra7a'0ey DWIM 15D SWW &k Tam 1`%) 1 D OWN W Oklyl ah) 3 0 Intersection: 18: Table Rock Rd & Southeast Dwy DlreWons SKAO LR L TR Maxim M"m 53 53 i6 Avwep Queue (0) ?B 13 1 Will )*A 44 .4D e Link Distenm (h) 141 571 UpeOwn Dlft(%) Dueuing Penalty(uMI ftwl6eyft 150 8lorap 3k The M) ambe►mMty4"h) Zone Summary Z" nide Queuhq Penalty: 3 Cenral Point Castro TIA ShTra6ic Report Kittalson A Associates, Inc. Page 1 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA B: Table Rock Rd & Hamrick Rd Build Year (Mitigated) Weekend Midday Peak Hour 1 1 t Lena Configurations M y A Volume (you) 104 T7 0 344 410 36 Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.92 0,92 092 0,92 0.92 0.92 Hourly Row rate(eph) 113 84 9 374 448 39 Pedestrians 1 Lee Width (fl) 12,0 Walking Speed (flys) 3.5 Percent shydage 0 Right tum flare (An) Median type TWLTL TWLTL Median liberal vent 2 2 Upsaawn rAgnal(R) 1070 p%, plaawn unblocked 0.01 0,01 0.81 vo, mnRutng volume 050 466 486 vi sage 1 canf vol 400 Y32, all confwll 301 vCu, unblocked val 705 222 248 to. single (e) 6.4 62 4.3 1C, 2 stege (a) 5.4 to (a) 3,5 3.3 2.4 P) quell fine,% 79 87 99 cin iepacity(yanwh) 643 665 903 ValdmeTdtel ti - -- & -- --9 ---374 - 766-- _ -- — ---.. _— -- — VoiumaLefl 773 0 9 0 C Volume Rght 0 64 0 0 39 c6H 543 665 983 1700 1700 Volumete Capadty 0.21 0.13 0.01 0.22 029 Owes Length 95th (fl) 19 11 1 0 0 Control Delay (a) 13.4 112 8.7 0.0 0A Lem LOS B B A Approach Delay (a) 12.4 0.2 0.0 Approach LOS B Analysis Hieelson 6 Associates, Inc, Synchm 9 Report 11112/2015 Page 1 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 17: Table Rook Rd & Northeast DVN Buid Year (Milgated) Weekend Midday Peak Hour N ♦ t 4 Lane Con6gurdans 4 F M 4 1. Vaiume(4e") 49 153 224 296 403 85 Sign Cartrol stop Fres Fra Seer 0% 0% 0% Peak Hour Fector 0.92 0.92 0.92 0.92 092 0.92 HouM6ow rate(vph) 63 199 243 311 438 92 Pedeeolene 1 L" V40(6) 12.0 Walkup Spsed(tai 3.5 PemmStockage 0 Right tum Asn (rah) IAedlntype TWLTL TWLTL klaolen storage Oki 2 2 UppremmOgA/(10 pX, Pmeacmunodcked VC, a0doung V*M 1293 485 831 vC1, Or 1 coni Val 485 vezeemp n6wl 50B vCu, unleaded WI 1293 465 531 IC. pnyle'(0) 8d 82 4.3 tC, 2 peps (s) 5A IF (SI, 3.5 33 2.4 p0 "W hes % 81 66 74 dfl!CapkSyAhFktO. -301 efld 115 Va'rmee?Ia8 d3 - Tgg . -1112- 403 530 Volume Left 53 0 182 81 0 VoXmftM 0 199 0 0 92 CISH 301 665 946 946 1799 VekmeIII COPT* 0.18 0.34 0.28 0.28 0.31 Ousua Lerpth 9% (ft) 16 37 28 26 a Control Daily (1) 19,5 14.3 10,1 48 0.0 Lens LOS C B B A AppMoh WSJ 15.4 8.2 0.0 Appmch LOS C Amiga Delay 5.5 ImeneeadonCappcliyUlflizi 553% IDUL"Gfsmrke Anpplle Farad (win) 15 K8lelace 8 Associates, Inc. Synch. 6 Recoil 111212015 Page 2 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 18. Table Rock Rd & Southeast Dwy Build Year (Mitigated) Weekend Midday Peak Hour 1 1 t i Lena ConBgurgons Volume(V") 5 39 75 514 545 41 Sign Control Slop Free Free Goals M 0% 0% Peek Hour Fetor 0.92 0.92 0.92 0,92 0,92 0.92 Heudy flax rate(vphl 5 42 82 559 592 45 Pedesldans 1 Lem Wldth (8) 12.0 WdWng Speed (111a) 3,5 Ismnl Books" 0 Right Nm Mm (wh) Madlan we TWLTL TWLTL Median storage wti) 2 2 upHmae alyul MI PX, piston unckedeed vC, mnlfirlag volume 1337 818 838 vcl, siege I =1 vel cite vC2, Op 2 opal vol 722 vCu, unblocked vol 1337 518 838 tc, single (a) BA 8.2 4.3 tC, 2 stoge (5) 54 tF (a) 35 3.3 2.4 PC queue free% 99 91 91 CM Capacity (veh(h) 383 494 850 Volume Totei 48 '62 359 837 Volume Left 5 82 0 0 Vdume Rim 42 0 0 45 c5H 474 NO 1700 1700 Volume to Capacity 0.10 0.09 0.33 0.37 Queue, t.engm 95th (ft) e a 0 0 Control Da4y, (s) 13A 9.8 0.0 01 Lam LOS R A Apivoaoh0a yts) 13.4 1,2 0,0 Approach LOS B Average Daley 1,1 mtereeden Cepaily UOlizalkn 51.7% IDULge1ALlvkm A Analysis Period (nun) 15 XHselson 8 Asswiales, Inc. Synchro 8 Report 1111212015 Page 3 Queuing and Blocking Report Build Year (Mitigated) Weekend Midday Peak Hour 1111212015 Intersection: B: Table Rock Rd & Hamrick Rd Manton Served L R L Men'mumame(R) 93 74 51 Avenge Queue (Il) 40 31 9 96th Qum (it) 70 55 3s Unit Odtence (R( 248 upareem Wk Time (%) Queuing PeniI (wh) Statvals"I k1(10 190 150 Storage 9k Trane (%) QueulYq Pon* (wh) Intersection, 17: Table Rock Rd & Northeast Dwy Oirectone Served L R L LT TR MeffilM"e(e) 74 119 93 312 22 Arerap Qw (R) 36 55 17 93 3 BOdiOMA it 70 As 51 157 15 Lek DWnce(R) 191 191 071 352 UpeeeiRt91iI*& I%) Qveukp PwwtO (V*) 91aeee 8rt'Qiil IRI 100 Intersection 10: Table Rock Rd & Southeast Dwy lar wles QuaV PwYlly. 2 Cenhel Point Costco TIA SinnTraMc Repos Kltlelson & Mandates, Inc Page 1 Queues Central Point Costoo TIA 2: 1-5 NB Ramps & E Pine St Build Year(Toul weekday PM Peak Hour J y ~ 4, 1 t ♦ Live Group Flow (vph) 68 998 1292 413 229 231 433 v/c Rallo 0,32 0.49 0.71 0.42 0.54 0.64 0.90 Conal Delay 9.7 11.4 28.2 9.9 33.7 33.8 48.1 Cunw Delay 0.0 0.0 0.5 0.0 0.0 0.0 0.0 Taal Delay 9.7 11.4 26.7 94 33.7 33,8 46.1 oueue Leath 50th (R) 20 202 444 103 117 116 t79 Qpreue Length 95m (A) 22 258 513 194 191 193 0340 Inlimal link Diet (11) 1110 494 660 Tum Bay Length(R) 15D 266 335 380 flue Capacity (0) 211 2030 1809 978 489 490 537 Bluve9an Cap Reeuin 0 0 199 D 0 0 0 Spllbalk CepRaducth 0 0 D 0 0 0 0 ftmp Cap Reducln 0 0 0 0 0 C 0 Reducad vk Redo 0.31 OA9 0.79 GA2 0:47 0.47 8,91 fpm peaddle voema exceeds capeotl, quads Cusue shown Is maslmum eller two cycles. Kthilean 6 Aemclim, Inc. Syndlm 9 Repoli 1111212015 Pae 1 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 8: Table Rock Rd & Hamrick Rd Build Year (Total) Weekday PM Peak Hour ♦ , r l Vcume(veWh) 71 79 19 484 569 26 Sign Contra) Stop Free Free Crede 0% 0% 0% Peak Hour Factor 0,92 0,92 0.92 0.92 0.92 0.92 Hourly flow rate(ryhl 77 60 21 526 616 28 Peoetrane 1 Ian Width (fl) 12.0 WeMdng speed (811) 3.5 Percent kcilpe 0 Right tum Bete ah) Median 4" None None Median ebhege ad) Upelrw elore118) 1078 PX,Platoon wa cland 1200 6831 &e cadding YC 1, adage 1 conlval 42, gap 2 conf nl vcu, unblocked vol 1075 268 288 tC, aingb(a) 6.4 62 4.3 tC, 2 Wage (a) IF (W 3.5 3.3 24 PC queue Bee % 54 84 97 cM cepnBy(vebm) 168 545 824 Volume Tate) 71 86 547 647 Vuluroe Left 77 0 21 0 Volume Rlpht 0 86 0 26 CSH 168 545 824 1700 Vol" ad CepacBy 0.46 0.16 0.03 C.38 Queue Length 95th (8) 54 14 2 0 Cmed Delay(R)474 12,8 0.1 0,0 Lane LOS E B A Approach DNey(9) 27,3 07 0.0 Approach LOS 0 Average Delay 3,6 Inlereecbh Capacity Uelize6an 55,3% ICU Laval of Serves, Are.W. Pedad hint 15 kieelson &Asndetes, Inc. Syr hra 8 Report 111122015 Page 2 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 13. Federal W2V & Northwest DwV Build Year (Total) Weekday PM Peek Hour r 1 Lane configurations i' F t Valium (rehrb) 2 91 a 0 22 22 Sign Control Stop Frte Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 092 0.92 0,92 Hourly flaw III(vph) 2 99 0 0 24 24 Pedesldens Lena Mdih (ft) Walking Speed (10s) Percent Backege Right tum 3ert (vah) Me tion tyFa Noce Nace Media akraga wh) UpeOeom sipal (ft) px, platoon unblocked VC, can>•chn9 whims 72 0 0 VC I, stage I cor[vd vC2 atop 2 crniwl vCu, unblocked vol 72 0 0 tC.III (a) 67 6.2 li tC, 2 Mage (s) tF(a) 3.8 3,3 22 PO queue hes % 100 91 99 cAlcepacly(veh(h) 046 1091 1636 VWuree Tote) 101 "D -48 - -- Volume Left 2 0 24 Vohme Right 99 0 0 cSH 1084 1700 1636 Veins to Capacity 0,09 0.00 Dot Ouaue L.engei 95th (R) 8 0 1 Control Way (a) 8.7 0.0 3.7 Lane LOS A A Approach Way (a) 8.7 0.0 37 Approach LOS A Average Delay 7.1 Intersection Cepacty Ullhatlan 115.2% IDUL"41- ka A Anal le Period (min) 15 Kitteleon 6 Associates, Inc. Synchro 9 Report 1111212015 Page 3 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 14' Federal Wav R Southwest DM Buld Yew (Total) Weekday PM Peak Hour Lane configurations Y A 4 VOMne(Ohlh) 2 2 0 2 22 2 Sign Control Stop Free Free Grade 0% 0% 0% Peek Hour Factor 0.92 0.92 0,92 092 0.92 0.92 Houdylow nte(eph) 2 2 0 2 24 2 Pedestrans Lm Width (N Walking Speed (foal Percent luackpe Right turn Aare (an) Modim type None None Mew enrage veh) llpesem signal (N p%, dial unblocked VC, coil volume 51 1 2 uC1, stage 1 earl all 42, Spa 2 mf all aCu, unblocked all 31 1 2 IC, single(a) 67 6.2 4.1 IC, 2 stage (6) f (a) 39 3.3 2.2 PO queue fres% 100 100 29 cmMigty{N1 I, Ion. 1069 1633 Vokmii11 4 2 26 Volume Len 2 0 24 Vol"flight 2 2 0 GSH 969 1700 1633 VeMmto Capacity, 0.d1 0.60 0,01 Gum Length 96M (n) 6 0 1 COW 0816y (a) SO 0,0 6.6 Lone LOS A A Adamson Oft (a) 6:7 0.0 66 Approach LOS A Average OalCy, 6.6 Iceslion Gepeeity Uft*w 161% ICU IAelelaWNe Analysis Pedod(min) 13 Kitlelson 6 Associates, Inc. Synchro 6 Report 1111212015 Pug.4 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 15; West Hamrick Dwy $ Hamrick Rd Build Year (Total) Weekday PM Peak Hour Lana Configurations F i } h10 Vcume(vsh1h) 78 94 27 10 90 20 51gn Control Free Free Stop Grade 0% 0% 0% Peek Hour Factor 0,92 0.92 0.92 0.92 0,92 0.92 Heudy flow rate(vph) 03 102 29 20 104 30 Pedeebians Lane Wldlh (t) Walking Speed (M) Percent Oloduga Right turn Here (veh) MI type TWLTL TWLTL Mellen arbitrage an) 2 2 Ilpabeam signal (it) PX, platoon unblocked vC, wnfdcing whine 105 212 134 VC1, stage 1 Oaf vol 134 42, stege 2 conf wl 70 vCu, unblocked Vol 155 212 134 tC, Mngle (5) 4.4 &4 0:2 tC, 2 stage (s) 5.4 IF (s) z5 3.5 3.3 PO queue bee % 98 88 97 CM capil(aMm) 1224 041 921 v014111 del 185. .29 20 104 30. Volume Let 0 29 0 104 0 Vohene Right 102 0 0 0 30 cSH 1700 1224 1700 841 921 Volume to Capi 0.11 0.02 0.01 0.12 0.03 Queue Length 95th (t) 0 2 0 11 3 Control Delay(a) 0.0 8.0 OA 99 9.0 Lana LOS A A A Approach Delay (3) 0.0 44 9.7 Approach LOS A Averege Delay 4.2 Intersection CapacityA/Igaeecn 29.7% ICCLIWOtSKVIN A Analysis Period (min) 15 Manor, & Amodetes, Inc. Strohm 8 Report IMV2015 Page 5 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 15: East Hamrick Dwy (FIRM & Hamrick Rd Build Year jolel) Weekday PM Peak Hour Lane Configurations A 4 P Volume(vetvllj 59 45 0 49 0 91 Sign Control Free Frea SDLP Crede 0% 0% 0% Peek Hour Fs*r 0,92 0.92 D.92 D.92 0.82 0.92 Hourly Sow rale (vph) 64 49 0 50 0 99 PadeeMns lane Wift (9) Waking Speed (91s) Percent 9loc lys Rlghl Wm flare (wh) Medlen type TWLTL TWLTL Media aora8e vah) 2 2 Up bean RIVA(It) pX, beton unblocked VC, wftm M9 worm 113 139 Be VC1, stage 1 conf cel 59 42, etlge 2 Mf cel 50 YQ, unblocked cel 113 138 89 tc, single (4) 4,4 9.4 5.2 Z, 2 aege (s) 54 IF (1) 2.5 3.5 33 PC queue Sae % 1D0 100 90 dA e11pd9yw0h) 1301 991 916 V01410M - 1`3 90 g9. Volume Left 0 0 0 Volume RIM 49 0 99 cSH 1700 1700 975 Volume kl Capacity 0.07 0.03 0.10 Queue Length 951h (A) 0 D 5 ContmlCelay(e) 0,0 0.0 9.1 Lane LOS A Appmech Way (3) 0.0 0.0 9.1 Approach LOS A Average Way 3.4 IntaM4Wn Cepxity U0lrtatlon 18.1% WLoWdg&*@ A Analysis Period (min) 15 Wdelson 5 Associates, inc Synchm a Reporl 111192015 Page 5 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 17: Table Rock Rd & Northeast Dwy Build Year (Tota) Weekday PM Peak Hour t 4 Lane CmAqunlions Volum (velim) 50 141 161 453 576 72 Sign Control Slap Free Free Gets 0% 0% 0% Peak Hoar Factor 0.92 0.92 0,92 0,92 0.92 0.92 Hourly flow rate(vph) 54 153 175 492 626 70 PedesMans 1 Lane WMIh (fl) 120 Waking Speed its) 3.5 Percent Blockage 0 Right turn hart (Veh) Median We None Nam Median storage vah) Upstream elgnal (l) p%, Pili unblocked VC, cordSCAeg vNume 1509 666 705 vC1, stage 1 cont wt 42, stop 2 mnf wail vCu, unblocked vol 1509 666 705 Ic, single(5) 6.4 62 4.3 F, 2 stage (e) rt (e) 3.5 3.3 2A PO queue Anse% 46 67 76 cMespacrty(vehm) 105 462 610 Vdume Total -54 f53 i67 --704- Volume Lel 54 0 1T5 0 Velums Fight 0 153 0 76 cSH 105 462 610 1700 Vcume to Capacity 0.52 0.33 0.22 041 Quem Length 951h (A) 59 36 20 0 Control Delay (sl 712 166 5.2 0,0 Lane LOS F C A Approach DNay(a) 30.9 5.2 0.0 Approach LOS U Average Galey 6.3 Intersection Capacity Utifizal 66:6& ICULG*d$WAN [ Analysis Period(m,n) 15 Kileson 6 Associates, Inc. Synchro 6 Report 1111212015 Pegs 7 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 18: Table Rook Rd & Southeast Dwy BuiM Year ITma6 Wmkdov PM Peak Hour 1 1 1 i 4, Lam Corfigurdons 'r' 4 U Volume(vehrh) 6 29 5o 609 688 29 Sign Cnntml Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rale (rote) 5 32 54 682 719 32 Pedestrian, 1 Larne Width (ft) 12.0 Walking Speed (file) 3,5 PemeM Blockage 0 P*I tum film (Ah) Madan type Nw Nan Maden storage An) Upabeem IIWW 00 p%, plsWon wbbckad vC, tnMRmng volume 1835 788 7B0 VC 1, Mage 1 cwf vol uC2. Mega 2 mania uCu, wWodnd vol 1535 765 160 tC, WRO (6) 5.4 6,2 0.3 lC, 2 stage (a) 1F(q 3,5 3.3 2.4 p0 quaue fast% 95 92 93 amelgn8q ielb1l) 120 406 758 VoromeTcw - 37 716 -179 Volume Loll 5 54 0 Volume Wghl 32 0 32 cSH 301 758 1700 Volume 10 cilway 0.12 0,07 0.16 own length 95th (ft) 10 6 0 Control Dtrfy(a) 16,6 1.9 00 Lane LOS C A Approach DWy(1) 16.6 1.9 0.0 Approach LOS C Average Daly 1.3 Intersection Cepeaky Udmatlon 89.6% ICUL&Ade 4h E Analysis Perlod(min) 15 Kitalson a Associates, Inc. Synchrc 8 Report 1111212015 Page 8 Queuing and Blocking Report Build Year (Total) Weekday PM Peak Hour 1111212015 Intersection: 2:1-5 NB Ramos & E Pine St Directions Sened L T T T T R L LT R Marlmum CAU6 (p 99 288 200 350 406 340 208 228 208 Average Queue (1) 32 96 82 199 202 81 125 166 38 gain Queue (e) 70 106 157 331 347 22C 190 231 140 Unk Distance (R) 1153 1153 503 503 662 682 Upstream Blk Time (%) Qwuing Panty ("h) Storage Bey Dist (ft) 150 265 335 Storage Blk Time(%) 2 3 Queulng Penalty(wh) 1 11 Intersection: 8: Table Rock Rd & Hamrick Rd Dimcdom Sersad L R LT TR Maemum Queue(B) 91 72 115 22 Ahrage Queue (8) 45 36 27 1 oath Quwe (10 80 84 91 7 Link Distance (rt) 249 354 985 Uw,eavn Blk Tkm (%) Queuing Penalty (rah) Storage Bay Did (t) IBD Storage Blk Tina I%) Queuing Penalty (wh) Intersection: 13: Federal Way & Northwest D Duero" Sand LR MAAMW Quwe(rt) 57 Averge Qwue (n) 32 SO Quwe 111 51 Link Distance (II) 150 UPaenm BWk Time (%) Quwing Penally (veh) Smug• BayDt" (rt) Scroll, Blk Pm (%) Queuing"(vah) Central Point Coatco TIA SimTrelfic Repast Nlttelwn & Associates, Inc. Pegs 1 Queuing and Blocking Report Build Year (Total) Weekday PM Peak Hour 1111212015 Intersection 14: Federal Way & Southwest Dwy 01mcdons Serwd LR Mmlmum Queue(9) 30 Awrp Quaw (N 2 p5th cku (5) 14 Link Dleenm (ft) 193 Updmmn elk The (%) Quoulnp Pw*d (wh) Smrepsaey 0w(9) Skrape 9Ik Time CA) Queuing Pesky (wh) Intersection: 15; West Hamrick Dwy & Hamrick Rd Diredms Sewd L L R Mmdmon 0uow (Il 50 99 59 Awmpe Qp (9) 4 30 21 9MON M 29 44 45 Link D sWm (ft) 154 154 dpdmreaklkm(%) Qkeukg Fondly (wh) SW*Ik l3w(fI) 150 S(orryo alk Tho (%) OAUhm Pendry (wh) Intersection: 16: East Hamrick Dwy (RIRO) & Hamrick Rd Olmclom Served R ktiknlen Qurlle(M 50 Awrepo Quew (A) 35 95M Q" (5) 5S Wk Dwalm (5) 112 Upamem 5k 1km (%) Qwukp Pocky (wh) SWROWow(n) Skrope Ski, Time (%) o mulnp PemRy ON Central Point Costco TIA SlmTrank Report Kdelaon & Associaks, Inc. Pape 2 Queuing and Blocking Report Build Year (Total) Weekdav PM Peak Hour 11112/2015 Intersection: 17: Table Rock Rd & Northeast Dwy Dkocthm Bewe Medmum Ouaue OD Avanpe Quem (B) eft 0M (to Lk* DMi (1) Upi elk TAM (%) scamp PwWty (ah) SbpBH DW (M Stmp Blk Tin N OmIng Penalq (ah) L R LT TR 162 78 265 41 54 41 127 6 118 63 242 25 197 197 671 364 Intersection: 18: Table Rock Rd & Southeast Dwy Dkac11ee8aeW LR LT TR WWIAOI a m 86 119 21 Aalp Ouaua(8) m M 1 900MAM 47 138 7 Link Dlatance(8) 162 982 871 Upakeemeik71M (%) Oueump Pe1* (wh) SWWBNWit (p Stege ek Tm (Y.) Oueulnp 1MW11(wh) Zone Summary ZOM WMQWAIg PNW 12 Central Point Coto TIA SlmTreft Report Ni6e1ean A Aewcleee, Inc. Pape 3 Queues Central Point Costco TIA 2: I-$ NS Ramps & E Pine St Build Year (Total) Weekend Midday Peak Hour ' y ~ ` 1 T Lane Group Flow(uph) 85 990 1027 291 118 117 351 ah Retlo 0.20 0,45 0.52 0.30 0.34 034 0.84 Control Delay 6.2 9.2 22.1 10.0 31,8 31.7 40.2 Queue Delay 0.0 0.0 0.0 0.0 0,0 0,0 0.0 Total Delay 6.2 9.2 22.1 10.0 31.8 31.7 40.2 Quos L&Vh SM (9) 17 178 296 65 63 62 134 Quake LerrpN 95M (t) 27 257 387 m134 102 102 219 hsrMk91(i Dial(9) 1110 494 660 Tum Bay I.ang81(11) 150 265 335 360 Bass Dowh(wh) 321 2190 1964 980 489 491 639 Stanailim Cap Reducin 9 0 B 0 a 0 a Spltlhaak Cap %@&& 0 0 0 0 0 0 0 SU)"""C Redum a a 0 9 9 0 a Reduced IUih5q 0.20 0.45 0:B2 0.30 024 0.24 0.55 m VaWmebrt9 tlaroor laquemll WAN ed byupN senfIgnel Walson & 8seaclates, Im, Bymhm 8 Repast 1111212015 Page 1 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA B: Table Rock Rd & Hamrick Rd Build Year (Tolall Weekend Midday peak Haur ♦ ♦ t 1 Lern CanSpural A M 4 fi Vol" ("10) 104 77 8 344 410 38 SignC trol Slop Fm I'm arl 0% 0% 0% PeM Hour Factor 0.92 0.92 0.92 0.92 0.92 092 Haurlyoft we (vi 113 94 9 374 446 39 PedmOime 1 Lrtn Wldth(6) 120 W*rlg SPeed (Ne) 3.5 PMM tdeokepe 0 Rpht tum We (Yah) mom type Nave Non Media vionpe vahl UP*Mp d" (10 1076 p)L pleman unblocked 0.91 0.61 0.61 4 -confit wlwr 1158 486 466 uci, dMe 1 mrdwl uC2,s"2cuWW vCu, ml 705 222 246 tc, shgfe (a) 6A 6.2 4.3 1C, 2 etepe (e) IF (a) 3.5 3.3 2.4 p04hnue baa% 65 57 99 cMapedry(SaMT) 326 665 983 OOMneTOW 113 64 363 466 Volume Left 113 0 9 0 Valume Right 0 R 0 39 c6H 325 665 983 1700 VulunM to Copal 0.35 0.13 OA1 029 Ounn Length 95th (t) 38 11 1 0 Control N" (a) 21.9 11.2 0.3 0.0 l.en LOS C B A Approtll Dally (3) 17.3 0.3 00 Al LOS C 3.3 $9.6% ICU Low A &Ma 15 Kill & Aeaociates, Inc. Spxhm 8 Report 11112/2015 Pap 2 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TA 13' Federal Way & Northwest Dwy Build Year (Tote) weekend Midday Peak Hour k t . -1 Volum (vahn) 2 131 0 2 35 30 Sign Carl Stop Free Free Grtla 0% 0% 0% Peak Hour Feeler 0.92 0.92 0.92 0.92 0.92 0 92 Hourly flow W(vph) 2 148 0 2 36 39 Padeeldme lens hider (1) Wai Speed (fV9) powt6lackagl Rlpht turn Am (veh) Msdm type None ler Maden Wage wh) 0ptlM Sl W(1) p%, pli unblocked VC, conflltilinpWlurm 118 1 2 vC1, awe 1 conical 42, Op 2coryi vCu, unblocked vol 116 1 2 IC, I'll (0) 6.7 5.2 4.1 tC, 21mage (e) IF (e) 3.8 3.3 22 p0 quMw, free % 100 87 96 t Willy,(iii 782 1060 1033 VoTMro'3uEf----" --'148' 3-. ft. volume Leff 2 0 38 volwm mgm 146 2 0 cSH 1083 1700 1633 vok" b cmi 9.14 0.0) 0.02 Owue Length 951h (1) 12 0 2 ca"0111W (1) 6.8 0.0 33 LmaLOS A A Alkii Dory(e) 0.8 0A 3.7 Approach LOS A 7.0 26.6% w1mlefemb 15 Kneflacn 6 Associates, Inc. Synchro 6 Reped 11112/2015 Page 3 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 14: Federal Way $ Southwest Dwy Build Year (Total) Weekend Middav Peak Hour t i l Lane Configurations 4' F 4 Volume (whrh) 2 2 0 2 35 1 Sign Conocl Stop Free Free Gros D% 0% 0% Peak Hour Feabr 0.92 0.92 0.92 02 0,92 0.92 Hourly flow rate (4h) 2 2 0 2 38 1 Pedestrians Lane W dlh (8) Walking Spored (Ns) Pxpnlelockya Right turn fare (wh) k1e81an type Nona None Mail storage we) DPIUMI igiw(M) P)( platoon unblocked YG,c Me"wWme 78 1 2 VC 1. stage 1 cart vol JCZ hog's 206nfwl vCu, unblocked vW 78 1 2 IC, dale (a) 6.7 6.2 4.1 IC, 2 stage (a) IF(o) 3.6 3.3 2.2 to queue free % 100 100 98 eMppaclly.(wNh) $33 1069 1633 yaldm TalN -4 - 3 "39 Volume Left 2 0 38 Volume'Rpnt 2 2 0 cSH 944 1700 1633 Volume to Crspadty 0,00 D.00 0.02 Queue Length 95th (8) 0 0 2 GO" Onlay (a) Be 0.0 7.1 Lam LOS A A Approach Delay (s) 6,8 0,0 7.1 Appioadi LOS A Average Dalry 6.9 Inkreeatlon Capedty Wl2a8on III% ICUlwdrifBsoNs A Analysis Period (min) 15 Kldelson 8 Associates, Inc. Synchro 8 Report 1111212015 Pogo HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 15: West Hamrick Rd & Hamrick Rd Build You, I,Totell Weekend Midday Peek Haur Lm Cenigurenons F 1 t R Y MUM (YOMh) 73 144 40 4 139 39 Sign Carmol Free Free Ship Gros 0% 0% 0% Ped Hour Ful 0.92 0,92 0.92 0.92 0.92 0,92 Hourly fmto(yph) 95 157 43 4 151 42 Pedestrians LAN WIE61(6) Waking Speed (Ne) NO Illocill %ht turn fln (Vol Mel typo TWL7L TWLTL Medlin enrage veh) 2 2 9X, platoon unblocked ye. C"MV v6kmr 211 254 163 vC1, wye 1 cont rat 163 vC2, Pop 2 met vw 91 vcu, unClocbE vol 241 254 163 IG*gw(5) 4.4 6.4 6.2 tC, 2 stye (a) 5.4 tF (s) 2.5 3.5 3.3 PO quaw ins% 96 81 95 aM.depaHly:YMh51) 1163 607 667 241 - -49 -' - - 4 T61 42 Valums Left 0 43 0 151 O VaMewltlOht 117 0 0 0 42 OSH 1700 1163 1700 607 687 Vdulm 10 Gepi 0.14 0.04 0.00 0.10 0,05 Queue Lw gth 951h 16J 0 3 0 17 4 car"Oft (9) 0.0 8.2 0.0 10.6 9.3 Lane LOS A B A App6pli Oefay (e) OA 7.5 10.2 Approach LOS B out"MMeb Anelyels Pence! (min) 15 K6hlmn 6 Aseanetea, Inc. Synchm 8 Report 1111212015 Page 5 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 16' East Hamrick Rd(PIRO) B Hamrick Rd Build Year(Totel) Weekend Midday Peak Hour Maine (41n) 47 70 0 44 0 134 Sign Cwlml Free Free Stop orede 0% 096 0% Peak Hour Fader 0.92 0,92 0.92 0.92 0.92 0.92 Hourly Bax no(Vph) 51 78 0 48 0 148 PedesMans Lane wwlh (8) Walking Speed (Na) Paraeal6kwkege ) wwv ypee( NJLTL TWLTL Median stamp wh) 2 2 ubeatw wm (ro pX, platoon unblocked we, taeft Volume 127 137 80 VC1, stage l mnl Vol 89 42, 12 conlVol 48 YCu, unalacked wl 127 137 89 tC."(e) 4.4 64 82 lC, 2 stage (a) 5.4 f (a) 2.5 3.5 33 p0 yaais fres, % 100 100 85 am Cos* (YOM) 12M 901 674 v"'70hl - 12T 49 f40 volume Len 0 a 0 Vol" Right 76 0 146 c9H 1700 1700 974 Voluree to Cepsdty 0.07 0,03 0.15 Queue LengO 9501 (8) 0 0 13 Coattail Way (a) 0.0 0.0 9.3 Lena LOS A App oolh Delay (a) 0.0 0.0 9,3 Approach LOS A UdWition 23.0% ICU L Md&pb 15 Killelson 6 Associates, Inc. Synchm 8Rped Page age HCM Unsignelized Intersection Capacity Analysis Central Point Costco TIA 17: Table Rock Rd & Northeast DPOV Build Year (Total) Weekend Midday Peak Hour t l Lane Wgurallone h P A A VON"(Veh1h) 49 183 224 295 403 85 Sign Control Stop Fme Fre. Grede 0% 0% 0% Peek Hour Fads 0.92 0.92 0.92 0.92 0.92 092 Hourly low rei(vph) 53 199 243 321 438 92 Pedestdms 1 Ilse Width (l) 12.0 Winking Sped (Ne) 3.5 Peroenl Bloekpe 0 Right tum gat (veh) Medlanlype Ilmr Ham Medlen "a veh) PK pWwn unMorked VC. aml1e8ng valme 1293 495 681 VC1, stege l confvol VC2, 1OW2eaffmal vCu, unblocked vol 1293 495 531 tC, give (e) GA 62 4.3 IG 2 "a (s) tF(e) 34 3.3 2.4 PO Owe free% Bo 66 74 CM CW Olry(amm) 135 595 918 Vd II —__. _ __—a —W m__..y�. . Volume Left 53 0 243 0 Volum milm 0 199 0 92 c5H 135 506 11 1700 Volume t6 Gepeellg 0.40 034 0.15 0.31 Queue Length 95th (ft) 42 37 25 0 COnh010eteyle) 40.3 14.3 6.2 0.0 Lane LOS E B A ApprONINDiig(e) 21B 02 0.0 Approach LOS C 8.8 729% IOUL"dsw4u 15 klft.lson 6 Associates, Ino Synchrc 0 Report 11!1212015 Pepe? HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 18' Table Rock Rd & Southeast Hwy BuiM Year (Total) Weekend Midday Peek Hour ♦ 1 1 i Lane ConOquraecns t A Volues(Vai 5 39 75 514 545 41 Sign Control Stop Free Free arods 0% 0% 0% Peak Har Factor 092 0.92 0,92 0,92 0.92 0.92 Hooey flow rete(vph) 5 42 82 559 592 45 Petlastnm 1 Lam W dlh (0) 120 Walking Speed (Na) 3,5 Percent Blockage 0 Right bum Bare (wh) Medlan"ir None Nova Malian sWraps veh) Upa0am *0 0) PX, Platoon unEhdad vC, berate" wlume 1337 618 030 vCi, stage 1 mni vol v02,aalc lwl vCu, unblocked vol 1337 816 1138 tC, Yr 0(a) BA 6.2 4.3 IC, 2 sage (a) 1F(a) 3.5 3:3 2.4 p0 queue free% M 91 91 d4Eapo*lwBml 154 494 080 VoWTMd -49 80 637 Volume Lao 5 82 0 Volu elligkt 42 0 45 cSH 395 880 1700 volume to Cloudy 0.12 0,09 0.37 Queue Length 9511% (it) 10 8 0 Central w(3) 15A 2.4 0.0 Lane LOS C A Appid*hDaily (a) 15.4 2.4 0.0 Approach LOS C Average Delay 1.7 Intawertan CepecBy Ua0sali0n 01.1% ICIi LwMoi4iarvls 0 Analysis Period (min) 15 Kitlelson & Associates, Inc, Sy9chm B Report 1111212015 Paye 8 Queuing and Blocking Report Build Year (Total) Weekend Midday Peak Hour 1 111 212 01 5 Intersection: 2: 1-5 NB Ramps & E Pine St Unctions served L T T T T R L LT R A$dmum a" (it) 73 244 180 221 200 61 148 151 235 Averege Queue (ft) 31 73 56 114 105 30 53 76 39 96s Oww IN 64 IBB 147 205 197 61 114 134 151 Link Distance IN 1153 1153 503 503 682 682 W~ &k Thea I%) Quwkq Penn6y (reh) sww Bey Met (4) 1110 265 335 Smrage Blk Time (%) 2 amino Pw* (vah) 1 Intersection: 8: Table Rock Rd & Hamrick Rd DWI Served L R LT vednunnOme(N 68 SS 135 Avnga Quaw (N 40 34 5 85"Um 63 58 40 Lhk DWnce 13) 249 364 op4Baaln Nk TWN(%) SWIOBWMK(N QwukpPo (veh) 13wuhgP&-^(rah) swwBW ,(N 180 Slangs Bac Tim (%) Q3aaky PAin*(vefi) Intersection: 13: Federal Wav & Northwest D Dlnctlone Swod LR LT kvkvesftregena 9kmep) 82 31 (N 36 1 86B9w1NlNe 57 10 Lkk Diswrce (N 150 177 DaeSfeve Blk'Ikma (%1 Queuing Penely (veh) SWIOBWMK(N SExpa 91k Thee I%) 13wuhgP&-^(rah) Cenlrel Paint Costco TW SknTraBk Repoli KINIson 5 Asscdales, Inc Page 1 Queuing and Blocking Report Build Year (Total) Weekend Midday Peak Hour 1 111 212 0 1 5 Intersection: 14: Federal Way & Southwest Dwy Medmum Queuelf) 67 Averap Queue 111) 5 96th Queue (ft) 29 Link Distance (6) 183 Upetmm 61k Tiro (%) Queuing Pona6y (veh) Stomps Bey Qht (p Slo alp Blk Time (%) Queuing Pmesy (we) Intersection: 15: West Hamrick Rd & Hamrick Rd klwdiirium Quw (9) 46 65 fib 55 Avenps Qukue(it) 2 17 42 29 95N "A (p 15 49 62 46 Link Dswcs(e) 222 154 154 UpeBMh ilk Tim (%) Queuing Penalty (wh) 910" ley 0* (A) 150 Sloraye ak Tin. (%) NOUN Per* (0b) Intersection: 16: East Hamrick Rd (RIRO) & Hamrick Rd Dlncsom Swwd R Maidnum Qusue(8) 107 Avenge Queue (8) 38 951h Quww(A) 69 LM 06wiw(it) 112 UPSOMn Mk TIm(%) 0 Qusukp Penalty (M) 0 Smropq O fMIR) Stange Bk Tkns I%) Queuing Pelalq ("h) Central Point Costco TLA ShTremc Repot ki8elsan 5 Assaciates, Inc, Page 2 Queuing and Blocking Report Build Year (Total) Weekend Midday Peak Hour 11/1212015 Intersection: 17: Table Rock Rd & Northeast Dwy DlrcBone Served L R LT TR Mel Queue (A) 96 95 2116 So Awrele Queue (ft) 43 51 98 4 961A cum (it) 61 72 196 23 Link Mance (t) 197 197 671 381 upon ewn Elk Timis (%) Queuing Penney (wh) Stowell Elk Time (%) Cull Peney (01111 Intersection: 18: Table Rock Rd & Southeast Dwy Malfwau,106M 39 iN 22 Awage Queue (R) 28 39 1 Ift OVA (11), 43 112 16 Link DMtenee(R) 1112 682 671 UpekWO1110 nme(%) Queuing Penally (wh) Seep&ydkt(A) ill 9M Time (%J QwAn9 Penalty(wh) Zone Summary Tree eAMOwiIAPM�:1 Centre! Pont Costco TIA SimTrelBc Fepcn WBMeon 6 Aseectalee, Inc. Page 3 Queues Central Point Costco TIA 2:1-5 NB Ramps & E Pine St Future Year (Total) Weekend Mkday Peak Hour y ~ ` • I Lara Group Flow (YO) 94 1299 1289 377 151 150 410 v/c Rgbo 0.30 0,54 0.90 0.35 0,59 0,59 0.78 Control Delay 4,3 87 20,2 74 45.7 45.4 31.9 Queue Way 0,0 0.0 0.7 0.0 0.0 0.0 0.5 Tobi [Way 4,3 0.7 211.8 7.4 45.7 454 32.4 Queue Length 51Rh (v 11 223 373 93 99 88 84 Queue Length 95th (R) m11 257 m402 m159 147 148 134 Infernal Link Met (1t) 1110 494 850 Tum Bay Length (R) 150 205 335 390 Bre Capadry (vph) 290 2370 2140 1071 340 341 979 Stmation Cap Reduchr 0 0 409 0 a 0 0 SpIlbrk Cap Reducrn 0 7 0 0 0 0 59 Storage Cap Reducln a 0 0 a a 0 0 Reduced We Redo 0.29 054 0,77 0.35 0,44 0.44 0.87 M - VdkMfor99thpercenUbauellelemeWedbyupebeem*nd Keelson 6 Arocierr, Inc. Syracihm 0 Report 11/1 2 2 01 5 Page 1 HCM Dnsignalized Intersection Capacity Analysis Central Point Costco TIA 13' Federal Way S, Northwest Dwy Fulum Year (Total) Weekend Midday Peak Hour 4, t l lam Contgumaons M L 4 Voli(no) 2 134 0 2 35 38 Site Cori Stop Fns, Fm Grob 0% 0% 0% Peek Hour Filar 0.92 0,92 0,92 0,92 092 0.92 Hourly own" (vph) 2 148 0 2 38 39 PednWna L" WMIa (8) iii Speed it P~9lodep Right Wm Bae (we) mom Mae Mea mm Medi alsomp vsh) I phi un8lodud Vic, co1113h8112V8hime 118 1 2 vC1, stage 1 cont val vi stage 2 oci vCu, unbbdmd vml 116 1 2 tC, si (e) 6.7 8,2 4.1 IC, 2 stage (a) f to) 3.8 3,3 2.2 p0 queue hes % 100 97 98 CIA CROly(vit 792 t0o 1633 Volume Total 148 2 77 Volume Left 2 0 38 Volume PogM 146 2 0 cSH 1083 1700 1633 Volume ucpadly 0,14 1 0,02 Onus Length 95h lot 12 0 2 COri Delay (a) 8,8 0.0 37 Lane LOS A A AWOMM Del" (a) 8.8 OA 3.7 Appach LOS A Average Delay 7.0 In8aoc8ar Capcity U0laMn 26,6% ICU lad N SWAM A ArMysis Perod(min) 15 IOlbleon It Associates, Inc. Synchm 8 Report 1111212015 Page 2 HCM Linsignalized Intersection Capacity Analysis Central Point Costco TIA 14; Federal Way & Southwest Dory Future Year Jots) Weekend Midday Peak Hour i a- t /0 4 I.rne ConSgurstions Y F 4 Volume Il 2 2 0 2 35 1 Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.92 0,92 0,92 0.92 0.92 0.92 Hourly saw rete Ivor) 2 2 0 2 38 1 Pedestrian Lane Widen IBI Walking Speed (l7s) Percent BWckye Right Nm Kara (wh) Motion type Nona Nons Maiden storage wh) Upstream signal (B) pX, platoon unblocked VC, conNcsig Volume 78 1 2 VGI stye 1 cardwl VC2, stye 2 