HomeMy WebLinkAboutCouncil Resolutions 1447RESOLUTION NO. A RESOLUTION AFFIRMING THE PLANNING COMMISSION DECISION ADOPTED AS RESOLUTION NO. 827 APPROVINGA CONDITIONAL USE PERMIT FOR DEVELOPMENT OF A COSTCO WHOLESALE MEMBERSHIP WAREHOUSE AND FUEL. FACILITY ON 18.28 ACRES WITHIN THE M-1 ZONING DISTRICT' - APPELANT SMITH (File No: 15022) WHEREAS, on February 2, 2016 the Planning Commission approved an application for a Conditional Use Permit ("CUP") application for development of a Costco Wholesale membership warehouse on 18.28 acres in the M-1 zone; WHEREAS, on February 16, 2016, the City of Central Point received from David J. Smith a timely appeal of the Planning Commission's decision to approve the CLIP application. The appeal alleged that the Planning Commission erred in its approval of the application based on several issues related to the traffic impact analysis, traffic mitigation funding and timing, heavy vehicle conflicts and the City's Statement of Values for Growth; WHEREAS, on March 10, 2016, after conducting a duly noticed public hearing, the City of Central Point City Council considered the issues raised on appeal and heard testimony and comments on the appeal; WHEREAS, Costco Wholesale is a Membership Warehouse Club, a conditional use in the M-1 zone per Planning Commission Resolution No. 764 and City Council Resolution No. 1217; WHEREAS, the Planning Commission's decision to approve of the Costco Wholesale CUP was based on the standards and criteria applicable to Conditional Use Permits set forth in Section 17.76.040 of the Central Point Municipal Code and written and oral testimony received by the City; and, WHEREAS, after duly considering the appeal and the evidence in the record, the City Council found that there was substantial evidence in the record to affirm the Planning Commission Decision and that the Planning Commission did not er as a matter of law and, per a duly seconded motion, directed staff to prepare a final resolution and findings affirming the Planning Commission Decision adopted as Resolution No. 827 per the Staff Report dated March 10. 2016 and specifically including Attachments "A", "B," and "D-2" therein. NOW THEREFORE BE IT RESOLVED, The City of Central Point City Council affirms the Planning Commission Decision adopted as Resolution No. 827. This decision is based on the Council's determination that there was evidence in the record to approve the CUT' application and that the Planning Commission did not err as a matter of law and is supported by the evidence in the record, the findings attached hereto as Exhibit "A — City Council Findings of Fact and Conclusions of Law," incorporated herein by reference, and Exhibit `Et Staff Report dated March 10, 2016" including Attachments "A" and `B" and "D-2" incorporated herein by reference PASSED by the City Council and signed by me in authentication of its passage this 24`h day of March, 2016. p Mayor Hank Williams ATTE � 9 City Representative Approved by me thi day of /Y , 2016. Mayor I lank Williams EXHIBIT "A" City Council Findings of Fact & Conclusions of Law Costco Wholesale Conditional Use Permit Appellant: David J. Smith 241 Saginaw Drive Medford, OR 97504 File No. 15022 March 24, 2016 PART 1 — INTRODUCTION Findings of Fact and Conclusions of Law On February 2, 2016, the Planning Commission in accordance with CPMC 17.76 approved a Conditional Use Permit authorizing the development of a Costco Wholesale membership warehouse and fuel facility on 18.28 acres within the M-1 zoning district ("Costco Application"). The project site is located on the eastern edge of Central Point city limits at the southwest corner of I lamrick and Table Rock road The site also has frontage on Federal Way, a local street. Surrounding properties include developed and undeveloped industrial lands, including the M-1 and M-2 coning districts. On February 16, 2016, David J. Smith filed an appeal ("Smith Appeal") contesting the Planning Commission's decision on grounds that the Planning Commission erred in approving the application as: 1. Costco's traffic study is flawed because it does not accurately identify trip distribution patterns. 2. Custer's traffic study does not indicate that the airport master plan has been taken into consideration. 3. Site access on an ODOT designated Fright Condor will mix existing and future high volume truck traffic with Costco generated traffic. 4. There is nothing in the record to verify that ODO'I' has funded and scheduled construction of the improvements relied upon to support the Costco application. 5. As a result of specific issues identified above, approval of the Costco CUP without further study will create immediate and future traffic congestion and hazards. 6. Approval of the CIDP is contrary to the Central Point Statement of Values relative to growth and transportation. Page 1 of 6 The Council's scope of review on this appeal is limited to the issues and evidence presented in the record before the Planning Commission as per CPMC 17.05.400(F)(3). As this appeal is on the record the City Council may not consider new evidence or issues that were not preserved in the record below. Council review is limited to determining whether there is substantial evidence in the record to support the findings of the Planning Commission; or whether en'ors of law were committed. Membership warehouses are permitted as a conditional use per the City's 2009 similar use determination under CPMC 17.48.020(W) and 17.60.140, which was adopted by the Planning Commission as Resolution No.764, and affirmed by the Council on Appeal as Resolution No. 1217. The applicable approval criteria for a Conditional Use Permit are set forth under CPMC 17.76.040, Findings and Conditions for Conditional Use Permits. PART 2 — APPEAL ISSUES 'there were six (6) issues raised in the Smith Appeal. The following is a summary of each issue in the Smith Appeal, including the findings and conclusions pertinent to each issue. L Traffic Study Flawed. - "Casten's traffic study is flawed in that it does not identify the present traffic patterns for Casten's members to the present store and, without that information, it is impossible to predict the route choices of Costco members to the proposed site. 'f he use of general population statistics in inadequate to assign predicted distribution of the 10,670 daily trips by Costco Members." Finding 1: The Applicant submitted a traffic impact analy'si's ("TIA) by Kittelson and Associates for the subject property into the record. City staff reviewed the TIA and there is testimony in the record as to the substance of the TIA from City staff. No other traffic reports or analysis were prepared or submitted into the record, by traffic engineer's or other traffic expert's. According to the TLA, 'the trip distribution pattern for.site generated trips was developed using zip code data from current memberships at the existing Costco warehouse located on OR 62 (Crater Lake Highway) in Medford, Oregon, as well as from the existing traffic patterns and major trip origins and destinations within the study area."' Trip distribution was verified by regional travel demand models provided by ODOTfor the base year (2006) and future year (2038). There was no traffic analysis supporting the allegation that the trip distribution methodology utilized in the TIA is flawed. Conclusion 1: The City Council concludes there is .substantial evidence in the record to find that the TIA is valid and contained adequate trip distribution methodology for the .subject property. 2. Cas'ten's traffic study indicates that there will be heavy traffic added to Biddle Road at the entrances to the Rogue Valley International -Medford Airport, but docs not indicate that the airport master plan has been taken into consideration in the traffic study. Traffic Impact Analysis: Central Point Costco Development, Central Point, Oregon. Kiltelson & Associates. October 2015. Page 37. Page 2 .1`6 Finding2: The Planning Commission's consideration of the Costco CUP application relied upon the Applicant's TIA and agency comments d e. the City ofMedford) relative to the identified traffic impacts and mitigation measures at the intersection of Biddle Road and Airport Road (See Finding 1776040(8)(4) in the Planning Department Supplemental Findings (`Supplemental Findings" in the record below.) The airport was identified as an agency entitled to notice, but did not submit comments into the record requiring additional traffic mitigation. The TTA identified impacts to the intersection. The City ofMedford recommended a condition of approval to include a median to resolve the impact. In a letter dated January 5, 2016, the City ofMedford indicated that the airport was opposed to the proposed mitigation measure because it was in conflict with the airport master plan. As an alternative, the City of Medford requested a condition that requires the applicant to pay a proportional share toward a future traffic signal at this intersection in conformance with the airport master plan The City ofMedford indicated this contribution would be sufficient to mitigate the impacts of this project. The estimated project cost is $450,000, including design, construction and inspection. Per the TIA, Costco contributes l0% of the traffic at this intersection. As conditioned, Costco .shall provide evidence it has contributed its proportionate share of the construction of signalization improvements in an amount not to exceed $45,000, which shall be payable to the City ofMedford prior to building permit issuance. No other traffic reports or analysis were prepared or .submitted into the record by traffic engineers or other traffic experts. Conclusion 2: The City Council concludes there is substantial evidence in the record m find that, as conditioned, the application complies with CPMC 17.76 and that the applicant will have contributed its proportional. share toward traffic mitigation to the intersection of Biddle Road and Airport Road at the time of development The Council fitnher concdudes (here is sufficient evidence in the record to determine that the airport did not request any mitigation for the airport master plan, but that consideration to such master plan was given 3. the access points for the proposed Costco site are on roads which ODOT has master planned as a freight corridor. ODOT's freight Profile identifies Table Rock Road as one of the local roads that "experience high volumes and of freight traffic." "fhe proposed location is in the midst of existing freight terminals, with more planned for the future, which will mix high volume truck traffic with 10,670 Costco member daily automobile trips. Finding 3. Heavy vehicles were evaluated in the Applicant's TIA at all study intersection and site drivewtrys, including Table Rock Road. No problems were identified with the mix of light and heavy vehicle traffic based on volume and impacts to LOSIVC. An ODOT representative was present at the January 5, 2016 hearing and did not identify safety concerns during his testimony (Audio Recording at 1'26). The Planning Commission considered in Finding 17.76.040(8) and 17 76.040(C)(2) the operational and safety conditions of ingress and egress on Table Rock Road, as well as all study intersections. Per the TTA and agency comments, the Planning Commission imposed conditions of approval requiring access restriction and mitigation measures to resolve traffic impacts associated with ingress and egress on Table Rock Road. No other traffic reports or analysis was Page 3 of 6 prepared or.submitted into the record by traffic engineers or other traffic experts ConCluSlon 3: The Council concludes there is sufficient evidence in the record for the Planning Commission to find traffic mitigation required by this project has been satisfied as conditioned and that the mix of truck traffic with the proposed development will not create additional safety concerns requiringfurther mitigation, except at identified and conditioned herein.. 4. there is nothing in the record to verify that ODOT has funded and scheduled construction of the improvements relied upon to support the Costco application. Without that confirmation that the improvements will be completed soon after the store opens is total speculation. Finding 4: Evidence in the record addressing traffic impacts and the timing of the Interstate 5 Northbound Off Ramp, Exit 33 Improvements, and the feasibility of imposing conditions for such traffic mitigation includes the 71A prepared by Kittelson & Associates, as well as comments received from the Oregon Department of Transportation (01)(97'). As conditioned, Costco will be required io enter into a Cooperative Improvement Agreement with ODOT andpaw its proportional share of the improvement cost prior to building permit issuance (See Revised Public Works Staff Report dated January 5, 2016, Condition No. 1). Evidence in the record establishes that the improvements are planned to be expedited such that they will be constructed as close to opening day of the .subject development as possible: The Revised Public Warks Staff Report dated January 5, 2016 states that, "Per ODOT, construction will commence at the earliest possible date. " (See Traffic Impacts and Mitigation Item No. 4) b. During staffs presentation at the January 5, 2016 Planning Commission Meeting, during a discussion of traffic impacts and mitigation (26:05), staff stated that ODO7 agreed to expedite construction of the off ramp improvements as close to opening day as possible. Don Morehouse, ODOTPlanner, concurred with the staff presentation and stated that he had nothing further to add (Audio Recording. at 1:26:15). Conclusion 4: 'There is substantial evidence in the record to .support the Planning Commission's decision as to the feasibility and timing of the traffic mitigation conditions. 5. Without further study, Costco has the potential to create immediate and future traffic congestion and hazards. Finding 5Per the TIA, the proposed Costco Wholesale and fuel facility is expected to generate 10,670 new daily trips. Ileavy vehicles were evaluated in the 7'1A and no problems were identified with the mix of light and heavy vehicles based on volume and impacts to LOS/VC. On the day of opening traffic impacts were identified at four (4) intersections: 1) Interstate 5 Northbound Off -Ramp,- 2) Table Rock and Ilamrick Road, 3) !able Rock and Airport Road, and 4) Airport and Riddle Road Although not identified in the 77A, the City of Medford provided crash data and comments in a letter dated January 5, 2016 indicating that traffic generated by Costco would negatively impact the intersection of Table Rock Road and Morningside ,Street Pagc 4 of 6 south of the project site In accordance with the TLA and comments received from affected agencies, the Planning Commission imposed conditions ofapproval requiring mitigation of the traffic impacts caused by the proposed Costco Wholesale (See Table 1 helow)_ Interstate 5 NB volume to capacity 77c) Enter into a Cooperative Prior to Off -Ramp Ratio is exceeded. Improvement Agreement building with ODOT and the City to permit develop and construct dual issuance right turn lanes per LAMP Project No 9. Table Intersection Failure due to Construct center turn lane Prior to Rock/Itamrick left turn delays and refuge within existing certificate of Road Table Rock Road right -of- occupancy way at Hamrick Road. Table Existing left turn delays cause Jackson County has .Jackson Rock/Airport the intersection to operate at funding to construct County ]able Road a Level of Service (LOS) h'_ improvements on Table Rock Road The existing status is Rock Road that includes Improvement aggravated by additional signalization of the Project traffic generated by the intersection_ the County commences in proposed use has indicated that 2077. construction of the improvements will begin in 2017, therefore, no interim mitigation is necessary. Airport7Biddle Traffic generated by Coleco Per the City of Medford in proofbf Road causes left turn delays which a letter dated.lanuary 5, payment results in a decline in the 2016, the applicant shall prior to LOSfrom C to E. contribute its pro -rata building .share toward construction permit of a signal at the issuance - intersection. Table Rock Road Trafficgeneraledby Costco Per the City of Medford in proof of at Morningside aggravates an existing left a letter dated.lanuary 5, payment Street turn delay at the imersectlon 2016, the applicant shall prior to contribute its pro -rata building share toward construction permit of a center left turn lane issuance. and refuge on Table Rock Road at Mornin .side Street Pcr the TIA, conditions of approval were established to address identified traffic impacts as .set forth in Finding 17.76.040(B), 17.76.040(C)(2), and 17.76.040(R)(2J in the record below. No other traffic studies or testimonyfrom a traffic engineer or other traffic expert was received as to the .substance of TIA_ Ngc 5 of 6 As demonstrated in the Applicant's Findings and the Planning Department Findings, the Planning Commission found the project as conditioned is adequate to accommodate the use (.See Planning Commission Findings for 17.76.040 in the record below). Conclusion 5: The City Council concludes that there is substantial evidence in the record to support the Planning Commission's decision that, as conditioned, the project will mitigate the traffic impacts generated by this project. 6. The placement of Costco in the proposed location is contrary to the Central Point Statement of Values: "Growth: We Value planned growth that will retain our small town atmosphere," and "Transportation: We value a system of transportation and infrastructure that is modern, efficient and sensitive to the environment." Finding 6: In considering the Conditional Use Application for the proposed Membership Warehouse and fuel facility, the Planning Commission was required to render a decision based on the proposal's demonstrated compliance with Standards and Criteria for Conditional Use Permits set forth in Central Point Municipal Code Chapter 17.76. Conclusion 6: The mission .statement is not part of the Municipal Code nor Comprehensive Plan 11 does not serve as a standard or criteria and is merely aspirational language under the City's general Mission Statement. The Planning Commission did not err in applying the Standards and Criteria .set forth in CPMC 1776_ I. PART 3 - SUMMARY CONCLUSION Council has reviewed the evidence and issues in the record and the issues raised in the Smith appeal. The Council concludes that there was substantial evidence in the record for the Planning Commission to approve the application, and the Commission did not commit errors of law. Phis Conclusion is based upon the findings herein, and the evidence in the record including the Applicant's findings and the Planning Staff Supplemental Findings of Fact and Conclusions of Law. Pagc 6 of6 Ak EXHIBIT "B" CENTRAL Community Development STAFF REPORT POINT Tom Humphrey, AICP 0'`=O1 Community Development Director STAFF REPORT March 10, 2016 ITEM Consideration o'a Conditional Use Permit application for the construction of a 161,992 square foot Costco membership warehouse and fuel facility on an 18.28 acre site at the southwest corner of I lamrick and 'I'able Rock Road The project site is within the Federal Way Business Park subdivision in the Industrial (M-1) zoning district, and is identified on the Jackson County Assessor's map as 37S 2W 126, Tax Lots 213, 214, 215, and 216. Applicant: Costco Wholesale; Agent: Steve Bullock, MG2 STAFF SOURCE Stephanie Holtey, Community Planner II BACKGROUND In 2009, based on the authority for similar use authorizations provided in CPMC 17.48.020(W) and 17.60.140, the Planning Commission approved membership warehouse clubs, such as Costco Wholesale, as similar to other uses permitted in the M-1 zone and approved such uses as conditional uses (Planning Commission Resolution No. 764). As a conditional use, the City has more discretion in determining the compatibility ofthe use with other permitted uses. Upon appeal, the City Council affirmed the Planning Commission's similar use determination and authorization of memhership warehouse clubs as a conditional use (City Council Resolution No. 1217). In 2015, Costco Wholesale submitted a Conditional Use Permit application to develop a membership warehouse and fuel facility on 18.28 acres in the M-1 zone (Attachment "A"). On February 2, 2016, the Planning Commission, in accordance with CPMC 17.76, approved the COP application (Resolution No. 827). The Planning Commission's decision considered testimony received by the applicants, proponents and opponents at the January 5, 2016 Planning Commission hearing, including the period That the record was left open (Attachment "B"). Aller the final decision, appeals were Filed by I,. Calvin Martin ("Martin Appeal" - Attachment "C-1 ") and David.l. Smith ("Smith Appeal" — Attachment DA") on February 16, 2016. The Martin Appeal and the Smith Appeal raise similar issues alleging the Planning Commission erred in approving the application based upon the following issues which are summarized as follows: • the use is not compatible; • the Traffic Impact Analysis submitted by the Applicant is flawed; • the use will generate signiticam traffic; and • hhe decision conflicts with the City's Statement of Values for Growth and Transportation. Upon appeal, the Council's consideration is based upon the evidence and issues presented in The record before the Planning Commission. Based upon that record, the Council must determine whether there is substantial evidence in the record to support the Planning Commission's decision, or whether the Planning Commission erred as a matter of law. Staff has reviewed the issues raised in the Martin Appeal and the Smith Appeal and the evidence in the record in the context of the standards and criteria that apply to Conditional Use Permits per CPMC 17.76. There are no issues raised that have not already been addressed by the Planning Commission as evidenced in the Findings of Fact and Conclusions of Law, for the Martin Appeal (Attachment "C-2) and the Smith Appeal (Attachment "I}2"). COUNCIL OPTIONS In an appeal of a'I'ype III land use decision, the Council has four options 1) Affirm the decision of the Planning Commission. If the Council does so, it must specify the basis for its decision; 2) Reverse the Decision of the Planning Commission. If the Council does so, it must specify the reasons for the reversal; 3) Modify the decision of the Planning Commission and specify the reasons for the modification; or 4) Remand the decision back to the Planning Commission with an explanation of the error and the action necessary to rectify the error. Given the constraints of the 120 -day rule, this is not an option unless the applicant concurs and agrees to extend the 120 -day limit. STAFF RECOMMENDATIONS There are two appeals before Council. though the hearings have been consolidated, the Council will need to make separate motions as to each appeal at the close of the public hearing. With regard to each appeal: Martin Appeal: Staff recommends the Council affirm the decision of the Planning Commission on the basis that there is substantial evidence in the record to find that the application complies with the Conditional Use Permit criteria in CPMC 17.76. Attached hereto as Exhibit C-2 are draft Findings of Facts and Conclusions of Law the Council may adopt in its motion to affirm the Planning Commission. Smith Appeal: Staff recommends the Council affirm the decision of the Planning Commission on the basis that there is substantial evidence in the record to find that the application complies with the Conditional Use Permit criteria in CPMC 17.76. Attached hereto as Exhibit D-2 are draft Findings of Facts and Conclusions of Law the Council may adopt in its motion to affirm the Planning Commission. ATTACHMENTS Attachment "A" — Planning Commission Resolution No. 827 including all exhibits thereto Attachment `B"—Staff Report dated February 2, 2016 (with Exhibits 1 —14; Exhibit 15 is the Revised Staff Report dated January 5, 2016 included in Attachment "A") Attachment "C -I" - Notice of Appeal — L. Calvin Martin dated February 16, 2016 Attachment "C-2"— Draft Findings of Fact & Conclusions of Law, Martin Appeal Attachment "D-1" —Notice of Appeal — David J. Smith dated February 16, 2016 Attachment "D-2"—Draft Findings of Fact & Conclusions of Law, Smith Appeal ACTION Consider the appeals of the Planning Commission's decision to approve the Conditional Use Permit allowing development of a membership warehouse and fuel facility on 18.28 acres within the M-1 zoning district and 1) affirm the decision; 2) modify the decision; 3) reverse the decision; or 4) remand the decision to take further action. —SUGGESTED MOTION Martin Anneal I move to affirm the Planning Commission Decision adopted as Resolution 827 and direct Staff to prepare a resolution approving the application for a Costco Wholesale Membership Warehouse and fuel facility on 18.28 acres within the M-1 zoning district as per the staff reports at Exhibits A and B hereto and the draft findings at exhibit C-2 attached hereto, for the Council's next meeting on March 24, 2016. Smith Appeal: I move to affirm the Planning Commission Decision adopted as Resolution 827 and direct Staff to prepare a resolution approving the application for a Costco Wholesale Membership Warehouse and fuel facility on 18.28 acres within the M-1 zoning district as per the staff reports at Exhibits A and B hereto and the draft findings at exhibit D-2 attached hereto, for the Council's next meeting on March 24, 2016. ATTACHMENT "A" PLANNING COMMISSION RESOLUTION NO. 827 A RESOLUTION OF THE PLANNING COMMISSION APPROVING A CONDITIONAL USE PFRMI I FOR DEVELOPMENT OF A COSTCO WHOLESALE MEMBERSHIP WAREHOUSE AND FUEL FACILITY ON PROPERTY WITHIN THE M-1 ZONING DISTRICT (File No:15022) WHEREAS, the City, by Planning Commission Resolution No. 764 and City Council Resolution No. 1217, determined that membership warehouses are a commercial use compatible with and closely related to permitted uses in the M-1, Industrial zone and therefore authorized them as a conditional use. WHEREAS, the applicant submitted an application for a Conditional Use Permit to develop an 18.28 acre site within the M-1, Industrial Zone with a 161,992 sq. ft. Costes Wholesale membership warehouse and four (4) island fuel facility; and, WHEREAS, on January 5, 2016, the Central Point Planning Commission conducted a duly - noticed public hearing on the application, at which time it reviewed the City staff report and heard testimony and comments on the application; and WHEREAS, the Planning Commission's consideration of the application is based on the standards and criteria applicable to Conditional Use Permit section 17.76 of the Central Point Municipal code; and WHEREAS, after duly considering the proposed use, it is the Planning Commission's determination that, subject to compliance with conditions as set forth in the Revised Staff Report (Exhibit "A") dated January 5, 2016, the application does comply with applicable standards and criteria for approval of a conditional use permit. NOW THEREFORE BE IT RESOLVED, that the City of Central Point Planning Commission, by this Resolution No. 827, does hereby approve the Conditional Use Permit for Costco Wholesale. This approval is based on Exhibit "A", the Planning Department Revised Staff Report dated January 5, 2016, including attachments incorporated herein by reference. PASSED by the Planning Commission and signed by me in authentication of its passage this 2"d day of February, 2016. Planting Commission Chair ATTEST: �. Cit§ Representative Planning Commission Resolution No. 827 (2/2/2016) STAFF REPORT A CENTRAL POINT REVISED STAFF REPORT January 5, 2016 EXHIBIT A Community Development Iom luumphrey, P Community Development Director ITEM (File No. 15022) Consideration of a Conditional Use Permit application far the construction of a 161,992 square foot Costco membership warehouse and fuel Facility on an 18.28 acre site at the southwest comer of Hamrick and Table Rock Road. The project site is within the Federal Way Business Park in the Industrial (M-1)zoning district, and is identified on the Jackson County Assessor's map as 37S 2W 121,'1 ax Lots 213, 214, 215, and 216. Applicant: Costco Wholesale; Agent: Steve Bullock, M02. SOURCE: Community Planner BACKGROUND At this time Costco Wholesale ("Applicant") is requesting s Conditional Use Permit to construct a new membership warehouse and fuel facility. The 18.28 acre project site is located an four (4) lots within the Federal Way Business Park Subdivision with frontage on Table Rock Road (Jackson County), Hamrick Road (City of Central Paint) and Federal Way (City of Central Point). rand east of the site is located in the City of Medford. It's the Applicant's intent to relocate its existing operation on Crater Lake I fighway to Central Point with a scheduled opening date of Fall 2016. Achievement of this objective requires approval of the CUP, as well as a Site Plan and Architectural Review (File No. 15028) and Class "C" Variance to the M-1 sign area standard (Pile No. 15032) (Agenda Items VI, B and Q. General Project Description: Costco proposes to conshuet a 161,992 square