control VCu, undoded col 78 1 2 tC, single (1) 8.7 62 4.1 tC, 2 stage (a) &(s) 3,8 3.3 2.2 to queue lee % 100 100 98 aUcapsdly(vehT) 833 1089 1633 vdmTow 4 2 39.Volume Left 2 0 30 Volume Right 2 2 0 cSH 944 1700 1833 valume le Capacity OA0 0.00 0.02 Queue Length 95th (B) 0 0 2 Control Way (e) &B 0.0 7.1 L.mna LOS A A Approach Delay (a) 88 0.0 7.1 Approach LOS A Average Delay 6.9 Inlerascson Cepadly, Utilization 18.8% IC17LAWofsm" Analysis Period (min) 15 Kinalson 8 Associates, Inc Synchm 5 Report 11112/2015 Pop 3 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 15: West Hamrick Rd & Hamrick Rd Future Year (Total) Weekend Midday Peak Hour Lam Conllgurdons Volume IV") 81 144 40 7 139 39 Sign Control Free Free Stop GMs 0% 0% 0% Peak Hour FacWr 0.92 0,92 0.92 0.92 0.92 0.92 Hourlyflowree(vph) 88 157 43 8 151 42 Pedestrians Lem Wsilh (N waking speed (fuel Pertantedukge Rl Irt bum Make (Yoh) Medlin type TWLTL TWLTL Meow storage turn) 2 2 upaCtw*nol(k) p%, passer, unblocked vC, cm8kdk o V*= 245 261 106 vC1, sap 1 miff vul 166 42, di contael 96 tCu, unblocked vol 245 291 106 Ic1*1111 (a) 4.4 5.4 8.2 C, 2 elope (s) 5.4 IF(s) 2.5 3.5 3.3 few 96 81 95 U1queseed (v h T) ilia 803 863 V&"Yvlel 245 43 8 161 - 42 Volume Left 0 43 0 151 0 VolumeRlpM 157 0 0 0 42 cSH 1700 1160 1700 803 693 Valumelocepa9ly, 0.14 0,04 0.00 0.19 0.05 Queue length 95111, (N 0 3 0 17 4 Conbol0eley(c) 0.0 8.2 0.0 10.5 9.3 Lane LOS A 9 A Approach Delay (a) 0.0 7.0 10.2 Approach LOS a Average Delay 4.6 showiclWa Capacity l3Mlhadon 36.8% 83UL"Otsw4w h Analysis Period (min) 15 K ibr on & Associates, Inc. Synchm 9 Repoli 111122015 Page 4 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 16: East Hamrick Rd (RIRO) R Hamrick Rd Future Year (Total) Weekend Midday Peak Hour r 4� i Inlereeclon Capacity Utllipabon 23:2% IOUL"alsv4m Analysis Period (min) 15 Kidelson 6 Associates, Inc. Synchro 6 Report 1111212015 Page 5 Lane Configurdons 1. f M Volume(valuh) 50 70 0 46 0 134 Sgn Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0,92 0,92 0.92 Howdy flaw rate(Vyh) 54 76 0 50 0 146 Pedestdom LAN VAft (k) Walking Speed (lUs) Percent Blockage Right tum flare (on) Medan type TWLTL TWLTL Medan storage Vat) 2 2 UPON sprat(N pX plOwn unblocked VC, conflicting volume 130 142 92 VC1, stage 1 wnl vol 92 42, atop 2 cad vml 50 vCu, unblocked Vol 130 142 92 tc, sln& (6) 4,4 6.4 6.2 tC, 2 step (a) 5.4 IF (a) 2.5 3.5 3.3 p0gueueiree% 100 100 65 old GpacRy(ve") 1264 697 970 V&MTOW 130 50 146 Volume LeR 0 0 0 Vokmm Rdpht 76 0 146 cSH 1700 1700 970 Volume m Capacity 0.06 0.03 0,15 Queue LmVth gft (it) 0 0 13 CMM Delay (a) 60 0.0 9.4 Lark LOS A Approach Delay (e) 0.0 0.0 9.4 Approach LOS A Inlereeclon Capacity Utllipabon 23:2% IOUL"alsv4m Analysis Period (min) 15 Kidelson 6 Associates, Inc. Synchro 6 Report 1111212015 Page 5 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 17 Table Rack Rd & Northeast Dwy Future Year (Total) Weekend May Peak Hour 4% t l ✓ V*m tvalph) 49 183 224 383 492 95 Sign Corbel Stop Free Fee Greve 0% D% 0% Peek Hour Fedor 0,92 0,92 0,92 0.92 0.92 0,92 Hovey Barr r*(Vph) 53 199 243 416 536 92 Pedooblens 1 Lee�na�WpQe (9) 12,0 Spwd 3 Wraerd61001200 0 RIihIWm Race (Veh) miew4 a TWLTL TWLTL Medln elarpe ueh) 2 2 Upobeen Owlift) PX Plebm unblocked Vol ao"AN YD0on1 1277 315 829 vC1, steps 1 rant vel 592 V02, ddklmdval 995 vCu, urbWWd vol 1277 315 628 Lc; 1Mp14(4) 6.8 9.9 4.6 IC, 2 MW (a) 5.6 IF (4) 3.5 3.3 2A PO queue M% 81 71 71 dAi'i"Wvel%p - 288 85 931 QUO111T01d 63 10 243 208 209 ZY 271 Volurne left 53 0 243 0 0 0 0 Volum Rghl 0 199 0 0 a a 92 aSH 258 686 831 1700 1700 1700 1700 vownrbalpachy 0.19 0.29 0.29 0.12 0,12 0.21 018 Queue Length 95th (1a 17 3D 31 0 0 0 0 Cowl 001M (1) 20,3 124 11.1 0.0 0.0 0.0 0.0 Lane LOS C 9 a Appbsci Way (1) 14.1 4.1 0.0 Appraech LOS a 44,5% IOULoddamose 15 Kinelson 9 Associates, Inc. Synchro 8 Report 111.212015 Page 6 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 19: Table Rock Rd d Southeast Dwy Future Year (Toil) Weekend Midday Peak Hour Lane Configurllone }} lF Volum (whm) 5 39 75 601 634 41 Sign Control Stop Free, Fns Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0,92 0.92 0.92 Hourly low rate(vph) 5 42 62 653 689 45 Pedeatdana 1 Lane Width (N 12.0 Walking Speed (1111) 3.5 Percentelodaga 0 Right tum lam (Yoh) MCAan Igo TWLTL TWLTL Median storage rah) 2 2 Upatream signal (ft) 726 PX, platoon undodmd VC, conllcltg vnhlma 1202 368 735 vC1, raga 1 wnf vol 712 vC2. stage 2 wniwt 490 vCu, undadwd vol 1202 368 735 LCI single (a) 6.8 6.9 4.5 lC, 2 stage (a) 5.8 IF (a) 3.5 3.3 2.4 1)0 queue hes % 99 93 89 CM Capacity (OU) 368 534 751 volurne Tow 48 12 327 327 459 274 Volume Left 5 82 0 0 0 0 Volume Right 42 6 0 0 0 45 cSH 586 751 1700 1700 1700 1700 VolhmhetocapecKy 0.66 0.11 0.19 0.19 027 0.15 Ouaoe Length 95th (ft) 7 9 0 0 0 0 CadM Delay (a) 11,7 10A 0.0 0.0 0.0 0.0 Lane LOS 8 8 Approach Delay (a) 11.7 12 0.0 Approach LOS B Average Delay 0.9 Inbuseadon Capacky Llll¢ation 36.3% ICUIMol9aryll. A Analyals Period(on) 15 Ki telson S Assccietes, Inc Synchm 8 Report 1111 212 01 5 Page 7 Queuing and Blocking Report LR Meft"Q"(X( oro Average Dueue (R) 40 w M" (Bl Future Year (Total) Weekend Middav Peak Hour LM Di (R) 150 Upili Ok Ties (%) 1111212015 Intersection: 2: 1-5 NB Ramos & E Pine St sla97fI*ow Uo Storage &k Time (%) *A*PWAKY(Oh) DlrecAom Served L T T T T R L LT R R Maximum Queue 111) 73 203 196 300 292 145 214 370 231 202 Average Clime (R) 35 71 101 190 174 73 B4 124 IDD 23 96 Gme(it) 67 153 195 303 28B 131 176 219 235 120 Link DWence)R) 1152 1152 486 496 676 676 Updvvn elk Tine I%) QmN Penalty (on) slo*say OW IT 150 286 335 390 Storage III Time I%) 0 1 QueWeg Pei ("h) 0 2 Intersection: 13: Federal Way & Northwest D Diredhm Served LR Meft"Q"(X( oro Average Dueue (R) 40 w M" (Bl 63 LM Di (R) 150 Upili Ok Ties (%) Oefp Peadty (veh) sla97fI*ow Uo Storage &k Time (%) *A*PWAKY(Oh) Intersection: 14: Federal Way & Southwest D Diredons Saved to MaknueOU"(h) B6 Avenge Liueue (R) 6 Oft I ift) 32 Link Dwi(it) 182 Up lMkTRM(%) Dueukp Penalty (Yah) ftropeeeyekt(R) Soi Blk Time I%) OWN 7MI1e9y(Y!h) Cenlral Paint Costco TIA SinnTra is Report Kitlelecn & Aesodates, Inc. Page 1 Queuing and Blocking Report Future Year (Total) Weekend Middav Peak Hour 11112/2015 Intersection: 15: West Hamrick Rd & Hamdck Rd Directors Sarwd TR L L R &Uxkw Queue(R) 40 70 120 30 Awrsp Queue (4) 1 12 43 24 85e Quaae(R) 13 43 83 42 Lour Dertence (R) 222 154 154 Upensot elk This (%) Quaueg PenMh (wh) Queuing Penaly (wh) 91tm1114By DIM(10 Swap 8*DM(1) 1W 150 Storage elk rine (%) Storage 61k Tens (%) QueAng Perky (wh) Intersection: 16: East Hamrick Rd (RIRO) & Hamdck Rd Deeckne Seined R Medmue Qeae(1) 77 Aw age Queue (R) 36 9ah ares(it) 55 Link Delo ne (R) 112 Upe6errr Sk Time (%) 45 Quwing Penalty (wh) ag SWW Bey Diet M 951h Qusus(R) Serape BA Tine (1L) 65 Quwing Penal (W) 55 Intersection: 17: Table Rock Rd & Northeast Directions Served L R L TR Maldmue Oueua(R) 99 75 1N 104 Awrspe Queue (11) 45 41 ag 14 951h Qusus(R) 58 65 176 55 Llnk Distance (R) 179 178 364 Up~ BBt Tee (%) Quaueg PenMh (wh) 91tm1114By DIM(10 1W Storage elk rine (%) Queuing PMaly(wh) Cenher Point Ceelca TIA SlmTraffc Repan KRMMon 5 Aaeocis es, Inc. Page 2 Queuing and Blocking Report Future Year (Tottl) Weekend Midday Peek Hour 11112/2015 Intersection: 18; Table Rock Rd & Southeast Dwy Oh¢tlone5eved LR L TR Medmum Oueue(A) 54 102 51 Average Oueue(0) 24 30 2 05th Onus (d) 47 72 17 Link OlSlanae (1) 144 572 Up"arn Silk Time (%) Queuing Penalty (Ohl Stomps Say DISI (t) 25D Sborage Slit Than (%) Oueung Penalty (Ohl Zane wlee Ouelittg Penalty: 2 c R N PMdcolbo TA SlmrrMk Regod 01I & Aaeuokin,, Inc. Page 3 Queues Central Point Costco TIA 2: 1-5 NB Rafltas & E Pine St Future Year (Too) Weekday PM Peek Hour -# t r Lane Group Flow(vph) 05 1317 1639 529 294 295 546 alc Rego 0.64 0.80 0.02 0,49 084 0.04 0.60 Gomel Delay 20.0 10.2 30.1 7.5 56.5 56.3 35.6 Dune Delay 0.0 0.0 20.0 0,2 00 0.0 2.3 Total Delay 20.8 10.2 58.2 7,7 56,5 56.3 37.9 Queue two Met (t0 19 265 587 101 175 176 131 Queue Length 95th (8) m30 326 m624 m121 #310 #311 200 Internal Wk Dlot(Ip 1110 494 850 Tum Bay Length (8( 150 265 335 350 Seem, copedy (yph) 157 2179 1087 1079 374 376 715 Starveeon cap Reduces 0 0 430 104 a 0 0 Spltlheck cep R.eludn 0 a 0 0 0 0 T7 Stange Cep Reeuctn 0 0 0 0 0 0 0 Re ll vk Roo 0.54 0.00 1.05 0.64 0.79 0.78 0.86 Queue alnwn le meumum Weer lata cycles. M Volume ler oath pereentlb nodus is metered by upstream signal. Kihelson &Msocletes, Inc. Syncmm 6 Report 11112@015 Page 1 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 8: Table Rock Rd & Hamrick Rd Future Year (Total) Weakdar PM Peak Hour Lane ConApwallons X P 1 }f }} Volum (ve") 72 89 26 615 709 27 Sign Control Stop Flea Free Olde 0% D% 0% Peak Hour Fedor 0.92 0.92 0.92 0.92 0,92 0.92 Hourly flow rem lvgh) 78 97 27 888 771 29 Pedxmarm I Law Wd01ft) 12,0 Walking Speed (ftys) 3.5 Psmant8hdus" 0 Right Wm We (reh) MdI TWIT TWLTL Mdmn starege vert) 2 2 UPrroono 1piel 1076 PX, Pmlcon unblodo d VC, eonlUcglpwWrn. MIS 401 901 VC1, stege 1 Wfvat 786 vC2, imp 2mnhvol 389 vCu, unblocked wl 1175 401 801 IC,WI(e) 8,8 6.9 4.6 tC, 2 stage (a) 5,8 T (s) 3.5 3.3 2.4 PC queue he % 79 84 96 d.4aepe64("") 370 801 705 VeMrTotal 76 97 31 394 334 514 286 Volume Left 78 0 27 0 0 0 0 MUM Nght 0 97 0 0 0 0 29 c5H 370 604 705 17x0 1700 1700 1700 VOIm Cepsdty 0.21 0.16 004 0.20 0.20 0.30 0.17 Queue Length 95th (h) 20 14 3 0 0 0 0 Card Way (a) 17.3 12.1 103 0.0 0.0 0.0 0.0 Lane LOS C 8 8 Appmeoh Delay (a) 14.4 CA 0.0 Approach LOS a Amp Delay 1.1 Intersection Cepeclty UUlhatlon 34.9% ICU I"OfBe In A Anetyals Farad (min) 15 Seteki a Associates, Inc, Synchm 8 Report 11112/2015 Page 2 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 13: Federal Way & Northwest Dwy Future Yean(Total) Weekday PM Peak Hour 4_ 1 I V i Lena ConOgundons M F 4 Volume(Whh) 2 111 21 2 22 22 Sign Control Slop I'm Free Orale 0% 0% 0% Peak How Factar 092 0.92 C.92 0.92 0.92 0.92 Hourly low We (vin) 2 99 23 2 24 24 Pedaablans Lane Wldlh (8) Walking Speed (Ne) Percent Blockage Right tum lore (vat) Median type Nana None Median storage veh) UPWW DW&l (8) pX, platoon unblocked VC, conNcing valuma 98 24 25 vC1, stege 1 MM vd vC2, stage 2 comf cel vCu, unblocked vul e6 24 25 tC, 91,1110,11 (e) 67 0,2 4.1 IC, 2 saga (3) HF (a) 3.8 3.3 2.2 PO queue hes % 100 91 99 CMMS* WA) 921 1058 1603 vdleyne diel - 1101 25 -" 48 Volume Leh 2 0 24 Volume Ri 99 2 0 CSH 1052 1700 1603 Volumelocapatiy, 0.10 001 0.01 Queue Length 95th (0) 6 0 1 Conal Dolay(a) 8.8 0.D 3.7 Lana LOS A A Approach Delay (a) 8.8 0.0 3.7 Appmadl LOS A Avenge Delay 6.1 Intersection Clickki Utlliza0on 22.1% Ig21wNd8wlw A Analysis Pence (min) 15 IOdelecn 6 Associates, Inc. Synchro 8 Repan 11117/2015 Page HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 14' Federal Way & Southwest Dwy Future Year (Total) Weekday PM Peak Hour Lane Confgunpons M t. Volume(00) 2 2 21 2 22 33 No Control Stop Free Free OrYY 0% 0% 0% Peak Hour Fodor 0.92 0.92 0.92 0.92 0.92 0,92 Heody bay mh(von) 2 2 23 2 24 36 Pamirom Leet Wldtlr(6) WakNp speed frog Pwroerd 6kmktpe Rightism flan (ah) m"m type None N NOM fMtlen stamp vth) Upelrne eigml (ft) PX, pknan Undacktd vC, com"WWme 106 24 25 41, stop 1 cpnf vol 42, tope 2 cmf vol vCu, unhlacked vol 106 24 25 G, tkgle(t) &1 62 41 G, 2 phot (e) Ile (5) 3A 3.3 22 ;kiNpany.(r�hnrl i61 4066 4603 -4 25 60 - - - — - Volume Left 2 0 24 Volum %ht 2 2 0 CSH 916 1700 1603 Volume to Cept00y 0.00 0.01 041 Queue Length 95th (a) 0 0 1 Comad32ie W 6.9 0,0 3.0 Lam LOS A A Approon DOW (0) 6,9 U 30 Approoch LOS A Uttzon 19.9% ICUIMef$WON 16 IGlklaon A Associate., Inc. Synchro 6 Report I V1 2/2C15 Page 4 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 15: West Hamrick Dwy & Hamrick Rd Future Year (Total) Weekday PM Peak Hour Ktelson &Associates, Inc. Synchs 8 Repan 1112M15 Page 5 y 1 l ~ Lane Configuraticns P ? 1 M Volum (veh/n) 87 94 27 25 96 2B Sign Conlml Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0,80 080 0,80 0.00 0.80 080 Hourly Bow rele(vph) 109 118 34 M 120 35 Pedestrians Lane Wii (ft) Waking Speed! (Ns) Peroentalmoki Right Nm Baro (veh) Madlm lype TWLTL TWLTL Medlin stmege veh) 2 2 Upstam signal (ft) pX, ple400r unaltered vC. mormiBng volume 226 286 168 vCt, einge 1 mnf vol 188 vC2, steps 2 mnf vol 99 vCu, unblocked vin 226 268 166 tC, single (a) 4-.4 64 62 tC, 2 stage (e) 5.4 de (a) 2,5 3.5 3.3 PO 4ueue hee% 97 85 g6 eMcapacity(yb�A) 1179 804 882 Volume TOW - 226 34 81 120 --36 --- VoNme Left 0 34 0 120 0 Volume Right 118 0 0 0 35 cSH 1700 1179 1700 804 002 Volume to Capacity 0.13 OA3 0.02 0.15 0.04 queue Length 95th (ft) 0 2 0 13 3 Coni (Way (a) 0.0 B.1 0.0 10.3 9,3 Lore L08 A 8 A Approach Delay (a) 00 4.2 10.0 Appri LOS B Average Delay 4.1 ellermlern Cepedty Mission 30,3% CUL"01-4 A Analysis Perod (min) 15 Ktelson &Associates, Inc. Synchs 8 Repan 1112M15 Page 5 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 16: East Hamrick D" (RIRO) & Hamrick Rd Future Year (Total) Weekday PM Peak Hour ecu 141ewaierwn AnOye(s Pedod(min) 15 Hittelson &Associates, Inc. Synchm 6 Report 1111212015 Page 6 y , 41 ~ Lane ConAQure50ns A 1' Veto"(uahlh) 70 45 0 52 0 91 Sign Control Frea Free Slop Grede 0% D% 0% Peak Hour Factor 0.a0 060 oaa 0,a0 0.60 0.60 Hourly kw rete(0) 66 56 0 a5 0 114 Pedestrians Lne Width (R) Walking Speed (Me) Proem 9iockye Right Wm dare (awl 14edlen type TWLTL TWLTL Median series rah) 2 2 dpeven ekn+(R) px, platoon unaloded vC, conmaklg volum 144 tet 11e VC1, stege 1 Gad val 116 vC2, 9e9e 2 aenlwl 65 vCu, unblocked val 144 161 lie IC, e60 N 4.4 5.4 6.2 IC, 2 elage (e) 54 IF(3) U 3.5 3,3 PC queue tree % 100 100 66 cm awatty*Al) 12M 672 942 Vwdl'1k T011e iM 65 04 Volume 1 0 0 0 Vaum4Rlght 56 0 114 GSH 1700 1700 942 Volume to cowIlr 0.66 0.04 0.12 Duous Length Man (R) 0 0 10 ConOM Delay (a) 0.0 0.0 9.3 Lane LOS A AppNKfi Dway (a) 0.0 0.0 9.3 Approach LDS A ecu 141ewaierwn AnOye(s Pedod(min) 15 Hittelson &Associates, Inc. Synchm 6 Report 1111212015 Page 6 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 17Table Rock Rd & Northeast Dwy Future Year (Total) Weekday PM Peak Hour Lane Conflguaki 4 B 1 bb Bt. V&ma lvelvhl 5o 141 161 590 726 72 Sign Conhol Slop Fare Free Grade 0% 0% 0% Peak Hour Factor 092 092 9.92 0.92 0.92 0.92 Houdy Bow Mile (vph) 54 153 175 641 789 78 Pedemnans i Lane WkM (ft) 12.0 Walking Speed (fba) 3.5 Pwant Blockage 0 Rlghl tum Ben (wh) Median type TWLTL TWLTL Meclan Stange van) 2 2 Opelaamalgni Int p%, plow unblocked vC, conAla'ng volume 1500 435 BBB VC1, ii t wnf Val 829 VC2, Sage 2 anf vd 671 vCu, unblaoked vol 1500 435 888 to, ahlgb (a) 6.8 8.9 4.5 C, 2 Mage (c) 5.8 IF (5) 3.5 3.3 2.4 p09ueue Ink, % Bo 73 74 cm own*(Vetuh) 208 574 681 vok ieTiow 64 'i5a 175 32T 821 _5P0 &N Volume Left 54 0 175 0 0 0 0 Vaime Rght 0 153 0 0 0 0 78 GSH 268 574 661 1700 1700 1700 1700 VOPonte to Capacity 020 0.27 0.28 019 0.19 O:N 020 queue Length 95m (ft( 19 27 27 9 0 0 0 Control Way (a) 21.8 13.5 12.4 0.0 06 0.0 0.0 Lane LOS G B B Approsb Way (9) 15.7 2.7 0.0 Approach LOS C 47.3% aLWN B7BMNs A 15 Kittelson & Associates, Inc. Synchro B Rapolt 1111 212 01 5 Page 7 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA I& Table Rock Rd 8 Southeast DwY Future Vear (Tool) Weekday PM Peak Hour 1 t l Lane Configurations tie 4 it to Volum (00) 5 29 50 745 838 29 519n Control Stop Fm Free Grade 0% 0% 0% Peak Hour factor 0.92 092 0.92 0,92 0.92 0.92 Hourly Bow rala(vph) 5 32 54 810 Bit 32 Le NMI (0) 12.0 Walking Speed (fall 3,5 brunt llpLiege 0 Righttum Sen (Ah) Ms4len type Tri4TL TWLTL Median acrap awh) 2 2 Upelmm algrul m 728 pX, platoon unIoDow vC, unBleft wkime 1441 472 943 Vol. stop 1 mf vol 928 vC2, elepe 2 canfW 814 vCu, unblocked vd 1441 472 943 tC, single (a) 6.8 6.9 45 IC, 2ekape(a) 5.8 IF (a) 3.5 3.3 2.4 no queue free% 95 94 91 aMslpw#y,tMMl) 801 bU Bib Volu"Toiet 37 N 485 106 807 335 Volume Left 5 54 0 0 0 0 Volume Not 32 0 0 0 0 32 cSH 486 616 1700 1700 1700 1700 Voum bocwa* 008 0.08 0.24 0.24 0,36 0.20 Quem LengOi 95tH (8) 6 7 0 0 0 0 Banldoeley(a) 130 11.4 6.0 C9 0.0 0.0 Lane LOS B B Appmadl OWay(a) 13.0 0.7 0.0 Approach LOS B Average oatryry 04 In*WA,'Bpk* UBlhetlen 42.0% ICU Legal afavAn A Analyals Perod(Mtn) 15 Kmaleon 8 Assodates, Inc. Synchra 8 Report 11112/2015 Page Queuing and Blocking Report Future Year (Total) Weekday PM Peak Hour 1111212015 Intersection: 2: 1-5 NB Ramos & E Pine St Cremona Served L T T T T R L LT R R Mavhnun Queue h7 96 191 239 377 376 340 410 536 562 230 Average Queue (11) 47 106 126 245 235 123 239 293 179 61 95th Queue (ft) 90 190 213 396 385 290 422 506 344 236 Link Ontariw (ft) Ouauki9 Penalty ("N 1152 1152 488 486 676 676 UpsOeem Elk Time I%) Queuing Penally(veh) Sturap Bay Did (ft) 150 265 335 390 Storage Elk Time p6) 2 5 0 7 15 Queuing Penalty(Yoh) 2 24 0 18 40 Intersection: B: Table Rock Rd & Hamrick Rd Directions Served L R L TR Mall Okaue(A) 92 69 53 22 Average Qusus (R) 47 39 10 1 95th Queue (it) 86 58 38 10 LA Dlefnm (9) 236 976 Upsol Elk Time (%) Queuing Penally Ivor) SOW Bey Dat (10 160 160 Storage Blar Tkee (%) Ouauki9 Penalty ("N Intersection: 13: Federal Way & Northwest D Directions Served LR Mekhnun Qusue fN 0 Avenge Call (a) 32 95th Queue (ll) 41 Link Dletance (tp 150 Upe9ve111 Blk Tkee (%) Queulrq Pervi y (veh) Storage all (B) Storage Elk Tkne (%) Oueuing Penury (Ah) Central Point Caalco TIA Sjrl Report Klaelson &Assodetes, Inc. Page l Queuing and Blocking Report Future Year (Total) Weekday PM Peak Hour 11n2n015 Intersection 14: Federal Way & Southwest Dwy AS 70 Directions Served LR LT Maximum Queue(A) 30 31 Average Queue (ft) 4 1 95M Qurr(A) 20 10 Lmk Distance (R) 162 514 Ilpetrern Elk Tkn (%) 154 Queukp Pensky (on) upstrekm Be rem (%) $torsos Bey Date (ft) Storage Blk Time (%) Queuing Penalty (on) Queuing PenaAy (rah) Intersection 15: West Hamrick Dwy & Hamrick Rd Dlncdona Served L L R Mulmum games (it) AS 70 51 Avenge Quakes (A) A 32 19 9filh Qurla (A) 36 48 44 Lmk Distance (ft) 154 154 upstrekm Be rem (%) Queuing Penalty (on) Stomp Dy Dte(A) 150 Storage Lek Tani (%) Intersection 16• East Hamrick Dwy (RIRO) & Hamrick Rd Demm"Sr4rd R k4rdmum Qusue(A) 54 Average Qurw (1) 33 951h dueue(A) 44 Link D'etrice (M) 112 um"m m Blk Time (%) Queuing Psmky (an) Storage Beyoldt') Storage Blk Tines (%) Queuing I>aeefty ("h) Central Point Costo TIA 51mTraffic Report Kinsaun &Asaocietes, Inc. Page 2 Queuing and Blocking Report Future Year (Total) Weekday PM Peak Hour 11/1212015 Intersection: 17: Table Rock Rd & Northeast Dwy Medmum Queue (10 74 Average Queue (ft) 35 95th Queue (ft) 79 Link 019mnw (ft) 179 Upeeeem Ilk Time (%) 109 Queuing Parody (veh) 20 blame ley Dia (A) 144 Stamgs Sk Tlme (%) 394 QwMg Penny (van) 97 154 22 22 44 52 1 5 73 109 to 20 179 144 364 394 250 Intersection: 18: Table Rock Rd & Southeast Dwy Dlnrcilons Served LR L MWmun Queue 52 79 Averepe Queue( R) 19 27 95th Queue (9) 47 65 Link Warm (R) 144 Upelman IIATiiw (%) Qwing Panay (veh) 6tunpeayoln(11) 250 SlorVo &k Time (%) Quaft Penally Kehl tar •lee Qwkq Penalty: 63 Cental Point Coaled TIA SimTraft Report Mean 6 Aewdarb, Inc. Pepe 3 Public Works Department A Matt Samitore, Director CENTRAL- - POINT REVISED PUBLIC WORKS STAFF REPORT January 5, 2016 AGENDA ITEM(S): Costco Membership Warehouse and Four (4) Island Fuel Facility Applicant: Costco Wholesale; Agent: Steve Bullock, MG2 BACKGROUND: The applicant is requesting a Conditional Use Permit (File No. 15022) and Site Plan & Architectural Review (Pile No. 15028) approval for the construction of a Costco Wholesale membership warehouse, including a four (4) island fuel Facility, with a scheduled opening date Fall 2016. The 18.28 acre project site is located on four (4) undeveloped lots within the Federal Way Business Park Subdivision. As a previously platted subdivision all utilities, with the exception of transportation infrastructure, are available and adequate to service the project. The applicant has prepared a Transportation Impact Analysis (TIA) I identifying and addressing transportation impacts and mitigation measures. The TLk was prepared in accordance with input from the City of Central Point, City of Medford, Jackson County and the Oregon Department of Transportation. The TIA took into account the County's Table Rock widening project (four travel lanes, a center tum lane, bike lanes and sidewalks, and signalization of Table Rock Road and Airport Road) scheduled to begin construction one year (2017) after the opening of the Costco project. EXISTING INFRASTRUCTURE Water There are 8 -inch waterlines that exist in Hamrick Road and Federal Way. Streets. Hamrick Road is a City Collector Street. rhe right-of-way in front of the subject property varies from 72-76 feet, which is adequate to serve the proposed project. Slormwatec There is a 36 -inch storm line in Hamrick Road. TRAFFIC IMPACT S& MITIGATION: The TIA evaluated twelve (12) intersections deemed to be affected by the project. Four of the intersections have issues at the opening of Costco (Build Year Fall 2016). Those intersections are: L Table Rock Road & Airport Road (Jackson County). Currently, this intersection operates at an unacceptable Level of Service (LOS F)- This status persists at Build Year and will be resolved upon completion of the Table Rock Road Improvement project in 2017. Because of the timing between Build Year and completion of the Table Rock Road project no mitigation has been proposed or required by the County. 2. Table Rock Road & Hamrick Read (Jackson County/City of Central Point). The applicant has requested full access movements on the two access driveways on Table Rock Road. Per the County, Transportation Impact Analysis Central Point Cox= Uevelnpment, Kittclson & Assacieres, Inc., October 2015 140 South P Street Central Point, OR 97502 •541.664.3321 Fax 541.664.6384 3. access on Table Rock Road will be limited as follows: a. Prior to completion of the Table Rock Road project, both access drives will be limited to right-in/right-out movements. Median islands will need to be installed by the applicant to restrict access movements. b. Prior to the completion of the ]'able Rock Road project, for the Table Rock Roadiffmarrick Road intersection the applicant will be required to construct a center mru lane and refuge lane within the existing Table Rock Road right -of way. c. Upon completion of the 'Fable Rock Road Improvement project, access movements will be limited to right-in/right-out, and left -in movements (no signalization) for the two access driveways on )'able Rock Road. 4. Northbound I-5 OffRamp(ODO]'). On the opening date for Coseco, the NB 1-5 off ramp will exceed the allowable volume to capacity (v/c) ratio, triggering the need for dual right mm lanes (TAMP 33 Project No. 9). Thu cstimatcd project cost is $1.3M_ The project cost sharing shall be as follows: ODO1', $800,000 Costco: $377,000 (Not to exceed) City: 5123,000 (Not to exceed) Per COOT, construction will commence at the earliest possible date. The applicant's proportional share will be payable to the City of Central Point prior to issuance of a building permit and is not SDC eligible. Airport Road & Biddle Road (City of Medford). The TIA indicates that the westbound approach of Airport and Biddle Road exceeds the level of service standard for the City of Medford. Mitigation measures were not addressed in the TIA. Based on comments from the City of Medford, the Rogue Valley International Airport is opposed to a median at the intersection of Biddle Rd and Airport Road. T'he City of Medford recommends a condition that requires the developer to pay a proportional share toward a future traffic signal at this intersection. The estimated project cost for a traffic signal at this location is $450,000 including design, construction, and inspection. The development's contribution is 10% based on additional traffic at this intersection per the Traffic Impact Analysis, dated October 2015, prepared by Kittelson and Associates, Tue. This results in a $45,000 contribution from the developer to this future project. 6. Table Rock Road & Momnnide Street (City of Medford). At the intersection of Table Rock Road and Morningside Street the City of Medford recommends a condition that requires the developer to pay a proportional share towards a future left turn lane at this intersection. Per the City of Medford letter dated December 24, 2015, this development will increase PM peak hour trips through the intersection by 20%. The City of Medford estimates the total cost for a left turn lane at this location to be 5300,000 including design, construction and inspection. A 20% contribution would result in a $60,000 contribution from the developer to this future project. 140 South P Street Central Point, OR 97502 .541.664.3321 Fax 541.664.6384 It should be noted that the IIA indicates that by 2020 additional lane configurations will be needed for the intersection of East Pine Street/Hamrick Road. The City of Central Paint is tentatively scheduled to complete these improvements by 2018, including improvements to the North-South Traffic to include a receiving lane, a thin lane, and designated right and left turn lanes on Hamrick Read North and South of the intersection. No additional improvements- will be made on E. Pine Street/BJddle Road as part of this improvement project. APPROVAL: 1. Oregon Department of Transportation. Prior to issuance of a building permit Costco shall enter into a Cooperative Improvement Agreement with the Oregon Department of Transportation (ODOT) , ec a similar agreement acceptable to the City and ODOT ("Agmernent"), to fund development and construction of a dual right turn lane at the I-5 Exit 33 northbound off ramp. The estimated project cost is $1.3M. The Agreement shall distribute costs as follows: ODOT $ 800,000 Costco: $ 377,000 (Not to exceed) City' $ 123,000 (Not to exceed) Total $1,300,000 Costco's contribution shall not exceed $377,000 and shall be paid prior to issuance of a building permit. 2. Transportation Conditions Jackson Comity Roads. The following addresses Jackson County Roads conditions of development only. See Jackson County Roads memo for general comments not imposed as conditions of development. A. Jackson County Roads, Condition 1 Prior to issuance of a Certificate of Occupancy, the applicant shall construct a left tum and left receiving lane on Table Rock at Hamrick Road. The tum and receiving lanes shall have adequate queuing to ensure safe and efficient operation of the intersection during the trial year of opening. Applicants Engineers shall prepare plans identifying the length of improvements. Plans shall be approved by Jackson County Roads and City of Central Point prior to issuance of a building permit. This improvement is not System Development Charges (SDC) eligible as it is in exchange for the required frontage improvements. This work will require a Minor Road Improvement Permit from Jackson County. B. Jackson County Roads, Condition 2 — Prior to issuance of a Certificate of Occupancy the applicant shall construct median islands in Table Rock Road in front of the two Table Rock Road approaches. Until completion of the County's Table Rock Road project these two Table Rock Road approaches will be limited to right-in/right-out. This work may be included in either the Minor Road Improvement Permit or the Commercial Approach Permit. C. Jackson County Roads, Condition 3 — As part of the Table Rock Road Project, the Table Rock Road approaches will be constructed as right-in/left-in/right-out movements. The Table Rock Road Project will install the medians as part of the Table Rock Road Project's expenses. 140 South 3rtl Street • Central Point, OR 97502 •541.664.3321 • Fax 541.664.6384 D. Jackson County Roads, Condition 4 -Al the County's Table Rock Road Project's expense the County will install a new signal at Airport Read and Table Rock Road. E. Jackson County Roads, Condition 9 —The applicant shall submit construction drawings to Jackson County Roads and obtain county permits as required. F. Jackson County Roads, Condition 10 -Prier to the issuance of a Building Permit the applicant shall obtain Commercial Approach permits from Jackson County Roads for any new approaches or improved approaches to Hamrick Road and Table Rock Road. The paved approaches shall have a 30' radii and a 40' width. Jackson County Roads requires the removal of any existing driveways not being used on Hamrick Road and Table Rock Road. G. Jackson County Roads, Condition 13 —Utility permits are required from Jackson County Roads for any utility work within the county road right-of-way. H. Jackson County Roads, Condition 16 — Prier to issuance of a Building Permit if drainage is directed to Hamrick Road and/or Table Rock Road, plans shall be submitted to Jackson County Roads for review and comment on the hydraulic report including the calculations and drainage plan. Capacity improvements or on-site detention shall be installed at the expense of the applicant. Upon completion of the project the developer's engineer shall certify that construction of the drainage system was constructed per plan and a copy of the certification shall be sent to Jackson County Roads. 3. City of Central Point A. HamrickRoad and Federal Way Improvements — Prior to Public Works Final Inspection, the applicant shall install sidewalks and street noes per the Public Works Department Standards and Specifications. B. Public Works Standard Specifications — The applicant shall use the 2014 revised Public Works Standards and Specifications for all new construction drawings. 4. City of Medford A. Per the City of Medford letter dated January 5, 2016, prior to issuance of a building permit, the applicant shall provide evidence that it has contributed toward the construction of signalizafion improvements at the intersection of Airport and Biddle Read. The applicant's share of the signalization improvement shall not exceed $45K, which shall be payable to the City of Medford. B. Per the City of Medford letter dated January 5, 2016, prior to issuance of a building permit, the applicant shall provide evidence that it has contributed toward the construction of left turn lane improvements at the intersection of Table Rock Road and Momingsidc Street. The applicant's share of the left mm lane improvement shall not exceed $60K, which shall be payable to the City of Medford. 140 South 3"d Street Central Point, OR 97502 •541.664.3321 Fax 541.664.6384 MA KSON COUNTY J Rocads December 10, 2015 Attention: Stephanie Hcltey City of Central Point Planning 140 South Third Street Central Point, OR 97502 Rads ATTACHMENT "E" E,I.u'l, R11ka xunly, P.E. caamy Enrinvar 2004nWn e]. WhIlacry.M.180a Peanrr541pr4 MS rav:p41p74e235 xunwa7lavxwncvumy.up m..,.l.cxvancou�Iva,S RE: Conditional Use Permit and Site Plan 8 Architectural Review for construction of a 161,992 square foot membership warehouse and four island fuel facility, including 783 parking spaces and site landscaping off Hamrick Road and Table Rock Road — county -maintained roads. Planning File: 15022 and 15028; 37 -2W -12B Tax Lots 213, 214, 215, and 216. Dear Stephanie: Thank you for the opportunity to comment on this Conditional Use Permit and Site Plan & Architectural Review for construction of a 161,992 square foot membership warehouse and four island fuel facility, including 783 parking spaces and site landscaping on a 18.28 acre site in the Industrial M-1 —zoning district. The project site is adjacent to Hamrick Road and Table Rock Road. Jackson County Roads has the following comments: 1. Prier to opening, Jackson County requests construction of a left turn and left receiving lane on Table Rock Road at Hamrick Road. The turn and receiving lanes shall have adequate queuing to ensure safe and efficient operation of the intersection during the first year of opening. This work will require a Minor Road Improvement Permit from Jackson County, 2. Prior to opening, Jackson County requests construction of median islands in Table Rock Road in front of the two Table Rock Road approaches. Until the County's Table Rock Road Improvement project to complete, the Table Rock Road approaches will be limited to right-inlrlght-out. This work may be included in either the Minor Road Improvement Permit or the Commercial Approach Permit. 3. As part of the County's Table Rock Road Improvement Project, the Table Rock Road approaches will be constructed as right-In/left-in/right-out movements. The County's project will install these medians at the project's expense. 4. The County's Table Rock Road Improvement Project will install a new traffic signal at Airport Road at the project's expense. :1Eny.drylNe .p..nACITJMCP n LM1¢022 A 15025.dm December 10, 2015 Pagc 2 of 3 5. The East Pine/Hamrick intersection will likely fail approximately one year after opening. Central Point should construct improvements to this intersection prior to failure. 6. Construction of the fourth leg of the Table Rock/Airport Road Intersection, with Airport Road Connecting to Federal Way, will significantly Improve traffic circulation in the project area. Jackson County would support any efforts which facilitate this Improvement. 7. Once the fourth leg of the Airport intersection Is complete and connected to Federal Way, the Federal Way access point will become a significant access for the project. The current site plan utilizes Table Rock and Hamrick Reads as the front of the project and for primary public access. Federal Way is prlmarlly utilized for delivery access and as a minor public access. The she plan should perhaps be modified to make Hamrick Road and Federal Way the front of the project to recognize the long term circulation. Regardless of the final "front" of the project, the public access to Federal Way should receive a major upgrade to encourage public use of this access and Improve long term circulation. 5. Jackson County estimates the value of the frontage improvements on Table Rock Road that will not be constructed by the applicant at $480,000. 9. The applicant shall submit construction drawings to Jackson County Roads and obtain county permits If required. 10.The applicant shall obtain Commercial Approach permits from Roads for any new or improved approaches to Hamrick Road and Table Rock Road. The paved approaches shall have 30' radii and a 40' width. Roads requests the removal of any existing driveways not being used on Hamrick Road and Table Rock Road - 11, The oad.11,The posted speed zone for Table Rock Road Is 45 mph, requiring an approach sight distance minimum of 325'. 12. Hamrick Road is a Basic Speed Rule road. The required approach sight distance Is 460'. 13.Utility Permits are required from Roads for any utility work within the county road right- of-way. 14. Please note Hamrick Road is a local road but the soon to be revised County TSP will designate it as a Minor Collector and is county -maintained with an Average Dally Traffic count of 799 as of 8/2014, 150' west of Table Rock Road. December 10, 2015 Page 3 of 3 15. Please note Table Rock Road is an Arterial Road with an Average Daily Traffic count of approximately 13,000 in the project area. 18.If drainage is directed to Hamrick Road and/or Table Rock Road, Jackson County Reads would like to review and comment on the hydraulic report including the calculations and drainage plan. Capacity improvements or on site detention, if necessary, shall be Installed at the expense of the applicant. Upon completion of the project, the developer's engineer shall certify that construction of the drainage system was constructed per plan and a copy of the certification shall be sent to Jackson County Roads. 17. We would like to be notified of future development proposals, as county permits may be required. 18. We concur with any right-of-wey dedicated. Sincerely, �% /'�'/ IZ/-- Mike Kuntz, P.E. County Engineer 00regon Kale Brown, Governor December 14, 2015 STEPHANIE HOLTEY, PLANNER CITY OF CENTRAL POINT PLANNING DEPARTMENT 140 SOUTH THIRD STREET CENTRAL POINT. OR 97502 ATTACHMENT 7" Cn,V. ne"Hr r foITMeP°et•fina Region 3, ErhWEL e I anMW'l Rotl Whia Ciry, Ott 97103 lAlq7746316 1'Ax (5411146397 Re: Cwtco Wholesale Conditional Use Permit: 15022 and Site Plan/Architectural Review: 15028. Thank you for the opportunity to review the Conditional Use Permit (CUP) application, Site Plao/Arehirectuml Review application and associated traffic impact analysis (PIA) for the construction of a 161,992 square foot membership warehouse and four (4) island fuel facility, including 783 parking spaces and site landscaping. The 18,028 acre property is located at the southwest comer of the Table Rock Road and Hamrick Road intersection. 37 -2W -12B Tax Lots 213, 214, 215, and 216. ODOT is requesting that the City of Central Point include the following condition for CUP 15022: • Costco shall enter into a Cooperative Improvement Agreement with the Oregon Department of Transportation (ODOT) to fund development and construction of a dual right tum lane at the 1-5 Exit 33 northbound off -ramp. Costco's share of the estimated $1.3 million improvement shall be limited to $500,000, with ODOT funding the remaining cost of the improvement. You may contact me at 541-774-6399 if you have any further questions or equire additional information. Thank you n house Senior Transportation Planner, Development Review Cc: Ron Hughes, Michael Wang, Catky Hershman, Jeremiah Griffin ATTACHMENT "G" Stephanie Hahey From: Kelly A Akin <KeIIy.Akin®cityofmadford.org> Sant Thursday, Decemher03, 201512:11 PM To: Stephanie Holley Subject: RE: Action Needed Request for Agency Comments on Land Use Applications Stephanie— Thank you for the opportunity to comment on the Costco applications. The City of Medford Planning Department has no comments. Kelly Akin Principal Planner City of Medford Planning Department 411 W 81° Street Medford OR 97503 From: Stephanie Halley Lett: Monday, November 16, 2015 3:51 PM To: KNry A. Akin lsAlact: Action Needed: Request for Agency Comments on Land Use Applications ItllparLrnar High Kelly, The City has received the following applications for Costco Wholesale: Condi Use Permit (File No. 15022) Site Plan & Architectural Review (File No. 15028) This request for agency comments (attached) was also sent to Alex Georgeagch in Public Works. Due to the size of the application, the site exhibits, findings and traffic information analysis have been posted an the City's website at the following location: http,y/ ce t aloo' t ea n a /cd/o olect/ o tco- o ditional-us -oerm'tsite-olan- amhitectural-review. If you have any questions, please feel free to contact me. Sincerely, Stephanie Holley, CFM Community Planner II Clly of Central Paint 14D South 3" Street Central Point, OR 97502 Deeks (541) 664-7602, Ext. 244 Fox: (541) 664-6384 www cenlralooinaracion.00y ATTACHMENT"H" ,�f,Y fFY[0 ROGUE VALLEY SEWER SERVICES W tylion: I a Wee Vile, Road, Cent I Poi, OR Mallet, Address: P O. Brix 113Q Coral Po[ , OR 7M 0005 4Tw,Osl=6300.Fu O4O6647171 wwwAvSS.us November 16, 2015 Stephetde Baht, City of Central Point Planning Department 155 Sowh Second Street Ccnaa] Pont, Oregon 97502 Re: Pile 15022 CUP and 15028 SPR — Cearco Wholnate,'faa Lon. 213, 214, 215, and 216, MAP 372W12R Sanitary sewer sevice to the proposed development can be had by connecting to the esistiog 8 inch fewer main on Federal Way. The connection can be done either as a innate service lateral or a public main lion entensioo. There Is an B Loch pipe tattered to the property at the Northwest comm that would fsriloara this Connection. A pneaee servlet, lateral cenamdoo willenquire. a permit from RVSS, which w11 he issued upon payment of od.1ta development fee.. A public sewer eacension must be designed by a bemsed e.,irtea and cooaon ,cd to accordance with RVSS standards. The project is within the Phase 2 sto.M, quality . end must comply witty emrswats, quality mcpriremean outlined in the RcVma! Storrewater Design Manned.'fhe proposed development does not Involve any sewer t.etM1c6on- 'Che project docs have stormwarer quality impacna and hoot comply with the standards established in the regional S tormwater Qsality Design manual. Rogue Valley Sewer Services r gdt.ts that approval of Oils daelop.t he subject m dm fickwo, mndinmc C Applicant most submit sautary sewer plans to RVSS for revnw and approes! demoosoanng compliance with RV55 stand.], prior In dm stat of conatrccdon. 2. Appheant must submit a stomhwatee maragement plan demonstrating complimrrr with the regional Sroemwater Design Manual fur review and approval by RVSS prior to be start of conawction. 3. Applicant .1 obtain a Idose clin, rim erosion and sediment conerol Permit hoar RVSS Price to any ground disturbing adt viiea. Feel free to call on, iff yon havle any questions. (�/YC0Q cant ppen, PE Manager K:\DATA\AGENCIF.S\CENTPT\PLANNG\SITEPLANREVIE W\2015\15028—COSTCO WHOLESALE.DOC ATTACHMENT 1-1"1 I[iYW4Y3M.tii Continuous Improvement Custamer Service CITY OF MEDFORD PUELIC WORKS DEPARTMENT 200 SOUTH W STREET TELEPHONE (NI) 774-2100 ENGINEERING 6 DEVELOPMENT OMSION MEDFORD, OREGON 97501 FAX (5411) 7r4-2552 SYL]Y cl meElcm,onus January 5, 2016 Stephanie Holley City of Central Point Planning Department 140 So. Third St. Central Point, OR. 97502 Dear Ms. Holtey: We have reviewed the Central Point Staff Report, dated January 5, 2016, for the proposed Costco Conditional Use Permit and have the following comments: We understand the Rogue Valley International Airport is opposed to a median at the intersection of Biddle Rd and Airport Rd, as described in Condition No. 3. We recommend a condition that requires the developer to pay a proportional share towards a future traffic signal at this intersection. The City of Medford estimates the total cost for a traffic signal at this location to be $450,000 including design, construction, and inspection. We estimate the development's contribution at 10% from the additional traffic at this intersection shown in the Traffic Impact Analysis, dated October 2015, prepared by Kittelson and Associates, Inc. This results in a $45,000 contribution from the developer to this future project. At the Intersection of Table Rock Rd. and Morningside St. we recommend a condition that requires the developer to pay a proportional share towards a future left tum lane at this intersection. See attached accident history showing an existing pattern of northbound rear -end collisions at this intersection. Per our December 24, 2015 letter, this development will Increase PM peak hour hips through the intersection by 20%. The City of Medford estimates the total cost for a left turn lane at this location to be $300,000 including design, construction, and Inspection. A 20% contribution would result In a $60,000 contribution from the developer to this future project. The City of Medford is open to discussing alternate mitigation designs, costs, and/or methodologies to calculate the developer's share of the cost of mitigating these traffic impacts to those as described above. These values are the best estimate we can make at this time with the information available. If you have questions, please contact me at (541)774-2115. Sincerely Karl MacNalr, PE Transportation Manager CC: Alex Georgevitch File Morningside St & Table Rock Rd 29 Accidents (rate: 1.32) 01/01/10 - 12/04/14 o� 10118110--v 0111011 0118/10'- 0111011 07112/13_ - T}jy� IS Wow filar, O moldents with Ineufficlent date low disld. . Straight m Parked X Pedestrian Fixed objects: r Stopped Erratic X Bicycle o General o Pole . Unknown ann Out of control Q Injury ■ Signal • curb s Backing v,_ Right tum OO Fatality ■ Tree tt Animal f Overtaking v-- Left turn Nighttime 4 3rd vehicle . Sideswipe 'F7-- U-turn l -w DUI . Extra data EhrvoY WR596R5 WYCIMb1n0.M Ol/OS/AIL /aa,m Lay ew+]ID+o.vm.rm+. .bniryNaeMliay biw 'utN ymRrzFV.1LX s CALEN Wl[ T r IXSiN MF SM l ARFEit 11'{COS WIL VENIdP Vdldll VEM]YOVE VM]MOVL VFN ]iiR VfMllY.f gtlF qS M4Ri sEVFMn Ni.LL pfOMNM[M Ni feUli 5fC W5[ L ]nvxov LszP ea , wNlmolro xNlOUNA veY.N. xoNn xmn vmiNil mmYRun MpIry NN ]l=.NRwX UrYN,N ry Im DYX vm+ ]mvv z/z/m+D wn eNROgro XnYlrwsmLA rn„ma xmn xmM sinijn vrxpl xMMMwM Ns[MMw z ] Drdswrymrlme vMl ]mNry snllm+o l]:]+ ]s SaIS TLR PO MOMIW6RA neu ntl none 14rM sinlLXt sloprMmTxl EbRIy Rd Vaiggn o a oFN.XIgSmtlur VM+ ]®IM an/pN lsas TAeA.NMRNW YOMNflSIDEsrx smn swq NnMM1t nmNeleM1 MOYnSMV VMryNn 4rl.npxNL wn nxvmp 6/3/M[0 ]Om ®+R 9A ryrvM i.5GEL0O p0 uVMM45CEA Rvama SImMM SbpgaNTr.l .w�rywI LUAMwN 0 41Li0+01]3. 0 ROg IIO SI Rper"i WM SIr.IN[ Tumwnn NoaryMx MoaMw1 0 0(pb4N.mtlom VM+ ](1/X110431 TRq£RDq PD M➢RMNOSYEA SMnnR SeuM DY�nll^R umw RiPl RN]nry Mn YerryMl PlMHm 0uymppYYy VMl im]LI/]MIIOIO IRX 0 Frye Fn[ HryXl VRa MTrY YNtle MCAn.wt i en pM1liM veM1l lOv9 +YI/]0l0 PN YW NwIR TMS RRPO MORMM JOEA LJnnipe Nmn S'Yei SOa/n vr.IJo M.nrywtAMiLwe aNwXp •MI/.FtlW WaaPm l+mp65 ./19/NIt 163L 0 LUN MCi PO MAINY640EA Rxrerl NwM M smut XMrywn xMxry RN I Npmpµned Zp/M Ve VMl 110®1. snSVIDIl 5159 ]S NSN i.WE.OSYW MOMM4LCFA Ixrme Nmn k NmM1 sValRn[ ..mW.M LopµainirY NWMM MpMLwI E l OiJbYrllm am VeP] RmVI SIld51 N+3/Bll le.11 YI[ROO PO Mµ0G510EA peaenf XOM XaM SVY/u S4Mpa�nRd MonrRN[MexnRNul E OfdoXwVgJa. VM] v[aYY Nu/ I so sWU TNtlE0 aM, .vYam asY srn+ �m..em 11vb6 LuWl Tw Rl/u SYtlm>y Vumgwe [yev MM[OR 0[wkYMIiR ]I15E9 NMUl]11RM 5]1 NUM TPM[R001® MpNM6RA 9amtlpt 5yM ]bA WiinlMleI 5YY50t NONryMN Mwnwl 0 0 OGWSOiew VMI ONm[mnp [+IYII YWMll ll 3p 5Nh GMERmO YfYM6lffA pN w1 Nmn Nmn SnYjn SmrryYMTM 0 OFbwNmeame VM+ Sf1951a ]]/1IgI1 l5M 0 RSYLROb NOMXiSIXA Ma'eUt IhvIM1 NTA NJprl TUnw NN NSUIryM+1 MUXMNo[ 1 NXUX wAl INUtl Rv. T16 IngnOv t55] fNSRLRi MT. WRRNFA YVSN NmX NT! SVirn[ Sbrpa YTn( Bl.YwhNIm MN. VT] 3/I(Nv +1:1] tlSW. 1, 5lC pap XNIDIMHSmfA NYN bM NTX LrY/n l�vnwNn NpxMN. NsY{NN •Fab�n9�mdee VM] ]/e/IDN +4 L.NE Mtq Rp MIRNBKA Mbe IbM NYM SVaIN[ i.nwLW WgRN Memi/Rw •N[aNry1m[bx tlAipymV iz+zm: ]/wmu +.v9 TiNN mqo t�iosn wt'. n.[ xw rNun sx,�yx nEORw Ru slewyx„ DrNYmnsmrsNw v.nl oN,ol�v Sz+s@5 yzl/mu ]Rlv TUNRovo RIORNNI@MIEA p.Y.a WTn svwpe smppe mrrY Xwpnu. Noxawl ervoY+rn Mo.l... n+wP w5mll lu wwwcsun xmmeao x�[n xmN sewM vmeMn.l w.wiwt M.wMw0 a IiON® ]nWNtl3 ]:p sq nwN TNLROgo .WNESYEn 9M.Jpe n.M 1u.TyN\a sY1MV Nenn9MR qIN OnbtlS 051m. vML n. nY wn is mvvu lul eoMvleMRA un TwNun TYNw uN umN✓.w NNrwNN OrN In UxeTApvvi N.X] 1319m19nyIDt3 l+'.11 Tn l.RNL15]6tl MOLMNGSSIF ii pe>.nq SouN� EauM SVYfM SlgpeaNTnI WWNUR Moxrywl Nimm.nlmaXa vdN.em lID]]] I]/1/ffi916M 1mO Xwq iii[IICQb Mp4NMF39fA MerN N XTX SVryRI $IopRtlln Tnl WiryM Noxa WI MRNaR 0 0 OlaOww Y^drY VMl 13X,6 1}H/WYl ]!L p MOpNIN6s0LA TPIFPpNpO MYIe Sq$ lSu iurM9Rl.lil Sw.peiNTN ApwM[ MaiML.4rc egbr VM+ WealMr vi+Wa E/E/IDY IY]] bSv,M it'll RO'S IIp pMNM45MEST lareN Knn MTn 91n19M YtppONTM MNLyNVI nMYy wt l 3 OreeawnL[m,loY VTS O V ❑ uj CT C nea' Tab;e Kock ----- - ------- ----- - - s o Cost Cstima'.e: Acproxrn:i.- y 20000 CA sgt,cre feel of ocver-crt O S15/sq. r. O _ lotcl Cost = Ss00,000 1 ATTACHMENT 1-2" Continuous Improvement Customer5ervice CITY OF MEDFORD PUSLIC'NORKS DEPARTMENT 20G SOUTH IVY STREET TELrPiCNE(541) 774-2100 ENGINEERING$ DEVELOPMENT DIVISION MEDFORD, OREGON 97501 FA (541)774-2552 www i Medford or us December 24, 2015 Stephanie Holley City of Central Point Planning Department 140 So. Third St. Central Point, OR. 97502 Dear Ms. Holley: We have reviewed the Traffic Impact Analysis, dated October 2015, for the proposed Costco Conditional Use Permit and have the following comments: 1. Mitigation is required at the intersection of Biddle Rd and Airport Rd due to project traffic degrading the level of service on the westbound approach below acceptable standards. The increase in traffic volume will increase competition for gaps in traffic for permissive movements resulting in the acceptance of smaller gaps and increase collision potential at the intersection. 2. The intersection of Table Rock Rd. and Morningside St. needs to be studied to mitigate safety effects of project trips on a decrease in safety at the intersection. The proposed increase in traffic will increase rear end pressure on northbound left turning motorists and decrease available gaps in southbound traffic. This will induce them to choose smaller gaps and increase collision potential at the intersection. The 90 P.M. peak hour project trips each way north and southbound represent a 20% increase over the 450 peak hour through trips each way counted on Table Rock in 2015. The development should contribute to a project to construct a northbound left turn lane at Morningside St and Table Rock Rd. If you have questions, please contact me at (541) 774-2121. Sincerely, Peter Mackprang Associate Traffic Engineer CC: Kim Parducci Don Burt Dan O'Connor ATTACHMENT "J" FINDINGS OF FACT & CONCL17SIONS OF LAW Costae Wholesale Conditional Use Permit File No. 15022 January 5, 2016 Applicant: ) Findings of Fact Costco Wholesale ) and 999 Lake Drive ) Conclusion of Law Issaquah, WA 98027 ) PART I -INTRODUCTION Costco Wholesale is requesting a Conditional Use Permit to develop 18.28 acres of vacant industrial land (M-1) zone with a membership warehouse and associated fear (4) island fuel facility. The 161,992 square foot membership warehouse will be located on the southwest property boundary and the fuel facility on the southeast property boundary. It is the applicant's intent to relocate its existing facility to the proposed site with a scheduled opening date Fall 2016. The project site is located on the eastern edge of the Central Point city limits at the southeast comer of Hamrick and Table Rock Road (Figure 1). The site also has frontage on Federal Way, a local street. Surrounding properties include developed and undeveloped industrial lands, including the M-1 and M-2 zoning districts. In accordance with Table 17.05.01, the Costco Conditional Use Permit application has been processed using Type Dl procedures as set forth in Section 17.05.400 of the Central Point Municipal Code. Including this introduction, these findings will be presented in three (3) parts as follows: 1. Introduction 2. Section 17.76.040, Conditional Use Findings & Conclusions 3. Summary Conclusion Figure 1 Location Map PART 2-CONDIl'IONAL USE FINDINGS & CONCLUSIONS 17.48.040 Condifianal Use,. The fallowing uses and their accessory uses maybe permitted in an NI-I district when aufeodzed i2 accordance with Chapter 17.76: A. Business offices and commercial uses that are compatible with and closely related in their nature of business to permitted uses in the M-1 district, or that would be established to serve primarily the uses, employees, or customers of the M-I district; B. Rail andtmekingdisnioution facilities. Finding 17.48.040(A): The City. by Planning Commission Resolution 764 and City Council Resolution 1217, determined that membership warehouses are a commercial use compatible with and closely related le permitted usr' in the AT zone. Conclusion 17.48.040(A): Cosmo Wholesale, a membership ovarehoussr that includes wholesale moornobile feel sales, is specifically allowed as a Conditional Use. Finding 17.48.040(B): There are no rail or trucking distribaion facilities associated with (he proposed use. Conclusion 17.48.040(B): Nol applicable 17.76.040 Findings and Conditions The planning commission in manting a conditional use purimil shall find as follows: A. That the site for the proposed use is adequate in size and shape to accommodate the use and to meet all other development and lot requirements of the subject zoning district and all other provisions ofthis code. Finding 17.76.040(A): As evidenced in the appticart s site plan, the 18.28 acre project site is ad,plere dy sized to accommodate the proposed s(ructures and off-street parking asfollows: l) Setback Requirements (CFMC 17.48.060). The proposed so ochres meet the setback requirements of the M zoning district as sel forth in Table 1 below: Fmnf (North) 20-ft 275-ft 1 950-N Side (West) li 10-ft 60-ft, 3-in 51-ft Side (East) 10-ft 395-ft 35-N Rear (South) 10-ft 60.8, 10-in 160-ft 1-in. ' File No. 09022 - M-1 Code Amendment. Page 2 of 11 2) Off Street Parking Requirements (CPMC 17.64.040), The applicant's parking plan proposes 783 parking spaces, which is 85 spaces in excess of the maximum 698 spaces allowed (Table 1). Table 2. Craton Parking Roquirpmm.nt Required Proposed Building Min.7Max. Parking Parking Costco Floor Area Parking Supply (No. Proposed Area by Use (Sq. Ff.2 Standard Ratio Spaces Parking Surplus/Deficit Retail 134.064 1200sf. 5.00 670 783 113 1/1,000 Warehouse 27,928 s.f. 1.00 28 28) TOTAL 161.992 1232 s.f. 4.31 69B 783 85 Proposed Adjustment 767,991 11307 s. f. 1.83 783 783 In accordance with Section 17.64.040(8)(2), the applicant is requesting an increase to the maximum parking standard for the proposed use. Table 3 summarizes the data provided in the applicant's parking demand analysis, which is based upon the frillowing: • Documented parking supply and demand at existing Costco Wholesale warehouses in Oregon; and, • The Institute of Transportation Engineers (ITE) Parking Generation, 4ih Edition recommendation to maintain a maximum parking milization of 90% during the typical peak periods to avoid illegal parking and repeating circulation.' The applicant's parking propa.sal for the Central Point location is slightly higher than the average minimum recommended parking ratio (Table 3) at 4.83 parking spaces per 1,000 s.f. CFA. Since the difference between the minimum recommendation and the proposed adjustment or within the range of acceptable statistical error (less than 5%) and is consistent with the ITE v ITC Parking Generation, 4" Edition, 2010. Page 3 of 11 recammendatlon in stay below 90% uttdization fir typical and seasonalpeaks, the request to increase else parkingstandard ds warranaed and can be accommodated as kinor rated by the applicant's site plan. 3) Loading Requirements/Section 1Z40�_ Loading r,gm,,dJw, retail butldmgsgreater than 100,000 sf GIA includes 3 bays plus I bay far each additional 80,00 s f. On this basis the proposed 161,992 of warehouse requires four (4) loading bays, which are provided on applicant's site plan and architectural elevations (north and west elevations). Additionally, the plans show three (3) loading areas for smaller truckwan deliveries. Condusfon 17.76.0401 The site is sufficient in size and shape to accommodate Che use and meet the development mallet requirement oj'the M-1 zone. IT That the she has adequate access to a pablic street or highway and that the street or highway is adecuate in size and ennditien to effectively accommodate the traffic that is expected to be generated by fee proposed use. Finding 17.76.040(h): The proposed Costco membership warehouse and fuel focisty will generate approximately 10,670 new daily trips. In accordance with Seeltan 17.05.900(A)(2)(e), the applicant prepared a Traffic Impact Analysis (77A) for the proposed Costco membership warehouse and fiel facility. The scope ofwork for the TIA was based nn sectima sesseons held on June 2, 2015 and August 13, 2015 with affected transportation agencies (i e Oregon Department of Transportation, Jackson County, City of Medford', and City of Central Point). It was agreed that the TIA would evaluate twelve (12) inter secttons and ad proposed site access driveways. Per the TIA Costco membership data was utilized in ( refraction with area -wide papulation, land use, employment and franspertolion information to determine how the transportation system will operate under build year (26 16) and fidure year (2030) conditions with and without the proposed C'osteo development in place. The TLA acc,,amedfor Jackson County's Table Rock Road wideningpomect, which is scheduled to begin construction one year (2017) after opening of the proposed Costco project, Upon completion of the project, Table Rack Road will include four travel lanes, continuous center turn lane, bicycle lanes and sidewalks on both sides of the roadway from Biddle Road to Airport Road. The roadway will then narrow to two (2) travel lanes with a continuous center turn lane, bicycle lanes and sidewalks on both sides of die roadway from Airport Road to the 1-5 crossing. Signaltaation of the Table Rock/Airport Road intersection will be completed as part of this project As a resultof the planned improvements, traffic impacts on Table Ruck Road (i.a Intersections affable Rack end Hamrick Road and Table Ruck and Airport Road) well be resolved. Based on the TIA and comment received from affected agencies, there are traffic impact to the followdng six (6) roadways City of Medford it id not provide any input into the TIA's scope of work. Page 4 of 11 1. Northbound f-5Off-Ramp (ODO4). 