foot membership warehouse located on the southwest site boundary north of the existing Fed Ex Distribution Facility (Attachment "A-3"). A total of 783 parking spaces arc proposed along with perimeter and interior landscape improvements. Architecturally the proposed Costco will be a large metal building similar to industrial warehouses like the Fed Ex Distribution building adjacent to the project site. In this case the building design provides for variation in building materials and roof lines, as well as articulation and detailing around the main enhance canopy. The color palette is a blend of earth tones (brown, grey) with Costco red and blue on the proposed signage. According to the applicant's findings (Attachment "B") the warehouse will be open to members from 10 a.m. to 9 p.m. on weekdays and until 5 p.m. or 6 p.m. on weekends. Deliveries for the warehouse typically occur between 3 a.m. and noon to minimize conflicts between large delivery trucks and Costco's members. A four (4) island fuel facility is proposed on the southeast site boundary to the west of the existing Fed Ex Distribution Facility (Attachment "A-3"). Each island provides six (6) fuel dispensers and provides stacking for 10 cars. In total the fuel facility includes 24 fuel dispensers and provides stacking few 70 cars. A canopy will cover the fuel dispensers (Attachment "A-13"). The fuel facility will be open to members from Gam to 10pro daily. Depending on demand, fuel deliveries may occur multiple times per day. ISSUES The City has evaluated the proposed use and identified four (4) issues: 1. Traffic. On opening day it is estimated that Costen will generate an additional 10,670 new daily trips - Due to the large volume of estimated traffic for the proposed use, the applicant prepared a Trsffie Impact Analysis (TIA) based on input Gam affected agencies including the City of Central Point, Jackson County Roads and the Oregon Department of Transportation (ODOT). It should be noted that the City of Medford was invited to participate in developing the'I'IA scope of work on June 2, 2015 and August 13, 2015, but no comments were received. The TIA identified impacts to four (4) intersections at opening day (Table 1, Items I-4) and one (1) intersection in 2020 (Table 1, Item 5). Additionally, impacts to the intersection of Table Rock Road and Morningside Sheet were identified and mitigation recommended in a revised letter from the City of Medford dated January 5, 2016 (Attachment r NBI-5 OR Ramp PM Peak C 061 0.77 0.94 Midday COOT Peak B 0.41 0.61 0.63 1 Table Rock Road & Hamrick Road Jackson PM Peak C E C - Midday County Peak B F B 3 Table Rock Read &Airport Road Jackson PM Peak F - F - C - Midday County Peak C E e 4 Biddle Road & Airport Road City of PM Peak C E - F - Midday Medford Peak B - C - F - 5 Hamrick Road & East Pine Street City of Central point, Jackson PM Peak Midday C - C D County Peak I B I B B It should he noted that one year after the scheduled date of opening for Costco, the County will begin construction ofthe Table Rock Road project. The project will widen Table Rock Road between Biddle and Airport Road to include four travel lanes, a center Nan lane, bike lanes and sidewalks and intersection signalization at Table Rock and Airport Road. Completion of the Table Rock Road project resolves traffic impacts of the proposed use on in&axtructure along Table Rock Road (i.e. Projects 2 and 3). A detailed summary of the traffic impacts and mitigation are set forth in the Revised Public Warks Department Staff Report (Attachment "D"), Resolution: To assure timely completion of traffic mitigation measures relative to the day of opening for the proposed use, staff is recommending: a. NB I-5 Off Ramo. Prior to building permit issuance, the applicant shall comply with the Oregon Department of Transportation (ODOT) requirement to contribute toward the construction of dual Page 2 of 5 right mm lanes from the off ramp to East Pine Street (IAMP Project No. 9). The estimated project cost is $1.3M. Project cost sharing shall be as follows: ODOT $800,000 Costen: 5377,000 (Not to exceed) City: $123,000 (Not to exceed) Per ODOT, construction will commence at the earliest possible date, which is necessary to prevent failure of the northbound off -ramp. b. Table Ruck Road and Hawick Road. Prior to certificate of occupancy, the applicant will be required to provide the following temporary improvements on Table Rock Road per Jackson Courtly Roads: i. Construct median islands in front of the access drives on Table Rock Road to limit movements to right-in/right-out; mid, ii. Construct a center left turn lane and refuge within the existing Table Rock Road right-of- way at Hamrick Road to case left tum delays. c. Table Rock Road at Airport Ruad. Per Jackson County Roads, no mitigation measures are recommended since operational deficiencies will be resolved upon completion of the 'table Rock Road widening project. d. Biddle Road and Airport Road. Currently this intersection operates at a LOS C. According to the applicant's TIA, the intersection will operate at LOS E on the day of opening. Per the Revised City of Medford letter dated January 5, 2016 (Attachment `T-1"), the applicant will be required to contribute toward construction of a signal at the intersection (See Condition No. 3). e. Table Rock Road at Morningside Street. Per the Revised City of Medford staff report dated January 5, 2016 (Attachment "I -P'), the applicant shall be required to contribute toward construction of a left mm lane at the intersection of Table Rock Road and Morningside Street (Condition No. 4). 2. Parking. the applicant's puking plan proposes 783 parking spaces fur warehouse members. The maximum parking spaces allowed based on the allocation of uses is 698 spaces. In accordance with CPMC 17.64.040(8)(2), the applicant is requesting an adjustment to allow for the proposed increase in parking based on a parking demand analysis specific to Costae Wholesale operations in Oregon (Attachment "C"). Resolution: The applicant's parking demand analysis recommends a minimum parking ratio oF4.83 parking spaces per 1,000 s.f. of Gross Floor Arca (GFA) to maintain a 90% utilization rate. According the Institute of Traffic Engineers (ITE) Parking Generation, 4'" Edition, when more than 90% of the parking spaces in a parking lot are occupied, there is an increase in illegal puking and repeating circulation. Costco's parking plan provides slightly more parking than the minimum recommendation to accommodate typical peak periods as well as provide additional spaces for seasonal peaks. Staff Page 3 of 5 recmnmends that the requested increase in parking is warranted. 3. Signage. The applicant's signage plan includes wall signs that are proportional to scale and size of the building- Although none of the proposed signs exceed 3.8% of the wall area on any elevation, they exceed the maximum sign area allowed in the M-1 zone. Resolution: Approval of the requested signage for the proposed rise is subject to approval of a Class "C" Variance, which will be presented to the Planning Commission for consideration (File No. 15032, Agenda Item VI -C)- Based on the applicant's proportionality rationale for the proposal, the variance request is deemed reasonable. However, if the variance is not approved, the applicant will be required to demonstrate compliance with the M-1 sign area standards prior to building permit issuance. 4. Lot Consolidation. The project site includes four (4) lots widen the Federal Way Business Park Subdivision. Based on staffs evaluation ofthe lot dimensions and site plan, the proposed warehouse occupies three (3) of the existing lots. The applicant has indicated it is their intent to consolidate the lots. Resolution: As a condition o'approval, the lot consolidation most be completed prior to building permit issuance. FINDINGS The Costco Wholesale Conditional Use Permit has been evaluated for compliance with the applicable Conditional Use Criteria act forth in CPMC 17.76 and found to comply as evidenced in the Planning Department Supplemental Findings (Attachment "T'). CONDITIONS OF APPROVAL 1. Prior to building permit issuance for the four consolidated lots, a Subdivision Re -plat shall be prepared and recorded and a copy of the recorded Subdivision Re -plat and Deed provided to the City. 2. The applicant shall satisfy conditions as listed in the Revised Public Works Department Staff Report dated December 15, 2015 (Attachment "D"). 3. Per Attachment 'TI", prior to issuance of a building permit, the applicant shall provide evidence that it has contributed toward the construction of signalization improvements at the intersection of Airport and Biddle Road. -the applicant's share of the signalization improvement shall not exceed $45,000, which shall be payable to the City of Medford. 4. Per Attachment "I-1", prior to issuance of a building permit, the applicant shall provide evidence that it has contributed toward the construction of left tum lane improvements at the intersection of Table Rack Road and Morningside Street. The applicant's share ofthe left tum lane improvement shall not exceed $60,000, which shall be payable to the City of Medford. 5. The applicant shall satisfy conditions as listed in the Rogue Valley Sewer Services Staff Report dated November 16, 2015 (Attachment "II"). Page 4 of 5 6. Prior to issuance of building permits for the proposed signage, the applicant shall either demonstrate compliance with the signage standards set forth in CPMC 17.48.080(A)(1) or receive a variance to the signage arca standard. ATTACHMENTS Attachment "A-1"- Site Comparison Attachment "A-2" - Site Circulation Attachment "A -3" -Concept Site Plan Attachment "A-4" - Central Point Costco Grading & Drainage Attachment "A -5" -Central Point Costco Utilities Attachment "A -6" -Preliminary Landscape Plan Attachment "A-7" - Concept Fluor Plan Attachment "A-8" -Concept Exterior Elevations Attachment "A-9" - Concept Elevations Attachment "A -l0" -Entry View Attachment "A-11" - NW Coma View Attachment "A-12" -East View Attachment "A-13" -Concept Fuel Facility Plan Attachment "A-14" -Concept Lighting Plan Attachment "B" -Applicant's Findings Attachment "C" --Traffic Impact Analysis Attachment "D" - Revised Public Works Staff Report dated January 5, 2016 Attachment "E" -Jackson County Roads Staff Report dated December 10, 2015 Attachment "F" -Oregon Department of Transportation Staff Report dated December 14, 20 t 5 Attachment "G" -City of Medford Planning Department Comments dated December 3, 2015 Attachment "H" -Rogue Valley Sewer Services Staff Report dated November 16, 2015 Attachment "I-1"- Revised City of Medford Staff Report dated January 5, 2016 Attachment "1-2" -City of Medford Staff Report dated December 24, 2015 Attachment "J" - Planning Department Supplemental Findings Attachment "K" - Resolution No. 827 ACTION Consider the Conditional Use Application and either: 1) approve; 2) approve with modifications; or 3) deny the application. Approve the Conditional Use Permit for Costco Wholesale subject to the conditions of approval per the Revised Staff Report dated January 5, 2016, Page 5 of 5 Z ' wan 67 ovi OL s W :�. f ` fir. ATTACHMENT 'A -Y r Ill1uuwuua. �i ATTACHMENT "A-4" 1 ATTACHMENT "A-5" 3E n i;� I OHI4,� I'�flll� I��� � � mT-L',n o�ii rrata� �I 1 Fl.VIIIMR MOTES U1IXfJIEGICIRAT06 bJ �qE�-S-fI�� _ � w.uu rJa.v m�w u a.c -aou i..am.a a.uc....., novaru wa, mm..,_ ••� ,m ii - .� a ,v -v ar COSTCO WHOLESALE PRELIMINARY LANDSCAPE PLAN CENTRAL POINT, OREGON SEPTEMBER 25 2015 �'- D1 F m —A COSH CENTRAL POINT. ON j mm - A 41 4 Eli Maw RiAll K m Z-z INCEPT FLOOR PLAN DD21-01 .EITE--ER.2.2015 smsommim,, = (D- C) » m a -- Em Em s it | ) / ( !; a 2 \§ ® ATTACHMENT „ \R: h(a | (D- C) » m a -- Em Em s it | ) / ( !; a 2 \§ ® : ƒew \R: h(a | | G4 }� . \§ ! / : ƒew . � MORIN ELEVAT .1111.11 s ! ! A 14iF ENINY FlEV11nOH EAST ELEVATON SWTHE AMM scue: fila. ra WEST ELEVATRM' Ca/�l i.L! as az zrts #I4Ga a CONCEPT ELEVATIONS oda CENTRAL POINT OR LM rs. , ATTACHMENT "A-11" W_ w W z lz O u 3 z If u CONCEPT FUEL TRUCK ROUTE CONCEPT ELEVATIONS - DETAIL SITE PLAN b C�OACID ee ac ae !' \i ee e, do no ! ��.----- uCI STACKING PLAN•• _ 3 CONCEPT FUEL FACILITY PLAN DD41-01 8 E PTEYBE R 16. 3R,5 W we; m4m--I f I � I ------------- u CONCEPT FUEL TRUCK ROUTE CONCEPT ELEVATIONS - DETAIL SITE PLAN b C�OACID ee ac ae !' \i ee e, do no ! ��.----- uCI STACKING PLAN•• _ 3 CONCEPT FUEL FACILITY PLAN DD41-01 8 E PTEYBE R 16. 3R,5 W ATTACHMENT "A-14" trtrrr.t...ervrr(e r[ea eer rrr<e.• [-t- r (YC( Yf a�'ieaaaL( t a r MIRFr�YRIM aJ� �X e r e e 2=4411111!99 � YL'r yyr[rCLtlY[tY tYYt[[[LCLYLttCLyf-'trt[Let[ [C n.an.r nor n.na,r,r n,ny.r,nor n�rna,aee uu�remnnn nr,nnu tete t_e LLLL •�• •ALL{.1 t1[[=1 i41.` -- � M nae enesnouse r.n., iae. — _ Y r �k4nN r k� t; r Ytf t(yyt��yt e 55 Lr �tet�t .�iY R RRR (e e r e e 2=4411111!99 � YL'r yyr[rCLtlY[tY tYYt[[[LCLYLttCLyf-'trt[Let[ [C n.an.r nor n.na,r,r n,ny.r,nor n�rna,aee uu�remnnn nr,nnu tete t_e LLLL •�• •ALL{.1 t1[[=1 i41.` -- � M nae enesnouse r.n., iae. — _ TO Central Point Land Use Permits Review Staff FROM Steve Bullock, MG2 and Costco CO ATTACHMENT '13" MEMO amrs DATE 11.3.15 PROJECT New Costco Warehouse Central Point Table Rack 6 Hamrick PROJECT NUMBER 140393-01 RE I Lead Use Applications fora nM coated, Warehouse In Central Point OR _ Project Description Propea l: Couni is considering buying some property on the southwest corner of the Table Rock Rd and Hamrick Rd Intersection that Is 16.26 acres In size. Their desire and intent would be to build a new Costco Warehouse (with a footprint of approximately 161,991 sq. ft.) and a Fuel Facility (4 Islands) together with all required parking and landscaping. In this case, the parking arse wall accommodate 763 parking stalls. Currently the subject property la undeveloped Industrial land. Surrounding the property Is a mix of developed and undeveloped Industrial land with distribution and manufacturing facilities. T Coated, Building l site Design: With over 30 years of building membership warehouse. Creep has 656 warehouses worldwide. This experience has allowed Cli to develop a carefully thought out program for constructing new facilities. This program includes: the layout of the warehouse floor plan that most effectively allows for the stacking and merchandising of products; the use of materials that are sustainable, long-lasting and energy effleiem; the layout of the site In a manner that provides for their parking and circulation needs; the Improvements to adjacent public Infrastructure to minimize and mitigate for any impacts they may makes, the development of an attractive, functional facility that the entire community views as an asset. The final design solution for each of Coatco's 600+eItse follows this program resulting in a unique solution that is tailored to the individual site, its environment and the community it is located in. Costco Operations: Generally Costco's warehouses am open to the public from 10am- 9pm. On the weekends they close a little earlier (5 or 5 pm). To avoid conflicts between their members and stacking the warehouse, deliveries are typically received between Sam and Noon. This minimizes potential conflicts between the large delivery trucks and Caatoo's membere. The gas station Is typically open from Gam - 10pm. Fuel deliveries can happen multiple time per day depending upon the demand. DATE 11.3.15 I MEMO PROJECT New Castro Warehouse Central Point v,sa m is PROJECT NUMBER 14-0393-01 The following sections of this narrative identify the applicable sections of the Central Paint code and provide moves. and drawing reference that describes how our proposed site and building design compiles with the City's Development Codes. Chapter 17.48, 111 INDUSTRIAL DISTRICT 17.48.020 Permitted uses. The following new and their accessory uses am Permitted in an M1 district, subject to the limitations Imposed In Sacnon 17.48.030: A. Warehousing; B. Storage and wholesaling of prepared or packaged merchandise; W. Other uses not listed In this or any other district, lithe planning demmiuion Mtle Pearn to be similar to these listed above and compatible with other larmltted uvea and with the Intent of the M1 district. Response Costco is a Wholesale Memhership Club which has as their primary locus the sales of prepared or packaged merchandise to their members. City staff has further made us swan ofa decision made by the City Council plated to Wholesale Membership Clubs in the M-1 zones which allows them subject to a conditional use permit This decision was appealed and confirmed In the Oregon Courts. 17.48.030. Standarlle. for..Prem!_,._................. ................. ,......... ................ ............ All uses within the Mi district shall be subjectto thereffewing conditions and standards: A. All raw materials, Mislead products, machinery and equipment, with the exception of automobiles and trucks normally used In the busineae, shall be atoned within an aMicaly enclosed building or sight obscuring, rroo-pierced Mos not less than six fist In height; Response: With the exception of the Fuel Facility, Costco's normal operation happens entinfy within their warehouse. B. The facility shall be in compliance with all applicable slate and federal environmental, health and safety regulations; Response Coati will obtain all repulnd state and federal permits as well as comply with dl health and safety regulations. C. In any MI district directly stress a street from any msidertal (R) district, all outdoor parking, loading or display acres Mall be set beck at beat M feet from the public nght- of-way end this setback area shall be planted with trees appropriate for the neighborhood, ground cover or other landscaping matedeis that are consistent with the gerearal existing character of the area, or that will establish a landscape throne, for other developments to fallow. This setback and landscaping requirement shall also apply to 101 Iota framing on any sheet designated in the compreleanelve, plan as a major adedal. DATE 11.3.15 MEMO PROJECT New Costco Warehouse Genual Point sea one PROJECTMUMRER 140393-01 Response: This section doss not apply In that then aro no residentially zoned properties adjacent to or across the street from the Cosfco property. 17.48.040 conditional Uses. The following uses and their acceesory uses may be permitted in an MI district when authorized in accordance with Chapter 17.76: A. Business offices and commercial uses that are compatible with and closely related In their nature of business to permitted uses in the MI dharof or that would be established to serve primarily the uses, employees, or customary of the MI d1mict, Response: As mentioned above, the City has determined that a Wholesale Membership Club requires a Conditional Use Permit to operate In an M-1 zons. The last section of this narrative will go over In detail how Cos}co's proposed project complies with the Conditional Use Permit approval criteria. 17.48.050 !Night Regulations. Maximum height ofany building or structure in an M1 dlstnct shall be sixty Teat. Response: Costco's warehouse Is roughly 38' from finished grade to the highest point on Me building, this Includes the parapet wells extending above the roof around the perimeter of the building. Light poles In the perking lot are roughly the "me Might, 38' tell pole on a 7.5' concrete bass. Sw the included elevations and site lighting pion included in the drawing package. 17.48.000 Its Aiwa.Rpuinments.................. ......... ..... ......................................................... There are no minimum site area requirements in has Mi district, exceptas necessary, to provide for retained panting, loading and yard spaces. Response: Costco Is proposing to build • warehouse having roughly 103,000 sq. R. For • warehouse of thin of" Costco has discovered through their experience from building over 800 warehouses that 800 parking shills (e/•) are needed to sMectively handle the volume of membom that use their facilities. The size of the property under consideration, about 18.78 acres, is large enough to accommodate these Improvements. 17.48.070 Yard Requirements. The following measurements Indicate minimum yard requlrerent, In an M1 district A. Front Yard. The front yard shall be a minimum of twenty feet. (Also sae Section 17.48.030(C)). B. Side Yard. The side yard shall be a minimum of len feet except when the side lot line is abutting a lot In any residential (R) district and then the side yard shall be a minimum of Manly foal and shall be Increased by mrshaf foot for each Foot by which the building height exceeds twenty foe. DATE 11.3.15 MEMO PROJECT New Cmsu,owarehouse C.mmIPoint .a.amrs PROJECTNUMBER 14-0393-01 C. Rear Yard, The mar yard shall be a minimum of len feet except when the rear lot line Is abutting a lot In any residential (R) district and Nen the raw yard shall be a minimum of twenty feet and shell be increased by onehaf foot for each foot by which lel building height exceeds twenty Net, D. Lot Coverage. No requirements. Response Costeo's proposed site plan (ase the drawing package) shows that the site fronts on three roads (Federal Way to the waft, Hamrick Rd to the north and Table Rock Rd to the "at). Of the three, only Tabby Rock Rd is • Major Arterial. Our assumption is that all throw frontages will require 70' Front Yard Setback. Our internal lot lines, to the South of the warehouse and west of the fuel facility will be side or rear setbacks Mat am required to M 10'. The warehouse is At fresf 00' from all property lines and the fuel facility and its ancillary Structure am at lent IS' from ail properly lines. The proposed site plan complies with the City's required yards. 17.48.080 Signs. Signs within the M1 district Well he limited to the following: 1. Permitted signs shall conlaln not more than one hundred square last of surface area on any one site, or on aggregate of two hundred square feet of surface on all aides which can be utilized for display purposes; 2. Lighted sgns shall be indirectly Illuminated Md non -flashing; 3, Identification signs shall be permitted within any required setback areas provided It does not extend Into or overhang any pealing area, sidewalk or other public fight -of - way; 4. Signs located within vision clearance areas atmtersections of stmels shall contemn to Section 17.60.110. Responsof Costco is proposing wall mounted signs#@ that Is proportional to the size of Meir building. This results In signglS the If Is larger than the standard Identified above. Further discussion of this and national for Approval is Included in the Conditional Use portion of this narrative. All sign illumination will be Indirectly illuminated and non -flashing. No Freestanding Signage is proposed so no sight or other obstructions will be created. C. Signs in the M1 district shall be permitted and designed according to provisions of Chapter 15.24. Response: Costco will fully comply with All the requirements of Central Point Municipal Code Chapter 18.74. DATE 11.3.15 MEMO PROJECT New Coalco Warehouse Central Point piii PROJECT NUMBER 14-0393-01 Chapter 17.64, OFF-STREET PARKING AND LOADING 17.64.030 OR -Suet Loadings. .............. ........................................,............ A. In all district, for soh use for which a building is W he erected or structurally aaered to the extent of increasing the floor area to equal the minimum Boor arae required to provide loading space and which will require the receipt or distribution of mshadahs or merchandise by truck or similar vehicle, there shot be provided off-street loading space in accordance with Ore standards last forth In Table 17.64.01, Oh -street Loading Requirements. TABLE 17.64.01 OFFSTREET LOADING REQUIREMENTS Use Contiguities Oh-Stm at Loading Berth Requirement (fractions rounded up to the closest whole number) RETAIL, RESTAURANTS, HOSPITALS, AND OTHER GOODS HANDLING Sq. Ft. of Floor Area No. of Loading Berths Required Over 100,000 3 plus 1 for each Ma0lonal 80,000 sq. R. B. A loading berth shall not be less then len fest wide, lNrly-five teal long acrd have a height clearance of boom W. Where the vehicles generally used for loeding and unloading exceed these dimeni the required length of these bertha shall be increased. C. If loading space has been provided in connection with an existing use or Is added to an existing use, 0w loading areas shall not he eliminated lelimination would result in less apace than Is required to adequately meet the mads of the use. D. OR -street parking amas used W fulMl the requirements of this tlhs shall not be counted as required loading spews and shell not be used for loading and unloading operations, Inapt during periods of Ne day when not required to neat parking needs. E. In no case shell any portion of a street or alley be counted as a part of the required parking or loading space, and such spaces shall be designed and foaled as to void undue interlemnce with the public use of steels or alleys. Response: Costco provide for all their loading needs on site and will not haw any of their doullwri" or delivery trucks Impact the public use of streets or alloys during their loading or unloading of product. In addition to the 4 dedicated alevated truck docks then are 3 other on -alta loading time for time and other smaller more local deliveries that can't use the elevated truck dock. This eeceeds the 4loading berths required In Table 17.64.01 (ecerpt above), 77.6t.0�0,„Off-StreikParklnp, Requirements All uses Shot[ campy With the number of oh -street parking requirements Idemifled in... Table 17.64.028, Nor-Rw[dantial Off -Street Peking Requirements. For non-maidsmal uses itre ph -sinal parking requirements am presented in terns of both minimum and maximum off. Mrset parking required. The number of oh -oast parking paces, In Table 17.54.02B, Non - Residential Off -Street Parking, may be reduced In accordsn a with subsection B of this section, Adjustments 0 OIFS~ VeNce Parking. DATE 11.3.15 MEMO PROJECT New Costco Warehouse Central Paint v,r,earm PROJECTNUMBER 14-039301 TABLE 17.64.02B NON-RESIDENTIAL OFF-STREET PARKING REQUIREMENTS Minimum end Maximum Vehicle Parking Requirement Use Cafegorkw (fractions rounded down to the Closest whole number) GENERAL COMMERCIAL Retail Stares, Personal 1 sparer per such 200 square het of net Poor area Services (excluding storage and other non -sales or non -display A. Calculation of Required Off-street Parking, off-street prong facility mo ulremenb set forth In ... Table 17.64.02B, Nonresidential OR -street Parking Requirement,, shall be applied es follows: 1. Where the application of the schedule moods in a fractional requirement it shall be rounded down to the lowest whole number. 2. For purposes of this chapter, groes Tibor area shall not include enclosed or covered areas used for off-street parking or loading, or bicycle facilities. 3. Whore nose or activities subject to difiring requirements are located in the some structure or on the same site, or on, intended b be served by a common facility, the total parking requirement shall be the sum of the requirements for each use or activity computed separately, except as adjusted through the site plan end architectural males, process under the provisions of subsection (B) of this section. The Community developmsnt director, when issuing a pennd(s) for multiple uses on a rte, may restrict the hours of obsession or place other conditions on the multiple uses so mal parking needs do not overlap and may men modify me total parking requierrwnt to be basad on the most Intense Combination of uses at any one time. 4. Where requirements are established on the basis of sesta or person capacity, the building regulations provisions applicable at the time of determination shall be used W defer capacky. 5. Whom residential use Is conducted logMsr with or accessory to other permitted uses, oppllcslble residential requirements shall apply In addition to other nonresidential requirements. 0. The parking requhemenle ou0lmd In ._Table 17.64.020, Nonresidential Off-street Parking Requirements, include parking for handicapped persons shall be provided pursuant to the requirements of subsection C of this section, Accessible Parking Requirements. Response Per fable 17.84.088 Costco will be required to provide not less than 070 perking stella and not mom Men 070 parking stalls (174,004 lfy 200 of/stall - 070 parking Walls). As menfloned earlier in this noriti through Costco's aatentlw esporlenca building these warehouses around the United States the proposed warehouse will rood approalmately 000 parking stalls to accommodate the demand. This request will be addressed In mom detail bolts In our Parking 3fudy and the Conditional Use Permit Discussion. DATE 11.3.15 MEYO PROJECT New Costco Warehouse Central Point wr•nrs PROJECTNUMBER 14-0393-01 B. Adjustments to Non-residential Off-street Vehicle Packing. The on -street parking requirements in Table 17.64.028, Nonresidential OMstreel Parking Requirements, may be reduced, or increased! in any commercial (C) or industrial (M) district as follows: 1. Reductions. The maximum oh -street parking requirements may be reduced by no mom than twenty, percent. 