2. Table Rack Road and Hamrick Road Intersection (Jackson County). 3. Table Rock Road and Airport Road Intersection (Jackson County). 4. Airport Road and Biddle Road Intersection (City of Medford 5. Ilamrick Road/East Pine Street/Riddle Road (City of Central Point). Subsequent to completion ofthe ILA the City ofMedford noted that a sixth intersection, the intersection of Table Rock Road and Morningside Street, would also be impacted by the project. The impacts and proposed mitigation for each of the above intersections are; 1 Northen l-5OB-Ramo. On the date of opening; the 71A indicates that the vohtme to capacity (v/c) ratio on the NB15Of Ramp will be exceeded trigging the need for implementation of r1VAP 33 Project No. 9 (dual right turn lanes from the off -ramp to East Fine Street)_ To mitigate this condition ODOZ required that Project Na. 9 ofIAMP 33 be required as a condition of development. Prior to commencement of construction of applicant's project ODOT's Project No 9 must be fully funded and scheduledfor construction. Recogn¢ing that the applicant's project was not reacemsiblefor the total onpaet it was agreed that the applicant will pay a prorated share of the costs. d Table Rock Road and Hanarick Rod IneLrsecliqn During the interim (period between completion of the applicant's project and completion ofthe County's Table Rock Road Projer site access an Table Rock Road will be limited to right -in/ra hl -out. As a result o(the access restrictions, left turn delays at Hamrick Road and Table Rock will restdt unacceptable interim levels of service (LOS F). The TIA demonstrates that the iderd/ ed interim impacts to the right- in/right-out access restrictions on the Hamrick/Table Rock Road intersection (non -signalized) are resolved upon completion of the Table Rock Wideningproject. To limit access and resolve the idemVied interm iimpact to flamroiVIable Rock Road, the County is requiring the following conditions: a. Uwilthe County 's Table Rock Road project is complete, the private Table Rock Road approaches will be limited to right -inlright-out only. To assure this movement the applicant shall construct median islands in Table Rock Road in front ofthe two Table Rock Road private approaches. b. Prior to certificate of occupancy, the applicant shall construct a left turn and left receiving lane on Table Rock Road at Hamrick Road The turn and receiving lanes shall have adequate queuing to ensure safe and efficient operation of the fntersection during the first year of opening. e. As part of the County's Table Rock Improvement Project, the Table Rock Road approaches will be constructed as right-in/left-tn/right-out movements. The County's project will install these medians at the project's expense. Page 5 of 11 3. Table Rockand Airport Road Intersection. Thisinaersecteam is..are.hy at LOSE. With the appllcam's project and the pending tmProvemen Gs to the intersection scheduled for 2017 as part of the Table Rock Road Widening Project the level ofservice will be improved to LOS A. During the interim it is agreed that a lower level ofservice is acceptable. 4. Air aort Road and Biddle Road. This Intersectiorz currently operatas at a LOS C'. Ailuild year, the ira,mcrioa will operate at a LOS 6. The City ofMeatford's revie'm cfthe 'CIA, per rz letter dared Janamy 5, 2016, indicated that the preferred mitigation waned be the eventual slgnaliza ion of this intersection and recommended that the en plieant pay their property nal .share 0000/o) of thefidure (no planned dat) signalization cos! prior to commencement of construction of the applicants project. S£Iamrick Road and Eas[Pine Street/Biddle Road ln(ersecdon. With completion afthe applicmtt's project the intersection cf Hamrick Rand and Raa Pine StreeUBiddle Road is not expected to exceed LOS 1), However, the TLA confirmed that by 2020 the City's 'TSP Project 9213 will be needed at this intersectinrz to avoid an unacceptable leve( ofservice. I'he city of Centra] Point is tentatively scheduled to complete the �rzecesanry irreprovemenb-os n Capita! Improvement Project by 2018, including north -south traffic receiving lanes', a then lane, and designated right and left turn lanes on Hamrick Road north and south of the intersection. The City is not requiring interim r..iagation, since the identified impacts do not occur at the buiidyear. 7ab1, Rock lecad and b7orningside Street Inas noire, Although net studied in the TIA the City of Medford. in letter., dated December 24, 2015 and January 5, 2016, stated that increased project related traffic vole me on Table Rock hotel waned increase .IUu,, potential to turning movements at the intersection. The Gtyof Medford recommends that prior to commencement ofconstruction of the applicant's project that the applicant contribute its proportional share (20%) toward fitteme (no scheduled date) construction of left tarn improvements at this intersection. Conclusion 17.16.040(B): Per the Applicant's TPA and the recommendations all the affzcmd agencies, traffic impacts of proposed use on public streets and highways have beers idem fed and will be mitigated as noted in the above findings and as conditioned in the Revised Staff Report dated January 5, 2016. C. That the proposed use will have no significant adverse effect on abutting property or the permitted use thereof. In making this detcmrit ation, the conunission shall consider the proposed location of improvements on the site; vehurular ingress, egress and internal circulation; setiacks; height of buildings and structures; walls and fences; landscaping; outdoor lighting; and signs. Findingl7.76.040(C): Thefollmvingeharacteriviicswereevaluatedinconsiderattonoftie proposal's impacts to abutting properties: 1. Pr000seo Location ofSite Fmprovenients. As illustrated in the Site Plan, the location of the proposed warehouse, fifer facility, parking and landscape improvements are consistent with the site design and development reguvements of the M-1 zoning disarct (See Finding 17.76.040(A)). Page 6 of 11 2. Vehicular Lngress F.eress and Internal Circulation. The project site proposes two access drives on each of the frontage roads (i.e. Federal Way, Hamrick Road and Table Rock Road). Per the 71A, access restrictions to private approaches on Table Rack Road, prior to completion of the Table Rock Road widening project, can Ye operational and safety issues at Hamrick Road. As demonstrated in Finding 17.76.040(B), access restrictions and mitigation measures resolve traffic impacts aserciated with ingress and egress as conditioned is" the Revised Staff Report dated January 5, 2016. 3, Setbacks- The applicant's site plan identifies the location afstrsmtures and off-street parking areas consistent with the setback requirements m the M-1 zoning district (.See Finding 17.76040(A). 4. Buddine Heieht. Per the Architeateral Elevationsubmitted by the applicant, the warehouse will have a varied roofbne with a maximum height af34 Ji at the top of highest parapet. The proposed building lueighi is typical of surrounding warehouse development and wtthiu the me -imam 60 ft building height allowed in the M-1 zone. The top of the fiuel canopy is 17 - ft 6 -inches within the maximum height requirements of the M-1 zone. 5. Walls and Fences: Due to the nature of the proposed use as bulk retail. sales, the applicant's proposal does not include site obscuring walls orfences. This proposal is typical of other commerciaUretail development in the city, orally consistent with otherpermitted uses in the M-1 zone, As such, the no adverse impacts to adjacent properties or their permitted uses will result, from the absence of fences and Nails 6. Lr nchasaperiZ The applicant's Landscape Plan illustrates proposed street ftcntage and off- street parking area landscape improvements consistent with site de eclopreent requirements in the M-1 zone. This is considered to be adequate and effective in avoiding adverse visual impacts to adjainingproperties. i. Outdoa s The applicant seubmitted a S4te Photometric Plan that .shows perzmeter and, ii nerbor lighting throughout the site. Lighting is oriented toward the interior site and is not deemed to cause an adverse impact to adjoining properties. 8. hlign.s. The Applicant has submitted a Class "C" !Variance (Nile No. 15032) from the sign area standard ofCPMC 17 48.080(A)(1). The signage variance request v ould allow wall signs that are proportional to the buddan; scale and dimension consistent with signage permitted in other commercial (C) districts in the City. Bayed upon the applicant's proportionality rationale far the proposal, the variance request is deemed reasonable. However, if the variance is not approved, the applicant will be required to demonstrate coneplianee with the M-1 sign area standards prior to building permit issuance. Conclusion (Z76.040(C): The applicant's project is typical efsat, development within the M-1 zone. As such, the site development standards for permitted uses in combination with the Page 7 of 11 conditions ofapproml relative to vehicle irtgress and ogres (Finding 17.76040(B)) are deemed snfficient to avoid adverse impacts to abt¢ting properties or permitted uses thereof D. That the establishment, main ten ance or operation vCge use applied for will comply with local, state and federal health and safety regulations and therefore will riot be detrimental to the health, safety or general welfare of persons residing or working in the surrounding neighborhoods and will not be detrimental or injurious to the property and improvernents in the neighborhood or to the general wclfarc of the community based on the review of those factors listed in subsection C of:his section. finding 17.76.040(1))The issue of safety is regulated through the building code and in conjunction with thefre district theproposeellueting srah,, mot be constructed and operated in compliance with all Federal, Stare and local regulation and ,shall be reviewed during the building penult process andinnor to a,aeoce of, building permit Th, Applicam'sfindings off{rm their commlunenl to complying with all Federal, State and local reguterians. Conclusion 17.76.040(D). The proposed Costco Wholesale is conisten! with this criterion. F. That any conditions required for approval of the permit are deemed necessary to protect the public health, safety and general welfare and may include: t. Adj us intents to lot size or yard areas as needed to best accommodate the proposed use, provided the lots or yard areas conform to the stated minimum dimensions for fie subject zoning district. t.nuss a variance is also granted as provided for in Chapter 1713 Finding 1 Z76.040(F)(1): The site is adequate to accommodate the proposed development as demonstrated in binding 17.76040(A). However, as a condition of approval, legal let consolidation ofthe font, (4) lots comprising the it, colil be required prior to building permit issuance to eliminate property boundary conflicts with the proposed structures. Cnnciusi, n 17.76.040(E)(1): As conditioned, the required lot consolidation is s'ehhuent to resolve the identified property boundary conflicts with proposed structures. 2. Increasing street widths, modifications in street designs or addition obstruct signs or traffic signals to accommodate the traffic generated by the proposed use, Finding I Z76.040(E)(2): See Finding 17.76040(B). Conclusion 17.76.040(E)(2): As demonstrated in 17.76.040(B), the transportation system is sufficient to accommodate traffic generated by the proposed use as a nidac ii,cl 3. Adustments to off-street parking requirements in accordance with any unique characterisncs ofthe proposed use, Page 8 of 11 Finding 17.76.040(E)(3): Per the Parking Demand Assessment included in the Applicant's T1A, the proposed use has parking demands, unique to Castor), that necessitate an increase in allowable parking The applicant has proposed an increase to the City's off-street parking standard to allow 783 parking spaces, which is consistent with the minimum recommended parkingfor Costco and maintains a utilization rate less 90% utilization per the 121, 's recamrnendation for off-street parking areas. Conclusion 17.76.040(E)(3): Per Finding 17.76.04(j(3), the requested parking increase for the proposed use is justified. 4. Regulation of points of vehicular ingress and egress, Finding 17.76.040(E)(4):.see Finding 17.76 040(C). Conclusion 17.76.040(E)(4): Per Finding 17 76 040,aQ, the limitation of access and interim mitigation at the intersection ofTahle Rock Road is necessary to maintain operational standards and safety at the intersection. 5. Requiring landscaping, irrigation systems, lighting and a property maintenance program, Finding 17.76.040(E)(5): The appbianl's project is typical of other uses/structures permitted in the NF1 district and as such the site development standards for permitted uses in the Ad I zoning district are deemed adequate to integrate the applicant's protect into the surrounding neighborhood. (lased vvpon evaluation ofothe' Costco Wholesale locations being in good condition, no additional conditions are deemed necessary relative to maintenance. Conclusion 17.76.040(E)(5): Not applicable. 6. Regulation of signs and their locations, Finding 17.76.040(E)(6)r The applicant's proposal fbrsigns includes wall signage that exceeds the maximum area allowable in the M-1 zone. Conclusion IZ76.040(E)(6): As a condition ofapproval, the applicant's Class "C" Tlariance request (File Na. 15032) shall be approved prior to issuance ofa building permit If the variance is not approved, the applicant will be required to demonstrate compliance with the M -I sign area standards prior to building permit issuance. 7. Requiring fences, borms, walls, landscaping or other devices of organic or ardticial composition to eliminate or reduce the effects of noise, vibrations, odors, visual incompatibility or other undesirable effects on surrounding properties, Page 9 of 11 Finding 17.76.040(E)(7): The project proyosal is for bulk retail sales. With the escein on of the m¢arnobilefioel sales, an outrightiter m ittel use per CiaiVIC 17.48.020(G), ail beeriness operations (i.e. retail sales, food preparation, tire installation) will occur within an entirely"cle"d structure_ Given the cha.aat"ce", of the proposed use and the compatibility of the site development rSee Finding 17.76040(4) and (C)), there are no noises odor, or other adverse impacts from the proposed structures or use that wrndd necessitate fences, berms, walls or additional landscaping. Conclusion 17.76.040(E)(7): Not applicahie. 8. Regulation of time of operations for certain types of uses iftheir operations may adversely affect privacy of sleep of persons residing nearby or otherwise conflict w.th other community or neighborhood functions, Finding 17.76.040(E)(8): The projectsite is within the I industrial zone. SierraarzdingproperCacsare zonedAsl1Jdctr'ialan,/M-2 Industrial General. Costen uses standard he, news hours, normally b it.veerz Met, and Spm ddowlay through Pbiday and loam to Spm or bpm ori weekends, and its fuel station from Gam m IOpm daily. Conclusion 1776.040(E)(8): Rased on the proposed operating horns and the coming of surrounding properties no further cgnd,b,w of operating hours is dirtied necessary. 9. Establish a time period within which the subject land use must be developed, Finding 17.76.040(E)(9): Per Section 17 76,060 the applimnt has one year to obtain a buddingpermit and diligently pursue construction to completion. The scheduled opening date hit deproposed Costco Wholesale is 1nA 29Z6 pet the Appltcant'sfiIcdngs. Cwndivition 17.76.040(E)(9): Aside from the building permit reyufremenf per.Section 1776.060, there are no issues ,oh the propmed development tirning- 10. Requirement of a bond or other adequate assurance within a sped➢ed period of time, Finding 17.76.040(E)(10): Fer the ApplicanPs TlA and the recmnmendations of the affected agencies, traffic impacts oftheproposed tae ori pub/ic s'traets and highways have been identified. will be mitigated, and applicant will he required to warrant improvements noted in the Findings 17.76.040(8) and or conditioned in the Revised .Staff Report dated January 5, 2016. Conclusion 17.76.040(E)(10): Asconde.,oned in the Revised Staff Report dated.lanuary 5, 2016, timely completion of warranted improvements is assured. Page 10 of 11 11. Such other conditions that are found to be necessary to protect the public health, safety and general welfare, Finding 17.76040(E)(11).' Aside from the previously discussed conditions related to file development of membership warehouse, there are no additional conditions. Conclusion 17.76.040(F,)(I1): Not applicable. 12. In considering an appeal of an application for a conditional use permit for a home occupation, the planning commission shall review the criteria listed in Section 17.60.190. Finding 17.76.040(F,)(12): There is no home occupation associated with the proposed Costco Wholesale. Conclusion 17.76.040(E)(12)r Not applicable. PART 3 — SUM.MARY CONCLUSION As conditioned, the proposed Costco Wholesale has been found to comply with the criteria set forth in Section 17.76.040 for Conditional Use Permits, Page 11 of 11 ATTACHMENT X" PLANNING COMMISSION RESOLUTION NO. 827 A RESOLUTION APPROVING A CONDITIONAL USE PERMIT FOR A COSTCO WHOLESALE ON LANDS WITHIN THE M-1, INDUSTRIAL ZONE (PILE NO. 15022) WHEREAS, the City, by Planning Commission Resolution No. 764 and City Council Resolution No. 1217, determined that membership warehouses arc a commercial use compatible with and closely related to permitted uses in the M-1 zone and therefore authorized them as a conditional use. WHEREAS, the applicant has submitted an application for approval a Conditional Use Permit to develop an 18.28 acre site within the M-1, Industrial nine with a 161,992 square foot Costco Wholesale membership warehouse and four (4) island fuel facility; and WHEREAS, on January 5, 2016, the City of Central Point Planning Conunission conducted a duly - noticed public hearing on the application, at which time it reviewed the Staff Report and heard testimony and comments on the application' and WHEREAS, the Planning Commission's consideration of the application is based on the standards and criteria applicable to Conditional Use Permits in accordance with Section 17.76 of the Central Point Municipal Code; and WHEREAS, after duly considering the proposed use, it is the Planning Commission's determination that, subject to compliance with conditions as set forth in the Staff Report (Exhibit "A") dated January 5, 2016, the application does comply with applicable standards and criteria for approval of a conditional use permit. NOW, THEREFORE, HE 1T RESOLVED, that the City of Central Point Planning Commission, by this Resolution No. 827, does hereby approve the Conditional Use Permit application for Costco Wholesale Thus approval is based on the findings and conditions of approval as set forth on Exhibit "A", the Planning Department Staff Report dated January 5, 2016 and the Findings of Fact and Conclusions of law as ad forth in Exhibit `B, " including attachments incorporated herein by reference. PASSED by the Planning Commission and signed by me in authentication of its passage this 5'" day of January, 2016. Planning Commission Chair ATTEST: City Representative Planning Commission Resolution No. 827 (1/5/2016) AATTACHMENT "B" CENTRAL Community Development STAFF REPORT POINT Tom Humphrey, RICE Oregon Community Development Director STAFF REPORT February 2, 2016 I FEM Consideration are Conditional Use Permit application for the construction of a 161,992 square foot Costco membership warehouse and fuel facility on an 18.28 acre site at the southwest corner of Hamrick and Table Rock Road The project site is within the Federal Way Business Park subdivision in the Industrial (M-1) zoning district, and is identified on the Jackson County Assessor's map as 37S 2W 1213, Fax Lots 213, 214, 215, and 216. Applicant: Costco Wholesale; Agent: Steve Bullock, MG2 STAFF SOURCE Stephanie Hohey, Community Planner E BACKGROUND Costco Wholesale ("Applicant") is requesting a Conditional Use Permit to develop a 161,992 square foot membership warehouse on 18.28 acres in the M -I, Industrial zone. The Conditional Use Permit application was considered at the January 5, 2016 Planning Commission meeting. Al that time staff presented an evaluation of the proposal relative to its compliance with the conditional use approval criteria set forth in CPMC 17.76.040. Based on the evidence submitted, the proposal was found to comply with the applicable review criteria as conditioned. The Planning Commission heard testimony from the applicant, and proponents and opponents ofthe application. Due to the timing of revised comments and conditions from the City of Medford on January 5, 2016, the applicant requested that the record remain open for seven (7) days following closure of the public hearing; including a seven (7) day rebuttal period. The public hearing was closed and, per a duly seconded motion, the request to leave the record open was granted with written comments to be submitted as follows: • Open record period — January 12, 2016 at 4:30 p.m.; • Applicant's rebuttal period—January 19, 2016 at 4:30 p.m. On January 19, 2016 the applicant submitted their written rebuttal (Exhibit "14") to the City of Medford's January 5, 2016 revised conditions and comments. Staff has reviewed the applicant's rebuttal and finds that the previously written conditions 3 and 4 in the Revised Staff Report dated January 5, 2016 adequately address the situation and do not need to be modified. ISSUES During the open record period, thirteen (13) letters were received with six (6) in favor, Eve (5) in opposition, and two (2) neutral. 'I he applicant responded to opposing testimony with timely rebuttal. It should he noted that some of the issues were anecdotal and beyond the scope of the conditional use approval criteria in CPMC 17.76.040 (i.e. Costco's business politics, impacts to local businesses and associated internship and scholarship opportunities). A summary of the written comments received during the open record are: I. Opposition. 'I estimony received in opposition to the proposed use primarily focused on traffic issues and includes three broad categories: 1) concerns about the TIA assumptions; 2) operations/safety; and 3) mitigation sufficiency/cost allocation. Due to the volume of the traffic generated by Costco, there is a perception that additional mitigation actions are necessary to ease operational and safety concerns. Emphasis was given toable Rock Road widening, impacts of heavy truck traffic, and the need for the applicant to bear the cost of improvements (Sec Exhibits "1" through "5"). The Applicant's Rebuttal (Exhibit "14") and the 11A (Exhibit " 15") address the testimony opposing the proposed use on the following basis: a. The TIA was prepared and reviewed by affected agencies and Southern Oregon Transportation I ingincers, LLC. The analysis relied on assumptions including Costae's market demographics, area -wide population, employment, land use, and transportation system information including heavy trucks/ vehicles (See TIA, Exhibit "15"); b. Per the conditions of approval, mitigation measure address safety and operational impacts necessary to provide adequate transportation s'ervices. c. Costae's cost share for the improvements are proportional to the impact generated by the proposed use and therefore sufficient to mitigate the financial cost of off-site impacts. 2. Support. Testimony in support ofthe proposed use counters concerns about adverse impacts to local business and further asserted support for the proposed location due to community benef is associated with economic growth stimulus and improved property values. It is further emphasized that traffic impacts have been adequately addressed and that the concerns about heavy truck traffic conflicts and congestion on Biddlc/Pine Street have been adequately addressed and mitigated (Sec Exhibits "6" through "11"). Based on evidence in the record and the applicant's rebuttal, the testimony received during the open record period has been adequately addressed (See Exhibits "14" and "15"). EXHIBITS Exhibit"I" — Letterfrom L. Calvin Martin, received January 12, 2016 Exhibit "2" —Letter from David Smith, received January 12, 2016. lixhibit `9" Letter from Tanya Wilkerson, received January 12, 2016 Exhibit "4"—Letter from Kathy and Ray Wilkerson Exhibit "5"—Letter from Dennis Burt, received January 12, 2016 Exhibit "6"—Letter from Wayne and I (attic King, received January 12, 2016 Exhibit "7" Letter from Kimberly Little, received January 1 I, 2016 Exhibit "8"—Letter from John Balzer, received January, 11. 2016 Exhibit "9"—Letter from Glen Finley, received January 11. 2016 Exhibit "10"—Letter from Laura Vaughn, received January R, 2016 Exhibit "11"—Letter from Pulver & Leever, received January S, 2016 Exhibit" 12"—Letter from Vic Agnifili, received January 12, 2016 Exhibit" 13" Letter From Vic Agnifili, received January 12, 2016 Exhibit `94"—Applicant's Itebuttal, received January 19, 2016 Exhibit `95"—Revised Staff Report dated January 5, 2016 ACTION Consider the Conditional Use Permit application and either 1) approve; 2) approve with conditions; or 3) deny the application. RECOMMENDATION Approve the Conditional Use Permit per the Revised Staff Report dated January 5, 2016 and all conditions therein. EXHIBIT "1" LCaIVinMartin, Developer's Agent P. O. Box 442, J.& ... ille, Oregon, 97530 (541) 779-66380ffice, (541)227-4262C.11 Design, Constmcdon Management, Construcnoe Cost Estimates, Contract Negatimicas Feasibility Studies, Quantity Surveys, Contract! Management, Contract Dispute Resolutions CIN and Regional Planning, Land Deyeloamen4 Lobbying. Wastewater Technologies Response to the Conditional Use -Permit Application of Costco to the City of Central Point, Oregon City of Central Point Oregon Planning Desartment and Planning Commission 155 South 2 Street Central Point, Oregon 97502 Via Hand Delivery Having listened to the applicant's presentation and their consultants, it became clear that no matter the difficulty with the site and its related traffic applicants would force a fit. Certainly the most significant problem relates to the traffic it generates and the assumptions made by the applicant's traffic consultants. The traffic consultants were hired to make it work in whatever way can produce an approval_ The consultants (Kittleson and Associates) are essentially a hired gun that represents the applicant and land owners, putting together a plan that they believe will convince the City to approve the plan. It is obvious that the City and Planning Commission look favorably on the locating of Costco in Central Point. Costco is an amazing retailer/wholesaler that is loved by its customers and admired by its competitors. The problem is that this site and this business are not an appropriate fit. Costco is a "warehouse" sales/membership store. This is true but Costco generates more traffic to its "warehouse" of 130,000 square foot store in Medford than the nearly 700,000 square foot Rogue Valley Mall. Costco parking is almost always near full and traffic is very difficult and congested, hence the reason for their desire to build a new store. A leaking roof is not the reason for their move. The reason is that they are losing potential business due to older persons and busy people not being willing to fight the traffic and congestion. They are smart retailers and they need a larger store to service the market and loyal customers that they have. ri Page two of three Kittleson Consultants have made many assumptions that can and should be examined, at the very least, by a neutral consultant. Clearly without questioning deeply their assumptions the T.I.A. reveals many problems that require expensive and time consuming mitigation. The cost numbers are very liberal and favor the applicant. They desperately need to be reviewed in detail by another neutral consultant. The use of Table Rock Road is necessary and that arterial is scheduled for major improvements but the acquisition of land for widening and funding of the cost has not even started, Land must be acquired, engineering completed, bids advertised for and then, depending on weather, construction begun. Based on other projects the construction could easily take a year and the other issues could take that much time or even more. The widening of Table Rock Road will only be done to just south of its intersection with Airport Road, The road to be effective needs to be widened all the way to its intersection with Merriman Road. The bridge crossing the l-5 is old and very narrow. The increased traffic and stress on this "elderly" bridge will require that it be replaced with a stronger and wider (at least four lanes) bridge. The cost of this bridge is far more substantial than any of the other proposed mitigation measures and likely more than all of them combined. Table Rock Road continues south into a fairly dense housing area with homes fronting directly onto the road and serves two large multifamily projects exiting only onto Table Rock Road. The proposed location of Costes will create a very dangerous mix of large heavy trucks (including triples) from adjacent and nearby businesses (Knife River Concrete and Aggregates, FedEx Ground and others). Table Rock Road to the north of East Pine Street and Biddle Roads serves many trucking companies and they will mix with the Costco traffic. This will create a very high likelihood of accidents and driver stress for all of East Pine Street, Hamrick Road and Table Rock Road_ There is no plan, apparent or in consideration, that will eliminate or diminish this condition. If you consider the age make-up of Costco customers it becomes apparent that large portions are seniors. The mix of senior drivers with congestion and heavy trucks is not appropriate or desirable and could have disastrous results. The land around the proposed Costco has not been developed to its potential, particularly to the North and West_ When that land develops the intersections will be even more stressed. The mitigation measures proposed create difficult driving and congestion all through Central Point's downtown area as well. Page three of three Traffic to Costco from western Medford, western Central Point, Jacksonville and the Applegate Valley as well as Grants Pass, Rogue River and Gold Hill will pass through Central Point. The Jacksonville and Applegate Valley traffic will come all the way through the downtown area of Central Point. If that traffic, through Central Point, becomes a problem and it is somewhat congested even now, then the traffic will reroute to the Table Rock Road option as the route of choice. The problems with that option have been previously addressed. The expenses, of this first set of mitigations, are likely to be much more than what has been projected by the applicant's consultant and others. There are no actual hard numbers for the projected work based on design drawings and completed land acquisition. The time frames for completing these improvements are very liberal and delays will add extra costs. In summary, Ibis proposed conditional use -permit application, though it can legally accommodate this facility, it is a very poor and troublesome location that will affect Central Point, Medford and Jackson County in a negative way both due to traffic and expense. My clients would urge you to not approve this application or require, at the very least, another independent traffic study. ^�Sincerely, L.Calvin Martin, Agent C.c. Garvey, Shubert, Barer Attorneys, Portland, Oregon EXHIBIT "2" lunUf ,�alj ?o�� January 12, 2016 Summary of January 6,2016 comments on application of .Costco Wholesale David Smith 241 Saginaw Drive, Medford, OR 97504 1. Co-owner of business on S. Front Street in Central Point and several apartments. 2. Longtime member of Costco and shop at present store at least twice a week. 3. Research of official records of ODOT and Central Point reveal that the proposed site for Costco is located on an official freight route system within the city and in the midst of freight term Ina ls.(Reddaway, Conway, Fed Ex.) One, Reddaway Trucking already account for 600 truck trips per day. According to OOOT materials Gordan Trucking owns a large parcel directly across from the proposed entrance to Costco, and intends to build a freight terminal, adding a significant increase in trucks using the area. 4 Costco's traffic study indicates its store will add 10,670 new trips per day, the majority of which will come from Medford on Biddle and Table Rock. 5. Costco traffic will add several thousand more cars per day using Biddle and adding congestion at the entrance to the airport. 6..,ODOT's Freight PmfBe Identifies Table Rock Road as one of the local roads that "experience high volumes of freight traffic." 7. Costco's traffic study is flawed in that it does not identify the routes its members use to access the existing Medford store; information which is necessary to accurately predict how those members will re- route to the proposed location. 8. Costco tries to identify its operation as a warehouse, but indicates in Its November 3, 20125 memo to the city staff ( at page 14) that its Parking Demand Study requires 783 parking stalls which is more than the city requires for a retail store the size of the proposed Castro. CONCLUSION: While the "member Warehouse' description of the Costco proposal may distinguish it from other retail stores as far as the variety of merchandise and profit margins, its impact on traffic will be greater than other retails stores of the same size. One need only nate how fast the Costco parking lot fills up and remains full during store hours; much more so than other retail stores which are open longer hours which results in less traffic in any given hour. Even the entire Medford Mall appears to have less parked cars. Costco and the city staff bath indicate the intention to have the store open in 2016, before the widening project on Table Rock even begins. It makes no sense to add 10,670 more vehicles traveling through a construction zone, for an undetermined period, which will create an additional prohlem which has not been addressed. EXHIBIT "Y January 12, 2016 City of Central Point Attn: Commissioners and Plant rig Department 140 S. Front Street Centra Paint, OR 97502 To Whom This May Concern I am writ ng this atter to share my strum; desire to keep Central Point a small, family friendly town. I undefstaid that bringing a large business, such as Costco would at first appear to increase revenue flow in the town of Central Point; however, I think upon further examination, it would be detrimental to the efforts that Mayor, Hank Williams, has recently put into our town's dowrtown and local business appeal. My thoughts go immediately to the small businesses that make up the backbone of this community — businesses that would inevitably be losing some oftheir customer base. In turn, some local businesses— ones that faithfully give back to our schools and community, would possibly be faced with the layoffof staff, or m extreme cases, closure of facilities. This could change the dynamics in Central Point — affecting revenue, Crater Foundation Scholarships, local internships for high school students, and hous Pig. People pay a prime price to live in Central Point, yet one has to wonder, 'f the traffic appeal is similar to that of Medford, if prices will eventually drop. I am confident that when reviewing this proposal, you will realize the detriment effect of tris decision. My hope is that Central Paint will continue to be a little oasis in the valley, with local bus posses that are booming, strong s,h..Is educating or children, safe parks to play In, and a strong housing demand. —hank you for your time. Best Regards, �I ,_ jt tLC� l:; LL- "-\_ Tanya Wilkerson �aN i 2 zols W P.II 711 Kathy lana Wilkerson Dear Central Point Planning commission, This is regarding the plans for the New Costco on Table Rock Rd. and Biddle. I live at 2524 Beebe Rd. in Central Point and I am very concerned of the traffic around my home. It's already bad to try to get out of my Central Point East subdivision. This seems to be a pretty big building they are planning and with the Pilot close by with all the trucks already from that this will be a complete nightmare. I assume that the roads around it will be widened somehow and traffic lights will be added. Who will be paying for this? I hope not us property tax Players as it's already $3800 a year which is higher than any city near Central Point. I am a Iso concerned that my house value will go down in price with no one wanting to live next to this nightmare of traffic. This will make it a low desirable area to live in we believe. Thanks for your time Kathy and Ray Wilkerson 541 6640533 Central Point East JAN 17 2016 EXHIBIT "5" 1111116 To whom it may concem This letter is in regards to the consideration of allowing Costco to build at the comer of Hamrick and Table Rock roads- My only request is that you read this letter and consider the negative impact that this would cause to the current families of Villas and Table Rock roads. Three years ago my family moved to a home located on Table Rock Rd. near One Rd. At the time the tragic was heavy but bearable. Since then, a sizeable increase in traffic has made us regret our decision. This increase, in my opinion, was caused from the increase in business activity and growth on the Crater Lake Hwy such as the new Lithia Auto Mall. People, trying to avoid the traffic congestion on Crater Lake Hwy have begun to use alternate routes to get to the Freeway, Rogue Valley Mall, Central Point, and others via Table Rock Rd. as well as Villas Rd. Several years ago, the Jackson County Roads Dept. did a traffic count study to determine the amount of traffic using Table Rock Rd. I don't have, nor remember, the exact numbers but it was somewhere in the realm of 13,000 cars a day, on average, were passing by the intersection of Wilson and Table Rock Rd. Based on several factors, one can assume that the number has significantly increased. Getting out of my driveway and on to Table Rock Rd. has become a nightmare. Crossing to get the mail, which lies on the opposite side of Table Rock Rd. is no longer a safe option. I've approached USPS, with the numbers and hazards, asking about having the mail boxes moved and was told to that it would not be a financially feasible decision. Thus not taking the safety of the residents in to account. Two people have died, within several hundred yards of my home, within the last 3 years while walking or crossing Table Rock Rd. and countless accidents have happened, making it, in my opinion, one of the most dangerous roads in the county. If you allow the placement of Costco, at the proposed site, Table Rock Rd. and Villas Rd. will become, more than ever, a safety and logistics nightmare for the people who live there. Not to mention the possible devaluing of our property. People traveling from North of the current location will be forced to use Table Rock Rd. and Villas Rd to get to the new location. These two roads will be, undoubtedly, overwhelmed with traffic. Please give careful consideration to this when making your decision on the placement of the new Costco. Please don't be another USPS and discount the safety of the residents. Sincerely, Dennis Burt 5969 Table Rock Rd. Central Point, OR 97502 541-226-6715 January 12, 1016 Central Point City Council 190 P Street Central Point, OR 97502 Dear Members OF the City Council, EXHIBIT "6" With respect and appreciation for You as the council of Central Point, MY wife and I submit to you for an approval of the proposed Costco Store. WeVe been members of the Costco Stores since 1985. Their products are of high quality and within reason. Their attitude and help has always been above reproach. IF You have a problem with their products, they are very quick to refund or replace the product with few exceptions (some electronic items). As property owners in JacKson County and Curry County, Costco has always been an asset In helping us with our needs. Also, their assistance in helping small and large businesses in theRpgue Valley in so many ways. The number of jobs have increased in the surrounding area along with other businesses. As retired teachers, we do encourage the approval of the Costco Store in Central Point. ThanK you for your time �Pyne andHatt�y in e K ngit 1909 Wga I Ave. Medford, OR 975ola P. S• Please don't forget the business coming in from California, Washington and other neighboring states From I-5. This produces growth with jobs. EXHIBIT "7' Kimberly Little 2467 Sunny0ew Lane Medford, OR 97501 Planning Commission City of Central Point 140S.3 rl S,. Central Point, OR 97502 January 7, 2016 To whom it may concern: I am writing to express my support ofthe proposed location of a new Costco Wholesale store at the corner of Table Rock Rd. and Hamrick Rd. Although I live in Medford, my dally place of employment is very near this location. I believe this proposed location has been well-chosen and would benefit the community of Central Point. It is just far enough away from the main part of town as to not affect traffic in the busiest areas, while at the same time, bringing people into the community who might not otherwise conduct their business in the area. I do not foresee any negative impact on traffic in the immediate area, when handled with proper planning for traffic control lights on the intersections around the facility, Thank you for your consideration of this proposal, and I hope that you will be able to approve their request to build this new store. Thank you, Kimberly Little IECIEoVE ��N �r�ol5 � 1 JOHN G. BATZPR P.O. BOX 970 M FI7FORD OR 97501 January7, 2015 EXHIBIT "8" City o:Central Paint Planning Comnrissior 140 S. Third Street Central Paco, OR 97502 RE, CCSTCOCondnmral Usc Permit Dear planning Commission, 1, along with various partners, own property in the area that CasLco proposes to re -locate We arc all in favor of the Cosmo development. This Costo. development will help stinwlate properties that have been stagnate since the recession and will give a needed boost to the surrounding properties. It will help to get the necessary infrastructure needed to dcvdop these properties. In additionit will help the tax base. The neighboring area was zoned 60 that it could be a focal point for commerce. We rhinle Cosrca will he great for the neighborhood. We hope the City will approve the Costco conditional use permit m li. Hauer rio EXHIBIT "9" January 9, 2016 Costco comments Central Point Planning Commission 140 S. 3" St Central Point, OR 97502 fo Whom It May Concern I am definitely in favor of approving the Custco store in Central Point near Table Rock Road and Hamrick. I reside in the Central Point East neighborhood, about 4 blocks north of the proposed Costco site. I am semi -retired and make numerous trips in the area that would be affected by traffic generated by the proposed Custco store. From my frequent observations, the comments I have heard about the truck traffic and other alleged problems on Biddle/Pine must be from persons who have no direct knowledge of the situation or most have some other agenda. Traffic on Biddle/Pine between Table Rack and Hamrick is some of the lightest in the area. Central Point needs more opportunities for shopping and employment. I think the opponents of development in Central Point, particularly in the area east of 1-5, are not thinking of the best interests of the community as a whole. I would be glad to give you any more information you may need in this matter, Sincerely, Olen Finley 359 Meadowbrook Ur. Central Point, OR 97502 541-840-9494 Ocna1"161 ianuary 8, 2016 City of Central Point Planning Commission 140 South 3r° Street Central Point, OR 97502 Re: Planned Castro in Central Paint My name is Laura Vaughn, I live at 5085 Dobrot Way, Central Point, Oregon. I attended and spoke quickly to the meeting last week on January 5, 2016. I am following up my nervous statements with the fallowing I have been a member of Costco, Executve Member, since 1993. 1 am a loyal and avid fan of the quality/pr!ce of items they offer tome no be rs. I have lived in the Rogue Valley since 1996—I have been at my present location in Central Point since 2001. 1 do not plan on moving anytime in the foreseeable future. I love Central Point. I have been atjust about all the Costco locations up and down 1-5 from Fresno, California all the way to Abbottsford, British Columbia, Canada.... including the original locaton in Kirkland, Washington. All Costco locations generate a bun arid demand — As a traveler, you search Costco out for the best gas prices! I can truthfully say the only Costco that is a bear to get in and out of is the one in Eugene on Cobourg road — did it stop me from visiting it— NO! I am aware that to shop at Costco means you need to have patience. And with the Eugene location — it is very similar to the proposed area — you go a half m'le north and it•s Country roads......... I am in favor of relocating the Medford Costco warehouse and fuel facility to the proposed location on Hari and Table Ruck Roads in Central Point. ;will look forward to being able to avoid the tangle and mess of highway 62 and Delta Waters Roads in Medford. As stated, the new locations will be within bicycling distance for us, but we will bring the car for the days when we stock up........ Ray's and Albertson's will still be our ;coal grocery stores for the quick in and out purchases! As I finished my nervous statement I mentioned — IT 15 ONLY THROUGH CHANGE THAT YOU GROW Any change Is well wo,th the hassle and delays that the construction will cause .... li al Costco members will appreciate a new facility, larger parking lot, larger warehouse and of course, more lines for the fueling station. The yearly property taxes received from Costco will be a boost to Central Point's operating budget, as well as the prospect of the additional jobs that Central Point residents could apply for........ Thank you for letting me put in writing what I was too excited to say in person at your meeting. PLEASE APPROVE THIS CONSTRUCTION AND LET COSTCO BEGIN TO HELP CENTRAL POINT GROW!! COSTCO WILL RELOCATE, PLEASE LET IT BE HERE AT HAMIRCK AND TABLE ROCK ROAD! Regards, c� u�u. Uau rl Laura Vaughn City of Central Point Planning Commission 140 S. Third Street Central Point, Oregon 97502 Re: COSTCO Conditional Use Permit Dee r Sirs: EXHIBIT "11" January 6, 2015 A number of us own properties in the vicinity of the proposed development and are in favor of your approval of this development. This area of Central Point has been stagnate for almost 10 years since the beginning of the recession and needs a shot in the arm to get it going again. We think the Castro development will provide that stimulus and will be beneficial to surrounding commercial and industrial properties. It will also enable some of the infrastructure improvements to get completed which would he necessary for other development, This area of the valley was once characterized as the logistical center of comme rce. This is probably why it was chosen by COSTCO. We think a good choice. We hope the City will work hard to make the proposed development a reality. Sincerely/ fT-4 Ilk P zols Ma te C,94 EXHIBIT "12" � � s S /SPA) �,��p..J�,.,_•,l�c-0STcr�ls�lM'd S'7cc%%l65 EXPIBIT/)Y 1261 A m � � �:Go 6NlZ�5 ' ?�2o ri � Cf l7� Po u l fl s f}- c -o A) t7 Wfi-P 4�f L1 HE e & 1!O(r1T o r2vS�� �r�k�c.Y ScG66�t'T -�fT���T y a Z ao£ Go yYco /f b � /,j 9 i,g' I -t I Cosyco EXHIBIT "14" January 19, 2016 Planning Commission City of Central Point 155 S. 2nd Street Central Point, OR 97502 RE: Conditional Use Permit — Costco Rebuttal Dear Chairman Pi land and members of the Planning Commission Costco would like to thank you for your thoughtful consideration of our Conditional Use Permit application. As you are aware, holding the public record open for an additional week to allow Costco to review comments submitted by the City of Medford on the day of our hearing has allowed some additional comments to be submitted into the record. Aside from the letters of support from the community for our proposed move, the overwhelming majority of testimony received at the hearing and subsequently submitted in written comments are related to traffic. Costco's traffic consultants, Kittelson & Associates, Inc., were directed to collaborate with all the agencies. Additional traffic counts and intersections were collected and analyzed to ensure the project could operate at acceptable levels of service and any safety issues could be mitigated. We are pleased to report that ODOT, Jackson Co. Roads and the City of Medford have reviewed and are in agreement with Costco's Conditional Use Permit as conditioned in the staff report. The attached letter from Kittelson & Associates is our response to each of the traffic related comments. It is our belief that the analysis provided adequately addresses the issues raised in the hearing and in written comments. Thank you for your consideration. Respectfully, Jac .Frank Costco Vice -President of Real Estate 999 take Drive • Issaquah, WA 98027 • 425/313-8100 • w rcosfco.com January 19, 2016 Project 9: 19046.0 Planning Commission City of Central Point 155 S. 2nd Street Central Point, OR 97502 RE: Conditional Use Permit Application Dear Chairman Piland and members of the Planning Commission: This letter responds to transportation -related issues raised in written comments submitted to the City of Central Point on or before January 12, 2016 and referencing the Conditional Use Permit Application by Costco Wholesale for a warehouse and fuel facility near the Hamrick Road/Table Rock Road intersection in Central Point, Oregon. 1. Comment: "Costco's traffic study is flawed in that it does not identify the routes its members use to access the existing Medford store, information which is necessary to accurately predict how those members will re-route to the proposed location."January 12, 2016 letterfrom David Smith. Response: To assure that the traffic analysis was based on reasonably worst-case conditions, none of the traffic associated with the existing Costco warehouse on Crater Lake Highway was subtracted from the estimated existing and future background traffic volumes, nor was any of it re-routed to the proposed new warehouse location. Instead, current market demographics were used along with area -wide population, employment, land use, and transportation system information to estimate the likely trip distribution and routing characteristics of the entirely new vehicle traffic that was assumed to he generated by the proposed new Costco warehouse. This additional traffic was then superimposed on existing and anticipated future background traffic volumes, resulting in a conservatively high estimate of the total amount of traffic the transportation system will need to be able to accommodate at all key intersections. 2. Comment: "It makes no sense to add 10,670 more vehicles traveling through a construction zone, for an undetermined period, which will create an additional problem which has not been addressed."Jon nary 12, 20161etter from David Smith. Response: As is normal practice in almost all road construction projects, a traffic management plan will be established and implemented forthe duration ofthe road construction period for the benefit of both vehicles and workers. 3. Comment: "Costco generates more traffic to its 'warehouse' of 130,000 square foot store in Medford than the nearly 700,000 square foot Rogue Valley Mall."January 11, 2016 letter from L. Calvin Martin. Response: We are not aware of recent traffic counts at the Rogue Valley Mall. However, a traffic analysis of a shopping center containing 700,000 square feet would be based on an assumption of near -full occupancy and would result in an estimate of about 25,000 average weekday trip ends. 4. Comment: "[sic] Kittleson Consultants have made many assumptions that can and should be examined, at the very least, by a neutral consultant." January 11, 2016 letter from L. Calvin Martin. Response: The traffic analysis and associated report that was initially prepared by Kittelson & Associates has been critically reviewed by transportation planning and engineering staff at the City of Central Point; Jackson County; City of Medford; and Oregon Department of Transportation. Additionally, the City of Central Point hired Southern Oregon Transportation Engineers, LLC to conduct a thorough review and provide comments of the transportation impact analysis. Staff from the public review agencies also participated from the outset in defining the scope and scale of the traffic analysis that was ultimately performed. The results of the critical reviews conducted by these agencies have been incorporated into the final report and the follow- up letters and technical memoranda that are part of the record. S. Comment; "Table Rock Road... needs to be widened all the way to its intersection with Merriman Road."January 11, 2016 letter from L. Calvin Martin. Response: Jackson County has jurisdiction over Table Rock Road in this area and has made the decision on the begin and end points of this particular widening project based on a multitude of factors that fall beyond the scope of this Conditional Use Permit Application. With respect to the adequacy of the transportation system to accommodate the proposed new Costco warehouse, the traffic analysis demonstrates that adequate transportation services can be provided without extending the Table Rock Road improvement project beyond its current boundary limits. 6. Comment: 'The bridge crossing the 1-5 Ion Table Rock Road] is old and very narrow. The increased traffic... will require that it be replaced with a stronger and wider (at least four lanes) bridge." January 11, 2016 letter from L. Colvin Martin. Response: The proposed new Costco warehouse does not cause the need for this bridge to be replaced or widened in order to maintain adequate transportation services. Z Comment: 'The proposed location of Costco will create a very dangerous mix of large heavy trucks (including triples) from adjacent and nearby businesses (Knife River Concrete and Aggregates, FedEx Ground and others)." January 11, 2016 letter from L. Calvin Martin. Response: The traffic analysis conducted by Kittelson & Associates was reviewed by appropriate City, County, and State agencies and explicitly considered the safety as well as the operational effects of the proposed new Costco warehouse. The mitigation measures incorporated into the conditions of approval have been found sufficient to maintain adequate transportation services with respect to both operations and safety. B. Comment: "The mix of senior drivers with congestion and heavy trucks is not appropriate or desirable and could have disastrous results." January 11, 2016 letter from L. Calvin Martin. Response: The traffic analysis conducted by Kittelson & Associates was reviewed by appropriate City, County, and State agencies and explicitly considered the safety as well as the operational effects of the proposed new Costco warehouse. The mitigation measures incorporated into the conditions of approval have been found sufficient to maintain adequate transportation services with respect to both operations and safety. 