2. Increases. The off-street parking requirements may be increased based on a parking demand analysis prepared by the applicant as pan of the site plan and architectural review propose. The padding demand analysis shall demonstrate and document juslincallon for the proposed increase. Response: Sas our submitted Parking Demand Analysis which describes Costco's need for around 800 parking all C. Accessible Parking Requirements. Where parking is pmvided accessory to a building, accessible padding shall be provided, constructed, striped, sI,md and maintained ss required by ORS 447133, and Section 1104 of his latest Oregon Structural Specialty Cade as set form In this rection. Response: Costco will meet or exceed Centel Points required Accessible Perking Requirements. I. Boycie Parking. Bicycle parking shall be provided In accordance with Table 17.64.04, Bicycle Parking Requirements. TABLE 17.64.04 BICYCLE PARKING REQUIREMENTS Land Use Minimum Requirement Minimum Covered Cmnmercial Retell 9ebs 0.33 soares cor 1.000 on. ft. 1 60%e Warehouse 1 0.7 spacell.000 W.ft. I 100% Response: Tho.33 space9/1,000 sq. R. results In 07 bike spaces. Due to the nature of their business, Coal has found that bicycle fra le to their warehouses IS rafhsr limifed. Some employees commute by bicycle, but wry few customers do. For that moon, they believe the Central Point's Bicycle Parking for Warehouse standard, which results In 10 bike stills, the most appropriate for a Cotco warehouse. We will address this In the CUP criteria as well if if is determined that this Is another deviation from a standard. Chapter 17.72, SITE PLAN AND ARCHITECTURAL REVIEW No perms[ required under Title 15, Buildings and Construction, shell be issued for a major or minor project, as donned in this section, unless an appllcabon for site pian and emhgectural review is submitted and approved, or approved with conditions, as set forth In this chapter B. Major Projects. The fallowing am 'major projects" for the purposes of the alta plan and architectural molaw, process and are subject to Type 2 procedural requirements as set loch in Chapter 17 06, Applications and Types of Review Procedures: 1. New constmc6on, including private and public projects, that: DATE 11.3.15 MEMO PROJECT New Costco Warehouse Central Point PROJECTNUMBER 14-0393-01 a. Includes a new building or building addition of five thousand square feel or more b. Includes the construction of s perking lot often or more porWng spaces; or a Requires ane or mon vadaneee or conditional use "mile and, in the Judgment of the director, will have a significant enact upon the aasthetic character of the city or Use surrounding area, Response: The proposed Costco warehouse will be a Major Project and will go through the Sfte Plan and Architectural Review process. 17.72.040 Site plan and archibctural standards. -............_............ _............ ....... _._........._._ ........._....... In approving, conditionally approving, or denying any site plan and amhileotu al review application, the approving authority shall have tis decision an compliance with the fallowing standards' A. Applicable site plan,landscaping, and architactural design standards as set forth in Chapter 17.73, Design and Development Standards; B. City of Central Point Department of Public Works Department Standard Specifications and Uniform Standard Detail. for Public Works Cmstruclfon; C. Acoeesibility and sufficiency of firefighting facilities to such a standard as to provide for the reasonable saFdy of Ire, limb and property, Including, but not limited to, suitable galas, access roads and fire lanes so that all buildings on the premises are accessible to fire apparatus. Response: Costco will demonstrate compliance with each of these cdterld through the drawing package submitted with this application and subsequent construction Permit applicarlons. Chapter77 17.73.031 General connectivity, circulation and mcceas standards. A. Streeta and Utilities. The public alreet and Wifity standards selforth In the City of Central Paint Department of Public Warks Standard Spectllcatlons and Unnonn Standard Details for Public Work. Construction shall apply to all davebpment wfthln the city. Response Costco will comply with all the public street and utll/ty standards required by the City of Central Point. B. Block Standards. The following block standards apply to all development: 1. Black perimeter: shall not exceed two thousand Mel measured along the public street right-of-way, or outside edges of access ways, or other acknowledged block boundary as described In subsection (0)(4) of this section. 2. Block lengths shall not exceed six hundred feet between through streets or pedesldan access ways, measured along street right-of-way, or the pedestrian access way. Block dimensions are measured from right-of-way W right-of-way along street frorneges. A block's perimeter Is the sum of all aides. 3. Access ways or pdvateiretall streets may be used to meet the black length or perimeter standards atthis section, provided they are designed in accordance with this section antl are open to the public at all times. DATE 11.3.15 MEMO PROJECT New Costco Warehouse Central Point PROJECTNUMBER 140393-o1 4. The standards for block perimeters and lengths maybe modified to the minimum extent necessary based on written findings that compliance with the standards are not reasonably practicable or appropriate due to a. Topographic constraints; b. Existing development patterns on abutting property which preclude the logical connection of streets or access ways; c. Major public facilities abutting the property such ss railroads and freeways; d. Traffic sabty conosms; a. Functional and operational reads to create large commercial buildng(s); or t Protection of significant natural resources. Response. The surrounding existing roads together with Costco's Internal drives comply with those requirements. C. Driveway and Property Access Standards. Vehicular access to properties shall be located and constructed in accordance with me standards sat forth In the City of Central Point Department of Public Works Standard Specifications and Uniform Standard Details for Public Works Construction, Section 320.10.30, Driveway and Property Acorea. Response: The submitted sift plan demonstrates compliance with this requirement. D. Pedestrian Circulation. Attractive access routes for pedestrian travel shall be provided through the publlo aldewalk system, and where necessary supplemented through the use of pedestrian access ways as required to accompli the fallowing: 1. Reducing defences between destinations or activity areas such as public sidewalks and! building entrances; 2. Bridging across barriers and obstacles such as fragmented pathway systems, wide streets, heavy vehicular tralllc, and changes In level by connecting pedestrian Pathways with clearly marked creating, and Inviting sidewalk deagnl 3. Integrating ag nage and lighting system which offers Interest and safety for Pedestrians; 4. Connecting parking areas and destinations with retail streets or pedestrian access ways Identified through use of distinctive paving materials, pavement striping, grade separation or landscaping. Response The submitted site plan and lands cap plan demonstrate compliance with this requilvream. 17 75.039 Off-Sthwt.Parklnq DiiI And R"oement,8tandsrtb. A. Connectivity. Parking lots for nor development shall be designed to provide vehiaular and pedestrian connections to adjacent sibs unless as a result of any of the fallowing such connections am not possl0le: 1. Topographic constraints; 2. Existing development patsma on abutting property which preclude a logical comisxdlan; DATE 11.3.15 MEMO PROJECT New Costco Warehouse Central Point e.r.11one PROJECTNUMBER 140393-01 3. Trelllcadf ty concerns; or 4. PmtedionolsignRcantnNuralmaourcee. Response. This Iequlremaint done not apply to Cornice's development In that roads ring IM sift on threat aides and then is no pond to provide connections to adjacent sifts. B. Parking Stall Minimum Dimensions. Standard panting Remove shall conform to the fallowing standards and the dimensions in Figure 17.76.03 and Table 17.75.02. Response As demonstrated In the Site plan, Ce teo's parking lot complies with these standards. C. Access. There shall be adequate prevision for ingress and egress to all parking spares. Response: Then is ads4wft provision for ingress and gnu to all parking spans and areas. C. Driveways. Driveway width shall be measured at the drivesays narrowest point,including the curb cut. The design and construction at driveways shall be as set loch in the Standard Spoelfc9dons and Public Works Department Standards and Specifications. Response: Costco will comply or second the City's minimum standards. E. Improvement of Perking Spaces. 1. When a concrete cum is used ae a wh" stop, It may be placed within the parking space up to two feet from the front of a apace. In such cases, the area between the wheal atop and landscaping reed not be paved, provided It Is maintained with apprepdale ground cover, or walkway. In no event shall the placement of wheel stops reduce the minimum landscape or walkway width requlmeri 2. All sreu utillaed for off-street parking, acciin and maneuvering of vehicles shall be paved and striped to the standards of the city of Central Paint for all-weather use and shall he adamaMy drained, including prevention of the flow of runoff water acreas sidewalks or other pedestrian areas. Required parking areas shall be designed with painted striping or ott a approved method of delineating the individual spares, with the exception of lots containing single-family or two-family dwellings. 3. Parking spaces for ones other than one and two family dwellings shall be designed no that no backing movements or other maneuvering within a street or other public right-of-way shall be necessary. 4. Any lighting used to Illuminate off-street packing or loading areas shall bee arranged as to reflect me light away from adjacent streets or pmpecies- 5. Service chase shall have a minimum vision clearence area forced by the intersection M the driveway conforms. the street right-of-way lire, and a straight line joining ted Ibas through points twenty feel from their Intersection. S. Pending spaces located along to outs boundaries of a parking lot shall be contained by a cum or a bumper hell so placed to prevent a mclor vehicle from extending over an adjacent property the, a public street, public sidewalk, or a required landscaping ante. 7. Parking, lending or vehicle manauvemp areas shell not be located within #0 front yard area or side yard area of a comer lot abutting a sheet in any residential (R) DATE 11.3 15 MEMO PROJECT New Costco Wnehoum Central Point >w•+r one PROJECTNUMRER 140393-01 distinct, nor within any portion of a strut setback area that is required to be landscaped in any commercial (C) or industries (M) district. Response: Costco's site plan, sift fighting plan and landscape plan all demonstrate compliance with these standards. F. Limilatlen on Use of Parking Areas. Required parking areas shall be used exclusively for vehicle puking in conjunction with a permitted use and shall not be reduced or encroached upon in any manner. The parking facilities shall be so designed and maintained as not t0 constitute a nuisance al any time, and shall be used in such a manner that n0 ha rind to persona n property, or unreasonable Impediment to trelflc, will ri Response: Guarico agrees with and will comply with this requirement. G. Parking/Losding Fill Landscaping and Screening. Parking lot landscaping shall be used to reinforce pedestrian and vehicular circulation, including parking lot entries, pedeuden access ways, and parking aisle. To achieve this objective the following minimum standards shall apply, Rowever, additional landscaping may be recommended during the site plan and erchllectural review process (Chapter 17.72). All parking lots shall be landscaped in accordance with the following sandal 1. Perimeter and Street Frontage Landscaping Requiremenb. The perimeter and areal frontage for all pal facilities shall be landscaped according to the standard. eel forth in Table 17,75.03. Response: Costco's site plan and landscape plan demonstrate compliance with this requirement. 2. Terminal and Interior Islands. For parking lots In excess of ten spaces ail rows of puling apace. must provide terminal is minimum of ser feel in width to protect parked vehicles, provide visibility, confine tralficto all and driveways, and provide a minimum of five feet of specs for landscaping. In eddleon, when ten or mare vehicle would be parked Bide -by -s ce, inn singing conhguration, interior landscaped Islands a minimum of sighlfel wide must be located within the parking row. For parking lots greeter than fifty parking spaces, the location of interior landscape inland shall be allowed to be consolidated for planting of large stands of true to break up the sreta of tlM perking lot. The numbw of town required In the InWer Iantlacaps area shall be dependent upon gra location of the parking lot in rotation to the buil0ing and public rlghtrof-way: a. Where the pal lot is located between the building end gra public right-of-way, sere time for every four spaome; b. Whom the parking lot is looted to the side at Me building and Poll abuts the public rlght-oM1way, we Vee for every six specw; c. When the parking lot is located behind the building and Is not visible from the public right-of-way, came Ines for every slight spaces. Response: The provided landscape plan demonstrate compliants with these parking lot landscape deign criteria. 3. 610 -smiles. The use of bioswalee within poking lots is encouraged and may be located within landscape areae subject to Bite plan and wchlhctural review. The been DATE 11.3.15 MEMO PROJECT New Costco Warehouse Central Point .....sane PROJECT NUMBER 140393-01 planting standards may be reduced in areas dedicated to bioswales subject to site plan and architectural review_ Response: As shown in our site pion, landscape plan and civil plans large bio -s ra les am proposed along the northern edge or the site. Costco is not proposing to reduce the tree planting standards In these areas. M. Bicycle Parking. The amount of bicycle perking shag be provided In accordance with Section 17.64.040 and constructed in acoml with the fallowing standards: 1. Location of Bicycle Perking. Rpu oad bicycle parking facgitirw shall be located onake in wall lighted, secure locations within fifty deet of well used entrances and not farther foam the enlranw than the closest eutomobile perking space. Bicycle parking Beall have direct access to bath the public right-of-way and to a main entrance of the principal use. Bicycle parking may also be provided Inside a building In suitable, .or. and accessible locations. Bicycle parldng for multiple uos(such as In a commercial center) may he dustered In one or several locations. 2. Bicycle Parking Design Standards All bicycle parking and maneuvering areas shall be constructed to the following minimum design standards: P. Surfacing. Outdoor bicycle parking fa:llihe. shall be surfaced in the same manner Y a motor vehicle parking area or with a minimum of a three inch thickness of hard surfacing (Is., kernel concrete, payers or similar material). This surface will be maintained in a smooth, durable and well drained condition. b. Parking Space Dimension Standard Bicycle parking spaces shall be st least six feel long and two teal wide with minimum overhead clearance of some feet. c. Lighting. Lighting shall be provided In a bicycle parking area so the all facilities am thoroughly irummosted and visible from adjacent sidewalks or motor vehicle parking lore during WI hours of use. d. Asset. Agve-foot aisle ler bicycle maneuvering shall be provided and malnented beside or between each now of bicycle parking. e. Signs. Where bicycle parking fecllNes are not directly visible from the public fights -of -wry, entry and directional sign. shall be provided to direct bicycle. from the public right-&4veki to the bicycle parking facility. Response: Costco will comply with Central Point's Bicycle standards. 17.75.043 Industrial Building Design Standards. Reserved. (Ord. 1946 (pen), 2011). Response: Although then am no specific Design Standards In the Industrial sones of Cantel Pull Costco believes the plena elevations and perspective drawings submitted demonstrate Costco's commitment to developing 4 high quality building and site. DATE 11.3.15 yEND PROJECT New Cuslco Warehouse Central Point v.ra is area PROJECT NUMBER 14-0393-01 17.76.OA6 Conditional Use Permit • Findings and Conditions. The planning commission in gmntng a conditional use permit shall NM as follows; A. That the site for the proposed use is adequate In sin and shape to accommodate the use and to most all other development and lot requirements of the subject zoning dlatnct and all other provkslons of thia code: Response: Coition believes they Mv* demonstrated through the submitted plans and drawings that the proposed 16.75 some site is adequate In size and shape to accommodate the proposed use and meet all the City's required standards. B. That the a i* has Uq.ate access W a public street or highway and that the street or highway Is adequate in size and candlgon to effectively accommodate the traffic that Is expected to be generated by she proposed use; Response: The submitted Traffic Report indicates that adequate access to public streets, will be provided. And the existing stmt, am or soon will be of adequate size and condition to effectively accommodate Ne traffic that Is projected to be generated by Cosfco. C. That the proposed use will have no significant adverse effect an abutting property or the permitted use thereof In making this determination, the commission shall consider the proposed locution of improvements on ate site; Vehicular ingress, egress and Internal circulation; eaheaks; Height of buildings and structures; Wall. and fences; landscaping; Outdoor lighting; And signs; Response: The submitted plans, elevation, drawings and reports document that there will be no significant adverse effect on abutting properties. D. That cw establishment, maintenance, or operation of the use applied for will comply with local, state and fadand health and safety regulations and therefore will not he detrimental to he health, safety or general welfare of persona melding or working in this surrounding neighborhoods and will not be detrimental or Injurious to he property and improvements In the neighborhood or to the Plowed vwNare of the community based on the review of (hos factor listed in subes alion C of this section; Response: Costco will with bath Ne construction and operation of Meir proposed warehouse comply with all local, ,fete and federal health and safety regulations. Therefore, the proposed development will not be dstr/Ment*/ to the fax/th sefery or immoral welfare of persons melding or working In The surrounding neighborhoods. E. Thal any conditions required for approval of the permit are deemed necessary to protect the public Mafih, safety and general welfare and may Include' 1. Adjustments to lot size "yard rasa as needed to beat accommodate the proposed use; provkled the lob, or yard moo conform to he stated minimum dimensions for the subject zoning distinct, uniess a variance Is also granted as provided for In Chapter 17.13. DATE 11.3.15 MEMO PROJECT New Costcc Warehouse Central Point ran ns PROJECT NUMBER 14-0393-01 Response: Costco doss not believe any adiustrnants to required yards am needed. 2. Increasing street widths, modifications in street designs or addition of street signs or treble signals to accommodate the traffic gerwrated by the proposed use, Response Costco does not baliays any modifications are needed to the surrounding roads or the required improvements to those roads. 3. Adjustments to off-street parking requirements in accordance with any unique characteristics W the proposed use, Response: Control Point's parking requirement for a refoll use, stated as a minimum and a maximum, is 1 parking stall for every 700 at of net floor ane. In Cosine 'a case, the not floor am Is 134,000 sq. ft. which requires 870 parking stalls. Our current proposal is to provide 783 parking stalls which our Parking Demand Study supports. 4. Regulation of points of vehicular ingress and egress. Response Costen believes ingress and pass points should be approved as submitted In the drawing package and no additional regulation should be required. 5. Requiring landscaping, irrigation systems, lighting and a property maintenance program, Responew Costco believas landscape and irrigation plans should be approved as submitted In the drawing package and no additional regulation should he required. 8. Regulation of signs and their locabuns, Response: Costeo Is proposing building mounted signage that Is In excess of the standard permitted by code. For this reason Costco will be submitting a Class C Exception to the signage standard described In CPMC For background and context. Costco and their design fesm have designed a sign package that is integrated Into the design of the building and Is proportioned to match the sule and size of the building. The signs an not too small or too largo in comparison to the scale of the building but they are substantially larger than what Is allowed as standard in the Industrial tons. The largest signs, which ere proposed on fhreo of the four sides, are 381 at.. However, this is In relationship with a wall foi that is over 18,000 of on the long side and over 10,000 if on the short side, in other words, the sign coven less than 3.8% of the smallest wall of the warehouse In total, including the signage an the Fust Facility which has a 21 N sign on each side of the foal canopy, the entire Costco site has 1,455 of of mounted on their buildings. For additional information sea the black and white elevation drawing, DD31-01, for the building DATE 11.3.15 MEMO PROJECT New Costco Warehouse Central Point ,s. eor m PROJECT NUMBER 14-0393-01 mounted signs and the specific Fuel Facility shut, OON-OT, for the gas canopy slumps. 7. Requiring fences, henna, walls, landscaping or other devices of organic or artificial composition to eliminate or reduce the ellects of noise, vibra0ons, orlon, visual incompatibility or other undesirable effects on surrounding pmperiies, Response: Costco does nor ban/eve any additional measures to control noise, vibntlons, colon, visual Incompatibility or other undesirable effects am necessary. 8. Regulation of flme of operations for certain types of uses if their operations may adversely ~ privacy of aleep of persons residing nearby or otherwise world with other community or neighborhood functions, Response: Nem needed. 9. Establish a thne period within which the subject land use must be developed, Response: Nom needed. 10. Requirement of a bond or other adequate assurance within a specified period of time. Response: Nona needed. 11. Sud1 other conditions that are found to be necessary to protect the public heabh, sell and general welfare. Response None needed. Conclusion With the drawings and background information that hes been submitted with this application we believe that the proposed Gorgon development is consistent with the required findings that need to be made to approve this Development Permit application. Please feel free to contact Costco or MUIvannyG2 should you have any questions or need further clarlficalion. Thank you for your time, consideration and assistance in this matter. Respectfully: Siwe Bullock, MO2 nn.aana..rwaaa-sus-m .r as..o..ewz �.,,..o.�e.�..rzvU��ueimmmoe.�smnra v.,.ze zmzsensm se.n er .•„•m. u.oe-vso.. ATTACHMENT"C' Transportation Impact Analysis Central Point Costco Development Central Point, Oregon October 2015 KITTELSON & ASSOCIATES, INC. TRANSPORTATION [NRIN[[RIN•/r LANNINO Transportation Impact Analysis Central Point Costco Development CerWW Point, Oregon rw♦aa/ha sMMm eM&^ weaMabe ssm jQ%u"M Awr sr wren allo*ft4 nc >m oer�ahrawr.y, aa.sM a,aarsassmx paa sraswz halts Mw a.M naaeM, M Roe hats na+rarsaa4re haFarrK arerrawr hadaao,WMe oaiia 20a Cen" .., Gun'. Ov,vawno. - - - - - - - - .-21 boosted.01"IlMarefiedi ..... ... . ............... ....... ................................... ......................... . . .. TABLE OF CONTENTS .. .... .. ..... . . ......................... 54 EMCLANESum mary. ..... ....... ... .. .................. .......... .............. .. .......... .... .. . . .. . ..... . ..... Introduction......_ ....... ...................... ... ........... ...... ....................................... ............................. 14 Projed )aacrIpLion.... 14 Scapaoft. flawn .. . ... . .. . . . ... ............ ........... I. ........ .... ..... ........................ ....... ................. .. 17 Existing CondflJons ............... ....... ...... ......................................... .. ..................... ....... .. .................. 19 1 .............. ...... . ...................... .. 36 Site cordite. and Adjacent Lind USes ........................ ................. ....................... . .... . ........ ... .... 19 Tnernoorim., F.1116es ......... ............... I.I.- ............ . ....... ......... I ...... ........... ...... ........... . ........ ..... ...... ........ . ........ .............. 29 Smdb,Amm nowsuffon . ... .................. ..................... . . .. .................. - ....... .... .. .. — - - - - - - - - .-21 boosted.01"IlMarefiedi ..... ... . ............... ....... ................................... ......................... . . .. abbinS Pavadour TnMcCorafflans.. ....... .... .. I . ....... . .. ...................... — ....... ................ .. .... .. ..... . . ......................... 54 Solemn, HUmea, Arwil.............,._......- . . ......... ..... .... ...... ............. .. ... ... ... ................... . .. .................. ...... 28 Transportation IMpIcL Analysis .................................................................................................. 30 Marine! Road" ont.nianas . ..... ... .. - ............... .......... ...................................................... ......... ....... .. .... ........ 30 PlannedIn-Pmms DemmOoprowes. ... . ......................... . ..... .......................... ................. ........... ... . . ..... . . . ........ 33 11.11AYaw (2016) 5.dW..nd Trmffic C.nMl.n . ....... .... .. ...... ............ ....... ........ .... .... . ......................... 33 I... In. nanmdnn Dwab . as, .................................. . . - ............ - ......................................... .............. ...... . ...................... .. 36 Troonitimnon wdTIp Assiglo,int ......... ......................... ......... . ........................................ .. .................. ..................... .. ... I Hulid-Ydffir (2016) TMI Tr.WC.rdfl.K......... .. ....... .......... .............................. .. .... .................... . ....... ....... .. ................. 41 Tibia ftak Road Acceia Al-barralm - . . . . ................. I ............ I I . ... ..... .. ........................ ............... ................ ... 47 Fotar. Year (20901 Dacawvurd Traffl, Cndftl.na ....... . ......... .................... ...... ........... ..... ................ ..... ........... ..... ................. 51 FMra Year (2=1 Toul TrWc Conoftbr% - .. ............ ...... ....... ......... ................ ............. .. .... .. ..... . . ......................... 54 Fura. Year (ZDM) MoRpatlan ...................... . . ......... ......... ........... ........ .... .... ........................ ..... -- - - .. — - - - - - sal Park" Aistamwi, ............ . ............ ........... 1. ..-1 1 1 . ........ ........... ..................................... I . ..... 1 1-1— ............... .. 99 Conclusions& Findings ............................................................................................................. ... ...... 62 References.............. ........................................ ........................................................................... 68 WF aombun A Wea . LIST OF FIGURES Figure 1. Central Point CoStCOS! Figure2. Site Vicinity ..................................................................... .................. ................................... 16 Figure 3. Study intersection and Lane Configurations ............ ............................................................ 22 Figure 4. Existing FM and Midday Peak HourTraffic Conditions ......................................................... 27 Figure S. Build -Year (2016) Background Traffic Conditions ..... —.1 .......... I ........... ---- ...................... 35 Figure6. Trip Distribution... ....................... ......................................................................................... 38 Figure 7. Site -Generated Trip Assignment .......... ......... . . ................................... .............................. 39 Figure S. Site -Generated Trip Assignment at the Site Acoesses; ..........................................................40 Figure 9. Build -Year (2026) Total Traffic Conditions ............................ Figure 10. Build -Year (2016) Total Traffic Conditions at Site Accesses Figure 11. Future Year (2030) Background TrEffic Conditions ............................................................. 52 Figure 22. Future Year (2030) Total Trallfic Conditions ........................................................................ 55 Figure 13. Future Year (2030) Total Traffic Conditions at Site Accesses ............................................. 57 ..I 0.-NlapnW E...51m� LIST OF TABLES P.x,,Niy ..Whoa Table 1. Existing Study Transportation Facilities and Roadways.........................................................19 Table 2. City of Central Point's Level of Service Standards ............................. .................................... 24 Table 3. Operational Standards for Existing Study Intersections ........................................................ 25 Table 4. Existing PM and Midday Peak Hour Traffic Operations.........................................................26 58 Table 5. Crash Type and Severity (2009 - 2013) at Study Intersections .............................................. 28 Table 6. Build -Year (2016) Background Traffic Operation fieXUftS ......................................................34 60 Table 7. Central Point Costco Dirralopment Trip Generation Estimate .............................................. 36 Table I. Build -Year (2016) Total Traffic Conditions ...................... ...................................................... 42 Table 9. Build -Year (2016) Total Traffic Conditions at Site Accesses ...................................................44 Table Ia. Table Rock Road Access Alternative Compa r1son ................................................................ 48 Table 12. Table Rock Access Operations In Table 12. Table Rock Road Access Pmdictlw Safety Comparison.._..........._.....................................50 Table 13. Future Year (2030) Background Treffic: Operations .............................................................53 Table 14. Future Year (2030) Total Traffic Operatlom ........................................................................ 56 Table 15. Future Year (2030) Total Traffic Operations at Site Accesses ............................................ 58 Ts ble 16. Typical Peak Parking Demand at Other Costco Warehouses In Oregon ..............................60 Table 17. Central Polm: Costco Recommended Patti rig Supply ............................................ .............. 60 rxW,.. a Ina/ ,I- amN.rnmrra.xoon.4.� 1 APPENDICES Appendix A— Fsdsting Count Data Appendix B — level of Service Descilption Appendix C— Existing Traffic Operation WorkslsMs Appendix 0—Crash Dale at Study Intersections Appendix E — Build -Year (2016) Background Traffic Operation Worksheets Appendix F — Bake Year (20%) and Future Year (2038) Agiorul TnWel Demand Model Appendix G—Build-Year (2016) Total Traffic Operation Worksheets Appendix H —Build-Ynr (2016) Mftipted Traffic Operation Worksheets Appendix I — Future Year (2030) Background Traffic Operation Worksheets Appendix J — Future Year (2030) Totol Traffic Operation Woduheah Appendix K— Future Year (2030) MB10ted Traffic Operation Worksheah m ,eea �Jof_ as bvnanuuNw W. Section 1 Executive Summary CenM1d PoMr Caettv Ce,ebprcnr F,Iw•uMe Summery EXECUTIVE SUMMARY 'g '#t1W6 XWberMIS Costco Wholesale is proposing to develop a new warehouse and fuel station located station located In the southwest quadrant of the Table Rack Rood/Hamrick Road intersection in Central Point, Oregon. This report summarizes the evaluation of the transportation impacts of the proposed development and provides recommended mitigation measures to accommodate its development. The analysis and evaluation completed for the Central Point Costco development resulted In the fallowing findings: Project Description • Castro Wholesale is proposing to develop a new warehouse and fuel station located in the southwest quadrant of the Table Rock Road/Hamrick Road intersection in Central Point, Oregon. o The development plan includes a 160,000 square -foot Castro warehouse and a 24 fueling position Costco Gasoline fuel station. This new Central Point Ccstco will replace the existing Medford Costco located at 3639 Crater Lake Hwy in Medford, Oregon. • The parcels of land that in which the proposed Costco would occupy are zoned as M-1 (Industrial) which allows the development of the Costco warehouse and fuel station with a conditional use permit (no land use or zoning changes are required). • In order to hest evaluate the anticipated transportation characteristia of the proposed Central Point Costco development, it was agreed that the Costco -specific date he used to most accurately represent the anticipated traffic characteristics of the unique development type. • The proposed Costco development n estimated to generate a total of approximately 10,670 net new trips on a daily basis, 900 net new trip ends during the weekday p.m. peak hour and approximately 1,365 net new trip ends during the weekend midday peak hour. • The distribution pattern for site generated trips was developed using zip code data from current memberships at the existing Costco warehouse located on OR 62 (Crater Lake Highway) in Medford, Oregon, as well as from the existing traffic patterns and major trip origins end destinations within the study area and the regional travel demand model. Embating Conditions • The study evaluated 12 off site Intersections in addition to site access points. • The study evaluated two time periods for each evaluation scenario: weekday p.mpeak hour and weekend midday peak hour. rrwwn a bercl•ta Mr. cowl Porn r ro.rco u..kpn.nr e�.,m. su,mm•ry Pent01S am 2ms • Based on recent traffic counts collected in May and July 2015, all of the study Intersections were found to operate at acceptable operating standards during the existing weekday p.m. and weekend midday peak hours except for the Table Rock Road/Airport Road intersection during weekday p.m. peak. o The Table Rock Road/Alrport Road Intersection is stop controlled in the westbound direction. Under existing conditions In the weekday p.m. peak hour, there is high delay for the critical movement (westbound left -turn) resulting In LOS F. • Crash data the most recent fie years (2009 — 2013) at all of the study intersections was reviewed to identify historical safety trends. o Turning movement and rear -end crashes were the most common crash type at the intersections, accounting for approximately 82%of all crashes. o There were no fatality crashes. o Four study Intersections were found to be in the 90th percentile and in compliance ODOT's SPIS: 1-558 Ramps/E Pine Street, Table Rock Road/W Was Road, OR 62 (Crater Lake H[ghway)/Y/ Was Road, and Table Rack Road/OR 99. guild Year 2016 A ealysia • The transportation impact analysis ewluated two different future year scenarios: year 2016, the assumed build out year of the development, and year 2030 a long -tens planning year. • The 2016 build -year background traffic analysis (without Inclusion of the project traffic) found that all of the study Intersections are forecast to operate at acceptable levels of service and volume-to-capactty ratios during the weekday p.m. and weekend midday peak hours except for the Table Rock Road/Airport Road iMerwctlon during weekday p.m. peak hour. o As under existing conditions, during the weekday p.m. peak hour there is high delay for the critical movement (westbound left -turn) resulting in LAS F. In addition, the critical movement is also operating with a volume -to -capacity ratio of greater than 0.95 In the build year (2016) background conditions (with no traffic from the proposed Costca development). • The build -year 12016) total tragic analysis(wfth inclusion of the project traffic) found that all study Intersections will continue to operate at acceptable krsels of service during the weekday p.m. and weekend midday peak hours with the exception of: o 1-5 NB Ramps & East Pine Street exceeds COOT standards (lane group v/c ratio s 0.85) with the northbound rlght-tum lane group's v/c ratio of 0.87 during the weekday p.m. peak hour. The need for additional capacity for this northbound right - turn movement hn been previously identified In the Final Draft [AMP: Exit 33 study which rails for the widening of the 1-5 northbound off -ramp to add a second right - turn lane at the northbound approach to East Pine Street. ODOT and the City of amort s a„o�mro, mr. a�r,alaomr wrco o..�v„K�r vyecir 15016 a reals Central Point are currently in discussions to determine Costco's appropriate proportional fair share contribution to this improvement as mitigation for the site generated trip Impacts. o Table Rock Road & Airport Road, as under existing and 2016 background conditions, continues to operate at a LOS F during the weekend p.m. peak hour. Improvements to the Table Rock Road/Airport Road intersection arc scheduled in year 2017 as part of Table Rock Road widening and a signal will be added to the Intersection. Th's Intersection is an existing deficiency; however, given that this Improvement is not currently scheduled until 2017, Jackson County and the City of Central Paint are currently in discussions to determine an appropriate contribution to this improvement as mitigation in the Interim for the Costco project. o Biddle Road & Airport Road experiences a higher delay tar the critical movement of the westbound approach, dropping from LOS C to E during the weekday p.m. peak period due to site -generated traffic. Even with the site generated traffic, the intersection is operating at a very low volume -to -capacity, ratio of 0.45 in the weekday p.m. peak hour and 0.141n the weekday midday peak hour. Site Access Ana/ys/s In the build year 2016 scenario, all site access Intersections are projected to operate at acceptable levels -of -service and volume -to -capacity, ratios during both the weekday p.m. and weekend midday peak hours, with the exception of the Table Rock Road/Northeast access. Note this is assuming this access is a full movement access and no Improvements to Table Rack Road are completed. Under this scenario, the critical eastbound left -turn movements at the Table Rock Road/Northeast access Is projected to operate at LOS F during the weekday p.m. peak hour, however, It Is still projected to operate well under capadty and meet the County's operational standard. Even though the build year (2016) analysis showed that all of the site accesses will be able to operate as proposed upon site opening before the Table Rock Road improvements art constructed, an evaluation of access alternatives for Table Rock Road was also completed to compare haw temporary improvements would impact the access operations in the interim. a The access scenarlos compared were: o Build Year (2016) Total Trafflc Conditions (Le., Full Access to Table Rock Road) with No Table Rock Road Improvements pas summarized above) o Build -Year (2016) Total Traffic Conditions with Temporary Table Rock Road Improvements (I.e., temporary widening of Table Rock Road along the site frontage to provide a center left -turn lane untll the ultimate widening project is constructed) n.. a su 6.1 me RnMlValnt U,2o CeMopmen[ Elrt[uAb6un�niory P.jnta PA96 IXr WNas o Build Year (2016) Total Traffic Conditions with Restricted Right-In/Right-Out Site Accesses (restrict Table Rack Road across to right-in/right-out only untll the ultimate widening project is constructed) The access afternatives evaluation found that: o Assuming full movement access and no improvements to Table Rock Road, the eastbound left -turns at the northeast access to Table Rock will experience relatively long delay (resulting in LOS F) but the access will still operate well under capacity and meet the County's operational standard during the critical time period. o Providing temporary widening along the site frontage to provide a temporary center turn Lane will allow all Table Rack Road accesses to operate acceptably as full movements until the ultimate Table Rock Road widening improvements are constructed in 2017. a Restricting the site's Table Rock Road accesses to right-in/right-out only will allow those accesses to operate at acceptable levels of service and volume -to -capacity ratios. However, It will add additional left -turn movements at the Table Rock Road/Hamrick Road intersection thus resulting in ovenccapacfty and LOS F conditions at that local This Impact could he reduced by adding temporary widening around the intersection to provide a northbound left -turn lane as well as a center refuge area north of Hamrick to allow vehicles turning left from Hamrick to make a two stage gap acceptance maneuver for the left -turn. o Once the ultimate Table Rack Road widening improvement is constructed in 2017, all site accesses to Table Rock Road will operate a good levels of service (LOS C or letter) and volume -to -capacity ratios (v/x0.21 or better) during the peak hour periods assuming they are full access movements. From a safety perspective, a predictive safety analysis found that: o Providing full movement accesses to Table Rack Road In the near-term with its current two lane configuration shows the probability for 1.2 crashes per year to occur combined at the two access points. o If these were restricted to right-in/right-out only driveways, the safety prediction lowers to a probability of 0.83 crashes per year (about a 30% decrease in probability). o If temporary widening was provided In the Interim for a two-way left -tum lane along the site's frontage, the probability would lower to 0.76 crashes per year (about a 30% decrease in probability). o The safety predictive analysis also shows that once the ultimate Table Rock Road widening Improvements are In place the safety prediction lowers as well to 0.77 crashes per year even with maintaining full movement accesses at both locations. pnehon a imcnora, Inr. IXnf/ol iolnf[aftto Ce�ebpmenf F•RYtlMSummNy Future Year 203OAnolysls FmJRra19aos ORv rus The future year (2030) background conditlons analysis (without the project traffic( found that all study Intersections will continue to operate at acceptable levels of service and volume-ta-capacity ratios during the weekday p.m. and weekend midday peak hours with the following exceptions: 0 Hamrick Road & East Pine Street operates with a v/c ratio of >1.0 during the weekday p.m. peak hour o Biddle Road & Airport Road (as under the build year conditions) has a critical movement which operates at LOS F during the weekday p.m. peak hour although the movement is still operating under capacity with a v/c ratio of 0.55 • The future year (2030) total traffic analysis (with the project traffic) found that the site - generated trips did not impact any study intersections not previously Identified in the 2030 background scenario. • All of the proposed site accesses operate at acceptable levels of service during the weekday p.m. and weekend midday peak hours under the future year 2030 total traffic scenario. Because of the planned roadway improvements along Table Rack Road, there is a significant benefit to the traffic operations at the site accesses along Table Rock Road when compared to the build -year (2016) total traffic scenario. Parking Assessment • City of Central Point Municipal Code directs that a parking supply of 670 parking spaces be provided for the Costco development (assuming retail land use). • The project is proposing to provide a total of 782 parking spaces on site. • As part of this report, a parking demand analysis was completed to demonstrate and documents justification for the proposed Increase in parking supply. • Actual parking supply and demand data from other Costco sites in Oregon indicates that a minimum parking ratio of 4.71 spaces/1,000 sq -ft he provided In order to supply enough parking to meet Costco specific demands. • Applying the demonstrated minimum parking supply of 4.71 spaces/1,000 sq -ft to the proposed Central Point Costca development equates to a minimum recommended parking supply of 753 spaces. • This indicates that the proposed parking supply of 782 is slightly higher than this minimum amount but within a reasonable range and will provide an appropriate parking supply to accommodate typical peak perlods as well as additional spaces for seasonal peaks as well. ~..a Nr xxx'l1a Section 2 Introduction CmrMvvmrmerco oeMapnenr vmrmta]9era muvduuoo nmx.aus INTRODUCTION Rittelson & Associates, Ina (RAI) has conducted a Transportation Impact Study (TIS) per requirements of City of Central Point's Zoning Cade Section 17.05.900. The TIS examines the current transportation network and addresses the transportation Impacts of the proposed Costco Wholesale development in Central Point, Oregon. The scope, methodoiogy, and key assumptions within the TIS were reviewed and agreed upon by the City of Central Point, Jackson County, and the Oregon Department of Transportation. In addition, the City of Medford was given the opportunity to review and comment on these elements (although no comments were received). PROJECT DESCRIPTION Costco Wholesale is proposing to develop a new warehouse and fuel station located roughly one mile southeast of the Interstate 5 (1-5) & Pine Street interchange In Central Point, Oregon. The site is located In the south-west quadrant of the Table Rock Road/Hamrick Road Intersection. The development plan for the 13 -acre site includes a 160,000 square -foot Castro warehouse and a 24 fueling position Costco Gasoline fuel station. Currently, the site is undeveloped, The development is planned to be completed and operational by October 2016. This new Central Point Costco will replace the existing Medford Costco located at 3639 Crater lake Hwy In Medford, Oregon. The project site plan with access driveways to each of the bordering roadways h illustrated In Figure 1. Project Location The proposed site is situated south of Hamrick Road between Table Rock Road and Federal Way as Illustrated in Figure 2 . Table Rock Road serves as the eastern boundary of the site. The property south of the site is currently owned and operated by FedEx Ground. The land use directly south, west and north of the site is designated as M-1 (Industrlal) and M-2 (Industrial General) as referenced in Central Point Comprehensive Land Use Plan 2008-2030 (Reference 1). The Costco development Is an allowed use under the industrial zone designation with a conditions use permit. Costco Trip Generation Characteristics Before and after data from other comparable Costco sites was reviewed to determine a representative trip generation estimate for the development. Based on a 160,000 square foot warehouse and a 24 - position gasoline facllity, the proposed warehouse and fuel station is estimated to generate 10,670 net new daily trips. Of those trips, 900 net new (445 Inbound, 455 outbound) trips and 1,365 net new (695 inbound, 670 outbound) trips are expected to occur during the weekday p.m. peak hour and weekend midday peak hour, respectively. nroron• Auotlane, sent �� .-r. r.IA r.]f....rv1fJ rk6I mu SITE PLAN I FIGURE CENTRAL POINT COSTCO 1 CENTRAL POINT, OREGON Krt rticox 8 Az]oQME]. IxC P�RUJECT DATA SITE PLAN I FIGURE CENTRAL POINT COSTCO 1 CENTRAL POINT, OREGON Krt rticox 8 Az]oQME]. IxC W1,0 Pohl Corm 0.wbpm•nt mbvlutlan SCOPE OF THE REPORT This report evaluates the following transportation issues: P,m omnas 0.YoW"13 • Existing roadway, land -use and transportation system conditions within the site vicinity during the weekday p.m. and weekend midday peak periods; • Planned deuelopmentsand transportation improsementsfor area surrounding Cosuo; • Build -year 2016 background (existing traffic counts plus background growths traffic conditions duriry the weekday p.m. and weekend midday peak periods; • Costco trip generation, distribution and trip assignment estimates for the proposed development; • Build -year 2016 total (build -year background plus site -generated trips traffic conditions during the weekday p.m. and weekend midday peak periods; • Build -year 2016 mitigations to study Intersections impacted by siteienerated trips during the weekday p.m. peak hour and weekend midday peak hour, • Future year 2030 background (build -year 2016 background plus 14 yam of regional growth) tmMlc conditions during the weekday p.m. and weekend midday peak periods; • Future year 2030 total (future year background plus s"nerated tnpsl traffic conditions during the weekday p.m. end weekend midday peak periods; • Future year 2030 mitigations to study intersections impacted by site -generated trips during the weekday p.m. peak hour and weekend midday peak hour, • Operational and safety assessment of the proposed site aconsa Including the Table Rack Road/Hamrick Road intersection) during the weekday p.m. and weekend midday peak hours during build -year and future year total tra fic conditions. • parking assessment for Costco site; and • Conclusions and Mndlrys. /) Ill¢4ona Mvrclow, I� Section 3 Existing Conditions eenml romr emrco o=Kroam.ne vmpaxrddas GIAInp CanOlno,u IXmberlln5 EXISTING CONDITIONS The existing conditions analysis identifies the current site conditions and operational and geometric characteristics of the roadways within the study area. These conditions will be compared with build - year (2016) and future year (2030) conditions later in this report. KAI staff visited and inventoried the proposed Central Point Costco development site and surrounding study area In May 2015. At that time, KAI collected information regarding site conditions, adjacent land uses, and transportation facilities in the study area. In addition, existing traffic counts at the study Intersections were collected in May and July 2015. SITE CONDITIONS AND ADJACENT LAND USES The proposed site is located roughly one mile southeast of the Interstate 5 (1-5) & Pine Street interchange In Central Point, Oregon. The land uses In the vicinity of the site arc light Industrial to the immediately west and south of the site, general industrial immediately north ofthe site and tourist and office professional, as well as low and medium density residential, north of E Pine Street/Biddle goad. The parcels of land that in which the proposed Costco would occupy are toned as M-1 (Industrial). The M3 zoning designation allows the development of the Costro warehouse and fuel station with a conditional use permit. No land use or zoning changes are required for the Costco warehouse and gas station at the proposed site. TRANSPORTATION FACILITIES The transportation system Inventory Identifies the current characteristics of roadways within the study area. Major roadways within the study area were identified and catalogued. Table 1 provides a summary of the existing roadway facilities included in this study. Table 1. Existing Study Transportation Paellitim and Roadways 1-5 "P, Rural In"e am 2 3045 M No No Pine st mi., Rrtetlal 4 3545 Partial Yas Na Penirye Rd MdorcolleRor 2 35-30 FmWI Tea No Namtlo, Rd local 2 30 PMIRI No No fMealWry Local 2 30 No No Na bbl. Rao, Rd Minor Artedai 2-4 30-05 Partial No Partial Bldde Rd Mbwr Arletlal 4 45 Pirtle Paral No VIIxi Rd Minor Mmlel 2 45 Yrs No No airport Id tont 2 35 Partld No Pxtlal Xelec PareOorTnnK1151 mpM1 npnrnh mlW prM1our 10 xl..,AA-1.Ns.mc (�ntml Fain! OVKo 0etebpmMt E<iraFO4ndlxou vmenxrmvs m•ee.lais Roadway Facilities The roadway network in the study area is comprised of an extensive street system made up of arterial, collector, and local roads. The roadway facilities within the study area are described below: • The 1-5 Northbound and Southbound Ramps provide entry and exit accesses to/from the Interstate. Interstate 5 extends from Southern California to the Washington -Canada border. The ramps provide access to Pine Street In both directions an the west side of the study area. • Pine Street -Biddle Road is a five tare roadway running east/west through the center of the study area. The roadway is named Pine Street west of Hamrick Road with a name change to Biddle Road east of Hamrick Road. Both segments are classified as minor arterials. The roadway is a five lane road, including two lanes in each direction and a center turn throughout the study area. There is no on -street parking on either side of the street. Bike lanes extend from the 1-5 Southbound Ramp to Table Rock Road. The posted speed Is 35 tulles per hour between Hamrick Road and 1-5 south ramp and 45 miles per hour between Hamrick Road and Airport Road. • Peninger Road is a 2 -lane, major collector, serving as a frontage road running parallel to and on the east aide of 1-5. The facility serves a variety of commercial and recreational businesses. There arc bike lanes both north and south of the Peninger Road/Pine Street Intersection and sidewalks mouth of the Intersection. Northbound from the intersection the roadway has a posted speed of 30 miles per hour and 25 miles per hour In the southbound direction. • Table Rack Road ranges from 2-5 lanes and runs north(snuth throughout the study area. The roadway has two lanes south of Biddle Road, and Is a five lane road with a center turn lane north of Biddle Road. Both segments of Table Rock Rad are minor arterials. The only on -street pdrking Is provided or, the east side of the roadway for a 0.15 mile segment north of Airport Road. The segment north of Biddle Road has sidewalks on bath sides of the roadway until Was Road. The posted speed is 30 miles per hour between Airport Road and Hamrick Road, and 45 miles per hour north of Hamrick Road. • Hamrick Road Is a 2 -lane roadway that will service two Costco access driveways. Hamrick Road Is a local road providing access for Industrial companies such as Reddaway and Knife River Materials. There Is no on street parking or bike lanes, however there are segments of sidewalk on both the north/south and east/west sections of the road. The posted speed Is 30 miles per hour throughout the study area section. Directly north of the site, between Table Rock Road and Federal Way, the roadway consists of a 3 -lane cress section with a two-way median turn lane. • Federal Way is a local road that currently serves FedEx Ground at the southern end of the roadway. There are two proposed access points along Federal Way. There Is no posted speed sign an this segment, nor are there pedestrian or bicycle facilities. 20 ammo' xtmtbm, me [enrmleomrr�rcn oe.emomem rmlKrx]Wa6 ru.u,v [o.ana.. atax.zms Airport Road is a local 2 -lane road, servicing bath commercial and industrial businesses. Airport Road does not have on -street parking, or bike lanes, however there Is a sidewalk an the north side of the roadway. Transit Facilities Rouge Valley Transportation District (RVTD) is a public transportation service provider, providing paratransR and fixed -route bus service within Jackson County. RVTD's central bus station is located in downtown Medford, providing eight fixed -route bus routes servicing the cities of Ashland, Central Point, Jacksonville, Medford, Phoenix, Talent, and White City. RVTD's Route 40 provides weekday service between Medford and Central Point with stops along East Pine Street west of 1-5. However, Route 40 does not have any stops within the vicinity of the proposed Costco site. There are no fixed-hus mutes or stops within the vicinity of the proposed site. STUDY AREA INTERSECTIONS The City of Central Point has completed several studies of transportation needs in partnership with Jackson County and ODOT. The City of Central Paint's 2030 Transportation System Pian (Reference 2) offers a comprehensive assessment of long-term transportation needs within Central Point. In addition, ODOT recently completed an Interchange Area Management Plan (TAMP) for the 1-5/Eost Pine Street Interchange (Reference 3). In addition, the Jackson County TSP is currently being updated (expected adoption in October or November 2015). Recognizing the long-term transportation needs, this TIA focuses an the analysis of study intersections within the site vicinity of the proposed Central Paint Costco site. Rased an knowledge of the transportation network within the site's vicinity and a previous coordination meeting with the City, County and COOT, the following 12 study intersections were Identified for Inclusion in this report: 1. 1-5 58 Ramp & East Pine Street - (traffic signal) 2. 1-5 NR Ramp & East Pine Street- (traffic signal) 3. Peninger Road &East Pine Street -(traffic signal) 4. Hamrick Road &East Pine Street - (traffic signal) S. Federal Way & Hamrick Road -(unsignalixed intersection) 6. Table Rock Road & East Vila, Road - (tha is signal) 7. Table Rack Road & Biddle Road -(traffic signal) B. Table Rock Road &Hamrick Road-(unsignalixed intersection) 9. Table Rack Road & Airport Road - (unsignalixed intersection) 10. Biddle Road & Airport Road - (unsignalixed intersection) 11. Table Rock Road & OR 99 (North Pacific Coast Highway) -(signalized intersection) 12. OR 62 (Crater Lake Highway) & E Vilas Road - (signalized intersection) The study Intersections and their traffic control and lane configurations arc Illustrated In Figure 3. KM 's avoe '.. � -RIW' WlnSCTEIE �-Ea..