9. Comment: 'The land around the proposed Costco has not been developed to its potential, particularly to the North and West. When that land develops the intersections will be even more stressed. " Jon udry 11, 2015 letter from L. Calvin Martin. Response: The projected future background traffic volumes used in the traffic analysis are based on estimates of future population and employment for Central Point and the surrounding urban areas, and therefore anticipate that growth will continue to occur throughout the urban area. Additionally, separate traffic analyses will be required of all nearby specific development applications that are expected to generate significant volumes of additional vehicular traffic. All such development applications will need to provide, as part of their own approval process, whatever mitigation is identified as being necessaryto assure continued adequate transportation services in the area. 10. Comment: "The mitigation measures proposed create difficult driving and congestion all through Central Point's downtown area."January 11, 2016 letter from L. Calvin Martin. Response: The mitigation measures set forth as conditions of approval were developed in collaboration with City, County, and State engineers and planners. They have been found to adequately mitigate the off-site transportation impacts associated with the proposed new Costco warehouse without creating unacceptable side-effects elsewhere. 11. Comment: 'The expenses, of this first set of mitigations, are likely to be much more than what has been projected by the applicant's consultant and others." January 11, 2016 letter from L. Calvin Martin. Response: The construction cost estimates associated with each condition of approval were developed and reviewed by registered professional engineers and are based on the most recent available unit prices from similar and/or nearby construction projects. 12. Comment: "1 assume that the roads around it will be widened somehow and traffic lights will be added. Who will be paying for this?" January 12, 2016 printed email letter from Kathy and Ray Wilkerson. Response: Costco has agreed to pay its proportionate share of each mitigation measure identified in the conditions of approval, which means it will fully mitigate the financial costs of the off-site impacts associated with the proposed new Costco warehouse. See also the response to Comment #1 above: the fact that Costco's traffic analysis has conservatively overestimated the facility's off-site traffic impacts gives further assurance that Castro is fully contributing its proportionate financial share of each mitigation measure identified in the conditions of approval. 13. Comment: "1 don't have, nor remember, the exact numbers but it was somewhere in the realm of 13,000 cars a day, an average, were passing by the intersection of Wilson and Table Rock Road". January 11, 2016 letter from Dennis Burt. Response: Traffic data available from Jackson County indicates that in 2008 the average daily traffic volume on Table Rock Road in the vicinity of Wilson Road was about 17,000 vehicles per day. The traffic analysis estimates the proposed new Costco warehouse will generate about 90 additional vehicle trips (45 in each direction) on Table Rock Road in the vicinity of Wilson Road during a typical weekday evening peak hour. 14. Comment: 'Table Rock Rd. and Villas Rd. will become, more than ever, a safety and logistics nightmare for the people who live there."January 11, 2016 letter from Dennis Burt. Response: The traffic analysis conducted by Kittelson & Associates was reviewed by appropriate City, County, and State agencies and explicitly considered the safety as well as the operational effects of the proposed new Costco warehouse. The mitigation measures incorporated into the conditions of approval have been found sufficient to maintain adequate transportation services with respect to both operations and safety. Thank you for the opportunity to provide these responses. Sincerely, Wayne Kittelson, P.E. Principal �� P1�[p44V i II Brett Korporaal Associate MEMORANDUM Dat¢ January 19, 2016 Project N: 19046.0 To: Stephanie Holtey City of Central Point 140 South Third Street Central Point, Oregon 97502 From, Brett Korporaal and Wayne Kittelson, PE Project: Central Point Costco TIA Subject Response to City of Medford Comments dated January 5, 2015 This memorandum responds to comments submitted by staff from the City of Medford related to the Central Point Costco Transportation Impact Analysis (TIA). Each comment from the letter dated January 5, 2016 is summarized below and then followed by Kittelson & Associates, Inc.'s (KAI) response. COMMENT 1 FROM CITY OF MEDFORD We understand the Rogue Valley International Airport is opposed to a median at the intersection of Biddle Rd and Airport Rd, as described in Condition No. 3. We recommend a condition that requires the developer to pay a proportional share towards a future traffic signal at this intersection. The City of Medford estimates the total cost for a traffic sign at this location to be $450,000 including design, construction, and inspection. We estimate the development's contribution at 10% from the additional traffic at this intersection shown in the Traffic Impact Analysis, dated October 2015, prepared by Kittelson and Associates, Inc. This results in a $45,000 contribution from the developer to this future project. RESPONSE 1 FROM KAI Costco Wholesale and the traffic engineers it has retained respectfully disagree that signalization is the most appropriate mitigation at the Airport Road/Biddle Road intersection. We believe there are good reasons to route trucks to the airport and Airport Road via Biddle Road. Biddle Road is currently a five lane road with a jug handle connection from Interstate 5, SR 62, SR 99, and SR 238 to the south of the airport. Biddle Road also provides a direct connection to E Pine Street, which provides access to Table Rock Road and 1-5 for trucks access north of the airport. KAI would need truck origin and destination data to determine optimum truck routing into and out of the airport. However, it is clear from information already available that a raised median can be constructed that will still allow trucks to make left- and right -turns onto Airport Road via Biddle Road. With a median at the Airport Road/Biddle Road intersection trucks would be able to make right -outs onto Biddle Road or a left - turn out of the airport can be accommodated at the O'Hare Parkway/Biddle Road intersection, which is roughly a quarter -mile south of the Airport Road/Biddle Road intersection and therefore does not require out -of -direction travel. Based on the low volumes on Airport Road, Costco's traffic engineers also question whether a traffic signal would be able to meet official installation warrants. A traffic signal will disrupt and add delay to all vehicles approaching the intersection whereas a raised median will re-route only a small number of vehicles — and it will re-route them in a way that does not add travel distance or create additional safety or operational problems. For these reasons, we believe that a raised median is the most effective and most appropriate measure to mitigate the effects of the proposed new Costco warehouse at this location. A planning level cost estimate has been prepared for a raised median at this intersection, resulting in an estimated total construction cost of $35,000. Attachment A contains KAI's planning level cost estimation spreadsheet for a raised median at the Airport Road/Biddle Road intersection. COMMENT 2 FROM CITY OF MEDFORD At the intersection of Table Rock Rd and Morningside St we recommend a condition that requires the developer to pay a proportional share towards a future left turn lane at this intersection. See attached accident history showing an existing pattern of northbound rear -end collisions at this intersection. Per our December 24, 2015 letter, this development will increase PM peak hour trips through the intersection by 20%. The City of Medford estimates the total cost for a left -turn lane at this location to be $300,000 including design, construction, and inspection. A 20% contribution would result in a $60,000 contribution from the developerto this future project. RESPONSE 2 FROM KAI The City of Medford provided KAI with crash data at the Table Rock Road/Morningside Street intersection dated 2010 through 2014. In the City of Medford's letter to the City of Central Point dated December 24, 2015, the noted concerns were focused specifically on northbound rear -end crashes. However, a review of the crash data provided by the City reveals that the total number of reported crashes has declined each year since 2010, and only one rear -end northbound crash has been reported in the past three years at this location. These observations cause KAI to question whether there is an ongoing significant northbound rear -end crash problem that warrants mitigation. Even if the City of Medford believes an intersection improvement is needed at this location, neither KAI nor Costco sees a nexus between the relatively small amount of net new site -generated traffic expected to travel through the intersection and the concern about northbound rear -end crashes: • To the extent a problem requiring correction exists, it was created by a combination of traffic volume, roadway design, and environmental factors that Costco did not affect. • To the extent a problem requiring correction exists at this intersection, it is created by northbound vehicles on Table Rock Road turning left onto Morningside Street, and this is a movement to which Costco is expected to add no additional traffic. • The City of Medford has thus far provided insufficient information to confirm the northbound rear -end crash problem, to the extent such crashes are an ongoing significant problem, can be attributed primarily to the volume of through traffic on Table Rock Road. More specifically, it is impossible at this time to rule out the possibilities that approach speed and/or intersection visibility are the primary contributing factors to a northbound rear -end crash problem. • Given that the vehicle fleet is rapidly evolving into vehicles with forward-looking radar and automated braking capabilities, it is likely that the rear -end crash problem at this intersection (to the extent it exists) will naturally decline in significance and incidence over time, simply because of the new vehicle technology that is already being deployed. The City of Medford states that Castro's proportional share for constructing a separate left turn lane should be 20%, based on the volume of additional traffic that is expected to pass through the intersection because of the presence of the Costco warehouse during a typical weekday evening peak hour. However, the City's computations do not recognize that when analyzing crash data transportation engineers use average daily traffic (ADT) data on the approaches at the intersection rather than peak hour volumes. The City of Medford provided 2014 ADT data at this location, which totals 15,416 vehicles per day. Daily site -generated trips accessing the proposed site via Table Rock Road from the south is estimated to equal 20% of total site -generated traffic. This would add an additional 2,134 daily trips to Table Rock Road south of the site for a total of 17,550 ADT when the site opens in 2016. When performed on the basis of average daily traffic, therefore, the City's computations would result in a proportionate share estimate of 12% and not 20%. In summary, neither Costco nor the traffic engineers it has retained sees a nexus between the site's generated trips and the possible need for a northbound left -turn lane on Table Rock Road at its intersection with Morningside Street. As well, Costco and its traffic engineers believe the need for and appropriateness of a northbound left -turn lane at this intersection has not yet been established, and that further investigation could reasonably conclude that traffic volume on Table Rock Road, while a contributing factor, is not the primary or the only factor contributing to northbound rear -end crashes at this intersection. Attachment B includes the crash data summary and ADT of the Table Rock Rood/Morningside Road intersection. d"AARVAYTIM Costco Wholesale believes that a contribution of $35,000 will allow construction and implementation of roadway improvements in Medford appropriate to mitigate the off-site transportation impacts anticipated within the City of Medford and attributable to the proposed new Central Point Costco warehouse. Even so, Costco Wholesale is prepared to contribute up to $70,000 to the City of Medford in order to assure that sufficient funds are provided to fully mitigate the proposed Costco warehouse's off-site transportation impacts within the Medford's jurisdictional boundaries. Attachment A Raised Median Cost Estimate at Airport Rd/Biddle Rd Central Point Costco Public Improvements R,TTEL,av €_ A,,o..I.. TE,. n,, Airport Rd.& Riddle Rd. Intersection •-•^^^--- ^•^•—•_ Castro wholesale Cnglne h, esimme- Conceptual P,eanred By Fred wlsmer• v5 & Chanes xadast, P5 na[e:Innunry ,h¢1,1—le has a Sarre of 3C 15eeral—s ole ouide belnw,l Mobe:euan(00210) LB ALL $400000 $400000 2 -emporary Protection B Oiretlmn of Traffic(00225) u5 ALL $2 000 00 $2.00003 3 Frosor Cartrol (00260) LB ALL $200000 $200000 4 Removal of Strutleres and Obstructiors (00310) LS AL'_ 5305�. 5 Clearing and GYubairg (00320) LS AL- 52 6 General Eadnworks(00330) CY 200 ] 6ubgrade Geatestia(00350) SY 80 0 A9gragale Base (00641) GY 48 0�22MOO 9 O Besse. HMAC (00]441 TOFS 3fi 10 oncrst Curb Concrete Curbs, Curb d0759) o0]59 LF 150 11 TrantlaS Concrete Curhs, Traffic Separator (00]59) LF 250 $1500 $3 75d00 12 Concrete is ands(00759) SF 170 $1000 $']9000 13 Conrete Walks(00]59) SF 900 $S 00 $450000 14 Tmraated C om as(00]50) 3 645000 $135000 15 Pavement Markings, Complete r LS ALL 5 100000 $100000 16 Permanent Lendseaping(01030) SF 900 $2.50 $2,25000 17 Engineering&Constriction Management LS 15%$ 21,265 53,202 20 16 City Construction Management LS t0F $ 24 4851 5250000 LI _ Page 1 oft Central Point Costco Public Improvements Airport Rd.& Biddle Rd. Intersection KITTCLSON ASSOCIATES TLs INCK costs. Wholesale Scope Accuracy. Level l: Protect scope well understood and well defined. 12: Turbo scope conceptual. Snipe lacks detail due to potential permit requirements; Unknown project conditions; limited knowledge of external Impacts Level 3: Protect scope Is a "vision with limited detail. Engineering Effort'. Level A: Preliminary engineering performed Technical Information is available, engineering calculations have been performed; clear understanding oftlle materials size and quantities needed to executelob. Schedule understood staffand permitling is famyclear(howeverthis element may still need refining). Protect Development B Construction Contingencies ranges between 10% 201A Level B: Conceptual engineering performed. Technical information is available, rough engineering calculations may have been performed o milar Information from previous similar work Is compared and used project Development Contingencies ranges between 15% to 25% and Construction Contingencies ranges between 20% to 30%_ Level C: No engineering performed Educated guesstimating. Limited technical Information available antler analysis performed Project Development and Construction Contingenoes should and seletted appropriately by Fort Manager Contingency may range up to 50%. Page 2 of 2 Attachment B Crash Data Summary & ADT at Table Rock Rd/Morningside St Morningside St & Table Rock Rd 29 Accidents (rate: 1.32) 01/01/10 - 12/04/14 12 V 152 0 10/18110 mnm12 07112/13, 12/09113�j N N }R 6 17 J7: p J 0 0 (clear filter)( accidents with Insufficient data for dis la i Straight � Parked x Pedestrian Fixed objects: 9 Stopped ate.. Euatic X Bicycle ❑ General o Pale Unknown a Out of control O Injury ® Signal ® Curb w Backing ?-,_ Right turn po Fatality ® Tree sf Animal � Overtaking Ae— Left turn p Nighttime 4 3rd vehicle — Sideswipe -�;7-- U-turn la DUI w Extra data MteneoMM gk VER 6.79 .,g al Me01oN. OR 01105/3016 a R—, OYuq olfilholD-13Ma/zo14 Momltysl*S6LMaRmk Atl SMW 6R�AR:TWEXR+ GSEO WlE )IME 06TR DRF 6 ffl SiREEi3 ]YREOFEOIL VENIOIR VENi01R VEN IMWE VEN3MM Vi.11 VEN 3IVVE UNE POS MALAY SFVHUY FALRI ENFORF FREM AT FAULT 3ECUUSE ]m1N1 ]/33 l.11:36 R.1 iRBIE RORM MOPMH4510ESi 9MMpe Nmh YmgRt T.m .Ft Rtv/.p Aut 0OFiieXipbatlme VeRI ]CO1958 y D. 6:31 0 TABLE P0O[PO MOeNNGSOE ST MveM Hmh Xw111 yraldi LraIMN M'm'n9AW Muiny Nn ] OFdlmiptmrlose VeM1I Wa06 3/OMM01)31 RSwU TA01ER0OIRD MOPXMGSIOE SL Pevertl Nmh Mmh S %Rt Sm[e6lnTril Mwmg Mi hbJpPW 0 0 OFol.X lmeba VeM1I SW&65 61vMM 15'33 3W XmM TNIE R9Q 1m ANIRN WGSIOE ST Fear. . SpGh SIM IRRIR8leh RRR.R. W{n,. 0 0 0.. MWy VeM1I DlE-ttarp 1.541 ll3M10 HIOE StlI NmN TAOtE ROR Ib MORNIXGSOE Si Re—d Sauth Soulh SOaiBM swFRRR k, If DD—g AM X %,Ra 0 0 DDUR A.. VeM1I ILC9155 QDW.. 1334 0 TABLE PLR RD XIXGSME Si... Nvlh NMh straglll uRftek MmpAue Rbnp.W 0 D OFdlwlMg lw[Iw VeM1I IO1M3 71MOM 9:31 0 TPMEROIX RO MNfSB1E 5T W—, Swth SOWM1 OainWnB Iu Fl BM MMp4t1 Mging Aut IMSM1ou 0 0 Olmpmp paahrg VMI ]0Al .I6:M 0 MORXWGLMY M Nbe mM1 U. .r o S,d MIf 01[Ytle Ml A.1 1 3 OFvelnv OmNR YNI 1016. lvl/301D 0:4 1d, North iAB1F ROR PO ST ICerp. XMh Saud, .—" .0, Mmp.W Mou✓r .IM F.R 0 0 00NIAImhd Vehl Wt.F- 1M)IGS 41AM111616 0 TABIERRI{RO MORXIHGSDESi Reared, Np[h North Lm6M1l 7.l .leh M-ft.M—.. I 1 OD uMw dSl ,k Ve VNl 31W914 SPDF"D 111:59 ]S NmIh TAB1 RD MORRH Df S) Reared, Mw[h NMA YnlBha S.,DA It MpAng Rul .,w 3 I OFdwnptoatlne Veh] RtvnH SIIMSI W13IMIl 16:11 ID'mnh iAR1E RO[R p0 BNIRN WDSIDF SL ReneM Nry NMM1 SnIdY ycppNMTnI MUMg Aw MMNRN 3 I DPdb ngi d— Veh] ],D,5 WVFDI119i7 S050uN iAB1E F. IM ..Gm Si ReuvN DR. xm[h sanyN SopVeGMTM D W., taoabce VehI VltlatRd Tra 11148% W/ Mll l JI DipB1E ROEII ROMORNIH45IX ST Xe I.. TYt,RR,h, RRg .O J— OR Rm]R 0 0 OGrt4ss Mein, VeM1I ]DO. M.H M.. Sia xweF CALF F. RD MDRNINGS g SO—Ra SmM xwaM1 Leae IFNLal 51rai MmiNRR Monpaul 0 0 0Qw.l 0ririn8 VeM1I OMtwtm 9116/M21 27_12 3Dy th TAM R RD MURMXGSOC Si Revell NCM Nmlk sYai@tl Ip,. Tral [0tlmm9tmtlu Vehl 111956 lv"ll 14,00 0 TAW RWR RD MOR ..MDM l—,R1 Fd Ih Ned, S a iut ,t,R .1. M All 1 I ON., Vehl Xh.d l4n 1E03i ]13NMI3155] R<DUR ]SIDE ST Reve.M Meth Nmth HralgM .,pRR!.11 0 0 .lawlglmtlou Vehl I203RR VIM3] 30A7 4 SwdO TALE Kb.W 6 NINGi'DE ST Rvatand Mnh F—h Slrn'Rln TumMBlek Rl-p Aul FIR A. 1 ] OIeRwNtmtlaY Vehl 1333435 71612012 1614 0 a W, pD MDRNMGUDESi NIe IMh NMh Sko FD iurNnv D,h MriN Au[MmsBAw 0 0 0Ftl ngNood— Vehl OW mt—, ]3]3696 ]1M/301113:39 0 TADIE RIX. RD M]PNWGLDE ST Mple Fnl R—h IR'. SMRM Mrviry AN.,A. l 1 OFtllbo]sI STOPSIGH VeM1I LO ml mmp 1315893 RDFim1316:30 0 TOBIE ROL1t PO Ap WYI(510F SL Rear. MMM1 NMh ..iRta Sop Lind, AN.on AN D 0 0FoFaMp lw d— Vehl IE3159O IIAM1115:43 155 amh TABLE RIXE W AR MMSW7F Nona,Wo Nlr NMh Sb ScppeG lniralM ....,p R 0 OFtlkwptmrlme Re I 13013 11361M13 ]SI Sm Nord, TABLE pOR RO RNIXGSR:f 5T SG , Nord, .r.F.1N...w, Mmslg A. OXRa DL 0 0 ..— VeM1I XI[aNPun 1313)15 )11UM1311M MON3MGSM. TABLE ROCK RO Mak . Tunrylek T-1.1X MONNAut MwlRAut l 1 OF,lt—MSTWSIGN VeM1I 1319M 9/10/OB 12 MN—h TRRIE R0RRD MORLNGSWRT Pe .1, $mkM1 SRRR, Stg dM IF MMMMONp AUI I 0Wllexigtm pax VNl VNNROI ..1)F Sv11M1314. 1. HwW iAB1£PLCR RO MORIBXGSWEST.—M XMh NMh SONRM SW,Dd k If MWAlt MOWSAm Off IdR 0 OfdlewNgim D— VMI 1334E 1319/M1314.1. 0 MOIIX WfSMESL TABUF. RD We S ah Fart Tu., %M .,m MTnl Moi nv Aul Mawy.1 0 0 OOWer Veltl .-a r 14 L3PJ0 fi3.. 1611 MYu1M1 TABLE RORRD MORMNGSUO Reared, HMM1 NMh ..RFI SEOpMM1raI MMpAN Mowy AN 3 1 OFmonn..d— VMS CITY OF MEDFORD, OREGON TRAFFIC ENGINEERING DIVISION 24 Hr Average Weekday TRAFFIC VOLUME Start 28 -Jul -14 Tue 0 Wed Thu Time Direction 1 Direction Direction Direction Direction Direction Direction Directio 12:00 AM 0 0 33 52 31 69 ' 01:00 30 50 26 37 ' 0200 16 19 13 39 ' 0300 S3 34 40 32 ' 0400 136 33 127 54 ' 0500 258 118 208 to ' 0600 287 197 199 280 ' 0700 414 244 253 407 ` 0800 323 280 194 400 ' 0900 252 277 284 273 188 337 ' 1000 318 271 259 310 194 399 ' 11.00 275 332 314 357 186 363 ' 12:00 PM 293 368 367 402 ' 01.00 364 387 456 439 ` 0200 311 417 345 476 ' 0300 376 519 295 569 ' 0400 372 542 259 625 ' 0500 370 520 298 587 ' 0600 295 304 205 341 ' 0700 197 249 159 260 ' 0000 176 180 115 232 ' 0900 142 175 111 205 1000 100 135 84 134 ` 11:00 46 71 58 lot ' Lane 3887 4747 5159 6338 1659 2594 0 0 Day 8634 11497 4253 0 AM Peak 1000 11:00 0700 11:00 0700 0700 - Vol. 318 332 414 357 253 407 - - PM Peak 1500 1600 1300 1600 - - - - V, 376 54z L% szs - - - - Comh. 8634 11497 4253 0 Total ADT ADT 11,327 AADT 11 327 Fri Sat Sun Direction Direolion Direction Direction Direction 1 0 0 0 0 0 0 0 0 0 0 0 Page 1 Site Cade. 338 Station to: Latitude. 0 0.0000 South Week Average Ion Direction Direction 32 60 28 44 14 29 46 33 132 44 233 148 243 238 334 326 258 340 241 296 257 327 258 351 330 385 410 413 328 446 336 544 316 564 334 554 250 322 178 254 46 206 126 90 92 134 52 86 0 4974 6354 11318 - 07'.00 1100 334 351 1300 1600 a10 s6a 11328 CITY OF MEDFORD, OREGON Page 1 TRAFFIC ENGINEERING DIVISION 24 Hr Average Weekday TRAFFIC VOLUME Site Cade. 000000009742 Station ID Latitude T 0 0000 south Start 28 -Jul -14 Tue Wed Tttu Fri Sat Sun Week Average Time Direction 1 Direction Direction Direction Direction Direction Direction Direction Direction Direction Direction Direction Direction Direction Direction Direction 12:00 AM 10 17 9 15 10 16 01:00 9 23 12 23 10 23 0200 3 9 3 6 3 8 0300 18 12 13 9 16 10 0400 44 11 48 11 46 11 0500 97 29 100 30 98 30 06'.00 124 39 133 33128 36 07'.00 191 59 175 60 183 60 0800 146 53 128 65 137 59 0900 112 77 98 95 105 86 10'.00 95 Be 121 92108 90 11'.00 ` 105 117 106 120 106 116 12:00 PM 114 140 102 140 108 140 01:00 98 141 126 138 112 140 02:00 111 138 108 158 110 148 03'.00 114 198 109 222 112 210 04:00 111 217 111 236 116 248 113 234 0500 127 260 12A 243 133 253 128 252 0600 102 171 91 158 2 5 65 111 0700 78 139 89 139 0 0 56 93 08'.00 67 100 54 103 60 102 0900 52 95 49 102 50 98 1000 33 ]] 28 55 30 66 11:00 19 30 17 44 18 37 Lane 589 1089 1954 2231 1642 1723 0 0 0 0 0 0 0 0 1912 2178 Day 1678 4185 3365 0 0 0 0 4090 AM Peak - - 07'.00 11:00 0:00 11:00 - - - - - - - 0700 11:90 vol. - - 191 117 175 120 - - - - - - - - 183 118 PM Peak 17:00 17:00 1700 1]:00 17:00 1700 - - - - - - - - 1700 17'.00 vm. 127 260 124 243 133 253 - - - - - - 126 252 Comb. Total 1678 4185 3365 0 0 p 0 4090 ADT ADT 4,089 AADT 4.089 ATI L. Calvin Martin, Consultant P. O. Boz 442 Jacksonville, Oregon, 97530 Appeal to the City Council of Central Point, Oregon Regarding: Costco Store Conditional -Use Permit your file #15022 This appeal is pursuant to your Municipal Code Section 17.05.400(F) Members of the Council, I am submitting this appeal in an effort demonstrate to you that the City of Central Point Planning Dept. and Planning Commission have committed an error in their approval of the Conditional -Use Permit for the Costco Store to be located in the City of Central Point in the Table flock Road Industrial Park. I have standing in that I spoke at the original hearing on January 6'", 2016 and appealed the decision to the Planning Commission subsequently. It is easy to understand the city s desire to have such a vibrant retail store in your City. Costco is an amazing marketer of goods and services. They have a loyal customer base and provide terrific products to their customers. The City Planning Commission has abused their discretion in allowing such a use in the industrial zone and at this location. In my previous appeal to the Planning Commission I discussed the impact of the traffic that Costco generates at any location. I demonstrated the traffic generated on a day to day basis is substantially more than is generated by the entire Rogue Valley Mall in Medford. This fact should be an occasion for pause and contemplation. You are required to follow the rules laid out in your Development Ordinance when approving such an application. It is interesting that in your STATEMENT OF VALUES regarding growth it is stated that "We value planned growth that will retain our small town atmosphere'. This project does not fit that statement. One of the issues is that the zone, that the store is to be located in, is Industrial. The areas all around the store are zoned industrial and much is heavy industrial. The reason that retail/commercial activities are allowed in those zones with restrictions, and not outright, and that they go through the Conditional - Use permit process is that they are not the primary use but an accessory use to the primary. It is the intent that these ancillary and non -primary uses are to allow for complimentary services and uses in the zone. These non -primary uses are allowed for convenience and efficiency. Uses such as restaurants and supply stores are allowed to keep people from leaving the general area to obtain needed services When a store like Costco is placed in that zone you have to play, and indeed did so, a very significant semantic game with what you call the store. In calling it a warehouse store the project mightjust seem like a fit. With that said, it is certain that the management of Costco is under no illusions, whatsoever, Page 2 73, Appeal that they are the largest retailer in the area. As I previously stated, Costco generates more traffic than the Rogue Valley Mall and they are about one fifth of their building footprint. lust consider the number of parking spaces that they are illustrating in their plan. It is obvious that they don't fit in this zone. They are not the complimentary service and supply provider that is allowed in the zone. A store of this size and magnitude should not be in an industrial zone. If they are allowed to develop on this site it will become a traffic disaster. The traffic issues have far reaching effects of congestion and cost on Central Point, Jackson County, and the City of Medford as well as the Oregon Department of Transportation. Of course, that means the tax payers who support those entities. In other words, all of us will be paying a huge price for the location of a store that is not an appropriate fit. It is not a code fit and it is not a size and traffic fit all in one. Once Costco goes in there will be no way to fix this problem. The area of this store and the road servicing it are plan designated as a Freight Traffic Route. It currently experiences very heavy truck traffic and will experience more as the balance of the lands near and adjacent to the Costco site develop. It is unwise and dangerous to mix high volume heavy truck traffic with a daily vehicle traffic load approaching 11,000. Traffic congestion around the Costco store will be a mix of heavy trucks and light vehicles. Table Rock Road will see the bulk of the traffic and the measures that have been suggested will only assist but not solve the problems related to this location. The additional traffic on Table Rock Road will soon find that it is not designed to handle the load further south of this store and people will soon move their preferred approach to Biddle Road and Table Rock Road north of the site. They will start using the freeway to enter Central Point from the North and the South. This will add congestion on the freeway off ramps north and south and a loading on Pine Street all the way to the intersection with Hamrick and Pine and Table Rock Road and Pine/Biddle Road. Anyone who travels these roads now, knows that congestion in the morning and afternoon is already critical_ Many people going to Costco do so on their way home. It will definitely be more of snarl than it already is. The improvements required in the Traffic Impact Study indicate a resultant congestion from construction that is not to be completed for as much as two years. In reality, some of these items, such as an 1-5 off -ramp improvement, are not scheduled by COOT until 2023. There is no definitive evidence that the schedule has been modified. There are no engineering studies or drawings that would support a timely upgrade of that facility. There is no indication, other than verbal at the hearing of January 6", 2016 that some concession might be made. There is no evidence that the improvements along Table Rock Road are funded or that the requisite imminent domain takings of additional land for widening and intersections have been done. There have been no bids advertised for and only estimates by the applicants traffic consultants. In fact, all of the items that should be in place for public safety and efficient road service are only ideas and