�.Efvewnui n�wusa.EEWE mEEET • \ , f aiewEnow..wvniaro • �M Vlr �sxe auva.EniasTaEEr • 3 ,r L R'ilVI WY\iuEw�IOID rremiwoEw� • �N f vr( rBY(611E1M].E VWEBfII£1 • TMLE m1ELW E W V W I1gO • ' Ali ' Y r.e�e m row.uwart�um • A r r STUDY INTERSECTIONS AND MME FASTING LANE CONFIGURATIONS 3 CENTRAL POIWr. OREGON emoiwmrresu•rxwa*•�e orolreeM]aJas r„en�a m.,vxa,. ame�zms Data collection at these twelve intersections included turning movement counts collected during a typical weekday (Tuesday through Thursday) p.m peak perlod (4:00 p.m. — 7:00 p.m.), and weekend midday (12',00 p.m. — 100 p.m.) peak period. In addition, existing lane geometry was documented, including turn pocket lengths, as well as pedestrian and bicycle facilities and the presence of trunsitand transit amenities. For signalized intersections, KAI obtained traffic signal timings from ODOT and the City of Central Point in order to correctly model and analyze each intersection. Appendix A" includes the existing weekday p.m. peak period and weekend midday peak period counts at each of the study Inteneztions. In addition to analyzing the 12 study Intersections, the proposed site plan Includes six new driveways to access the site, each of which will be analyzed In accordance to the roadway jurisdiction it is located. As shown in Figure 1, the six proposed site access include: • Northern full -access driveway located on Federal Way; • Southern full -access driveway located on Federal Way; • Eastern Hamrick goad driveway right-in/right-out access; • Western Hamrick goad driveway full -access (full access); • Northern full -access on Table Rock Road; and • Southern full -access on Table Rack Road. More information about the performance of these site accesses, as well as the assessment of access alternative scenarios, is provided later in this report. INTERSECTION OPERATING STANDARDS Thr nperating standards of four jurisdictions were used to assess the operations of the 12 study intersections based on their respective location. The four Jurisdictions are- City of Central Point, City of Medford, Jackson County, and Oregon Department of Transportation. City of Central Point Operating Standards Central Point uses performance standards based on level of service (LOS). All LOS analyses described in this report were performed in accordance with the procedures stated in the 2000 Hlphway Capac;tY Manual (HCM 2000) (Reference 4) as required by the City of Central Paint's 2030 Transportation System Plan. HCM 2000 defines LOS as a quality measure describing operational conditions within a traffic stream, generally In terms such as speed and travel time, freedom to maneuver, traffic Interruptions, and comfort and convenience. When analyzing traffic conditions, LOS Is used as a measure of performance (corresponding to delay) at an intersection with values ranging from LOS "A", Indicating goad operations and low vehicle delay, to LOS "F", which Indicates an intersection at, or over capacity with high vehicle delay. Table 2 provides the City of Central Point's LOS standards for signalized and unsignalized Intersections. The Citys policies require Intersections to operate at LOS D or better. A description of Level afservim and its criteria is presented In Appendix "g". amprvomr m'n r..ron ' r,olnr rssava rx.oa c-dit r a.m 'zass Table 2. City of Central Polot's Level of service standards n aQ.d. alaaamd. a so-zoam�e. so-ts.ranm c a1-35.coda ]Yl5 wcw 0 3S3s.t 25-35..nd. E 55-40 amnes 35-00—W. F SW ]tt .W Sv[ Jackson County Operating Standards The acceptable motor vehicle performance standard for signalized and unslgnalized Intersections per Jackson County Transportation System Plan (Reference 5) is a volume -to -capacity ratio (V/C Ratio) no greater than 0.95 within the boundary of the Metropolitan Planning Organization and 11.85 outside of the MPO boundary. Each study intersection is within the Rogue Valley Metropolitan Planning Organization (RVMPO) boundary. Therefore, intersections falling within the County s jurisdiction will he assessed assuming a VIC ratio standard of o.95. ODOT Operating Standards ODOT operates and maintains the study intersections for the ramp termini of 1-5. ODOT's operating standard for interchange ramps Is a maximum V/C ratio for the ramp terminal that is more restrictive than the V/C ratio for the crossroad, or 0.85 as identified In the COOT OHP Policy IF Revbions (Reference 6). For signalized Intersections an arterial roads under ODOTjurisdiction, the V/C ratio must he no greater than 0.95. At intersections where one or more approach" Is maintained by a city or ODOT, the more restrictive of the agency's performance standard will be applied as stated in the Jackson County Transportation System Plan. Intersections within the City of Central Point and the City of Medford limits will be assessed assuming ODOT operating standards must be met. Study intersections which have governing agencies for more than one approach Include OR 99/Table Rock Road and OR 62 (Crater take Rwyj/East Villas Road intersections. Based on the direction from the Jackson County Transportation System Plan, ODOT's operating standards will be applied when analyzing these locations. Table 3 summarizes the intersection operational standards and Jurisdiction administering associated with the existing study Intersections. Central Point Street Jurisdiction Mop (Reference 7) was used to determine the jurisdiction of each study interaction. pfnUan ant .."l— cmmn romt m,lco oaraap,ene F o-wp andldory Table 3.Oparatloltal Standards for Existing Study Intersections Pmleafar91146 orbbe.2ms 1 1-5 s9 awnp a E Rae sc 0om smamne nvup V/r so.as ] 1-5 Me Ramp a EPlnst 000T slemmen Lane ynup Y/C sodas 3 PenlnRr Rd a E pule sL Marl, County si,R,WRd 0.95 vic 6CRg 4 Namdck ad Pin sr CGnbal Polnl sanalued v/C s 0.95 a4 LOS o or better 5 FedenlWryaNamdd RJ C.u,, C"f CmPuine suY std,"Icvnerol do enlWry v/c s 0.95 and LOS o ar t r 6 Tabu Rad Rd a E YIW Ad Count, SenelheE Vic 50.95 1 Tatu Rod Rd a addle Rd Count, Sentrud V/C S 0.95 a Tau. Rock Rd a Hwrld Rd County Step film., co Hamdk v/c suss 9 Tatle Ruck Rd a ARd Counq•Clp'al Cannot Pnlnt sbO".o, . vn AlNirport v/Cs oss oRd LD50 or ostler 30 alddla Rd a AlrportM (It, cf Madrard Tapwa{sbp L0.50 oruaaer ll Toole flock Rda0RW OOor, ccuncy slmandad V/C50as 1] aR62(C.r1ake Hwy)MV1Rd Ad uO ,County WaRad v/[sdss EXISTING PEAK HOUR TRAFFIC CONDITIONS Existing peak hour traffic operations were analyzed for a typical weekday (Tuesday — Thursday) p.m. peak period (4:00 p.m. to 7:00 p.m.) and a weekend midday (12:00 p.m. to 3:00 p.m.) peak period. Existing turning movement counts collected in May and July 2015 were used in determining the existing operating conditions at each of the study intersections per jurisdictional standards. Figure 4 provides the intersection turning movement counts and summarizes the Intersection operational results for the existing weekday p.m. and weekend midday peak hour traffic mnditluos. As shown in Figure 4 and in Table 4, all of the study Intersections operate at acceptable operating standards during the existing conditions weekday p.m. and weekend midday peak hours except for the Table Rock Road/Airport Road intersection during weekday p.m. peak. The Table Rack Road/Airport Road intersection Is stop controlled in the westbound direction. Under existing conditions in the weekday p.m. peak hour, there is high delay for the critical movement (westbound left -turn) resulting In LOS F. Appendix "C' Includes the traffic operation worksheets for the existing tmfflc conditions scenarios. dM4an 4 Navcluh; Inc. seoNolPoml cmrca xurwomem P.elwa cnmm�w Table\. Exinin( PM and Midday PeakNwr TrekSk Operabana Pro/eCt a l$ds ameerzms 1. H]e pame YEaY[pine5[rttt pM Pqk ♦ 9.i 015 (](pI _ MO B ]93 0.41 3. LS NB Papp\Fart Pine S~0.1P_p_ Ilk C i16 061 �[ Ml. keit pMk 0 M4 _ 0,41 061 3. Pntlger0wd 8 fta Pim 51ma lumY.DM rM.k a E ]44 M6 4. NamMkSwdi Eael Plne Slrtrt PMPeek { 36k 0.39 0.n COOnry, [hy _ _ NID� 0 161 O.0 S. Fdenl Wry A, NamiMk Pmd PN Pak Noa.. • ka am {anly,Dry MIDP WaW w A 15 aType Sodaaad IIYaa Pwd MrSPeak C WI _0.M 081 _ Cwµp MO Paak C ID.6 OSl ). Taek Pa}kwd\Elddk aad PM Peak C 30. 0.14 CainY MIDPkak C_ ni 034 fl Tatlepod OeadII WMdAwO _ %NpW FegLouM _ C 315 am GUNp MOPNk EiOMuM 5 li.] 001 9. Tatle Onk Ewd\Mp rtpmd PMA kepkNee/ f ll.l U Calkp _ MN)P0 C 158 _ 630 WA, 1D Bekeed A ,ry koad 4YM A1P�k waam epbud C R1 _ 0X wmad NMwr w.mmna 0 w9 It iEYepW Owd\Q193 ODDf. _ 1M hak C a1— LL]i an ____ — MIOPgk C _ I3L DR 13,MUAbNNbkPWd _ _CwnM_ _ WOi _ MIA0 4e3 0!1 CpunM1 WDp C 30a 0./1 Mnn: ikr uMWlmwernen[brewrledlp all umwyhndbVVlMSs haW mlM lGD K90wW Eb�IryMwrlo0 lC6atwtl IXLM¢; .1, b rrywlad b bmrde px veNkk: r V/C pa lb b 4RW a �-m nC -T okuhtea Ne w W Mi dM fryI .1m W tw madlraWlnkme WplMe tlw Pea 3]mM.b al ft paRbv; xd MIaeI4RaYdalamYbselonWmYnkbb+b jnrlpeed ,kanmtde_ a km m, a avwlom, ln.. � ®M�Y�{EPWE911@� N •tel Ww'1YIE� I I %l� p w rewvE{ Ew<arwEr YriwrrYwa.rr Errb Er Wwn wP+,w� wr.�Wlrr I cm"w vwmcwem ayemvmenr vmkca3waa e,na,p rmarnw, amaerlcls SAFETY HISTORY ANALYSIS Crash data available for the most recent five years (2009 — 2013) at all of the study Intersecdans was provided by OOOT. Crash data was analyzed to document recent crash types and severity at study intersections and Identify crash trends lf applicable. In addition, study intersections were screened for compliance with ODOT's Safety Prior" Index System (SPISI and 900 percentile rates using the HCM prediction model. There were no reported crashes atthe two of the study intersections: • Federal Way & Hamrick Road • Table Rack Road & Hamrick Road In total, there were 192 crashes between all of the study Intersections within the five year study period. Table 5 provides the reported crash type and severity at each of the study intersections. Appendix "D" includes the five year summary of crash data at each of the study lntersectlons- ToblaS,Craah TypoandS ity(Za09-2013)at$tady In�a am I.Ha Wr/ePM! a 5 0 0 i 0 1 a ] i.l-alaaaRaa/e 11MA > u 0 1 1 0 1 6 is 3.aaRlrP Mdm1 k 3 a 0 1 0 0 a d 6 71. a. Y "RC/am it 1 u o 1 o a a 0 a 19 li s.r. ft!rlw eft a 0 a a o a o V fti 11 12 5 0 0 0 3 1] 11 ZIMIWaR5dwaa M ] 3 0 0 0 0 0 5 5 aTwwwRallrrAar 0 0 1 9 9 15 0 0 5 1 0 0 a 0 0 a o 0 o a a 9. Taaa ll•b N/Kavt Ra 3 3 17 13 0 0 3 C 0 0 0 3 1 0 5 10. IIY rAtAlr Pa Re a.T+l• "M ]O. TrAaw9 Re/Qr sa 0 1 5 a 0 a 16 11 0 L 3 1 0 1 1 19 16 0 a TOPa fl a 13 • 5 1 a A a 0 fA NOM:'PMProwwLY mm ty: PI•Penonall0l*N Turning movement and rear -end crashes were the most common crash type at the intersections, accounting for approximately 82% of all crashes. Roughly half of the reported crashes were Injury crashes. There were no fatality crashes. Four study Intersectlons were found to be In the 901" percentile and Incompliance ODOT's SPIS. The four intersections include: • 1-5511 Ramps/E Pine Street, • Table Rack Road/W Was Road, • OR 62 (Crater Lake Mighway)/W Was Road, and • Table Rock Road/OR 99. ze nro-w�aawrwM, mr. Section 4 Transportation Impact Analysis ![nVd POMICmKO CINk{mn! /rq'h1NlA^OG lravraMMm lmp[e Nwryr4 2mler IDlS TRANSPORTATION IMPACT ANALYSIS The transportation impact analysis identifies haw the study area's transportation system will operate under build -year (2016) and future year (2030) conditions without and with the proposed Costco development in place. The Impact of traffic generated by the proposed Costco development during the typical weekday p.m. and weekend midday peak hours was examined as follows: • Other planned in -process developments and transportation improvements within the study area were documented; • General background growth in the area was estimated; • Project-genanted trips were estimated for build -out of the project; • Project trip -distribution patterns were derived from Costco membership data, existing traffic patterns, a region wide travel demand model and a select zone analysis within Central Point were valuated; • Build-year(2016) and future year (2030)condhionswere analyzed with the addition ofsite- generated traffic at each of the study intersections and site -access points during the weekday p.m. and weekend midday peak hours; • Operatlonal and safety assessments were completed at each of the proposed site accesses and the intersection affable Rock Road/Hamrick Road build -year plus project, and future year plus project scenarios; and • On-site parking standards and proposed parking supply was evaluated. PLANNED ROADWAY IMPROVEMENTS This section provides a summary of transportation improvements that are planned and can be assumed to be completed under the two future year scenarios (per agency direction). These transportation Improvements have been Identified by the City of Central Point, Jackson County, as well as OOOT and documented in the City of Central Point's 7030 Transportation System Plan, Final Draft TAMP: 1-5 Exit 33, and Rogue Valley Metropolitan Planning Organization's 2009 — 2034 Regional Transportation Plan (Reference 8). Under the direction of the City of Central Paint and OOOT, KAI has assumed the planned roadway improvements listed in the Final Draft /AMP: 1.5 Exlt 33 based on the year of estimated completion, as well as all Tier 1 improvements (within the site's vicinity) listed in the City of Central Point's 2030 Transportation System Plan. Tier 1 improvements have been defined as financially constrained projects that can be reasonably funded within the next twenty years. These Improvements have been classified as either short (2008 —2012), medium (2013 — 2011) or long-term (2018-2030) improvements. nHeaan a.dwVNry W. Cm Vvl Pofi[C.s. ovu .,, 1q,uyar(aeon InpMAnolpR Final Draft TAMP: I-5 Exft33 Planned Improvements rroirtfalfalas M Iao15 The Oregon Department of Transportation and City of Central Point have Identifad and prioritized roadway Improvements at and around the 1-5/East Pine Street Interchange. Based on the findings from the most recent Final Draft /AMP: 1-5 Exit 33 completed In May 2015 the following planned roadway improvements will be assumed. • 1-5 Southbound On -Ramp: The description of the planned project includes widening East Pine Street beginning at the west and of the freeway overpass to add a second westbound left -turn lane with up to 200 feet of additional storage. This project Includes the widening of the southbound on-ramp to create two receiving lanes that merge to a single Ione. The estimated cost of the project is $1.7 million and has been designated as low to medium priority, therefore this project will be included the future year (2030) scenarlos ofthis TIA. • 1-5 Northbound Ramp Terminal: The description of the planned project includes widening the 1-5 northbound off -ramp to add a second right -turn lair at the northbound approach to East Pine Street. The second turn lane would provide an additional 350 feet of storage for to manage queuing on the off -ramp that cannot be managed with signal timing. The estimated cos[ of the project is $1.3 million and has been designated as low to medium priority, therefore this project will be included the future Veer (2030) scenarios of this TIA. East Pine Street at Hamrick Road: The study verdles and calls for the Implementation of Central Point TSP Tier I Project #216, which widens the west and north approaches to add a dual left -turn lane and second receiving lane. Central Point Transportation System Plan Planned Improvements The planned transportation Improvement program prioritized roadway improvement projects between 2008 and 2030. There was no Tier 1 short term (2008 — 2012) projects that occurred on the study roadways within the site's vicinity. Listed below are the Tier I roadway improvement projects that will be included In future (year 2030) analyses. • Tier I Project # 213 — Table Rock Road & South Hamrick Road Intersection: Although the City's current TSP calls for a signal at the Table Rock Road/Hamrick Road, discussions with City of Central Point and Jackson County Staff have Indicated this is no longer a planned or desired Improvement. As such, no signal at the intersection of 7,1610 Rock Road/Nsmrlck Road has been a wnW In the 0naiyala. • Tier I Project R 216 — East Pine Street & Hamrick Road: The project description Includes widening the west and north approaches In order to add a second astbound left -turn lane and second recxMng lane. The project also includes restriping the northbound approach to Include dual left -turns and a single through-shamd-right turn lean. In addition, the project includes restriping the southbound approach to include a left turn, through and exclusive right -turn lanes. Identified as a medium priority, this project will be Included in the future year (2030) scenadas. nism•a aw�om, x,. ren(ml pdn[Who Cenbpmen[ T•ApvrtNlpn ImpXr,4plyai• PrynYp1T46 IXroEnl0l5 • Tler 1 Pm;ect g 218 — East Pine Street & Table Rock Road: The project description includes widening the west approach to add a second eastbound left -turn lane to help reduce queuing and minimize delay at the intersection. The project has been identified as a long- term project and will be included in the future year (2030) scenarios. • Tler I Project M 219 — Table Rack Road & West Vilas Road: The project description includes widening to increase capacity by adding an eastbound lane and shared through -right turn movement. The project has been identified as a long-term project and will be included in the future year (2030) scenarios. RVMPO 2009-2034 Regional Transportation Plan Planned Improvements • Table Rock Road Improvements: RVMPO, the City of Central Point, and Jackson County have identified significant capacity improvements to Table Rock Road between the 1-5 overpass and Biddle Road. Under Projecbk 821, Table Rock Road Is schedule to be widened from a two lane crass section to four lanes and a continuous center turn al with bike lanes and sidewalks on both sides of the roadway from Biddle Road to Airport Road. South of Airport Road, Table Rock Road will he widened to a three lane cross section with bike lames and sidewalks on both sides of the roadway continuing to the 1-5 overpass. Currently, this project Is scheduled to be constructed in 2017. The project will also include the sigralization ofthe Table Rock Resell part Road Intersection. • Federal Way Extension: Federal Way is currently only accessible via Hamrick Road and terminates just south of the FedEx Ground freight facility entrance. The City of Central Point Transportation System Plan shows the potential for a future connection of Federal Way to tie into the future signalized Intersection at Table Rock Road/Airport Road. While the timing of the Federal Way connection has not been determined, the slgnalization the Table Rack Road/Airport Road Intersection will occur in 2037 with completion of the Table Rock Road widening. The extension of Federal Way will be included in the future year (2030) scenarios. • OR 62: 1-5 to Dutton Road Planned Roadway Improvement: Currently, OR 62 (Crater Lake Highway) exceeds capacity standards. ODOT and the RVMPO has completed the necessary studies to begin the Oregon 62 Expressway projecq which is a multlmodal soli that will increase capacity and Improve safety along the corridor, a critical business connection for freight, tourism and commuters (Reference 91. The 4.5 mile project will run on the east side of the Medford Airport, parallel to Crater take Highway, beginning at Whittle Avenue bypassing Commerce Drive, Coker Butte Road and Vila Road before cannecting beck with OR 62 just north of Corey Road. The project is projected to begin construction in late fall 2016. For the purpose of this study, KAI has Incorporated the change In travel patterns and growth based on the regional travel demand model for both future year (2030) background and total traffic scenarios. Based an the travel demand models, vehicular growth at the study intersection of OR 62/W Was Road will not experience growth In the northbound and southbound direction to and from OR 62 between the build -year (2016) and future year sx umvo•a,ur•dom, IM. Gena oe mum cewlopmenr I,geaM l9aK r,on.portomnrmoom+�ruha amt., fors (2030) background scenarios as northbound and southbound traffic shifts to the OR62 Expressway upon completion. PLANNED IN -PROCESS DEVELOPMENTS In -process development plans were obtained from the City of Central Point. The in -process developments to be assumed in this study include the approved residential development for White Hawk. This development includes apartments, duplexes, and a 5.5 acre city park at the intersection of Beebe Road and Gabbard Road. The project was granted approval in 2014 and has a design year of 2017. Site -generated trips and trip distribution information from this project was derived from the White Hawk Development TmfJic Impact Analysis (Reference 10). BUILD -YEAR (2016) BACKGROUND TRAFFIC CONDITIONS The build -year (2016) background scenario analysed how the study area's transportation system will operate without the site -generated traffic In year 2016. Build -year background traffic conditions were analysed for both the weekday p.m. and weekend midday peak hours. Background Growth Rales TraMc growth within the study area is expected to follow the trends adopted In the final Draft TAMP: I- 5 Exit 33. The growth described in the IAMP used models prepared by ODOT's Transportation Planning Analysis Unit (TPAU). In conjunction with the forecasted growth of households, population and employment, a base year 2006 and future year 2038 trawl demand model were provided by COOT. After review of the study area's model and previous studies a 2.0% annual growth rate was determined and agreed upon to be applied to existing turning movement counts collected at the study intersections. Traffic Volumes The traffic volumes developed for the build -year (20161 background scenario reflect existing traffic counts plus one year of annual background growth and in -process development traffic. Level of Service Analysis As mentioned previously, all level of service analyses described in this section were performed in accordance with the procedures stated in the 2000 Highway Capacity Manual as required by the City of Central Point 2030 Transportation Systems Plan. Operating standards at the study intersections were assessed based an the jurisdiction in which the study intersection Is located. acevo� • n..orran, rz. Gnvd ImPoMeNmonnebpu TrwvpvmXon pWiAwfyflr Intersection Operations PmjertelAJK 4ro41W5 Figure 5 presents the build -year (2016) background traffic volumes and operations results at each of the study intersections. As under existing conditions, the results of the build -year background traffic analysis indicate that all of the study Intersections arc forecast to operate at acceptable levels of seMce and velume�to.capacry ratios duringthe weekday p.m. and weekend midday peak hours except forthe Table Rock Road/Airport Road intersection during weekday p.m. peak hour. The Table Rock Road/Alrpurt Road intersection is stop controlled in the westbound direction. As under existing conditions, during the weekday p.m. peak hour there is high delay for the critical movement (werthound left -turn) resulting in Los F. In addition, the critical movement: Is also operating with a volume -to -capacity ratio of greater than 0.95 In the build year (2016) background conditions (with no traffic from the proposed Costs development). Appendix "E' contains the build -year (2016J background traffic operation worksheets. Table 3. 6ugd-Yaar (2016) fladrgrownd Traffic Oparasian Raauha 1.1-s. Anp a 6Mrine s.. RM reek R a.4 031 Door MWrbM a ia6 o.w 2.1-S R6 Ramp a Cwt raw HreR PNM[ C 231 0.113 MOT AND Peak 5 151 0.42 3. Pi,rurer lbgl a 1.. 11. street crro�' ial oak a lY! Ma CmnW. Dq MOMak B IT.a Oso a. IMmrtreet ld Road a Fart P. s-WCW PMPI pM6 ]EA Oil M Co A MID 5'rax — k 11.3 Us s.rMnlwryaYinnd Road PMMk R.ramund A 5.1 ao2 Counry, ary MIDIMR w.'a a 32 am 6. Tawa Mal RoW&Wu Road WPaak c 3uA 0.® coumy MJDruk B alk 0.66 T. Tawe look P.ad a 6lddle qWd PM PaRk S 303 Bl3 eXWlty MD rpk 0 192 0.32 S. Table Root Read a Namrld Road nrL Ftlbeurd ult c 22] O.Oi Coulny MIOPnk EamouN ldt B L3.1 Dm ipda Rai gwd6M'port Ppad ma 67rr�x a Era 6J7 Wunty MIDPeak Weallaand a 16.6 0.22 10. Diddle Raad AMrPo"aad Clay of PMPwk WMCaura a 22.6 0.27 MaMmd MID Paak Wataward R 125 DID 11. Tawa Rod Road A 09 99 MCD. AI Mak E 26A 0.T3 cpun MO Falk c v4 DR U. OR 62 a Sart Was Road Door, PM Parx D 46.4 Offi Coumy MIOPnF c 32A 0.23 Morrao maotiln nwroranur nanraumnrwnwnsmwe cOmwlW janweytepn(ryymarwvl ey - D" Ir Mortal In nconde per Fetid, a V/C Raro N Maned Is vehidaho.,dty situ *16 nkvleds IM number of MVcwa d rdaJ hv'ka np[Ity of fut nodM,%ftRrmdlon during tna peek IS minutea of Me rixk hour: aM 61d pMRWo Indlotesm MlewNan aPerNM W1. Ih Iun.drolnKemrdo da. 34 RltM1hon A hrpcloMy Lc _�� am MNRspewla amxi wNrx rrw Y.�.�..R i Jll J+V IVl91DRRWos E RNEsrREET vwrNrgx., wrrrrrrr .aw Nlvsp ewr�rs+rr�r WYYyMM�r inYlla 1'l li! RxeERu wpvKMNRrx nao xx.y NRr.la. ynn.IwyN r u it �WwR�RM�pEN.E�R�T •,yrlN w�.NLL.Y ��witi TN1£RocR Ram e_w.vus Rovr w.wNrrw +.nom I, • I � s TA94F RCU Im1➢1� 1pM T.1li RCCN PYDf NMRICX RdY LpBIEM POfpfpN411(L KMY 1NMy VtYwYxv grMYrr�l /w/guy Np YT\M\ RW41WrMf WSW NrW xr 'MMYY/n+ IV el 1r V, Z k ppOJ RJxaf NMOfiRMC TRIE IYIGkRMUp MIM ORBf WVRI6 K44 I MYVwMM _.ISIrN WrreNMls xWMYv1N Ntww� Vu�,YLrwf _a/I\ J✓�l /m I Jfl a�E 1 a I / GUILD -YEAR {]016) BACKGROUND TMFEICCONDD10N5 I fIGRRE WEEKDAY PM AND WEEKEND MIDDAY11111 IJR5 5 CEWRAL MINT, OREGON cenw� Poinr cmrco veeropnmr vwaerll➢IMa nmroo,runonxnpo«.uwMo- amfier1015 COSTCO TRIP GENERATION DATABASE For the past 15 years, KAI has maintained a database of traffic data and travel characteristic for Costco Wholesale. The database contains transportation Information such as trip rates, trip type percentages, and parking demand for Cove. locations In the United States, as well as Canada and Mexico. A large portlon of the data Is from existing Costco sites In the Pacific Northwest. The data base Is updated and refined each time new Costco traffic counts or information become available to KAI. In order to best evaluate the anticipated transportation characteristics of the proposed Central Point Como development, it was agreed that the Costco database information be used In this TIS since it provides use -specific data that most accurately represents the anticipated traffic characteristic of the unique development type. Costco has Invested significant effort Into developing this site-specific trip generation database for both their warehouses and their fuel stations because of the unique characteristics of Costco customer travel that exists due to membership requirements and the nature of Costco sola. These unique elements apply to the trip generation and distribution for Costco warehoum, Costco Gasoline fuel stations, and the interaction of trips between the two. COSTCO TRIP GENERATION CHARACTERISTICS The data collected at existing Costco developments in Oregon and Washington indicates the trip generation characteristics summarized in Table 7 Including total trip ends as well as pass -by trips ends from the surrounding street systems. Generally, trip generation characteristics of Costco warehouses also Include diverted trips, however, due to the location of the proposed she and Its distance tram 1-5, OR 62 (Crater lake highway) and other major facilities, it was agreed with the agencies that diverted trips would essentially be considered new trips through the outlined study Intersections. Therefore, a specific diverted trip reduction was not applied in this study. In addition, the pass -by trip rates used in this study are significantly lower than those found at most Costco locations. Surveys at existing Costco sites typically demonstrate pass -by rates in the range of 3U-35% during the weekday and weekend peak hours. however, again due W the relatively low volumes currently on the adjacent streets to the site, pass -by trips were constrained to no more than 15% of the adjacent street volume thus resulting in pass -by rates of only 7-15%. Ta61a 7. Central Point Costco Derelopneat Trip Owaealion Estimate T LITap FnL, 13,1W SAN 61M 1,05 31st 533 1,155 713 M Ib[eMI TLpE eouby nivf rlla -1170 -73$-133 355 -- -0J 1W 40 -M V. ISO vM laae03 as arrrT,l/IMr IDA" I 3.W I am I aW I W 1 4" As I /a aA xlrtrkan 4M xftcW a,mWoos�rco.rcoo�i�nr ry.