suggestions at this point. It is possible that some may be completed within two years but at this point it is far from certain. Page 3 of3, Appeal An additional issue that has not been fully vetted is the intersection of Riddle and Airport Road. This Intersection is important as persons traveling to the airport are often on short time frames and congestion creates difficulties for them. Considering the fact that Table Rock Road to the south of the site will not be able to handle the traffic The impact on all of these roads is signif cant and not easily solved if at all. The argument can be made that the costs for all of the improvements needed to place this major retailer in an industrial zone along Table Rock Road more than eclipses the cost of the store itself by a factor of five. Estimates for the widening of the freeway overpass on Table Rock Road exceed 20 million dollars. Further south of the overpass are single family residences that need to back out onto Table Rock Road to exit their properties. The estimate for acquiring these properties for road widening does not exist, but would be very high. Table Rock Road is designated as a freight route in the overall traffic master plan and this enormous retailer with its accompanying vehicle traffic is not an appropriate mix with the truck traffic in that area. This traffic is well documented and I am certain that all of you are more than aware of the significant truck traffic that occurs on Table Rock Road to the North and South of this site and the truck traffic that enters and exits Central Point onto Pine Street from the Interstate 5. This type of traffic mix is difficult in small amounts that will always be present but to introduce vehicle traffic that is more than the Rogue Valley Mall to these roads even with the proposed improvements should give you pause. Vehicle and truck accidents will undoubtedly increase and serious injuries will occur when Costco's large number of senior drivers are forced to mix with large truck traffic. The intersection of Vilas Road and Crater Lake Highway has been the scene of horrendous accidents and many deaths and this location and traffic load creates at least four intersections with that type of potential. It was not long ago that the City of Central Point decided to pass on a "big box' store proposed by Walmart in this general vicinity. In fact, Walmart's proposed site created fewer problems than this site. Some of the same reasons that are expressed here were used to discourage the development of the Walmart store. It should be noted that the super -sized Walmart does not generate anything close to the traffic that this Costco site will generate on a day to day / hour to hour basis. If it was not a fit for Walmart at a more appropriate site, then this location and store is certainly not a fit. I am urging you to reconsider and overturn the decision of the Planning Commission on merit Thank you for your time. Respectfully submitted this /16"/'�day of February, 200116 L. Calvin Martin ATTACHMENT "C-2" COSTCO WHOLESALE CONDITIONAL USE PERMIT DRAFT FINDINGS OF FACT & CONCLUSIONS OF LAW L. Calvin Martin Filing Date: February 16, 2016 File No. 15022 City Council Appeal I (caring March 10, 2016 PART 1 - INTRODUCTION On February 2, 2016, the Planning Commission in accordance with CPMC 17.76 approved a Conditional Use Permit authorizing the development of a Costco Wholesale membership warehouse and fuel facility on 18.28 acres within the M-1 zoning district ("Costco Application"). The project site is located on the eastern edge of Central Point city limits at the southwest corner of Hamrick and Table Rock road. The site also has frontage on Federal Way, a local street. Surrounding properties include developed and undeveloped industrial lands, including the M-1 and M-2 zoning districts. On February 16, 2016, L. Calvin Martin fled an appeal contesting the Planning Commission's decision on the basis that the City of Cenral Point Planning Department and Planning Commission committed an error when approving the Conditional Use Permit for the Costco Store (`Martin Appeal"). The Martin Appeal addressed several issues that focused on legitimacy of a commercial/retail use in the M -I zone and traffic related concerns, which are addressed below. The Council's scope of review on this appeal is limited to the issues and evidence presented in the record before the Planning Commission as per CPMC. 17.05.400(F)(3). As this appeal is on the record the City Council may not consider new evidence or issues that were not preserved in the record below. Council review is limited to determining whether there is substantial evidence in the record to support the findings of the Planning Commission; or whether errors of law were committed. Membership warehouses are permitted as a conditional use per the City's 2009 similar use determination under CPMC 17.48.020(W) and 17.60.140, which was adopted by the Planning Commission as Resolution Nu.764, and affirmed by the Council on Appeal as Resolution No. 1217. The applicable approval criteria for a Conditional Use Permit are set forth under CPMC 17.76.040, Findings and Conditions for Conditional Use Permits. PART 2 -APPEAL ISSUES 'I here were seventeen (17) issues raised in the Martin Appeal. Though some of these issues overlap, staff has attempted to lay each issue out separately for Council consideration. the following is a summary of each issue presented in the Martin Appeal including the draft Endings and conclusion pertinent to each issue. Page I of 11 I . Planning Commission Abuse of Discretion. "1'he City Planning Commission has abused their discretion in allowing such a use in the industrial zone and at this location." Finding k Membership warehouses, per Section 17.48.020(W) and 17.60.140, are allowed as a conditional use in the M -I district per Planning Commission Resolution No. 764 and City Council Resolution No. 1217. As such, the Planning Commission considered and approved the Costco Conditional Use Permit (CUP) application in accordance with the conditional use permit standards and criteria set forth in CPUC 17.76. Per the Applicant's Findings ("Applicant's Findings" and the Planning Department Supplemental Findings ("Supplemental Findings ") and testimony provided in the record, evidence was submitted into the record as to each criterion under 17.76.040 and was found to comply with all such .standards and criteria. Conclusion 1: The Council concludes that the Planning Commission did not err in finding that membership warehouses are permitted subject to a conditional use application under CPMC 17.76 and/or that there was substantial evidence in the record to find that all such standards and criteria were met under 17.76.040.. 2. '1rallic Impacts. Traffic generated by Costco on a daily basis is substantially more than is generated by the entire Rogue Valley Mall. Finding 2: The Applicant. submitted a traffic impact analysis ("TIA) into the record prepared by Kit[elson and Associatrs for the subject property. City r[affreviewed theT1A and there is testimony in the record as to the substance of the TIA. No other traffic reports or analysis were prepared or submitted into the record by traffic engineers or other traffic experts. Testimony from opponents was limited to opinions as to the amount of traffic that would be generated by the subject application. There was no other traffic analysis in the record to contradict the Applicant's TIA, nor does the record contain any traffic analysis as to the amount of traffic at the Rogue Palley Mall.. Conclusion 2: The Council concludes there is not substantial evidence in the record to find that traffic at the Rogue Valley Mall is relevant to this application, n or is there .sufficient evidence in the record to substantiate the amount of traffic generated by the mall. 3. Development Ordinance. —"You are required to follow the rules laid out in your development ordinance when approving such an application." Finding 3: The Planning Commission's considered the subject application as a CUP under the City's authorization of membership warehouses as a conditional use in the M-1 zone as discussed in Finding 1 above, and Finding 17.48.040(A) ofthe Planning Department Supplemental Findings in the record. The planning Commission considered and approved the Conditional Use Permit for Costco Wholesale based on the application's demonstrated compliance with the standards and criteria for conditional use permits per CPMC 17.76 as setforth in the Applicant's bindings and the Planning Department Supplemental Findings (See Resolution No. 827 and attachments thereto). Page 2 of 71 Conclusion 3: The Council concludes that there is substantial evidence in the record to find that the Planning Commission applied the relevant .standards and criteria under Resolution Nos. 764 and 1217, and CPMC.' 77.76 to approve a membership warehouse and fuel facility and applied the evidence in the record to find such standards and criteria were met. 4. Statement of Values. - "Your S I AT EMENT OF VALUES regarding growth. _stated that, "We value planned growth that will retain our small town atmosphere." 'Phis project does not fit that statement." Finding 4: In considering the Conditional Use Application for the proposed Membership Warehouse andfuel facility the Planning Commission was required to render a decision based on the proposal's demonstrated compliance with ,Standards and Criteria for Conditional Use Permits setforth in Central Point Municipal Code Chapter 1776- Conclusion 4: The mission statement is not part of the Municipal Code nor Comprehensive Plan. 11 does not serve as a standard or criteria and is merely aspirational language under the City's general Mission Statement. The Council finds the Planning Commission did not err applying the Standards and Criteria cf ('PMC 17.76. 5. Accessory Use. —"One of the issues is that the zone that the store is to be located in is Industrial. The reason that retail/commercial activities are allowed in those zones with restrictions, and not outright, and that they go through the Conditional Use Permit process is that they are not the primary use but an accessory use to the primary." Finding 5: The Planning Commission found that membership warehouses were adopted by the City as conditional uses in 2009 as .set forth in handing 17 48 040(A) of the Planning Department .Supplemental Findings adopted by the Planning Commission. The Planning Commission found that as a result of the similar use determination, membership warehouses are not considered accessory uses but are permitted subject to the standards and criteria for Conditional Use Permits per CPMC 17.76. Conclusion 5: the Council concludes that the Manning Commission's consideration of membership warehouses as a conditional use and not as an accessary use is in conformance with the (,try's similar use authorization per CPMC 17.48020(W) and CPMC 17.60.140_ ,See also Planning Commission Resolution 764 and City Council Resolution 1217. 6. Semantics. —"When a store like Costco is placed in that zone you have to play, and indeed did so. a very significant semantic game with what you call the store. In calling it a warehouse store the project might just seem like a tit. With that said, it is certain that the management of Costco is under no illusions, whatsoever, that they are the largest retailer in the area." Finding 6: The Planning Commission's consideration of Casten CUP to develop a membership warehouse and fuel facility is based on the City's .similar use authorization for Page 3 of 71 membership warehouses in the 2W zoning district per Finding 17 48.040(A) in the Planning Department Supplemental Findings and h'inding 1 above_ Conclusion 6: Membership warehouse clubs, such as Costco Wholesale, are allowed in theVI-I district subject to the standards and criteria .setforth in CPMC 17.76, Conditional Use Permit 7. Not a Fit in the Zone. —"As 1 previously stated, Costco generates more traffic than the Rogue Valley Mall and they are about one fifth of their building footprint. Just consider the number of parking spaces that they are illustrating in their plan. It is obvious that they don't fit this zone. They are not a complimentary service and supply provider that is allowed in this zone. A store of this size and magnitude should not be in an industrial zone. If they are allowed to develop on this site it will become a traffic disaster." Finding 7: As noted in findings 5 and 6, membership warehouses were approved in 2009 as a conditional use in the M -I zone. With regard to traffic, CPMC 17.76 requires consideration of the fallowing: A. 7 hat the site for the proposed use is adequate in size and shape to accommodate the use and to meet all other development and lot requirements of the subject zoning district and all other provisions of this code; B. That the site has adequate access to a public street or highway and that the street or highway is adequate in size and condition to effectively accommodate the traffic that is expected to be generated by the proposed use; C. That the proposed use will have no significant adverse effect on abutting property or the permitted use thereof. In making this determination, the commission shall consider the proposed location of improvements on the site; vehicular ingress, egress and internal circulation; setbacks; height of buildings and structures; walls and fences; landscaping; outdoor lighting; and signs; D. 'I hat the establishment, maintenance or operation of the use applied for will comply with local, state and federal health and safety regulations and therefore will not be detrimental to the health, safety or general wel fare of persons residing or working in the surrounding neighborhoods and will not be detrimental or injurious to the property and improvements in the neighborhood or to the general welfare of the community based on the review of those factors listed in subsection C of this section; E. That any conditions required for approval of the permit are deemed necessary to protect the public health, safety and general welfare and may include: 2. Increasing street widths, modifications in street designs or addition of street signs or traffic signals to accommodate the traffic generated by the proposed use, Page 4 of 11 3. Adjustments to of -street parking requirements in accordance with any unique characteristics of the proposed use, 4. Regulation of points of vehicular ingress and egress, +xs 11. Such other conditions that are found to be necessary to protect the public health, safety and general welfare, The findings adopted by the Planning Commission reviewed the criteria for Conditional Use Permits set forth in CPMC 17.76 and made findings that the site is adequate in size and shape to accommodate the use; the site has adequate access to a public street or highway, the proposed use will not have adverse effects to abutting properties or permitted uses thereof, that the use will not be detrimental to the health safety or general welfare ofpersons residing or working in the .surrounding area or the community; and that the conditions imposed are deemed necessary and sufficient to protect the public health, safety and general welfare. See the Supplemental and Applicant's findings in the record below. More particularly, the only traffic impact analysis or other expert evidence submitted into the record is the 7 I .submitted by the Applicant, and comments from the City, City of Medford, OIJOTand the Airport The Planning Commission imposed conditions of approval pursuant to the 71A and comments from otherjurisdictions for traffic impact mitigation. No expert testimony was received into the record countering the 71A or agency recommendations for truffle impact mitigations (See binding 2 addressing traffic generated by Cosice, compared to the Rogue Valley Mall). All other evidence as to traffic was conjecture or speculation. As demonstrated in Finding 17.76.040(0) in the record below, the Planning Commission considered the proposal's impacts to abutting properties, including an evaluation of the location of proposed.site improvement; vehicular ingress, egress and internal circulation; .setbacks; building height; walls and fences, landscaping, outdoor lighting and signs. The Planning Commission found that the proposed project is typical of site development within the M-1 zone and that the .site development standards for permitted uses in combination with the conditions of approval relative to ingress and egress per Finding 17.76 040(8) in the record below are sufficient to avoid adverse impacts to abutting properties or permitted uses thereof. As demonstrated in 6'inding 17.76 040(l)) in the record below, the Planning Commission considered the issue of safety and found that there is sucient evidence in the Applicant's findings to demonstrate, in conjunction with the building code andfire district regulations, that the proposed use will comply with local, state and federal health and .safety regulations and therefore not be a detriment to the health, safety and general welfare of the community or persons residing or working in the surrounding neighborhoods. Conclusion 7. The proposed membership warehouse and fuel facility was evaluated against the standards and criteria for conditional use permits and found to comply. There is substantial Yngc 5 of 11 evidence in the record for the Planning commission to find that the use is compatible with the zone. 8. Traffic Effects Far Reaching. —"The traffic issues have far reaching effects of congestion and cost on Central Point, Jackson County, and the City of Medford as well as the Oregon Department of Pransportation. Of course, that means the tax payers who support those entities. In other words, all of us will be paying a huge price for the location of a store that is not an appropriate fit. It is not a code fit and it is not a size and traffic fit all in one. Once Costco goes in there will be no way to fix this problem." Finding 8: Per the TIA, the proposed Costco Wholesale and fuel facility is expected to generate 10,670 new daily trips_ Heavy vehicles were evaluated in the TIA and no problems were Identified with the mix of light and heavy vehicles based on volume and impacts to LOS/PC. On the day of opening traffic impacts were identified at four (4) intersections: l) Interstate 5 Northbound Off Ramp; 2) Table Rock and Hamrick Road; 3) Table Rock and Airport Road; and 4) Airport and Riddle Road. Although not identified in the TIA, the City of Medford provided crash data and comments in a letter dated January 5, 2016 indicating that traffic generated by Costco would negatively impact the intersection of Table Rock Road and Morningside Street .south of the project site In accordance with the TIA and comments received from affected agencies, the Planning Commission imposed conditions of approval requiring mitigation of the traffic impacts caused by the proposed Costco Wholesale (See Table 1). interstate 5 NB Volume to Capacity (v/c) Enter into a Cooperative Prior to Off --Ramp Ratio is exceeded. Improvement Agreement building with OD07 and the City to permit develop and construct dual issuance right turn lanes per /AMP Project No. 9. Table Intersection Failure due to Construct center turn lane Prior to RoeklHamrick left turn delays and refuge within existing certificate of Road Table Rock Road right -of- occupancy. way at Hamrick Road. Table Existing left turn delays cause Jackson County has Jackson Rock/Airport the intersection to operate at funding to construct County Table Road a Level ofService (LOS) F. improvements on Table Rock Road The existing status is Rock Road that includes Improvement aggravated by additional .signalization of the Project traffic generated by the intersection. The County commences in proposed use has indicated that 2017 construction of the improvements will begin in 2017; therefore, no interim miti ation is necessarv. Afrport/Biddle Trak generated by Costco Per the City ofMedford in Proof of Road causes left turn dela s which a letter dated January J, ayment Page 6 of I l As demonstrated in the Applicant's bindings and the Planning Department Findings, the Planning Commission found the project as conditioned is adequate to accommodate the use (See Planning Commission Findings for 17.76.040 in the record below). Conclusion 8: There is substantial evidence in the record for the Planning Commission to find that as conditioned, the application complies with CPMC 1776 and that traffic impacts from the project will funded or constructed at the time of development. 9. Heavy Vehicle Conflicts. - "Traffic congestion around the Costco store will be a mix of heavy trucks and light vehicles. Table Rock Road will see the bulk of traffic and the measures that have been suggested will only assist but not solve the problems related to this location." Finding 9: The Council incorporates binding 8 as iffully set forth herein. Conclusion 9: There is .substantial evidence in the record for the Planning Commission to find traffic mitigation required by this project has been satisfied as conditioned. 10. Additional Traffic Impacts on fable Rock Road. - "Additional traffic on Table Bock Road will soon find that it is not designed to handle the load further south of this store and people will soon move their preferred approach to Biddle Road and Table Rock Road north of the site. They will start using the freeway to enter Central Point from the North and the South. This will add congestion on the freeway off -ramps north and south and a loading on Pine Street all the way to the intersection with Hamrick and Pine and'I able Rock Road and Pine/Biddle Road." Finding 10 !'he 71A did not identify any issues south of the project site on Table Rock Road. Although not identified in the TIA, the City of Medford .submitted comments on December 24, 2016 and January 5, 2016 indicating that the intersection of 7ahle Rock Road at Morningside Street would be adversely impacted due to left turn delays and associated safety concerns. Per the City of Medford's request, the Planning Commission imposed a condition requiring financial contribution for the applicant's proportional share of traffic mitigation to the intersection prior to building permit issuance_ Page 7 of I 1 results in a decline in the 2016, the applicant shall prior to LOSfrom C to E. contribute its pro -rata building share toward construction permit of'a signal at the issuance intersection. Table Rock Road Traffic generated by Costco Per the City of Medford in Proof of at Morningside aggravates an existing left a letter dated January 5, payment Street turn dehn at the intersection. 2016, the applicant shall prior to contribute its pro -rata building share toward construction permit of a center left turn lane issuance, and refuge on Table Rock Road at Morningside .Street As demonstrated in the Applicant's bindings and the Planning Department Findings, the Planning Commission found the project as conditioned is adequate to accommodate the use (See Planning Commission Findings for 17.76.040 in the record below). Conclusion 8: There is substantial evidence in the record for the Planning Commission to find that as conditioned, the application complies with CPMC 1776 and that traffic impacts from the project will funded or constructed at the time of development. 9. Heavy Vehicle Conflicts. - "Traffic congestion around the Costco store will be a mix of heavy trucks and light vehicles. Table Rock Road will see the bulk of traffic and the measures that have been suggested will only assist but not solve the problems related to this location." Finding 9: The Council incorporates binding 8 as iffully set forth herein. Conclusion 9: There is .substantial evidence in the record for the Planning Commission to find traffic mitigation required by this project has been satisfied as conditioned. 10. Additional Traffic Impacts on fable Rock Road. - "Additional traffic on Table Bock Road will soon find that it is not designed to handle the load further south of this store and people will soon move their preferred approach to Biddle Road and Table Rock Road north of the site. They will start using the freeway to enter Central Point from the North and the South. This will add congestion on the freeway off -ramps north and south and a loading on Pine Street all the way to the intersection with Hamrick and Pine and'I able Rock Road and Pine/Biddle Road." Finding 10 !'he 71A did not identify any issues south of the project site on Table Rock Road. Although not identified in the TIA, the City of Medford .submitted comments on December 24, 2016 and January 5, 2016 indicating that the intersection of 7ahle Rock Road at Morningside Street would be adversely impacted due to left turn delays and associated safety concerns. Per the City of Medford's request, the Planning Commission imposed a condition requiring financial contribution for the applicant's proportional share of traffic mitigation to the intersection prior to building permit issuance_ Page 7 of I 1 Conctusion 10. There is substantial evidence in the record for the Planning Commission to find that the Applicant will improve, or make financial contributions tmvard traffic mitigation, that is roughly proportional to the impacts of this development. 11. Improvement Timing. - "The improvements required in the'I raffic Impact Study indicate a resultant congestion from construction that is not to he completed for as much as two years. In reality, some of these items, such as an I -g off ramp improvement, are not scheduled by ODO'I' until 2023. there is no definitive evidence that the schedule has been modified. There are no engineering studies or drawings that would support a timely upgrade of that facility. There is no indication, other than verbal at the hearing of January 6ih, 2016 that some concession might be made. There is no evidence that the improvements along Table Rock Road are funded or that the requisite imminent domain takings of additional land for widening and intersections have been done." Finding I7: There was evidence in the record that identifies traffic impacts and mitigation measures and the feasibility of imposing conditions for such traffic mitigation which includes the TIA prepared by Khtelson & Associates, as well as comments received from affected agencies, including the Oregon Department of Transportation (ODOI), Jackson County Roads, City of Central Point Public Works Department, and City of Medford Evidence in the record addressing traffic impacts and the timing of improvements is as follows_ -Table Rock Road Improvement Project. The traffic impact analysis prepared by Kitlelson & Associales took into account planned roadway improvements, including the.fackson County Table Rock Road Improvementproject, which is scheduled to be constructed in 2017 (.See TIA, Page 32)_ -Interstate 5 Northbound Off -Ramp, Exit 33 Improvements. As conditioned, Costco will be required to enter into a Cooperative Improvement Agreement with ODOT and pay its proportional. share of improvement cost prior to building permit issuance (See Revised Public Works Staff Report dated January 5, 2016, Condition No. 1)_ Evidence in the record establishes that the improvements are planned to be expedited such that they will be constructed as close to opening day of subject development as possible_ The Revised Public Works Staff Report dated January 5, 2016 states that, "Per ODOT, construction will commence at the earliest passible date. " (See Traffic Impacts and Mitigation Item No. 4) b. During staffs presentation at the January 5, 2016 Planning Commission Meeting, during a discussion oflraffic impacts and mitigation 06:05), staff stated that OD01agreed to expedite construction of off ramp improvements as close to opening day as possible. Eon Morehouse, ODOTPlanner, concurred with the staffpresentation and .stated that he had nothingfurther to add (Audio Recording_ at 1 26' 15). Page 8 of l l Conclusion 11: There is substantial evidence in the record to support the Planning Commission's decision as to the feasibility and timing of the traffic mitigation conditions. 12. Biddle Road and Airport Road Intersection. - "The intersection of Biddle Road and Airport Road has not been fully vetted. This intersection is important for travelers using the airport. Congestion will create difficulties for them." Finding 12: The applicant's TIA indicates that the westbound approach ofirport and Biddle Road exceeds the level ofservice standard for the City ofMedford Ina letter dated January 5, 2016, the City ofMedford requested a condition that requires the developer to pay a proportional share toward a future traffic signal at this intersection. The estimated project cost is $450, 000, including design, construction and inspection_ Per the TIA, Costco contributes 10% of the traffic at this intersection. As conditioned, Costco shall provide evidence it has contributed its proportionate share of the construction of signalization improvements in an amount not to exceed $45,000, which shall he payable to the City ofMedford prior to building permit issuance. Conclusion 12: As conditioned, facility adequacy at this intersection is met by the Planning Commission's requirement that the Applicant contribute its pro rata share of the signalizalion improvements per the City of Medford Comments dated January 5, 2016 13. fraffic Impacts Not Easily Solved, if at all. - "The impact on all these roads is significant and not easily solved if at all" Finding I3: Trade impacts and mitigations are identified in the 71A and by the City of Medford, ODOT relative to the intersections of Biddle and Airport Road and Table Rock andMorningside Street. The Planning Commiesion's decision to approve the CUP is subject to conditions of approval assuring timely completion of the mitigation actions outlined in the TIA and requested by the affected agencies. See also Finding 8 incorporated herein by reference. Conclusion 13: There is .substantial evidence in the record that as conditioned, the project will mitigate its proportionate traffic impacts caused by this project and that such conditions are feasible. 14. Cost of Improvements. - "The costs for all of the improvements needed to place this major retailer in an industrial zone along Table Rock Read more than eclipses the cost of the store itself by a tactor of five. Estimates for the widening of the freeway overpass on Table Rock Road exceeds 20 million dollars. Further south of the overpass are single family residences that need to back out onto Table rock Road to exit their properties. "Ihe estimate for acquiring these properties for road widening docs not exist, but would be very high" Finding 14: There is no evidence in the record from affected agencies or traffic experts or engineers to demonstrate that the Interstate 5 overpass on Table Rock Road warrants replacement or that Table Rock Road improvements south of Interstate 5 are required, other than Pagc 9 of l l required mitigation at the intersection of "!'able Rock Road and Marningside ,Street, which was addressed See also ."finding No.8, incorporated herein by reference_ Conclusion 14: There Is substantial evidence in the recordfor the Planning Commission to find traffic mitigation required by this project has been .satisfied as conditioned and that .such conditions are feasible. 15. Freight Route, Traffic Conflicts. - "Table Rock Road is designated as a freight route in the overall traffic master plan and this enormous retailer with its accompanying vehicle traffic is not an appropriate mix with the truck traffic in that area" Finding 15: Heavy vehicle impacts were evaluated in the TIA and no problems were identified with the mix of light and heavy vehicles based on volume and LOSIVC ratios (See Synchro Reports in the TIA Appendices). No other expert testimony was presented as to the mix of vehicle traffic. Conclusion 15: There is substantial evidence in the recordfor the planning Commission to find that the mix of light and heavy vehicles does not create problems that would warrant further traffic mitigation or denial of this application. 16. Vehicle and (tuck Accidents. - `Vehicle and truck accidents will undoubtedly increase and serious injuries will occur when Custer's large number of senior drivers are forced to mix with large truck traffic." Finding 16: Ileavy vehicle impacts were evaluated in the TIA and no problems were identified with the mix of light and heavy vehicles based on volume (See .Synchro Reports in the TIA Appendices) nor was there evidence in the record from experts ac to the "large number of senior drivers." Conclusion 16: There is .substantial evidence in the recordfor the Planning Commission to find traffic mitigation required by this project has been satisfied as conditioned and safety concerns do not exist as a result of this project. 17. Vilas and Crater Lake Highway. - "The intersection of Vilas and Crater Lake Highway has been the scene of horrendous accidents and many deaths and this location and traffic load creates at least four intersections with that type of potential." Finding 14: A crash analysis was conducted as part of the TIA at all study area intersections (TIA Page 28) to document crash types, trends and severity_ The 7M found that there were no fatality crashes and the most common crashes were turning movement and rear -end crashes accounting for approximately 82% ofall crashes. There is no expert evidence in the record substantiating this allegation. Conclusion 14: There is substantial evidence in the recordfor the Planning Commission to find Page 10 of 11 traffic mitigation required by this project has been satisfied as conditioned and safety concerns do not exist as a result ofihis project. PART 3 — SUMMARY CONCLUSION Council hes reviewed the evidence and issues in the record and the issues raised in the Martin appeal. The Council concludes that there was substantial evidence in the record for the Planning Commission to approve the application, and the Commission did not commit errors of law. This Conclusion is based upon the Findings herein, and the evidence in the record including the Applicant's findings and the Planning Staff Supplemental Findings of Pact and Conclusions of Law. Page 11 of 11 ATTACHMENT "D -V BEFORE THE CITY COUNCIL FOR THE CITY OF CENTRAL POINT, OREGON NOTICE OF APPEAL Re: Costco Conditional Use Permit (File NO. 15022) Date of Decision: February 2, 2016 Pursuant to Section 17.05.400(F) of the Central Point Municipal Code David 1. Smith files this Notice of Appeal and states the following: Appellant has standing to bring this appeal in that he appeared and testified before the Central Point Planning Commission on January 6, 2016 and filed written comments on January 12, 2016 within the comment period (written comments are attached hereto). The specific issues raised on appeal which were raised during the comment period are as follows: 1. Costco's traffic study is flawed in that it does not identify the present traffic patterns for Costco's members to the present store, and, without that Information it is impossible to predict the route choices of Costco members to the proposed site. The use of general population statistics is inadequate to assign predicted distribution of the 10,670 daily trips by Costco members. 2. Costco's traffic study indicates that there will be heavy traffic added to Biddle Road at the entrances to the Rogue Valley International -Medford Airport, but does not indicate that the airport master plan has been taken into consideration in the traffic study. 3. The access points for the proposed Costco site are on roads which COOT has master planned as a Freight corridor.. ODOT's Freight Profile identifies Table Rock Road as one of the local roads that "experience high volumes and of freight traffic". The proposed location is in the midst of existing freight terminals, with more planned for the future, which will mix high volume truck traffic with 10,670 Costco member daily automobile trips. 4. There is nothing in the record to verify that CLOT has funded and scheduled construction of the Improvements relied upon to support the Costco application. Without that confirmation that the improvements will be completed soon after the store opens is total speculation. Considering the above issues the approval of the conditional use permit without further study has the potential to create immediate and future traffic congestion and hazards, and, the placement of Costco in the proposed location is contrary to (the attached) Central Point Statement of Values: "Growth: We value planned growth that will retain our small town atmosphere",and, "Transportation: We value a system of transportation and infrastructure that is modern, efficient and sensitive to the environment." Respectfully submitted this 16th day of February, 2016. David J. ith D CsC�C��bC� FEB 1 6 2016 D January 12, 2016 Summary of January 6,2016 comments on application of .Costco Wholesale David Smith 241 Saginaw Drive, Medford, OR 97504 1. Co-owner of business on S. Front Street in Central Point and several apartments 2. Longtime member of Costco and shop at present store at least twice a week. 3. Research of official records of ODOT and Central Point reveal that the proposed site for Costco is located on an official freight route system within the city and in the midst of freight terminals.(Reddaway, Conway, Fed Ex.) One, Reddaway Trucking already account for 600 truck trips per day. According to ODOT materials Gordon Trucking owns a large parcel directly across from the proposed entrance to Costco, and Intends to build a freight terminal, adding a significant increase in trucks using the area. 4 Costco's tragic study indicates its store will add 10,670 new trips per day, the majority of which will come from Medford on Biddle and Table Rock. S. Costco traffic will add several thousand more cars per day using Biddle and adding congestion at the entrance to the airport. 6 ... ODOT's Freight Profile identifies Table Rock Road as one ofthe local roads that "experience high volumes of freight traffic." 7. Costco's traffic study is flawed in that it does not identify the routes its members use to access the existing Medford store; information which Is necessary to accurately predict how those members will re- route to the proposed location. B. Costco tries to identify its operation as a warehouse, but indicates in Its November 3, 2011111 to the city staff ( at page 14) that Its Parking Demand Study requires 783 parking stalls which Is more than the city requires for a retail store the size ofthe proposed Costco. CONCLUSION: While the "member Warehouse" description of the Costco proposal may distinguish It from other retail stores as far as the variety of merchandise and profit margins, its Impact on traffic will be greater than other retails stores of the same size. One need only note how fast the Costco parking lot fills up and remains full during store hours; much more so than other retail stores which are open longer hours which results in less traffic in any given hour. Even the entire Medford Mall appears to have less parked cars. Costco and the city staff both indicate the intention to have the store open in 2016, before the widening project on Table Rock even begins. It makes no sense to add 10,670 more vehicles traveling through a construction zone, for an undetermined period, which will create an additional problem which has not been addressed. �i CENTRAL POINT Mission It is the mission of the City of Central poemeo build and maintain a highly livable community by working in harmony and being a catalyst for partnership with all the members of the community, public and private. Statement of Values Growth: We value planned growth that will retain our small town atmosphere. Public Safety: We value a professional, service-oriented public safety policy that promotes a sense of.sa(ety and security in our city. Transportat4nt-. We value a system oj'iransportation and infrastructure that is modern, efficient and sensitive to the environment. Community: We value a clean and attractive city with parks, open space and recreational opportunities. Service: We provide the highest level ofservice possible in the most efficient and responsible manner. City Hall 140 S. 3`d Street Central Point, OR 97502 (541)664-3321 ATTACHMENT "D-2" COSTCO WHOLESALE CONDITIONAL USE PERMIT DRAFT FINDINGS OF FACT AND CONCLUSIONS OF LAW Appellant David J. Smith Notice of Appeal Date February 16, 2016 File No. 15022 City Council Appeal Hearing March 10, 2016 PART I - INTRODUCTION On February 2, 2016, the Planning Commission in accordance with CPMC 17.76 approved a Conditional Use Permit authorizing the development of a Costco Wholesale membership warehouse and fuel facility on 18.28 acres within the M-1 zoning district ("Costco Application"). The project site is located on the eastern edge of Central Point city limits at the southwest comer of I lamrick and Table Rock road. The site also has frontage on Federal Way, a local street. Surrounding properties include developed and undeveloped industrial lands, including the M-1 and M-2 zoning districts. On February 16, 2016, David J. Smith filed an appeal ("Smith Appeal') contesting the Planning Commission's decision on grounds that the Planning Commission erred in approving the application as: 1. Costco's traffic study is flawed because it does not accurately identify trip distribution patterns. 2. Costco's traffic study does not indicate that the airport master plan has been taken into consideration. 3. Site access on an ODOT designated Fright Corridor will mix existing and future high volume truck traffic with Costco generated traffic. 4. There is nothing in the record to verify that ODOT has funded and scheduled construction of the improvements relied upon to support the Costco application. 5. As a result of specific issues identified above, approval of the Costco CUP without further study will create immediate and future traffic congestion and hazards. 6. Approval of the CUP is contrary to the Central Point Statement of Values relative to growth and transportation. The Council's scope of review on this appeal is limited to the issues and evidence presented in the record before the Planning Commission as per CPMC 17.05.400(F)(3). As this appeal is on the record the City Council may not consider new evidence or issues that were not preserved in the record below. Council Page 1 of 6 review is limited to determining whether there is substantial evidence in the record to support the findings of the Planning Commission; or whether errors of law were committed. Membership warehouses are permitted as a conditional use per the City's 2009 similar use determination under CPMC 17.48.020(W) and 17.60.140, which was adopted by the Planning Commission as Resolution No.764, and affirmed by the Council on Appeal as Resolution No. 1217. 'Phe applicable approval criteria for a Conditional Cso Permit are set forth under CPMC 17.76.040, Findings and Conditions for Conditional Use Permits. PAR,r 2 -APPEAL ISSUES 'There were six (6) issues raised in the Smith Appeal. The following is a summary of each issue in the Smith Appeal, including the findings and conclusions pertinent to each issue. L Traffic Study Flawed. - "Costae's traffic study is flawed in that it does not identify the present traffic patterns for Costco's members to the present store and, without that information, it is impossible to predict the route choices of Costco members to the proposed site. 'Phe use or general population statistics in inadequate to assign predicted distribution of the 10,670 daily trips by Costco Memberss." Finding 1: The Applicant .submitted a traffic impact analysis ("TIA) by Kittelson and Associates for the subject properly into the record. City staff reviewed the TIA and there is testimony in the record as to the substance of the TIA from City staff. No other traffic reports or analysts were prepared or submitted into the record, by traffic engineers or other traffic experts. According to the TIA, "the trip distribution pattern for site generated trips was developed using zip code data from current memberships at the existing Costco warehouse located on OR 62 (Crater Lake Highway) in Medford, Oregon, as well as from the existing traffic patterns and major trip origins and destinations within the study area. "' Trip dishribulion was verified by regional travel demand models provided by ODOTfor the base year (2006) and future year (2038)_ There was no traffic analysis supporting the allegation that the trip distribution methodology utilized in the 7'1A is flawed Conclusion 1: The City Council concludes there is .substantial evidence in the record to find that the TIA is valid and contained adequate trip distribution methodology for the subject properly. 2. Costco's traffic study indicates that there will be heavy traffic added to Biddle Road at the entrances to the Rogue Valley International -Medford Airport, but does not indicate that the airport master plan has been taken into consideration in the traffic study. Finding 2: The Planning Commission's consideration ofthe Costco CUP application relied upon the Applicant's TIA and agency comments 6 e. the City of Medford) relative to the identified traffic impacts and mitigation measures at the intersection of Biddle Road and Airport Road (See "traffic Impact Analysis: Central Point Costro Development, Central Point, Oregon Kittelson & Associates. October 2015. Page 37. Page 2 of 6 Finding 17.76040(8)(4) in the Planning Department Supplemental Findings ("Supplemental Findings" in the record below) The airport was identified as an agency entitled to notice, but did not submit comments into the record requiring additional traffic mitigation. The TIA identified impacts to the intersection. The City ofMedford recommended a condition of approval to include a median to resolve the impact In a letter daled.lanuary 5, 2016, the City ofMedford indicated that the airport was opposed to the proposed mitigation measure because it was in conflict with the airport master plan. As an alternative, the City ofMedford requested a condition that requires the applicant to pay a proportional share toward a future traffic signal at this intersection in conformance with the airport master plan_ The City ofMedford indicated this contribution would be .sufficient to mitigate the impacts of this project The estimated project cast is 5450,000, including design, construction and inspection. Per the TIA, Costco contributes 10% of the traffic at this intersection. As conditioned, Costco shall provide evidence it has contributed its proportionate share of the construction of signalizalion improvements in an amount not to exceed 545,000, which shall be payable to the City ofMedford prior to building permit issuance. No other traffic reports or analysis were prepared or submitted into the record by traffic engineers or other traffic experts. Conclusion 2: The City Council concludes there is substantial evidence in the record to find that, as conditioned, the application complies with CI'MC 17.76 and that the applicant will have contributed its proportional share toward traffic mitigation to the intersection of Biddle Road and Airport Road at the time of development The Council further concludes there is sufficient evidence in the record to determine that the airport did not request any mitigation for the airport master plan, but that consideration to .such master plan was given. 3. The access points for the proposed Costco site arc on reads which ODO'f has master planned as a freight corridor. ODOI's freight Profile identifies Table Rock Road as one of the local roads that "experience high volumes and of freight traffic" The proposed location is in the midst of existing freight terminals, with more planned for the future, which will mix high volume truck traffic with 10,670 Costco member daily automobile trips. Finding 3: heavy vehicles were evaluated in the Applicant's TLA at all study intersection and Nile driveways, including Table Rock Road. No problems were identified with the mix of light and heavy vehicle traffic based on volume and impacts to LOSIVC. An ODOT representative was present at the.lannary 5, 2016 hearing and did not identify .safety concerns during his testimony. (Audio Recording at 1:26). The Planning Commission considered in Finding 17.76.040/8) and 17.76.040(0)(2) the operational and safety conditions of ingress and egress on Table Rock Road, as well as all .study intersections_ Per the TIA and agency comments, the Planning Commission imposed conditions of approval requiring access restriction and mitigation measures to resolve traffic impacts associated with ingress and egress on Table Rock Road No other traffic reports or analysis was prepared or .submitted into the record by traffic engineers or other traffic experts_ Conclusion 3. The Council concludes there is sufficient evidence in the record for the Planning Page 3 of 6 Commission to find traffic mitigation required by this project has been satisfied as conditioned and that the mix of truck traffic with the proposed development will not create additional. safety concerns requiringfurther mitigation, except at identified and conditioned herein.. 4. 'f here is nothing in the record to verify that 0D0 has funded and scheduled construction of the improvements relied upon to support the Costco application. Without that confirmation that the improvements will be completed soon after the store opens is total speculation. Finding 4Evidence in the record addressing traffic impacts and the timing of Interstate 5 Northbound Off -Ramp, Exit 33 Improvements, and the feasibility of imposing conditions for such traffic mitigation includes the TIA prepared by Kittelson & Associates, as well as comments received from the Oregon Department of Transportation (ODOT). As conditioned, Costco will be required to enter into a Cooperative Improvement Agreement with ODOT and prry its proportional share of the improvement cost prior to building permit issuance (See Revised Public Works SeeffReport dated.7anuary 5, 2016, Condition No 1). Evidence in the record establishes that the improvements are planned to be expedited such that they will be constructed as close to opening day of the subject development as possible: The Revised Public Works Staff Report dated.lanuary 5, 2016 states that, "Per ODOT, construction will commence at the earliest passible date. " (See 'Traffic Impacts and Mitigation Item No. 4) h. During staffs presentation at the January 5, 2016 Planning Commission Meeting, during a discussion of traffic impacts and mitigation (26:05), staff stated that ODOT agreed to expedite construction of the off ramp improvements as close to opening day as possible. Dan Morehouse, OIJO7 Planner, concurred with the staff Presentation and stated that he had nothing further to add. (Audio Recording. at 1.26:15). Conclusion 4: There is substantial evidence in the record to support the Planning Commission's decision as to the feasibility and timing of the traffic mitigation conditions. 5. Without further study, Costco has the potential to create immediate and.future traffic congestion and hazards. Finding 5: Per the TIA, the proposed Costco Wholesale and fuel facility is expected to generate 10,670 new daily trips. Heavy vehicles were evaluated in the TIA and no problems were identified with the mix of light and heavy vehicles based on volume and impacts to LOSIVC. On the day of opening traffic impacts were identified at four (4) intersections: 1) Interstate 5 Northbound Off -Ramp, 2) Table Rock and Hamrick Road,- 3) Table Rock and Airport Road, and 4) Airport and Diddle Road. Although not identifed in the TIA, the Cily of Medford provided crash data and comments in a letter dated January 5, 2016 indicating that traffic generated by Cosica would negatively impact the intersection of Table Rock Road and Morningside Street south of the project site. In accordance with the TIA and comments received from affected agencies, the Planning Commission imposed conditions ofapproval requiring mitigation of the traffic impacts caused by the proposed Costco Wholesale (See Table I below). Page 4 of 6 Intei,eahn, Interstate 5 NR Impact 7olume to Capacity (v/c) Mitigation Enter into a Cooperative Thning Prior to Off-Ramp Ratio is exceeded. Improvement Agreement building with ODOI'and the City to permit develop and construct dual issuance right turn lanes per LAMP Project No 9. Table Intersection Failure due to Construct center turn lane Prior to Rock/Hamrick left turn delays and refuge within existing certificate of Road Table Rock Road right-of- occupancy. way at Hamrick Road Table Existing left turn delays cause .lackson County has Jackson Rock/Airport the intersection to operate at funding to construct County Table Road a Level of Service (LOS) K improvements on Table Rock Road The existing status is Rock Road that includes Improvement aggravated by additional signalization of the Project traffic generated by the intersection. The County commences in proposed use has indicated that 2017. construction of improvements will begin in 20/7, therefore, no interim mitigation is necessary. Airport/Riddle Traffic generated by Costco Per the City of Medford in Proof of Road causes left turn delays which a letter dated January 5, payment results in a decline in the 2016, the applicant. shall prior to LOS from C to E. contribute its pro-rata building share /award construction permit of a signal at the issuance. intersection. Table Rock Road traffic generated by Costco Per the City ofMef ord in Proof of at Morningside aggravates an existing left a letter dated January 5, payment Street turn delay at the intersection. 2016, the applicant shall prior to contribute its pro-ram building share toward construction permit ofa center left turn lane issuance. and refuge an Table Rock Road at Mornin side Street Per the TIA, conditions ofapproval were established to address identified traffic impacts as .set forth in binding 17.76.040(8), 17.76040(C)(2), and 17.76.040(E)(2) in the record below. No other traffic .studies or testimony from a traffic engineer or other traffic expert was received as to the substance of the TIA. As demonstrated in the Applicant's Findings and the Planning Department Findings, the Planning Commission found the project as conditioned is adequate to accommodate the use (See Planning Commission Findings for 17.76040 in the record below). Page 5 cf 6 Conclusion 5: The City Council concludes that there is substantial evidence in the record to support the Planning Commission's decision that, as conditioned, the project will mitigate the traffic impacts generated by this project. 6. 'Phe placement of Costco in the proposed location is contrary to the Central Point Statement of Values: "Growth: We Value planned growth that will retain our small town atmosphere," and "transportation: We value a system oftransportation and infrastructure that is modern, efficient and sensitive to the environment." Finding 6. In considering the Conditional Use Application jar the proposed Membership Warehouse andfuel facility, the Planning Commission was required to render a decision based on the proposal's demonstrated compliance with Standards and Criteria for Conditional Use Permits .set forth in Central Point Municipal Code Chapter 17.76. Conclusion to The mission statement is not part of the Municipal Code nor Comprehensive Plan. It does not .serve as a standard or criteria and is merely aspirational language under the City's general Mission Statement. The Planning Commission did not err in applying the Standards and Criteria set forth in CPMC 17.76. t. PART 3 — SUMMARY CONCLUSION Council has reviewed the evidence and issues in the record and the issues raised in the Smith appeal. The Council concludes that there was substantial evidence in the record for the Planning Commission to approve the application, and the Commission did not commit errors of law. This Conclusion is based upon the findings herein, and the evidence in the record including the Applicant's findings and the Planning Staff Supplemental Findings of Fact and Conclusions of Law. Page 6 of 6