�rssxus rwowrtaaan xna�r MoyNr oaae.rioss As shown In Table 7, the proposed Costco development is estimated to generate a total of approximately 10,670 net new trips an n dally basis, 900 net new trip ends during the weekday p.m. peak hour and approximately 1,365 net new trip ends during the weekend midday peak hour. Pass -by Trips A key trip characteristic considered was that of passby trip capture. Pass -by trips represent trips that are currently traveling on the surrounding street network for same other primary purpose (such as a trip from home to work( and stop into the site an route during their normal travel. As such, pass -by trips do not result In a net increase in traffic on the surrounding transportation system and, typically, their only effect occurs at the site driveways where they become turning movements. Again, based on existing traffic volumes on Table Rack Road and Hamrick Road, the pass -by trip reduction has been reduced to a maximum of 15% of existing weekday p.m. and weekend midday peak hour volumes along thew roadways. This Is compared to the 30-35% pass -by rate documented from surveys at existing Costco developments. We believe this represents a very conservative but defensible approach to the trip generation analysis. TRIP DISTRIBUTION AND TRIP ASSIGNMENT The trip distribution pattern for site generated trips was developed using rip code done from current memberships at the existing Costco warehouse located on OR 62 (Crater lake Highway) In Medford, Oregon, as well as from the mating traffic patterns and major trip origins and destinations within the study area. Localized trip routing through the study intersections was assessed based on the lend use, traffic counts completed at the study intersections, and general patterns in the site vicinity. Additionally, OOOT provided KAI with a ban year (2006( and future year (2038) regional travel demand model, as well as a select zone analysis fur the trafflc analysis zone that the site will occupy. The models and select zone analysis verified the trip distribution patterns and slte-generated trip assignment for the proposed Costco warehouse and fueling station. Figure 6 illustrates the trip distribution throughout the site's vicinity. Bawd on the trip distribution throughout the study area, Figure 7 and Figure 8 present the slte-generated turning movement counts at each of the study Intersections and site accesses for the weekday p.m. and weekend midday peek hours to and from the proposed Costco site. Appendix -F-Includes the base year (2006) and future year (2038) regional travei demand models, as welt as the seleerzone analysis provided by 000T. 37 Ir wr A.1M irc. C."i /Por, O",. IIA aw."Ol N I46BMVL EElNF 811eHT 13M PIMGEEPtlE 61IHf iFIN1C91RDEU6ERNE4lRFEf w4evyWMIW Wr�IrV,IM WN'MMIm WM1uu4M wWPWMxa 17 XhNpILk PWOdENNETAEE! �LMLWI.Y611.\WlOf roeD TMLE NILY ROAEd WVYASPLVD r.MpW Mxrr W�MrrIgM wM wW�yuy R� W�ar,Wnrls�w.xuiMw�M 1 � rulE Pocx Pmo d e wqs Paln TIME I V b1 IYYO d IMM RC( PN.P w+..WMM � w TA.lFP XRd 5YUMRP01l1 WrrWMw. M.eb+a n. eiottEroEoeewwrlom naExau nom-�ca.W oP ezdw vuswl>.o ti•�YW MIW Wwr11EYl Ri W+xIOWRww � M WnW suMw. u'rul YOh Pr „`•'•"m SREraENEIAT DTR Fl�unE m WEE[ Y PM MID WEEKEND MIDDAY PEAK NOURS �,ry sti CEARRAL POINT. OREGON 1 � eiottEroEoeewwrlom naExau nom-�ca.W oP ezdw vuswl>.o ti•�YW MIW Wwr11EYl Ri W+xIOWRww � M WnW suMw. u'rul YOh Pr „`•'•"m SREraENEIAT DTR Fl�unE m WEE[ Y PM MID WEEKEND MIDDAY PEAK NOURS �,ry sti CEARRAL POINT. OREGON / WF6THAM11L4 ROM. 4 WJ ,Kmla fAhxYWIIX M.4OWI'614NgF'XRMO A • b •��ll 1 �y I� RE]IRWWAY.ACNTNIgf Ej � •'NMYIV IOW •ltl F� EW9 �1 { I ( y rANerm rou. �rlrA.srom \ •jg�TE"I � r�wa W... wmA[erwn / w�eCMM1WW Nww Wb/.w � \ 11 I I rulr'gocx Rao. nFAsrow. vw�wtiw w., i.. �\ $ 4 R@ 1 �® SIT EGENERATED TRIPS AT SITEgCCE55ES FIGURE WEEKDAY PM AND WEEKEND MIDDAY PEAK HOURS R CENTRAL POINT. OREGON cmawronr rmxa rx..now�•�, amMa,unxws ws rmn.wrNrpo imrx[An•Ir,6 lals BUILD -YEAR (2016) TOTALTRAFFIC CONDITIONS The build -year (2016) total traffic scenario analyzed how the study area's transportation system will operate with the site -generated traffic of the proposed Costco development. Any impacts due to site - generated traffic will be documented and mitigations will be identified at the impacted study intersections. Traffic Volumes Site -generated traffic volumes (shown in Figure 7 and Figure 8) were added to the build -year (2016) background traffic volumes for the weekday p.m. and weekend midday peak hours (shown In Figure 5) to arrive at the build -year (2016) total traffic conditions shown in Figure 9. Intersection Operations Figure 9 also summarltesthe intersection operations analysis forthe build -year (20161 totaltral scenario. The build -year (2016) total traffic scenario Identified two additional Imera lona as not meeting operational standards compared to these not previously Identified in the buildyear(2016) background scenario. Table 5 also presents the build -year (2016) total traffic operation results at each of the study intersections. All of the study intersections operate at acceptable levels of service during the weekday p.m. and weekend midday peak hours with the exception oF. • 1.5 No Ramps i East Pira Street exceeds ODOT standards (lane group vie ratio 5 0.85) with the northbound right -turn lane group's vyc ratio of0.87 duringthe weekday p.m. peak hour. • Table Rock Road A, Airport Rood, as under existing and 2026 background mnditlons, continues to operate at a LOS F during the weekend p.m. peak hour. However, delay at the intersection Increases due to trips accessing Table Rock Road. During the weekend midday peak hour, site -generated traffic causes delay to increase by approximately 31 seconds, causing the level of service to drop from LOS C to LOS E. • Riddle Rood A Airport Rood experiences a higher delay for the critical movement of the westbound approach, dropping from LOS C to E during the weekday p.m. peak period due to site -generated traffic. While no slie-generated tragic is expected to be coming from the westbound approach, the delay Increases because of the amount of vehicles making the northbound left at the unsignallnd intersection. Even with the site generated traffic, the intersection Is operating at a very low volume-ta-capacity ratio of 0.451n the weekday p.m. peak hour and 0.141n the weekday midday peak hour. x�xehon AArto ,,roc QntIW PoMt CneKa C¢vebpment Prcq'eoe N]Wa6 rrarpartaMon lmpxtd�wlysla C[bBer]O15 Table 4 Build -Year (1016) Total Traffic Conditions 1.455B Aamp IE+II PIn+51nV PM peeF B B6 O.BI DWT IO Po+R B d➢a O.M $. 45 XB Ramp4Fea[Plne Sbst ��~ C yll \� OCOT MlOveaY G dib 063 3. Ponlneer Road A, U. Mn. St—t OW; C.w .Ory - pMprV - r MDhA C 30.2 nfb l Nemldpo+dO Faf PFe Sbwt FM1V C LLl O.BI CuurdY, Oty M. B lil OM S. Fadenl Wry 6 HmnrkMPoetl MOMCound B ]0.9 us rnumn qy MDppk Nwplaund B ]3➢ 0]S _ a Tabb Rad Rada VXm Rad ITd hak C 339 0. Cw.Ry MID Peak C 310 0.bI a. Task RNd BOM i ll A R d C 339 DA3 [vary MDPwk C ]l3 Ob3 a.TaEle RoS Ro+i a N.k.—I FMhak M44 oLert F e3F 0.K Cw MIOPnk r MPbalM 41, C lie D35 9, Table Red PN 6Npartllwd _ tiAaft \ F »LO I" [wnry Mp MYt WMtlwq E 17A 0.73 16 dddk Amd\14pon Aad C"d _ MIM W ! _ Medford ) MIpyM YlelbuM c IRS 0.15 IY TaBle potYRWJ\OR 99 __UueAy CDpT, PM heY C 3B3 DTS __MOPaA C 3!L ___D.f6 _ Y2 (.T B36 FaR VIgsRmd pWr, IM Iut p S 0.W 12 CuaM aW PYt C 3i3 0.75 Xaes:'1M1e alYOlrnvenrtM4 rtoated for RlvnNena4ad Meree3tlwbw+dmiM 3WO XldFxw CowrM ARan6 Y45•teW MSerM; DMaY k npwt/d In srnNr ryr wledl;' V/C 11db1 b lgMed u RYh-bolwrM IYIb MARX mluaYrn M nunMrcf NYtba dMdN M Te =r+eM a M+m.d,wvA•Me.em�dwbs me peak ss mImM6 AtkpoF bu; aM ar rMiPklat.]e. oro lomaeebO oPmrAa 6f.� Re p��bakTan'aeranmMs RrnrBd�aS�lom,rnr. IE6B M11F86EpNE STME! Y•iyruNly err+MqN • II; J K rBP4i51 Fo� gr�gr pYrMNI4r W�qN • II; J Paulami rcm I F PwF srPFFr aww�MNls wJr+wyry N.WFILK PwoeeNlE6iT@T pMFML wAY1MMCRp rI9lE ROLRWID IwvLIS qCM rrawyW rawv Wnerr(r,N MYew NXv wr��wyN Xuy Wrap . lE PCIRPOW I BICYEP'1ro wrWWNw wnnw WWN • ,n-/�, T/AIE XIXX RO/J I NW RkX w•n wry WN wW�uyN u WNwv mem a amuF �Ao1 �rww TAxFPmanow�l oP• wezawws� .aaw rPN W. r.r.aN wwr.WNw WWN wa.WNw. W.vN I fiUI YEAR (20161 TOTAL TRAFFPC CONDRIONSI Fi yqe W EERDAY PM AND WEEREND MIODAY PEAl HCRJl 9 0'^ CENTRAL POINT, OREGON Central PoM[ms(tn OeveMPn,ent P lea!r Iwks, rm nlyv rteflon lmpvtt Mohd. IXtolerl015 Site Access Operations There are six proposed driveways accessing the Central Point Costco site, two on each of the site's bordering frontage roads. on the west side of the site, two full accesses are proposed with movements accessible to northbound and southbound on Federal Way. A full access (Closest to Federal Way( and right-In/right out access (closest to Table Rack Roadl are proposed on the north side of the she with access to and from Hamrick Road. Finally, there are two full accesses proposed on along Table Rack Road. The southern -most driveway on Table Rock Road would be the primary access for vehicles to access the Costco Gasoline fuel station. Table 9 presents the traffic operations at the proposed site accesses. The governing agency's standard is determined by the roadway in which the site access Is located. Figure 10 also Illustrates the bulld-year (2016) total traffic conditions at each of the proposed site access during the weekday p.m. and weekend midday peak hour. Appendix 'G' contains the build -year (2016) total traffic operation worksheets. Table 9. guild-yer 1=016) Total Traffic Conditions R Site Accesses 13. rehnlWrvexoMwesf PlufMY nnvf PMPekk wME.uw A u I NO okM 11.N, MID Peak IWWwnd A eJ 1 014 111N.rd W., A 9d ..ktannMY Cftcf PM M. waMwM A E.T am Cvft Pnlnt Mo Prlk kv LcuM A R.R '. 15. Wen H.MMckl nnVe*W6 M.M&Road cry of PM Plek NcM... d LEa A 1J 0,U 0.mWplInt .,D,..x NcraRb-MLaR a 103 on 15. Eat NNnrtk Act JMVtlryMbht- autiAW ,,N Rmd ctt,cf MIM NOMDiund -[ A 9.1 0.10 U1VVPgnt MIaM NOMbwM Wt A 93 0z 11.7able Rock Rd A Nuft—t Or IAk.vn PMM aeaAound. F its 0.5a caunry MIa P.. EeXbvundLae E Y3 a.. A.T+MU Ruck RCW A5-ffi-vt OrluaaAy Jackson PM Paek EafRound C ish 0.12 Caunh humped Ea/Dound C 15J 0.12 rap aleck al M..1;uo innnemam uexu an um 2u nM, nYmanwp npaMd Inawndk per nNd.;- VIC R.U. hdMad a .1c c,W.rW rkV. whxh almM. th. number M% IM.k dlodedE Ma afaOry or the madary/In.rm11cn donna M'e Mk 15 minutes N tte pak M1aur; eM 1 M w/ seeks Indra an InMxgbn vpvatlh. W. IN IuendlRlnn'e eMnd.kx As can be seen from the table and figure, all of the site access intersections are projected to operate at acceptable levels -of -service and volume -to -capacity ratios during both the weekday p.m. and weekend midday peak hours, with the exception of the Table Rock Road/Northeast access. Note 013 13 assuming this access Is a full movement access and no Improvements to Table Rack Road are completed. Under this scenario, the critical eastbound left -turn movements at the Table Rock Road/Northeast access is projected to operate at LOS F during the weekday p.m. peak hour, however, It is still projected to operate well under capacity and meet the County's operatlanal standard with a volume -to -capacity ratio of 0.52. This means that while drivers wishing to make a left -turn out of this location will experience delay, they will still be able to find sufflclent gaps in the trafnc flow along Table Rack Road to complete the turn. Again, this is a near-term scenario for the first year of opening of the Costco development before the Table Rack Road widening improvements are constructed in 2017. u RllSehvn a Aaa<rnM, m�. / I M91NVtlY]l1GCAYf,IN1IA,Y IIMY GHfMM6YtX MI➢IIYH. Wd,CMRMP . V ir) r / e �I 8 �� J rtoau,wnv.ro� *oxr _ TPae xo�rtuo,nwix.�srowr I � /� � 1r a: • e r Ili �j� �g ? r• 1 KVMNO Ib —�jl�—/\J` dj} I .VIE JR'OCKPYDI6dM„EyM'1� 1 \ � li •�14~�/ y Po Ili El11lD-YFM (2016(TOTAL PM CEKEND IDD SUE ACCESSES Neurtc e WEEKDAY PM ANO WEEKEND MIDDAY PEA[ NOU.M F�OWe a� CEMTMLPDIMf,OW N 10 cennd emnrm,rco oe,.rormenr vroMrarawa r,w,rwmmnn arooen,rory.m ume•rsass BUILD -YEAR (2016( MITIGATIONS This section provides a discussion on mitigations for the impacted Intersections under build year (2016) total traffic conditions. As outlined above, the build year (2016) scenario Identified two additional intersections as not meeting operational standards compared to those not previously identified in the build -year (2016) background scenario: the 1-5 NB Ramp/E Pine Street and Table Rock Road/Airport Road intersections. Mitigations for both these locations have already been identified through previous planning efforts by the City of Cental Point, Jackson County, and ODOT. These are discussed below. Appendix Rhi" contains the build -year (2016) mitigated traffic operation worksheets for the intersections outlined below. 1-5 NE Ramp A East Plne Street Mftigotlon Site -generated trips Increase the northbound right -turn lane's v/c ratio by 2% during the weekday p.m. peak hour, resulting in a v/c ratio for the lane group of 0.87. This is greater than ODOT's standard of a maximum vile of 0.85 for each lane groups at a ramp Interchange. The need for additional capacity for this northbound right -turn movement has been previously identified in the Final Draft TAMP: Exit 33 study which calls for the widening of the 1-5 northbound off -ramp to add a second right -turn lane at the northbound approach to East Pine Street. The second turn lane would provide an additional 350 feet of storage to manage queuing on the off ramp that cannot be managed with signal timing. Based an the assumed parameters of the project, this project would have the following benefit at the 1-5 NB Off - Ramp Intersection: The northbound right -turn lane group would operate with a v/c ratio of 0.49 in the build - year (2016) total traffic scenario during the p.m. peak hour with the proposed improvements stated in the Final Draft LIMP: Exit 33. OOOT and the City of Central Point are currently In discussions to determine Castro's appropriate proportional fair share contribution to this improvement as mitigation for the she generated trip impacts. Table Rock Rood 6 Airport Road Intersection Improvements to the Table Rack Road/Airport Road intersection are scheduled in year 2017 as part of Table Rack Road widening. In addition to widening Table Rock Road at the intersection, a signal will be added to the Intersection. The details of the signalized Intersection have not yet been finalized; therefore, mitigated assumptions were based on the project description of Projects 821 In the RVMPO RTP. The signalized Intersection has the following impact: ' With the addition of a signal, the level of service and delay improves significantly during bath the weekday p.m. and weekend midday peak hour. Based on a 60 second cycle length the Intersection operates it L05 A with an average delay of 9.7 seconds per vehicle and a v/c ratio of 0.51 during the weekday p.m. peak hour. b xlNtrona,Walaey Mr. CenVol Pofif rn•Rn OeMopment PmlecrllStlK rro„,Pwemw+rn,vrra,wry.a aene.rmss • The westbound approach Improves to a LOS B with an approach delay of 15.4 seconds per vehicle with the signal, compared to LOS F and an approach delay over 100 wands without a signal during the weekday p.m. peak hour under build -year (2016) total traffic conditions. This Intersection is an existing deficiency; however, given that this Improvement Is not currently scheduled until 2017, Jackson County and the City of Central Point are currently in discussions to determine an appropriate contribution to this Improvement as mitigation in the Interim for the Costco Project TABLE ROCK ROAD ACCESS ALTERNATIVES Even though the build year (2016) analysis showed that all of the site accesses will be able to operate as proposed upon site opening before the Table Rock Road Improvements are constructed, an evaluation of access alternatives for Table Rock Road was also completed to compare how temporary Improvements would Impact the access operations In the Interim until the Table Rock Road widening Is completed in 2017. The accessscenarios compared were: • Build Year(2026)Total Traffic Conditions (i.e., Full Access to Table Rock Road)with No Table Rock Road Improvements (as summarized above) • Build -Year (2016) Total Traffic Conditions with Temporary Table Rock Road Improvements (Le., temporary widening of Table Rock Road along the site frontage to provide a center left - turn lane until the ultimate widening project is constructed) • Build -Year (2016) Total Traffic Conditions with Restricted Right-In(Rlght-Out Ate Accesses (restrict Table Rock Road access to right-In/rlghtaut only until the ultimate widening project Is constructed) Operational Comparison Table 10 compares the access operational results for these three scenarios. Also Included for comparison are the operational results for the Table Rock Road/Hamrick Road intersection which does change depending an how the site's Table Rock Road accesses arc configured. 47 ~_4 auW.M n•. cm.M oN,r .av,db mt rmnrpdrt,Uo .fipatdnolyf6 Table 10. Table Rock Road access \IMratfive Co""rbon Pryar•IwW IYNYriniS mo dFramdd to dlon validea luming Me 6om 1. .. morale• atwo A1W W Mdptaaa� lee rawlad NMv I imPmve op•raaore m L09 & 09.Prheh md.lva3eN tivaMdrypm. pule MvrmdL03 P, d).)ywl� M Wao.so m aMwadue mubrypak Mea. The following conclualons can be drawn from the comparison In Table 10: • Assuming full movement access and no improvements to Table Rock Road, the eastbound left - turns at the northeast access to Table Rock will experience relatively long delay (resulting In LOS F( but the access will still operate well under capacity and meet the County's operational standard with a volume -to -capacity ratio of 0.52 during the critical time period. • providing temporary widening along the site frontage to provide a temporary center tum lane will allow all Table Rock Road accesses to operate acceptably as full movements until the ultimate Table Pack Road widening Improvements are constructed in 1017. • Restricting the site's Table Rock Road accesses to dght-In/rght-out only will allow those accesses to operate at acceptable levels of service and volume -to -capacity ratios. However, R will add additional left -turn movements at the Table Rock Road/Hamrick Road Intersection thus resulting in over -capacity and LOS F conditions atthat location. This Impact could be reduced by adding temporary widening around the Intersection to provide a northbound lett-turn lane as well as a center refuge area north of Hamrick to allow vehicles turning left from Hamrick to make a two stop gap acceptance maneuver for the left -turn (w0l Improve operations to LOS E and v/a0.58 In the weekday p.m. peak hour and LOS F and v/F0.80 in the weekend midday peak hour. NnaNnna wmeMrw,aM. Baa' iMrwk a.eMvnd ut c aif acs S. Taw MdRwd• HamMd Road courts Modems Allqum lee c r9 0.35 17. Tale• Pods Mad a No Nud lactim pupnY_ E_an_beu_ntl b_e_ E h_1_ Odi an Mlnp EEaMuMMh [ oaf 1a TWle Rock Matl RSvudwn W Msksvn rad c H,a 042 0.11 0d coon Mad abound [Mboune C 111 0.11 Waan IMM [aeMuglaR c 15.7 0.19 B. Tanta nuYRutl R MamddMad Cam" MDpaak Eaed.mu! a 134 M iT.rakno[k no.d\xaMae! Ydlan pMM uMnuMllf c rat nl9 Dnaaady cauna, MIOM [aNpuMlan c M 0.16 is TaMnxk Matl asoudnM< ldam rmM [aebund c 131 an Or Carts M01'M1 O,aowd a 13A 0.10 I TWallaak M1ai\MmrHRadr Milian pMt, [wawa 2nd lieMJB "Aai-0c. Male 91WUM IR>6D >L0lea 033coo Mp FMI{ FaRppuMIMY143 amMT,MNzknvtl\smh., wkaon rMM eadixodddlea 0bDdwwl C. MOPuk eYbalne19D aAl Nu%a Nal•Addi names mu wldrarM• amend aaainlno tiw Navmride•nardbound lefeaurn lana.well as aaaM aunt am mo dFramdd to dlon validea luming Me 6om 1. .. morale• atwo A1W W Mdptaaa� lee rawlad NMv I imPmve op•raaore m L09 & 09.Prheh md.lva3eN tivaMdrypm. pule MvrmdL03 P, d).)ywl� M Wao.so m aMwadue mubrypak Mea. The following conclualons can be drawn from the comparison In Table 10: • Assuming full movement access and no improvements to Table Rock Road, the eastbound left - turns at the northeast access to Table Rock will experience relatively long delay (resulting In LOS F( but the access will still operate well under capacity and meet the County's operational standard with a volume -to -capacity ratio of 0.52 during the critical time period. • providing temporary widening along the site frontage to provide a temporary center tum lane will allow all Table Rock Road accesses to operate acceptably as full movements until the ultimate Table Pack Road widening Improvements are constructed in 1017. • Restricting the site's Table Rock Road accesses to dght-In/rght-out only will allow those accesses to operate at acceptable levels of service and volume -to -capacity ratios. However, R will add additional left -turn movements at the Table Rock Road/Hamrick Road Intersection thus resulting in over -capacity and LOS F conditions atthat location. This Impact could be reduced by adding temporary widening around the Intersection to provide a northbound lett-turn lane as well as a center refuge area north of Hamrick to allow vehicles turning left from Hamrick to make a two stop gap acceptance maneuver for the left -turn (w0l Improve operations to LOS E and v/a0.58 In the weekday p.m. peak hour and LOS F and v/F0.80 in the weekend midday peak hour. NnaNnna wmeMrw,aM. Rnt,ol PolntOn[o 0nelvP'nent T parlotlon pnPoc[Malrak pnJ u'M6 RtvbnAfs As requested by the City of Central Point, the operations of the site accesses to Table Rock Road In the year 2017 once the Table Rack Road widening Improvements are constructed were also evaluated. These were evaluated to compare operations with the accesses as full movementaccessas and as right- In/right-out only accesses. Table 11 summarizes the operations of the Table Rock Road site accesses in the year 2017 once the Table Rack Road Improvements are In place. Table 11. Tebae Rock Road Avera Op0,0111 m In 2017 a.TWRaa a,adaH•na6no,d a�°°• Coaly aeDM1•1 akabutl uM EkeapuM GR C a ISA W GU oil 1TT•t %&Ruda Nmkswt cv�Cs" faTWe RodRutlalatlrA. UrMwR reuen eMewk_ fatlewdlMt C L1 am _ a�IIrY rkYkuVlaR C SU 0.1] ....adpn eMM fk�eae a tat 0a] Cwuv Mlold 4ahwmd 1 II3 Oaa a.TWaRaARad\NnndtliRau Isdw, rMM raakmad Gk o 'so 0M Gwi aF eeY ewWMelaR f Sad 0.15 1].TtkRoURaa\IluwMct RIwwY Ngnon eMe� 6nIwa11RR a 0.b raunN Mloe� SWaeuMlan • 11.s 0D _ IaTaale RadRal \SUM••s arNkww saw• eMeeek Fameund a cL3 ao! cgnN wopak 'Y M R 10.7 ass The following conclusions can be drawn from the comparison in Table 11: • Once the ultimate Table Rock Road widening improvement is constructed In 2017, all site accesses to Table Rock Road will operate a good levels of servica (LOS C or better) and volume-ta-cepacity ratios (v/r--0.21 or better) during the peak hour periods assuming they ace full access movements. • The accesses will also operate acceptably as right-in/right-out only accesses once the ultimate Table Rock Road Improvements are constructed, however, restricting those access will add additional left -turn movements rt the Table Rock Road/Merrick Road intersection. The additional left -turn demand will muse the critical eastbound left -turn movement to ger from LOS C and v/c = 0.18 to LOS O and v/s • 0.54 in the weekday p.m. peak hour and LOS 8 and v/c = 0.21 to LOS F and r/c = 0.75 in the weekend midday peak hour. Safety Comparison In addition to the access operations comparison outlined above, the predicted safety, performance of the accesses under the various alternatives was rcvkwed. A safety Analysis was performed for the Table Rock Road accesses using the predictive crash methodology from Chapter 12 of the Highway Safety Manual, with adjusted crash calibration factors from Coors, calibrating the Highway Safety Manual Predictive Methods for Oregon Highways. The accesses were evaluated as unsignalbed Intersections (slnce no specific safety predictive functions are provided for accesses). The analysis looked at five scenarios: a amapn•Auo,koo, Mc. CmtrolPoM.'. Onebp ' ranrrpt•flon Impo[tAMyfl[ • Table Rack Road as Two lanes with Full Movement Access • Table Rock Road as Two Lanes with Rt/RO Only Access • Table Rock Road as Three Lanes with Full Mcvement Access • Table Rock Road as Five Lanes with Full Movement Access • Table Rock Road as Five Lanes with RI/RD Only Access Pra,YRpl�aa (R,bMI015 In order to predict crashes at dight-in/right-out intersections, head-on collisions and angle crashes were omitted from the prediction methodokW to represent a RIRO driveway. Table 12 summa rites the results of this evaluation and safety comparison. Table U. Table Rack goad Access Predictive Safety Carrpadann Ttl4Rah RuaarntM1�rt 01a ON all npY lnaR fauaaw atR u3] U. Tw MrvlhVipurfI pia M sae Ttl6 aahRWllaerlMa$0116 0.ar 053 nba ROdnu//fawlw•nOwam am TOW MRORIaMtlwibaar"a 40 mblenohnoaa/eare,wtawo.fx aaa TWrRodtRap SONaYrtaNa3a car NXIW G�InRTai* Rah Rua wewOnT" Raa Raal.'aftsw Dx0.x7 an rWcNR dR rerwGIs 035 ra01• Rah RotllfauRwawaam 030p.fa d.m Interpretation of the predictive safety results is complex. These arc not absolute numbers and Instead represent more of the probability for crashes to occur. In addition, the agencies must welsh the results of the safety predictive results with thane of the traffic operstlonal results as there are tradeoffs to each. ataa•n a ave ..Ice. Qnfml didf mako O ov[ v* Im/¢talN16 hmfPortmlon Anru'ranoryftr ano6er10]5 Providing full movement accesses to Table Rock Road in the near-term with Its current two lane configuration shows the probability for 1.2 crashes per year to occur combined at the two access points. If these were restricted to right-in/right-out only driveways, the safety prediction lowers to a probability of 0.93 crashes per year (about a 30% decrease in probability). If temporary widening was provided in the Interim for a two-way left -tum lane along the site's frontage, the probability would lower to 0.76 crashes per year (about a 30%decresse In probabllity). The safety predictive analysis also shows that once the ultimate Table Rock Road widening improvements are in place the safety prediction lowers as well to 0.77 crashes per year even with maintaining full movement accesses at both locations. FUTURE YEAR (2030) BACKGROUND TRAFFIC CONDITIONS The future year (20301 background scenario analyzed how the study area's transportation system will operate without the site -generated traffic in year 2030, representing a 15 year lowterm future condition at the study Intersections. Fmure year trelRe conditionswere analysed for both the weekday p.m. and weekend midday peak hours. The future year (2030) background scenario includes the planned roadway Improvements and land use developments previously mentioned for the build year as well as other planned improvements that are expected to be in piece by the year 2030 such as the Table Rock Road widening and the Table Rock Road/Airport Road intersection signal. Appendix "1" contains the future year (1030) background traffic operation worksheets for the intersections outlined below. Traffic Volumes The 2030 background traffic volumes reflect existing traffic counts plus 15 years of annual background growth and in -process development traffic. Volumes along end accessing to and from OR 62 (Crater Lake Highway) were not grown by the annual growth me due to the expected completion ofthe OR 62 Expressway project. The future year (2038) model provided by ODOT shows that daily volumes along OR 62 do not increase when compared to the base year (2008) volumes. The 2030 background conditions traffic volumes aro summarized in Figure 31. nnr�ax..ononr, rK. IL SB P.WPS eE GINE 9TNEET 'Mwpry PN0.WXw N�Iw lurlr iB HB PAIIp&C ERIE 51gEET yNeq Ml0.Wr wsYyu�ryr, PFNIY1Ep ppeG6EPWE5IPEET • all� y N'seW Px Puy .ntWapn� • � � y � • /tel i i�l f\v`.an !'p .T v.P� I � �K_wm �i .H. •���6 I � eL,d �• � �d'_....�: INMniElt npMa¢PNE fiTEET wyy w newrrru IFLEWLL rvAY6M/JIRR IpIJ wssl.Nlurw reww`n\a 9n w •Xy Dill •/� \ •/wme JNjI I T1BlE RpGll gplp 6 OIOGE R4G w.ww.N Www. Nv..ewy.WP� • RNI � JIl y �: eloo� muo N nwvcer Rono w.ww.N Www. Nv..ewy.WP� • l" JIl 1r �: .eN�rocNnwoe wuNrx ]No wwnwwy e.war•r • Nw.r+�.+ww r.w war WE ¢� Rwx qw.o a nlnom ROEo w.ww PN Wwy war... •=>X; /tel ¢� Rwx qw.o a nlnom ROEo on s.wPu�m w.ww PN Wwy war... •=>X; /tel on s.wPu�m w.ww PN Wwy war... •=>X; FUTURE W WEEKDAY (3 PMAN WEED ND TRAFFIC CONDITIONS REURE WEEKDAY RM AND WEEKENDMIODAY PEAKHOURS11 CENTRAL POINT, OREGON I a�n•1 r•mem+m wu.lopnent rgaeel2mw mnapa.Gtwn Impoa7noMb wmtr.25ss Intersection Operations Figure 11 and Table 13 present the future year (20301 background conditions operational results at each study intersection. All of study Intersections operate at acceptable levels of service and volume -to - capacity ratios during the weekday p.m. and weekend midday peak hours with the following exceptions: • Hamrick Road • Fist Fine Street operates with a v/c ratio of>1.0 duringthe weekday p.m. peak hour • Biddle Road i Airport goad (as under the build year conditions) has a critical movement which operates at LOS F during the weekday p.m. peak hour although the movement is still operating under capacity with a v/c ratio of 0.55 Tabb 13. Future Year (3030) Background Trefllc 011eeagum I.H1R MIr aeiRp1141Grtw ccoonM M MI. wk a las an off a SLS x 15 NE M1npafan pkw Wwl fW! rwftw Morwk C a 3n1 aal_ 0.55 3.Mw Rofd A EW 1. Rrew 0.�' rlh County. raY MIo wx C c Irl v 0.35 12-1 0.75 9.wmWRlledaEanrm. suety cnrn5', uh Iw1Yr Mrore.i— o a YI l" ]sa as S. redenl VM1Y6XmMAvad c -ft -w IM Fly Mor..k HwNbovtl xmlwwea e _ a aA a ]s am 6. TeMe Ray Roeda VPw Road C -w —mow•! _ _ CC __ 9fA _ 35.2 Om ]. Table RakRo+da elMeRatl CoumY Cwnh PMNnMk MMk_ _ _ ..p, k "MS,wk _ _ fa and Ue faalvW leR [I C _ a a 35,3 a. 0.F _11A Man _ B.I.W. RxI RMd\WmKF Rwd lis 117 am edl 9. TableRd Reeda Nrport Patl Qumcky.r rMPwl Iearw4 A 1].] s.as \] 5x5 10.eA1dle Road\Anpert roti'ol Mtlfs PMM M'awwW _ NM1+Weurd 0 F a 1U r.l 39.5 x15 11.Able qod RoedaoR% OCCT Cn- Cowry pm Wereel _ We _ C C _ 39.1 019 3os_ aan 12, 5fl 62a Hf[YI e+AaM 5�• Cpunh rMP_ Mlo rwt - -- c C fes 591 39.9 0.73 Natty: 1Ae allkal mWement G+epaMd M+II un9Anallad InGneNons Nwd on tlG ]IXO M9Rwry GWcay Manuol," t05 •1a+el olLMa: OalaY If repoGetl In +emMt pwveM1ld+; a V/E Rnlo a donned w ve'.AtlNo-opclly rttle wGtM1 wiwGGf Ne number Wve41tW tlMd+d by tlw ®Pdry of riot mdwry/lydenecllori durMA the R+k 19 minutw W the pwk bour+nd bid a•IMPalidMauv IMeruNon ppeefl�e D.kw Ito IvfkdlntloAf ftwtlertls. ..meho• s ae,artova Inr. 4nrml MnrCmKoGMloprrtn[ ho16[e nns Tm,upartotivn lmwct Mvly4 CaeMrxltS FUTURE YEAR (2030) TOTAL TRAFFIC CONDITIONS The future year (2030) total traffic scenario analyzed how the study area's transportation system will operate with Costca's site -generated trips in year 2030, representing a 15 year future condition with the addition of site -generated traffic at each of the study intersections. Future year traffic conditions were analyzed for bath the weekday p.mand weekend midday peak hours. The future year 12030) total scenario also Includes the planned roadway improvements and land use developments previously mentioned. Appendix 7" contains the future year (1030) total traffic operation worksheets for the intersections outlined below. Traffic Volumes Traffic volumes for the future year (2030) total traffic scenario reflect the 2030 background scenario volumes plus the addition of site generated traffic. The future year 2030 total traffic volumes are summarized in Figure 12 for the offsite study Intersections. Intersection Operations The Intersection operations for the 2030 total traffic scenario arc also summarized in Figure 12 and in Table 14. As can be seen from the figure and table, the future year (2030) total scenario determined that site -generated trips did not impact any study intersections not previously identified in the future year 120301 background scenario. As In the 2030 background scenario, the Hamrick Road/East Pine Street Intersection operates with a v/c ratio of X1.0 during the weekday p.m. peak hour and the critical movement at the Biddle Road/Airport Road operates at LOS F during the weekday p.m. peak hour. raaha a4u 4In[. N003l10'1NIOd 1W1ND ZZ S nO NV3d AVOOW3ON3133MONV Nd AV0133M 31098 SNOWONO]JNiWl WiO1(OEM) MA 3rIIN :ce.l➢C.PCwlm ..,an, nonwnonon nremrRndpn: Table 34. Future Year (20301 TNI Traffic operation' Profenl19ae6 ame..loss 1. 1359 Ramp A E at Pine Rite[ PMPeak B 13A a" COOT Mln Psak a ]E1 0.96 _ ].IS M9 Pmpa Fam Pine street Roar PIB PwY C 31B 0.w Mlopbk [ AIR Dd3 3. P.,Jn, Rwd A EaNPlne S. on nu CIN _PM Pak_ MIO PmY _ _ I C C D-0_ Ile 0.15 0.14 4 Marrvid Ped B teat PIM Sh Per "Fall, _ 0 Ya In Cwmp City WO Reae, B 1BT oae I . Federal va, aelmld load VM Reek YNIREoinl B im 019 Coumy,Dty rely Peak Renhib uN B 12.0 am _ s. Tad. RM Road B VVa Road PM Peak D l 55.9 an Fauely MRt... R I C 21.7 _01 7. Y.W. Rak Road a lido, Road PMMY 0 10 Mw-- County MI01ek C b4 M1er a. iahle RNrRotlY WmM euH Pa, Few, FAAanuee C 573 all Carmry MID IwR Fa4NUM mnMR B 1FA 0]3 9, Table Mod Rqd 6 Wpert R,en1 CarmV IMPakC _ I Y,1 0.H MIO Rat a 215 DBJ 30.&dMIRudaAina,p rad cited Mohd PaRRM Ra019I I PYalllaad _ Ila�w.a e P W >31 Y i1. TaMPodet'alaOla AJ CIDO" _ IMM1Ik _ 40.9 am Caller MN Pcak _D [ _ 39.7 0.A ]2. L1P 67l Fy[VYa MOW _ ODWI CCUMF _ _ PM M1t MIDRaY _ _ O NL 493 [ n1 a74 nwr' mecencemwnmem mreywreu lYrmun WnaxreammFRnonF below menav n.AaFuye[q +wrwr: a 41r1 b rnWrNd In a�Ne fw wndm r V/c IMIb b dlMd awMde-m®p.dlY MMnA alMeta lla mnrtiv W altles Mldtd W Ne '.mad. lMernFF'4. rRuzRlon durlla Mapnk35 mYWFOFIIw pnkhnur and aMl erllY Yde4lmam mW tlonagnllnFb.Ra Rs iunMkrlods NlidardF. Year 2030 Site Access Operations Figure 13 and Table 15 presems the year 2030 traffic conditions at each of the site accesses. All of the proposed site accesses operate at acceptable levels of service during the weekday p.m. and weekend midday peak hours. Reca use of the planned roadway Improvements along Table Rock Road, there Is a significant benefit to the traffic operations at the site accesses along Table Rack Road when compared to the bulld-year(2016) total traffic scenario. W neahnn a Ramadan r Nr. A WN.XA.iR N,adY,.....R,.1d0 wT�uu.n AlW Rh'{MXMCf MMO W�Yrg1V I.v 1YY�IIYA1`I iIMNiW �w�w�Y� �mALFAAr.xuRFinarwn WA�llNiLTMlTOWY =Z� x*v • , h WA�llNiLTMlTOWY =Z� x*v • , h .T �A.ACM,lA,TM hrrrr M � , h MI TM ,IE pR¢N.SN1N�1(Att • hrrrr M � , h FUTURE YEAR (]0301 TOTAL TRAFFIC CONDITIONS AT SITE ACCESS ESI FlGuliF WEEKDAY PM AND WEEKEND MDOAY PEAK NOUNS 13 CENTRALPOINT,OREGON [bnrml Paln[rm rto R,ebPme,rt 1rtNynrtOlNN Lpxf Nwi}ftr Table 15. Fue rs Year 120301 Total Tr\Illc Operations at Site Acces ers "owa#l: IXoov'.15 li. pose, War& Nanhwea OnaawaY cu of 4,111. PolR IIM Paak MIn PBk wsa000d Wwfsou d A A io 1C SA hdmiwwasowhwaa orl'maY Cay of PM Woolmnd M01 MOPS rm1.1 POOrt k ..hound A 01 i. W. NamR Road OMeway& HamrtlPoed [Rigor PM" agnhwom Ya ! 15 Ca_mnl POlnt Mia Perk NcrVltlu-0Yft is 1e 1a FaRHxnrf* Road (set ln/RIahP cua\NamMRotl LRyof PM Puk NontboW A 1] glAo.ts CenlnVoln[ MPnk Rodhboudl A ls17 Tab.Pn4.nd&NdMaat 3adlmn PM Pak Fettuubd Yrt c .nount, hasPak YRWund YR c .19eMMk FalbauM a .PopluaWaY Coun mMk ENEou,d ! .re .aa: M4gNu movllMll n IepWNn for.. Vnnl,Inean ----o. awvrry•xoY wµv nY -u.«o.«raCo. W,1,,apniedh.... no. pit wh4k;'V/C R.C.4 Mflmd of rehkl ,—fgosofty no. wWh Yku4W N.—u Ww0loi dl,M1 hl ea Wadt, of Lha medway/In4r5eRlon data dw Rak 15 mtru of Me pack hour, Md W �4 Irofo a wruteon apnth,a a11ow 14 Jurwdofl,z aa. FUTURE YEAR (2030) MITIGATIONS This section includes the mltlgatlons to the Intersections Identified as not meeting operational standards In the year 2030. As outlined previously, there are two locatlom found to not meet standards In the year 2030 background conditions. The additional of site generated traffic did not trigger any additional locations to not meet standards in the year 2030 scenarios. The two locations found to not meet standards in the year 2030 background conditions are: a Hamrick Road & East Pine a Biddle Road &Airport Road The mitigated result for each impacted intersection is outlined below. Appendix W contains the future year (1030) mitigated traffic operation worksheets for the intersections outlined below. Hamrick Road A East Pine Street Mitigations The Intersection of Hamrick Road/Fast Pine Street experiences a heavy volume of vehicles making a southbound right -turn at the intersection, with a v/c ratio for that movement of above 1.0 during the p.m. peak hour of the future year (2030) background traffic conditions. Them have no improvements identified beyond Project #216 stated In the City Central Point's transportation system plan. In order to mitigate the intersection, there are several options: The addition of a southbound richt-tum lane would improve Intersection operations to LOS C with on ovenll v/c ratio of 0.76 and average delay of 25.2 seconds per sehicle. The v/c ratio of the southbound right -turn movement would decrease from 1.27 to 0.70 with the addition of an additional turn lane. Km o, a Auonom, In. GnfM blot Wrto G.ebrmen[ Ira,Y[talAN6 r,vmlwlanon rmavicexlwM�• IXbaeraal5 The addition of a second eastbound left -turn lane would also mitigate the Intersection to a volumeAc-capacity ratio of <0.95 (currently under review as one option in the Jackson County TSP) The conversion ofthe intersection to a roundabout would also mitigate the intersection to a volume -to -capacity ratio of <0.95 (currently under review as one option in the Jackson County TSP) Middle Rood A Airport Road Mitigations This intersection operates at LOS F during both the 2030 background and 3030 total traffic conditions. The project is not adding any traffic to the critical westbound approach. There are no knows plans for improvements at this location by the City of Medford but the heed for mitigation Is not triggered by the project. PARKING ASSESSMENT City of Central Point Municipal Code 17.64.010 states that all land uses shall comply with the number off-street parking requirements. These requirements for non-residential land uses ale stated in Table 17,64.028. Retail store was assumed as the general commercial use for the proposed Costco development. This use states that no more and no less than 1 parking space per 200 square -feet of net floor area (excluding storage and other non -sales or non -display areas( be provided. Based on the proposed 160,000 square -foot warehouse, of which 134,000 is usable sales space, this would equate to a minimum and maximum requirement of 570 parking spaces for the Costco development Municipal Code 17.64.040.8.2 states that the off-street requirements may be Increased based on a parking demand analysis prepared by the applicant as part of the she plan and architectural review. The parking demand analysis shall demonstrate and documents Justification for the proposed increase. Parking Demand Analysis The proposed lite plan as Illustrated In Figure 1 provides a total of 782 parking spaces which is 30% mora spaces than the maximum allowed based on Central Palat's Municipal Code. Based on the nature of Costco sales and operatlons, the proposed parking has been carefully considered and is proposed given known parking demand characteristics for Costco sites. Costco is a unique use that demonstrates the need for a particular amount of parking to accommodate typical and peak demands. In fact, one of the reasons for relocating the existing Medford Costco to Central Point Is to build an a site that can provide sufficient parking supply. Table 15 provides a summary of the documented parking supply and demand at existing Costco warehouses in Oregon (including the current Medford location). W xaeaw•x..mmn, CentmlPow C..M bpmmt i,q'xY/f9J1a Tmn...... Mpa[[AnaryfN IXmberlp35 Table 16. Typical Peak Parking Demand at Ctthar Costco WarMouatl In Oregon As shown in Table 36, these three other Costco locations demonstrate atypical peak parking demand of 4.24 spaces/1,000 sq -ft. Guidelines from the Institute of Transportation Engineer's Parking Generation, 4th Edition (Reference 11) recommend that users perceive a parking lot to be "full" once utilization reaches 90% of capacity, noting that hcreases in illegal parking and repeating circulation occur beyond this level. Given this guidance, our recommendation is to provide sufficient parking to maintain a utllization of below 90% during the typical peak periods. Table 16 shows that, based on data from other Costco developments, the parking ratio required to maintain 90% utilization during the peak or less is a minimum of 4.71 3paces/1,000 sq -ft. Applying the demonstrated minimum parking suppIV of 4.71 spaces/1,000 sq -fit to the proposed Central Point Costco development equates to a minimum recommended parking supply as summarized In Table 17. Table 17. Central Point Costco Pecommanded Parking Supply The table shows that a minimum of 753 parking spaces should be supplied in orderto provide sufficient capacity for the likely parking demand an site. This indicates that the proposed puking supply of 782 is slightly higher than this minimum amount but within a reasonable range and will provide an appropriate parking supply to accommodate typical peak periods as well as additional spaces for seasonal peaks as well. In addition to parking space totals, accessible parking requirements are presented In Table 17.64.03 of the CWs Municipal Code. For land uses providing a total number of parking spaces between 501 and 1,00% which applies the proposed Central Point Costca site, 2%oftotal parking provided is required to be accessible. Costco has planned to Include approximately 2.2% or 17 of its total parking spaces to be accessible parking, based on total parking spaces equaling 782. The site plan shows that this requirement is being met. Section 5 Conclusions & Findings onn•'(.. 99 'o..remrm•�r fmcNova Niny CONCLUSIONS & FINDINGS r 1..ensvxs omen zas The analysis and evaluation completed for the Central Point Ccstco development resulted In the following conclusions and findings: Project Description Costco Wholesale is proposing to develop a new warehouse and fuel station located in the southwest quadrant of the Table Rock Road/Hamrick Road intersection in Central Point, Oregon. o The development plan includes a 160,000 square -foot Costm warehouse and a 24 fueling position Costco Gasoline fuel station. This new Central Point Ccstco will replace the existing Medford Costco located at 3639 Crater lake Hwy in Medford, Oregon. • The parcels of land that in which the proposed Costco would occupy are zoned as M-1 (Industrial) which allows the development of the Costco warehouse and fuel station with a conditional use permit (no land use or coning changes are required). • In order to best evaluate the anticipated transportation characteristics of the proposed Central Point Costco development, it was agreed that the Costco -specific data be used to most accurately represent the anticipated traffic characteristics ofthe unique development type. The proposed Costco development is estimated to generate a total of approximately 10,670 net new trips on a daily basis, 900 net mew trip ends during the weekday p.m. peak hour and approximately 1,365 net new trip ends during the weekend midday peak hour. The distribution pattern for site generated trips was developed using rip code data from current memberships at the existing Costco warehouse located on OR 62 (Crater lake Highway) in Medford, Oregon, as well as from the existing traffic Panama and major trip origins and destinations within the study area and the regional travel demand model. Existing Conditions • The study evaluated 12 off site Intersections in addition to site access points. • The study evaluated two time Periods for each evaluation scenario: weekday p.m. peak hour and weekend midday peak hour. • gaud on recent traffic counts collected in May and July 2015, all of the study intersections were found to operate at acceptable operating standards during the existing weekday p.m. and weekend midday peak hours except for the Table Rock Road/Alrpert Road Intersection during weekday p.m. peak. eeMen a,u .W lM. We l.1.Ko OMbOment .ntfub &nndh e,o,Re„seas IXtaG,]W$ o The Table Rock Road/Alrport Road intersection is stop controlled in the westbound direction. Under existing conditions in the weekday p.m. peak hour, there is high delay for the critical movement (westbound left -turn) resulting in LOS F. Crash data the most recent five years (2009 — 2013) at all of the study Intersections was reviewed to Identify historical safety trends. 0 Turning movement and rear -end crashes were the most common crash type at the Intersections, accounting far approximately 82%of all crashes. o Them were no fatality crashes. o Four study intersections were found to be in the 90th percentile and in compliance ODOT's SPI5: 1-558 Ramps/E Pine Street, Table Rock Road/W Was Road, OR 62 (Crater Lake Nighway)/W Visa Road, and Table Rock Road/OR 99. g Wld Yeor 7016 Analysis • The transportation impact analysis evaluated two different future year scenarios: year 2016, the assumed build out year of the development, and year 2030 a long-term planning year. • The 2016 build -year background traffic analysis (without inclusion of the project traffic) found that all of the study Intersections are forecast to operate at acceptable levels of service and volume -to -capacity ratios during the weekday p.m. and weekend midday peak hours except for the Table Rock Road/Airport Road intersection during weekday p.m. peak hour. o As under existing conditions, during the weekday p.m. peak hour there is high delay for the critical movement (westbound left -turn) resulting in LOS F. In addition, the critical movement Is also operating with a volume -to -capacity ratio of greater than 0.95 in the build year (2016) background conditkns (with no traffic from the proposed Costco development). • The build -year (2016)total traffic analysis (with inclusion ofthe project traffic)found that all study intersections will continue to operate at acceptable levels of service during the weekday p.m. and weekend midday peak hours with the exception of: o 1-5 NO Ramps 6 East Pine Street exceeds COOT standards (lane group v/c ratio s 0.85) with the northbound right -turn lane group's v/c ratio of 0.87 during the weekday p.m. peak hour. The need for additional capacity for this northbound right - turn movement has been previously identitled in the Final Draft TAMP: Exit 33 study which calls for the widening of the 1-5 northbound act -ramp to add a second rili turn lane at the northbound approach to East Pine Street. 0007 and the City of Central Point are currently In discussions to determine Costco's appropriate proportional fair share contribution to this Improvement as mitigation for the site generated trip impacts. rabhon a Iue,/ony W. onnm romr r�rcn lhvebpmmc m,Kiusroo.a rmuma• PryKtarIDK ame.rzau o Table Rock Road & Airport Road, asunder existing and 2016 background conditions, continues to operate at a LOS F during the weekend p.m. peak hour. Improvements to the Table Rack Road/Airport Read Intersection are scheduled in year 2017 as part of Table Rock Road widening and a signal will he added to the intersection. This Intersection Is an existing deficiency; however, given that this improvement is not currently scheduled until 2017, Jackson County and the City of Central Paint are currently in discussions to determine an appropriate contribution to this Improvement as mitigation In the Interim for the Costco project. o Biddle Road & Airport Road experiences a higher delay for the critical movement of the westbound approach, dropping from LOS C to E during the weekday p.m. peak period due to site -generated traffic. Even with the site generated tragic, the Intersection is operating at a very low volume -to -capacity ratio of 0.45 in the weekday p.m. peak hourand 0.14 in the weekday midday peak hour. Site Access Analysis • In the build year 2016 scenario, all site access intersections are projected to operate at acceptable levels -of -service and volume -to -capacity ratios during both the weekday p.m. and weekend midday peak hours, with the exception of the Table Rock Road/Northeast access. Note this is assuming this access is a full movement access and no Improvements to Table Rock Road are completed. Under this scenario, the critical eastbound left -turn movements at the Table flack Road/Northeast access is projected to operate at 105 F during the weekday p.m. peak hour, however, it is still projected to operate well under capacity and meet the County's operational standard. • Even though the build year )2016) analysis showed that all of the site accesses will be able to operate as proposed upon site opening before the Table Rock Road improvements are constructed, an evaluation of access alternatives for Table Rock Road was also completed to compare how temporary improvements would Impact the access operations in the interim. • The access scenarios compared were: o Build Year (2016) Total Traffic Conditions (i.e., Full Access to Table flock Road) with No Table Rack Road Improvements )as summarised above) o Build -Year (2016) Total Traffic Condhions with Temporary Table Rock Road Improvements (i.e., temporary widening of Table Rod Road along the site frontage to provide a center lett-lum lane until the ultimate widening project is constructed) o Bulid-Year (2016) Total Traffic Conditions with Restricted Right-In/Right-Out Site Accesses (restrict Table Rock Road access to right-in/right-out only until the ultimate widening project is constructed) • The access alternatives evaluation found that: er aeaao•aauwab, er. a,,.1 value ox". ov.Nomenl cwvlwk,ua nntllnps P"ct a saosa a,.., IO , o Assuming full movement access and no improvements to Table Rack Road, the eastbound left -turns at the northeast access to Table Rack will experience relatively long delay (resulting in LOS F) but the access will still operate well under capacity and meetthe County's operational standard dudngthe critical time period. o Providing temporary widening along the site frontage to provide a temporarycenter turn lane will allow all Table Rock Road accesses to operate acceptably as full movements until the ultimate Table Rack Road widening improvements are constructed in 2017. o Restricting the site's Table Rack Road accesses to right-in/right-out only will allow thane accesses to operate at acceptable levels of service and volume -to -capacity ratios. However, It will add additional left -turn maverrents at the Table Rock Road/Hamrick Road Intersection thus resulting in over -capacity and LOS F conditions at that location. This Impact could be reduced by adding temporary widening around the intersection to provide a northbound left -turn lane as well as a center refuge area north of Hamrick to allow vehicles turning left from Hamrick to make a two stage gap acceptance maneuver for the eft -turn. o Once the ultimate Table Rock Road widening improvement is constructed in 3017, all site accesses to Table Rock Road will operate a good levels of service (LOS C or better) and volume -to -capacity ratios (v/x0.21 or better) during the peak hour periods assuming they are full access movements. e From a safety perspective, a predictive safetyanalysis found that: a Providing full movement accesses to Tahle Rock Road in the near-term with its current two lane configuration shows the probability for 1.2 rnshes per year to occurcombined atthe two access points. o If these were restricted to right-in/right-out only driveways, the safety prediction lowers to a probablllty of 0.83 crashes per year (about a 30% decrease In probability). o Iftemporary widening was provided inthe interimfor atwo-way left -turn lane along the site's frontage, the probability would lower to 0.76 crashes per year (shout a 30% decrease in probability). o The safety predictive analysis also shows that once the ultimate Table Rock Road widening Improvements are In place the safety prediction lowers as well to 0.77 crashes per yeareven with maintaining full movement accesses at both locations. as xk .l &,l .W Inc [en4al VWnr CwKn 0.nlornxnt con.wno•:s rmume Future Year 1030 Analysis Ptv/rtalJMa c,.me..tau The future year (2030) background conditions analysis (without the project traffic) found that all study intersections will continue to operate at acceptable levels of service and volume -to -capacity ratios during the weekday p.m. and weekend midday peak hours with the following exceptions: o Hamrick Road & East Pine Street operates with a v/c ratio of >1.0 during the weekday p.m. peak hour o Biddle Road & Airport Road (as under the build year conditions) has a critical movement which operates at LOS F during the weekday p.m. peak hour although the movement Is still operating under capacity with a v/c ratio of 0.55 • The future year (2030) total traffic analysis (with the project traffic) found that the site - generated trips did not Impact any study intersections not previously idemified in the 2030 background scenario. • All of the proposed site accesses operate at acceptable levels of service during the weekday p.m. and weekend midday peak hours under the future year 2030 total traffic scenarlo. Because of the planned roadway improvements along Table Rock Road, there is a significant benefit to the traffic operations at the site accesses along Table Rock Road when compared to the bulld-year (2016) total traffic scenario. Parking Assessment • City of Central Point Municipal Cade directs that a parking supply of 670 parking spaces be provided for the Costco development (assuming retail land use). • The project Is proposing to provide a total of 782 parking spaces on site. • As part of this report, a parking demand analysis was completed to demonstrate and documents Justification for the proposed increase in parking supply. • Actual parking supply and demand data from other Costco sites In Oregon indicates that a minimum parking ratio of 4.71 spaces/1,000 sq -ft be provided in order to supply enough parking to meet Costco specific demands. • Applying the demonstrated minimum parking supply of 4.71 spaces/1,000 sq -ft to the proposed Central Point Costco development equates to a minimum recommended parking mppiyof 753 spaces. • This indicates that the proposed parking supply of 782 is slightly higher than this minimum amount but within a reasonable range and will provide an appropriate parking supply to accommodate typical peak periods as well as additional spaces for seasonal peaks as well. Wse x, a N.wtloh• me Section 6 References Gntml4d,rt Lm [N aevdopnRM Pe/eppMO REFERENCES �IMv I1fOP6 Cnctr, M15 1. City of Central Point. Central Point Comprehensive Land Use Plan 2008-2030, Central Paint, Oregon, May 2013. 2. City of Central Paint. City of Central Point Transportation System Plan 2030, Implemented by Ordinance #1922, Central Paint, Oregon, December 18, 2008. 3. David Evans and Associates, Inc. Final Draft TAMP: i -S Exit 33 (Central Palm), Oregon Department at Transportation, Salem, Oregon, May 2015. 4. Transportation Research Board. Highway Capacity Manual 2000, Transportation Research Board of the National Academies of Science, Washington, D.C., 2000. S. Kittelson & Associates, Inc. Jackson County Transportation System Plan, Ordinance No. 2005-3, White City, Oregon, March 16, 2005. G. Oregon Transportation Commission. OHP Policy IF Revisions, 1999 Oregon Highway Plan, Salem, Oregon, December 21, 2011. 7. City of Central Point GIS, Street Jurisdiction Map, Jackson County Smartmap, Central Paint, Oregon, January 2014. S. Rogue Valley Metropolitan Planning Organization. 2009-2034 Rogue Valley Regional Transportation Plan, Central Point, Oregon, April 27, 2009. 9, Oregon Department of Transportation. OR 62: 1-5 to Dutton Road, Oregon department of Transportation, http://www.omgon.gov/ODOT/HWY/REGION3/pages/hwy62_indea.aspx, April 2013. 10. Southern Oregon Transportation Engineering. White Hawk Development Traffic Impact Analysis, Medford, Oregon, July 20, 2014. Il. Institute of Transportation Engineers. Parking Generation, 4i° Edition, Institute of Transportation Engineers, Washington, D.C., 2010. of ath-aA .K m,. KITTELSON 8r. ASSOCIATES, INC. TNA NNP ONT.•TION CNO IN REM... / PIANN INN 101 a C•POOI aau'Avvd, auI! 301, aobN, ID 83702 209.3911.2aa3 208.338.2868 MEMORANDUM Date: November 10, 2015 Prclactu.]901 Mr. Matt Samitore City of Central Point 1405outh Third Street Central Point, Oregon 97502 From Brett Korporaal, Julia Kuhn and Sonia Daleiden projem Central Point Costco TIA subject: Response to Comments— Central Point Costco TIA This memorandum responds to comments submitted by staff from the City of Central Point (via Southern Oregon Transportation Engineering, LLC), related tothe Central Point Costco Transportaticn Impact Analysis (TIA). Each comment Is summarized below followed by aur response. COMMENT 1— SUBMITTED BY CIN OF CENTRAL POINT "Page 30 of the study in the last paragraph, KAI assumes that planned roadways In the IAMP as well as Tier 1 Improvements listed in the City's TSP have been financially constrained and can be reasonably funded within the next twenty years. Many of the projects and/or improvements identified are not funded and there is no current mechanism for funding at this time. These include: • Widening East Pine Street to add a second WBL and widening the I-5 SB on-ramp for two receiving lanes ($1.7 million) • Widening the 1-5 NB off ramp at East Pine Street to include an additional NBR ($1.3 million) • Widening west and north approaches at Hamrick/Pine Street intersection • Widening to include a dual eastbound left at Table Rock/Biddle Road intersection" KAI RESPONSE As part of the scoping process, KAI received confirmation from each of the jurisdictions that the Tier 1 projects identified in the IAMP and RVMPO's RTP should be included in the TIA analyses. As communicated in an email from Wei Wang, ODOT, on Thursday, July 2, 2015, "Page B of TIA, Planned Transportation Improvements — This should reference the RVMPO PTP Tier 1 projects and also 9LENMME. H. IM01MIEli -CENTRAL PonYT CikTCt7 TTAWE{VR1 f1NAL R£SPoNSE rO COMMENT5119145 CEMlRAL P[dW LbSTCOT RESFYJ To I:DMarfNJS-i]NAL.00TX fentml 1oinK"sKo TIA 1mi11# 19046.0 Narrmbv 10, .15 Pulte2 consider improvements/mitigations identified in IAMP 33. It is possible that some of them could he triggered earlier or may by mitigation for this development. Please review the Interchange Area Management Plan 1-5 Exit 33 (IAMP 33). The proposed Costco TIA should be consistent with IAMP 33." Based on this email, we submitted a "Scoping Memo Response to Comment" memorandum to the City of Central Point, Jackson County and ODOT that stated, "We will include any planned transportation improvements referenced In RVMPD RTP Tier 1 and IAMP 33 that will be completed during or prior to the proposed build out of the site." Additionally, on Tuesday, September 29, 2015 KAI held a telephone conference with representing members from each agency to review and discuss the initial findings from the TIA. During this call, we verified with agency staff the funded Tier 1 projects from the RTP and IAMP to include in our analyses. Our TIA is consistent with all of our previous correspondences from staff. We are unclear as to the change in direction about those projects to include in the analyses and would appreciate additional insights from agency staff. COMMENT 2 — SUBMITTED BY CITY OF CENTRAL POINT "The TIS doesn't include a queuing analysis, which is a requirement in the scoping letter. A queuing analysis should be performed in SinnTraffic and follow the methodology outlined in ODOT's Analysis Procedures Manual (APM)." KAI RESPONSE 2 KAI analyzed queuing for all site access points, the 1.5 NO Ramps/E Pine Street and Table Rock Road/Hamrick Road intersections based on scoping direction from the City, County, and ODOT. Queuing was reviewed for the impact of the site -generated trips on 95th percentile queue lengths. Per the TIA, queues were calculated for the 2016 and 2030 scenarios during the weekday p.m. and weekend mid-day peak hours. For comparison purposes, the build -year (2016) total scenario also identifies queues lengths assuming an interim three lane configuration along Table Rock Road. The 2030 scenario provides the queuing assuming the planned and programed Improvements to Table Rock Rand are in place. The queuing analysis was completed using SlmTraffic within Synchro g software, which implements the 1000 Highway Capacity Monuaf methodology and Is in compliance with ODOT's APM. In order to provide a conservative analysis and reflect the worst-case conditions, queues were reported for a peak 15 -minute analysis. Vehicle queue lengths were rounded to the neat 25r' foot (assuming 25 -feet of storage per vehicle). 91d.11.n A An d.,el. Mr. aw'w, IdaaO central polnreo:tre na pikeet'. ISl Ideambe.lo, IS eased Build -Year /2016/ Total Trial Condition Queue lengths Table 1 presents the queue lengths for the build -year (2016) total traffic scenario. As documented in the TIA, the northbound right -turn at the 1-5 NI3 Ramps/E Pine Street intersection exceeds capacity with the inclusion of site -generated trips. With the inclusion of site -generated trips, the queue lengths Increase from approximately 125 feet under background conditions to 350 feet under total conditions. However, with she -generated trips the queue Is still maintained within the right -turn lane storage and does not spillback into deceleration area of the northbound off -ramp during the weekday p.m. peak hour. No queueing impacts were identified at the other intersections analyzed. In addition, a three -lane roadway along Table Rock Road does not change the estimated queue lengths northbound and southbound. However, it is important to note that the absence of a left -turn lane can cause delays to through travelers along Table Rock Road. Further, the absence of a left -turn lane also Increases queue lengths and delay for vehicles making left -turns out of the site. The Table Rock Road widening is completed in year 2017 and will provide benefits to the overall transportation system. Table 1. 95th Percentl le Queuing — 2016 Conditions 2. L5 NS Ramp/E -Ind 51 stone. Lenon' PM Peak MIO Peak 150 25 50 las she 150 Sas 200 135 SAD 350 lis R, Table Roek Rtl/Namrlck Rd Stuck, L@n' 160 Ike Peak 15 25 25 D M ID Peak IM Peak so us 0 25 25 D 25 D SS. Federal Wry/N¢Rnweal DW; MIO Pxk 0 l5 D 25 0 14. Federal Wp/Sauthwest Den,PMPeak 0 0 D 25 MIOPeak Peak D D D 25 0 0 IS. Wert III Rd Dwy/Hemdh Rd PMP MIO Peak _ 0 0 25_ 15 25 35 25 25 16. EastmrkX NaRd IRIROOq/Namrlck Ad Pre leak 0 25 MIO Peak 0 15 1].hble Rock Rd/NartMast Deny PM Peak 75 50 25 0 MID neck 50 SO 50 0 10. Table Rock Xd/South.nt D'Rr R.T.W.R.Ald/Hamrlck Rd PM Peak 25 0 25 1 0 MIO PnX 35 0 l5 Stan Lm IX 160 0 PMPeak 35 25 IS 0 MID Peak 25 25 ES o 17. Table Rah Rd/Nartheast D" PM Peak 25 50 25 D MIDPeek 25 50 25 0 16. Table Rock Rd/Slutneaal Dwy PM Peak 25 0 35 0 MID Peak 15 0 25 10 Nates' 95` P ... here linnue I¢Ntni have Oen noun........ rat n -rape, one nn ars reprerenr ea rev or .—I ^"ese enpm sen. reported where applicable rt the respective Interaectlan. Smraae lanes for len aid rlaht turns Into the site We not Included In the hall 1201611 des surwl¢ wIM IM eeceptlon at the Wea' Wnnlck Rd Owy/Hern ilk Rd sae atou where there Is PreWask, a Mo wry bRturn lan.'R two -wit, IeRtum lane II be r.sill alone Table Roc. RM for access hRo and of tic she ddeewNs; a W Indicates 95'" prcentlle queues ..usellN ansa, Weth. Rltt .. a s sec'mas, Inc Polite. Huhn can mI Point Cosko TIA Protect 1. SSU16.0 Novem6elf0, ZOf5 Pv,,4 Future Year (2030) Total Traffic Condition queue lengths Table presents queue lengths for the future (2030) total traffic scenario. As shown, all estimated queues can be accommodated within the storage provided during both peak hours analyzed. Table 2.9Sth Penentlle queuing —2030 Conditions re,dad where epparable re the re ,mauve Intenedles. Sten, ands star, Table Roe Rwd will be induces In Me two-way IeM1-tum lane when the Tads Rod Road Impmveme ly are eomgaM In yev 2017. At the Wert HamMk Rd D"/Hwnhk Rd are ami, dere Is presumed, a -way left4urn lane. Future year md, or do as not lrcludasIs no to overseas the site on Federal Way bemuse of law volume ofbank and turnln, move meets in to and aut of the se; Rose! Intlkaks 95a IIrortlle queue ..,..did, slane, leryth. COMMENT 3 —SUBMITTED BY CITY OF CENTRAL POINT "If multiple access points are being proposed on Table Rack Road and S Hamrick Road then City and County access spacing standards should he taken into consideration and shown to be in compliance or otherwise justified." KAI RESPONSE The Cll Transportation System Plan (TSP) Identifies Table Rack Road as a major arterial. Based an Table 5.2 In Central Point's TSP a minimum spacing standard of 500 feet applies given the 45 mph posted speed. The Table Rock Road/Northeast Driveway is approximately 420 feet south of the Table Rock Road/S Hamrick Road unsignalized Intersection. This driveway serves as the site's main driveway. The Table Rock Road/Southeast Driveway Is located at the very southern edge of the she boundary. The spacing between the two site driveways is 500 feet, meeting City access management standards. Although distance between the main driveway and the 5 Hamrick Road intersection does not meet the City's standards, there are no queue conflicts or operational issues associated with the spacing. le.lnda lem Lorca, Into Rot¢, Mono Ston W 2.1-5 NB Ramps/E Rd. St PM Peak 50 135 335 200 MID Peak 25 20 150 150 p tare F R. Table Po[Y Pd/Wmdc4 Rd real Real, 25 25 25 0 MHORRIOPaN 25 24 25 0 PM Peak 0 25 0 25 13. sedrml way/NORMvert Do, MIO Peak 0 25 0 25 0 14. redenl Way/5outhweII Owy PM Peak 0 0 0 25 MID Paul 25 0 0 25 0 15. West damrld Rd OwyMamrlck Rd Pre Post 0 25 35 25 MIO Pnk 0 1 25 25 25 PM Peak o 25 16 Ern Ham tick Rd IRIR01 Dwy/H—dolk Rd MID Peak B 25 12. Table Rock RdMortFeast Owy PM Peak 25 SO 50 0 MIOPeak 35 So 50 0 PM Peak 25 0 25 0 12. Table Rods Rd/Soulhnnt Owy MIO PeaX 25 0 25 0 Notre: 95 peromIlly queue lenatha have heed rounded to the no, n5 fioR am aeMtluepresent I lease I stories; Stodge IMIha Gere re,dad where epparable re the re ,mauve Intenedles. Sten, ands star, Table Roe Rwd will be induces In Me two-way IeM1-tum lane when the Tads Rod Road Impmveme ly are eomgaM In yev 2017. At the Wert HamMk Rd D"/Hwnhk Rd are ami, dere Is presumed, a -way left4urn lane. Future year md, or do as not lrcludasIs no to overseas the site on Federal Way bemuse of law volume ofbank and turnln, move meets in to and aut of the se; Rose! Intlkaks 95a IIrortlle queue ..,..did, slane, leryth. COMMENT 3 —SUBMITTED BY CITY OF CENTRAL POINT "If multiple access points are being proposed on Table Rack Road and S Hamrick Road then City and County access spacing standards should he taken into consideration and shown to be in compliance or otherwise justified." KAI RESPONSE The Cll Transportation System Plan (TSP) Identifies Table Rack Road as a major arterial. Based an Table 5.2 In Central Point's TSP a minimum spacing standard of 500 feet applies given the 45 mph posted speed. The Table Rock Road/Northeast Driveway is approximately 420 feet south of the Table Rock Road/S Hamrick Road unsignalized Intersection. This driveway serves as the site's main driveway. The Table Rock Road/Southeast Driveway Is located at the very southern edge of the she boundary. The spacing between the two site driveways is 500 feet, meeting City access management standards. Although distance between the main driveway and the 5 Hamrick Road intersection does not meet the City's standards, there are no queue conflicts or operational issues associated with the spacing. le.lnda lem Lorca, Into Rot¢, Mono Cent IPoInI Coe rra TA Ymje[Y a:'sa*so NovemEer I0� 1015 Pogi Further, we have worked with the project team to maximize the spacing of access points and to optimize internal circulation for both the warehouse and fuel station. We can work with the City to seek a design exception to the 500 feet standard between the main driveway and S Hamrick Road intersection with Table Rack Road. Per Table 5.2 of the TSP, the applicable access spacing standard along S Hamrick Road Is 300 feet. The East Hamrick Road Orkneway/5 Hamrick Road site access meets the spacing requirement between the driveway and the unslgnalized Intersection of Table Rack Road/S Hamrick Road intersection. The distance between the west and eastdriveways along 5 Hamrick Road is roughly 520feet, also meeting the City's access spacing standards. The West Hamrick Road Driveway/S Hamrick Road site access is located approximately 200 feet west of the Hamrick Road/Federal Way unsignalized intersection, not meeting the City's spacing guidelines. While the spacing does not meet City guidelines, our analyses demonstrated that no operational or queuing conflicts are anticipated between this driveway and the S Hamrick Road/Federal Way unsignalized Intersection. We will also work with City staff to seek a design exception for the spacing between the west driveway and the S Hamrick Road/Federal Way intersection. COMMENT 4 — SUBMITTED BY CITY OF CENTRAL POINT 'The proportional share for impacts to facilities such as the 1-5 NB off ramp can be determined by a volume comparison. The 2016 no -build right turn volume is 310 PM trips. Proposed development in 2016 adds 90 PM trips. Adding 90 trips is approximately a 23% impact. The same methodology can be used for other facilities." KAI RESPONSE Thank you for clarifying the applicable methodology for proportionate share impacts. We will work with Costco and the agencies in determining the proportional share for projects which Costco will he responsible based an feedbackfrom the agencies. xlrteNan a mmeom, Inn. �Irt. ImAo HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA B: Table Rock Rd IL Hamrick Rd Buildi (Mitigated) Weekday PM Peak Hour -A ♦ 1 T 1 Lane Configurations h Ir h f If Volume (whT) 71 79 19 464 569 26 Sign Conti Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.92 082 0.92 0.92 0.92 0.92 Hourly Sow rale(vph) 17 86 21 526 616 28 Pedestrians 1 Lane Width (t) 12,0 Walking Speed (Ns) 3.5 Percent Mock!" 0 Rght tum Aare war) Median type TWLTL TWLTL Median storage war) 2 2 Upstraarn sipnet(t) 1076 p7L pataon unblocked 0.70 0,70 0.70 VC. cordSiV*M 1201 634 646 vC:l stage 1 conical 634 YC 2. stye 2 control 367 vCu, unbloci 1075 266 268 IC. ainph is) 1 6.2 4.3 IC, 2 stye (a) 5,4 IF(s) 3.5 3:3 2.4 p0 queue hes, % 81 84 97 cm ca4ledlY("1 410. 56 824 Vdlvii"inTdGl _.. . _77 __ _+88. _ It ..1. .847 .... . Volume Let 77 0 21 0 0 Vdume Rph! 0 86 0 0 28 cSH 416 545 824 1700 1700 Vglumetoc4ed4y 019 0.16 0.03 0.81 0.38 Ouew Length 9511h (t) 17 14 2 0 0 Contra! Delay (a) 159 12:6 9.5 1 0.0 Lane LOS C 6 A Approvlr Delay (s) 142 0.0 0.0 Appraach LOS B Average Delay 1.8 IldeneollaniGapaciky Whir 48:2% I0113asalalMYb A Analysts Period (min) 15 Klftason 8 Asamlatea, Inc. Synchro 6 Repor! 11!1212015 pye 1 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 1T Table Rock Rd & Northeast Dwy BulldYear Utgeted) Weekday PM Peak Kxr 1 t l valume(v;wh) 50 141 161 453 578 72 Swn Control Stop 163 0 Fina Fina Small 0% 462 810 0% 0% Peak Hour Fmbr 0,92 0,92 0.92 092 0.92 0.92 mmdy IN rela(Vph) 64 153 175 492 626 78 pedeeMana 1 15.6 10.7 00 0.0 Left Rdth (h) 120 c B WAIN Spaad (Ns) 3.5 2.4 00 Palpntlikkad a 0 41 Un AIM(,mbh) AYdlen "a TWLTL 1WLTL Median alaraps wh) 2 2 upatraw aw71a118) p%, plalmn unbbc od aC, mnM411ng momma 1609 am 705 YC 1. slaps 1=1 mol 066 sC2, at*2 mf mol 942 vcu, wblocw wl 1009 898 705 tc;* ld(4) 6A BR 4.3 1C. 2lops (e) 54 IF (1) 9.6 3.3 2.4 p04wus aw % al 67 T8 i1A'f791gty;(yyyn) 269 482 r611) Volume 1A1 54 0 175 0 0 wgum fwbt 0 163 0 0 76 cSH 259 462 810 1700 1700 vdum10 Capacity 0.19 0.33 0.22 0.20 0.41 Ouaua Lanp15 BSIh (ft) 17 36 20 0 0 Car" [way (1) 20.3 15.6 10.7 00 0.0 Laity Los c c B Approach Way (a) 17.8 2.4 00 Appmacn LOS C 15 kihelson 8 Assoclates, Inc. 1111212015 ICu Lawilluft Synchm 8 Report Page 2 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 18: Table Rock Rd & Southeast Owy 8uildYeer (Mitigated) Weekday PM Peak Hour Lam ComIguretins M i T t• Vol"(vehrh) 5 29 60 009 688 29 Sign Control Slop Free Free Grade 0% 0% 0% Peat Hour Factor 0.92 0,92 0.92 0.92 0.92 0.92 Harty hoe rate(vph) 5 32 64 662 748 32 Pedestrians 1 Ian Wklh(h) 42,0 Wa irp Speed (be) 3,5 Pemaol Blockage 0 Right tum Adie (veh) Median type TWLTL TWLTL Median storage veh) 2 2 Upstream agw ryl) 726 p%, platoon unbludwd 0.90 vC, oomiefirq vol" 1535 765 T60 v01, ships 1 conf Vol 785 vC2, e*a 2 wnf vol 771 vCu, unblocked wl 1544 765 790 tc ekgb (a) 6.4 62 4.3 UG, 2 stage (e) 5A IF (s) 3.5 3.3 2.4 p09unis hss% g6 92 93 aM capaa6y(wi 315 406 756 Vol" TOW 37 51 6V 779 Volume le6 5 64 0 0 Volume Right 32 0 0 32 cSH 390 758 1700 1700 Volume t0 Cape* 0.02 0.07 0.39 0.46 Quem Length 95th (try 5 6 0 0 conlrel Deley(a) 15.2 10.1 0.0 0.0 Lane LOS C 0 Approach Delay (a) 15.2 0.8 00 Approach LOS C Ia2kaelafsas4w Analysis Period (min) 15 Kittelson 6 Assadens, Inc. Synchm 8 Repom 1 111 212 01 5 Page 3 Queuing and Blocking Report BuildYear (Mitigated) Weekday PM Peak Hour 110212015 Intersection: 8: Table Rock Rd & Hamrick Rd Mmtlmumauew(m 188 77 65 Aymop Queue (2) 43 34 9 Gain Quew (8) 93 57 37 Link Dsance(8) 248 Upekeam RM Time (%) 210 Qwulp P'er^ (wh) 50 Sro ma ft ow (a) 188 158 Slorpe Rlk Time (%) 0 amIn8 Penely(vet) 0 Intersectlon: 17: Table Rock Rd & Northeast D DWJkin Served L R L T TR Meemum 0":(8) 74 92 210 173 50 Awrpe Quew(m 33 44 87 6 6 9tkh a" M) 58 70 142 57 31 Link DWbm 0u 191 191 671 304 V688Yem 11"k GmN Renety(wh) SW*B* Dot (11) 150 Slope Rik Tkw((%) 1 0 QBeuk Ime"lly704h1 3 0 Intersection 18� Table Rock Rd & Southeast Owy Memos aeewi '53 53 19 Awwpe Quer (8) 26 13 1 fttGdeee.@) 44 40 8 Link Dieu (R) 141 871 UP**i n N IR`W(%) Qui PereftySbreOkBey:D1N9 190 Slorage Rik Time (%) 01,140I19 Peeety{wh) Zone Summary zone"Queft Reney:3 Central Poin! Cosh. TIA SimTmfFc Report Kittelaon 8 Associates, Inc. Page I HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA B: Table Rock Rd g Hamrick Rd Build Year (Mitigated) Weekend Midday Peak Hour 1 1 Lane Conagurai h p 14 16 Volum (velM) 104 T7 B 344 410 36 Sign Conhol Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 092 0.92 0.92 0.92 hourly Now rate(aph) 113 84 9 374 446 39 Pedestrians 1 lane WBdth (ft) 12.0 Walking Speed (Ma) 3,5 Panent Blockage 0 Right tam flare (veh) Medan type TWITL TWLTL Madan s"a vah) 2 2 Upseaamt too' (R) 1076 :X, platoon unlocked 0.61 0.81 O.B1 VC, conflicting volume 856 466 406 VCl,stageI contvot 406 VG2, afaga 2 mrd sal 361 wCu, unaaaked vol 705 222 246 to. 111 (2) 6.4 6.2 4.3 (C, 2 stage (a) 5A IF (a) 3.5 3.3 2.4 p04uaus Gee% 79 87 99 alb Cadi(WA) 543 665 983 VMieieltdw Volume Left 113 a 9 a 0 Volume Rot 0 94 0 0 39 c8H 643 665 983 17W 17xO Vdume to Capacity 0.21 0.13 0.01 0.22 0.29 Queue Length 95th (ft) 19 11 1 0 0 Control ONay(a) 13.4 11.2 8.7 0.0 0.0 Lane LOS B B A Approach Delay (a) 12.4 02 0.0 Approach LOS B Average Delay 2.4 husfake'al Capacity U6lia W 38.7% ICYt"e $Mfr A Analysis Pehod (min) 15 Kltalson 8 Associates, Inc Si a Repot 111(2/2015 Page HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 17' Table Rack Rd & Northeast Dwy 9u[W Year (Midgaad) Weekend Midday Peak Hour t Volume(W") 49 163 224 296 403 86 Sign Control Stop Free Fns &ade 0% 0% 0% Peek How Fedor 0.92 0.92 0.92 0,92 092 0.92 Howly,Me, rib(vph) 53 199 243 321 438 92 ped"Mon, 1 Lam WM(8) 12.0 Wealrp Speed Me) 3.5 P~11110cmild 0 Wght Wm Sema mh) khMlype PhLTL TWITL Medico samge wh) 2 2 upelmm algdd(Q1 p%. OmIoon unolacked VC, codating Moms 1203 485 631 Ycl, sage I contvd 485 Y04 tlgi4 domvti 606 VCU, unbWW vd 1293 455 531 tC, olryy(e) 64 8,2 4.3 C, 2 step (s) 5A F(i) 3.5 3.3 2.4 dW4W*(WA) - -301 50 9B _53. NO -112- -4M 630 Vokme Lab 53 0 162 51 0 VolumsfWA 0 199 0 0 92 GSH 301 685 946 946 1700 Vol&M0C@ WH 0.16 0,34 0.26 016 031 Queue length 9Wh (n) 15 37 26 26 0 Canool OYey(s) 19.5 14.3 10.1 46 0.0 Lem LOS C 9 6 A APOW Oft (S) 154 5,2 OA Appinah LOS C AMP Delay 5.5 Inarnewap$*Uliil[edom 5849. ICUUeelelowAn ArWyels Pedod (min) 15 KiMlson 6 Associates, Inc. Syrchro 8 Report 1111212015 Page 2 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 18: Table Rack Rd & Southeast Hwy Build Year (Mi69ated) Weekend Midday Peak Hour J 1 1 t Lens Goaflgumllws Y 1 f P Volume (40) 5 39 75 514 545 41 Sign Cartel Stop Free Free Grade W. 0% 0% Peck Hour Factor 0.92 0.92 0.92 0.92 0,92 0,92 Hcudy flax rete(vph) 5 42 82 559 592 45 Pedestrians 1 Lane Wldth(1) U.0 Waking Speed (Ns) 3.5 Peroenl Blaekapa 0 Rlght tum Nie (veh) Median type TWLTL TWLTL Model "a seh) 2 2 Upstream signal IN PX, platoon waWed vC, wnfficdV vftme 1337 618 636 VC1, stage 1 cont wl 616 V02. pegs 2 wnlvd 722 vCu, unblocked vol 1337 616 638 C. angls(s) 6,4 6.2 4.3 tC, 2 stage (s) 5.4 tF(a) 3.6 3,3 2,4 PC qua, ft" % 99 91 91 CM Wall(uehh) 363 464 860 Vatume Tidal 48 782 350 837 Volume Left 5 62 0 0 VaMme Rpm 42 0 0 46 cSH 474 660 1700 1700 Volume to Caoe4Nv 0.10 OAP 0,33 Wal Queue Length 950 (ft) 6 3 0 0 Control Oelay (s) 13.4 9.6 0.0 0.0 Lane LOS 3 A Approach Delay (a) 13.4 1.2 0.0 Approach LOS 5 Average Delay 1.1 mlers466on Cepeclty U611xesbn 511% ICSLSOOISD*b A Analysis Paliod(min) 15 Kiftelwn & Aasw4ua, Inc. Synchro 8 Report 1111212015 Page 3 Queuing and Blocking Report Build Year (Mltlgatedl Weekend Middav Peak Hour 1111MU16 Intersectlon: B: Table Rock Rd & Hamrick Rd Dlnxdkns served L R L Meklmum Qwue (R) 93 74 51 Avenge Queue (K) 40 37 0 90 Qum (R) 70 55 39 link D4tnp (R) 246 UpetreemNk TNM (%) Oueuig Penelry (Nh) sterwe"Dw(19 160 150 Svi Ek TNns (%) QueURtp Rently (VA) Intersection' 17: Table Rock Rd & Northeast Dwy Mniclons send L R L LT rR Mtiilm"Ol uetlp 74 119 93 312 22 Avenge Qum (R) 36 55 17 93 3 955ii31 isAll 70 69 51 197 15 Link DWnca(R) 191 191 571 352 it%) U19i aNiliv (�i 91d1*1B40111(1)1 15D Storepe6lk TMe(%) 1 Q'uilift IIYIp'(Nh) 2 Intersection: 18: Table Rock Rd & Southeast Ow Dh dms Served LR L TR MlaftmAINue Q1) 52 77 22 Amp Qurse (RI 25 29 1 95mauNi:M1 48 66 7 Lh*Ousi(R) 156 671 UPONdi:l9k Tkm (M) Qu�a�idr�Penelh Swh) Sbri9keN4:li 150 Smnpe 9k TkM % Quwlnp:PMiilly �i tar well OM" ftrARr 2 CenSel Polnt CCaCD TIA SlmTreRk Report klftelson & Assadates, Inc. Page 1 Queues Central Point Costco TIA 2: 1-5 NB Ramps & IF Pine $t Bulle Yeer(Totdl Weekday PM Peek Maur A Ra90 Con6ol Delay Quem Daley Total Delay Oueua two S01h (R) Queue Length 95th (R) Iftnal I3nk Olt (it) Tum Bay Lenge (l) Bw Cptlty (VO) Slevaeon Cap Reeudn Sp9EriCall Radudn Sbrpe Cap Reluctn ROMW vk Ra80 Queue sham In meelmum KIIMaan 6 Amcidw, Inc. 11112/2015 0,32 0.49 0.71 042 0.54 0.54 0.90 9.7 11.4 28.2 9.9 33,7 33,9 46.1 0.0 0.0 0.5 00 0.0 0.0 0.0 9.7 11,4 28.7 9,9 33.7 33.8 46,1 20 202 411 109 117 11.8 119 22 258 513 194 191 193 9340 1110 494 990 150 265 335 3B0 211 2030 1808 978 489 490 837 0 0 188 0 0 0 0 0 a 0 0 0 0 0 a a o 0 0 9 0 0,31 049 0,79 OA2 0.41 0.47 0,81 Symhm 8 Report Page 1 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA & Table Rock Rd & Hamrick Rd Build Year (Tom0 weekday PM Peek Hour -A ♦ 1 ? 1 Vauree web) 71 79 19 484 569 26 Sign Cmbsl Stop Free Free GM* 0% 0% 0% Peso Hour Fedor 0,92 0,92 0.92 0.92 0.92 0.92 Handy Boy rate (vph) 77 88 21 526 818 28 P.destnans 1 Less Width (ft) 12.0 Wawa speed (to) 3.5 Penurt bootepe 0 Rght tum ere (van) Medan" None None Maden darpe van) UpMewvda WM 1076 X, paitcon unbloclad 030 0 %0C oarraft Moe 1201 8th 648 VC1, Stege 1 mnfwl VC2, Nae 2 coot vol vCu, unblocked Vol 1075 268 288 tc, orge(e) 8.4 6.2 4.3 IC, 2 saga (s) IF (S) 3,5 3.3 24 PO queue free% 54 84 97 cM capacity (V N 188 515 824 Volurns Tow 77 88 541 647 Vol" Left 77 0 21 0 Volume Rpht 0 66 0 28 cSH 168 545 824 1700 Volume th Cepecity 0.46 0.18 003 0,38 Queue Length 95th (ft) 54 14 2 0 Central 0610Y (a) 43.4 12,6 0,7 0.0 two LOS E B A Approach Delay (9) 27.3 0.7 0.0 Approach LOS 0 Average Delay 3.6 ntreeean Capacity Utitzabon 55.3% ICU UM Of SKI" Aa.lvai. Paned (min) 15 Hittelson & Assodate% Inc. Synchro 8 Bepart I V1212015 Page 2 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 13: Federal Way & Northwest Hwy Build yesr(7otal) Weekday PM Peak Hour t i ! Lyre Configurations Y A 4 Valium (whm) 2 91 0 0 22 22 Sign Control Stop Fee Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 092 0.92 0.92 0,92 Hourty few rate(vph) 2 99 0 0 24 24 Fedestdans Lena WtlN(N) Walking Speed (Ns) Parcent Bkckage Right tum Nara (win) Medlar type Nara None Medien storage vah) Upea", eiral (m p%, platoon unblocked VC, con"volume 72 0 0 VCl, stege I confvW VC2. Stage 2 mf vol vCu, unblocked vol 72 0 0 IC. am* (a) 6.7 6.2 4.1 IC, 2 Mage (a) F (S) 3.6 38 2.2 PC pueue hate % 100 91 g9 cA apacly(whm) &6 1091 1836 Volume Tett 101.. -0 _..4B- Voluae LeR 2 0 24 Volume Ryht 99 0 0 CISH 1084 1700 1636 Voters to Capacity 0.09 0.00 0.01 Dueue Leco 95th (R) 6 0 1 Contact Delay (c) 8.7 0.0 3.7 Lane LCIS A A Approach [Way (a) 87 0,0 17 Approach LOS A Avenge Delay 7.1 Intersection Cyaclry, UOgzetlon 16.2% CUL"00- A Analysis Padod (min) 15 KiRelson a Associates, Inc. Synchfo 6 Report 1111212015 Page 3 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 14: Federal Way A, Southwest DW V Build Yew (Total) Weekday PM Peak Hour a - r 1 Lane Configurations Y P d vow"(vehlh) 2 2 0 2 22 2 Sign Control Stop Free Fm Bade 0% 0% 0% Peek Hour Factor 0,92 0.92 0,92 OR 0.92 0.92 Hourly Im rate(vph) 2 2 0 2 24 2 Perini Lata Wkm (n) WaNp Speed (NS) Percent &ackpa flight Wm flare (veh) khodial Will Nacre Medan SWW veh) up~ signal IM PX,, Platoon unblocked vC, canAlatlnpv0lume ai 1 2 vC1, Supe 1 marl vol YC2, rage 2 mf val vCu, unblocked vol 31 1 2 ti Ynga(0) 6.7 6.2 41.1 1C, 2 atpe (s) IF (a) 3:6 3.3 2.2 PC m apicRy.(11")... 612 1066 1633 VDW"i iolil d -2 26Vol" Len 2 0 24 Vol" Right 2 2 0 cSH 969 1700 1633 vokanfo Opac6y 0.00 000 0.01 Qum Length 95th (ft) 0 0 1 Coned Batty (a) 8.7 0.0 6.8 Lam LOS A A Approach ONry(S) 6.7 0.0 86 Appmch LBS A Averpe Dalry 6.5 IMateacPon OSpec0y Ut9W m 16.1% ICULWdbIM1 A Kiltelson 6 Associates, Inc. Synchro 9 Report 1111212015 Page 4 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 15: West Hamrick Dwy a HamrIck Rd Build Yea (Total) Weekday PM Peak Hour Kittelson & Assouans, Inc. Strohm 8 Report 1111212015 Page 5 Lane Configural t. 0 f 1 M Volums(vshl 76 94 27 18 96 26 Sign Control Free Free Stop Grade 0% 0% 0% Peak Houf Factor 0.92 0,92 0,92 0.92 0.92 0.92 Houdy Saw rate Ivor) 53 102 29 20 104 30 Pedestians Lane Width IN Walking Speed (R2s) Percent Blockage Right tum Sate (van) Median type TWLrL TWLTL Mal storage veh) 2 2 Upstream signal (S) pX, platoon unblocked VC, conMcl volume 195 212 134 vCl, stage 1 cenf vol 134 Y02, stage 2 carr val Ill vCu, unbbcked vol 165 212 134 tC, angle (a) 4.4 &4 62 KC, 2 stage (s) 5.4 tF(s) 2.5 3.5 3.3 p09uaus fres % 98 all 97 CMlegal (Ahm) 1224 641 921 Val"TOW fm .29— —2T '104 - 30. Volume left 0 29 0 104 0 Volume Right 102 0 0 0 30 cSH 1700 1224 1700 841 921 Volume to Capacity 0.11 002 0.01 0.12 0,03 Oueua Langur g5th (N 0 2 0 11 3 Control Delay (a) 0.0 8.0 0.0 99 9.0 two LOS A A A Approach Di (a) 0.0 4.9 9.7 Approach LOS A Avenge Delay 4.2 liesareelon Capartly, U19¢atron 29.7% ICU L"ol36NU A Analysis Period (min) 15 Kittelson & Assouans, Inc. Strohm 8 Report 1111212015 Page 5 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 16: East Hamrick DW (RIRQ) & Hamrick Rd Build Year (Tota) Weekday PM Peak Hour + ♦ if, 1 I Volume(wlah) 69 45 0 46 0 91 Sign Cmhol Free Fm Sblp Grade 0% 016 O% Peek Hour Fedor 0.92 0.92 0.92 0.92 0,92 0,92 Ib My Mw ads(vph) 64 49 0 50 0 99 Pedeadns L" WiAh (8) Waking Sped (ore) Percent Blockage Right turn flare (wh) Mellor hypo TWL71. TWLTL Median etotage wh) 2 2 Mp*wn signal (It) pl6 plaoor unblocked VC, oonllic" vdome 113 139 89 VC 1. *hep 1 cont Val 89 VC2, slag* 2 Mlvd 50 vcu, U*Ocked Vol 113 139 89 IC, riigh(s) 4,4 SA 8.2 IC, 2 "a (1) 5.4 IF (s) 2.5 3.5 03 p0 gwue Ines % 100 100 90 d Qq*Ky{whAl) 13M 901 978 MKININTM - fm- 50 -09 Volume Left 0 0 0 Volume Right 49 0 99 c5H 1700 1700 975 Volume to cepedty 0.07 0A3 0.10 Qww Length 95th (B) 0 0 8 Control Delay(a) 00 0.0 9.1 Lore LOS A Approach Qday is) 0.0 00 9.1 Approach LOS A 3.4 19.1% 0L"dw4b 15 aitelson &Associates, Inc. Synchro 8 Report 111192015 Page 6 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 17: Table Rock Rd & Northeast Dwy Build Year (Total) Weekday PM Peak Haw 1 1 1 i two CaMguraecns 9 F Q A Volum (vahlT) 50 141 161 453 576 72 Sign Cwiml Shp Free Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 092 0.92 0.92 Hourly flow rate W) 54 153 175 492 626 78 Pedestrians 1 Lane Wldlh(B) 120 Walking Speed (Ns) 3.5 Percent Blodka8a 0 Right turn Bare (veh) Median type Noee None Mather storage vah) Dpromem algnal (ft) :X, platoon uncorked vC, mrdBcling volume 1509 666 705 ,Gl, stage 1 mind mil Y02, 1112 oon7vol vCu, unblocked vol 15N 666 705 IC, Singh(c) 6.4 6.2 4.3 IC.2 stage (s) IF (e) 3.5 3.3 2.4 p0 queue free % 48 67 76 cM capacity lVeflT) 105 462 810 V army Tbl61 64 153 b67._.Ta._- Volume Left 54 0 175 0 Volume Rlght 0 153 0 78 CSH 105 462 810 1700 Volume to Capacity 0.52 0.33 0.22 0.41 queue Length Both (ft) 59 36 20 0 Corel) lay(%) 71.2 16,6 5.2 0,0 Lane LOS F C A Approach Delay (1) 30,9 5.2 0.0 Approach LOS D Average Oelay 6.3 Inmrmdm Crpaclly Miami 68:9% ICULMOtomb 11 Anayete Period(min) 15 KiBelson & Associates, Inc. Synchro 8 Raper) 1111212015 Pegs 7 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 18: Table Rock Rd & Southeast DWy Build year(7oi Weekday PIV Peak Hour Lane CoOgura6Gne `ry 4 7. Valium (veah) 6 29 50 609 668 29 Sign Control Slop Free Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Heudy6ow has(uph) 5 32 54 662 719 32 Pedestrians 1 Lane WMm l6) 12.0 Walking Speed (ta) 3,5 Pergep6aakege e Right Wm Ran (wh) Man type Nuns Name Madan Wage m) Lpseeameight0% PX, doloon unblocked 4, emscling Nei 1535 766 760 VC 1. page 1 cant eel VC2,e1allil nrvd vCu, unblocked vol 1635 765 760 tG,"(3) IIA 6.2 4.3 tC. 2 page (a) tF (a) 3.5 3.3 2.4 p(O quasi Mae % 96 92 93 eldclim q VeWh) 120 406 755 VoluineTo51. 37_..115 -,179. Volume Left 5 54 0 Volume 111 32 0 32 GSH 301 756 1700 Volume to capi 0.12 0,07 046 Queue Length 95th (q) 10 5 0 ConWMry(a) 10.6 1..9 00 Lace Lq3 C A Aypmach 01111017 (a) 16.6 19 0.0 Approach LOS C Average Delay 1.3 InMnadon capacity U9lludkon 89.6% icuueddGMa f Analysis Padod(min) 15 Kidelsan & Associates, Inc. Synchm B Report 1111212015 Page 8 Queuing and Blocking Report Build Year (Total) Weekday PSA Peak Hour 1111212015 Intersection: 2: 1-5 NB Ramos & E Pine St 01mmone Served L T T T T R L LT R WnnumQueuem 99 288 200 350 406 340 208 PPB 208 Average Queue 111) 32 Be 82 IN 202 81 125 166 3a 95th Queue (ft) 70 186 157 331 347 220 190 231 14D Link Distance (1) 1153 1153 503 503 682 682 Upstream Blk Time (%) Queuing Penalty (wh) Sterege Bay Divi (M 150 285 335 Storage Blk Time (%) 2 3 Queuing Penalty (veh) 1 11 Intersection: 8: Table Rock Rd & Hamrick Rd Olmcitons Served L R LT TR ,1ladmum Ouew (R) 91 72 115 22 Awrege Queue (R) 45 38 27 1 95th queue 110 90 64 91 7 Lh* Dw a oe (R) 249 384 985 Upiii ea Time(%) Qusukp Penally (wh) swap Bay DwM 199 S(mege &k Thm N Queuing Penally (veh) Intersection: 13: Federal Wav & Northwest D Dkedlma SeraM LR 6Wlmum Queue (it) 57 Aveege Qwue (1) 32 90 Queue (11) 51 Link distance (R) 150 URNM elk ilme (%) Queuing Penally (veh) S1mge say Do (IQ Storage Bilk Time I%) Neu9t9 Pw^ (wh) Cental Point Cwtw TIA SirrTra&c Report Meehan a Aeacdatse, Inc. Page 1 Queuing and Blocking Report Build Year (Total) Weekday PM Peak Hour 11112/2015 Intersection: 14: Federal Way & Southwest Dwy link Dktnce (it) 183 up0 Bik Tkm(%) Duwwp wpb ("11) smt ykaeyOWM Slwage BlkTnm l%) DukN wmb(VI i) Intersection: 15: West Hamrick Dwy & Hamrick Rd Dlwdlme SwNd L L R Yadsm a"M so IS 58 Amore Dues (R) 4 30 21 BM GWA(Aj 48 M 48 Link Ddmm (it) 154 154 upa ftum(%) QMkq washy (rh) slapkCq OW(A) 1S0 Smrop 81k TOM (%) Gua" wmb(wh) Intersection' 16' East Hamrick Dwy (RIRO) & Hamrick Rd Dlredwa Served R vakam Own(8) 80 Avwtpe Qm s(ft) 35 85masw(5) 58 Lek Dll7nCe (S) 117 uphewo elk Tkm (%) slowilyaw(ft) Stomp Slit Tian (%) OWNP OMly(rh) Central Point Costco TIA SlmTraft Report I0mlean 5 Asemieles, Inc. Page 2 Queuing and Blocking Report Build Year (Total) Weekday PM Peak Hour 11112/2015 Intersection: 17: Table Rock Rd & Northeast Dwy Dhad6ne Served L R LT TR MOMM gusts (B) 162 76 285 41 Avomp Queue (6) 54 41 127 6 9Stn Dueus(M 118 63 242 25 Link Dkmos (it) 197 197 671 364 Upei Blk TMm(%) Stomp I* Dle(R) 0-91 Pwr"(wh) Ski De TIM (%) Stops Bey Di Queuip Pi (fan) Stomp Bk Tom (%) Qusuing Psnsiy (wh) Intersection: 18: Table Rock Rd & Southeast Dwy olmd"Seim LR LT TR kTlipfWti Qww(&1 68 110 21 Aveme Qtem Bt) 20 M 1 98A Dtem(1 47 f36 7 Link Nei (ft) 162 9112 671 UPMW DTkm t%) Queuing Pw* (-h) Stomp I* Dle(R) Ski De TIM (%) Queuip Pi (fan) gene v&! Queukg PM412 Cenod Point Costco TIA &mTmft Report KKtelean & Amoclema, Inc. Pap 3 Queues Central Point Costoo TIA 2:1-5 NB Ramos & E Pine St Build Yew(Twa0 Weekend Nddey Pest hour 1 a — k 1 i r e/C Rd* 0.20 0.16 0.52 0.30 0.34 0.34 0.64 Control Delay 0.2 9.2 22.1 10.0 31.8 31.7 40.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total D" 0.2 9.2 22.1 100 31.8 31.7 403 0"Lano all (a) 17 176 .298 65 63 62 130 Queue LZwpN 90m It) 27 257 387 m134 102 102 219 mWnit met(1) 1110 464 0 Tum Bay Length (R) ISO 205 335 380 Bees Cepetlryf(apll) 321 2190 1064 990 IBB 491 0 SlsMon Cep Reductn 0 0 0 0 0 0 0 Splileeak CeplM6cm 0 0 0 0 0 0 0 Storage Cap all 0 0 0 0 0 0 0 Reduced NC ReSo 0.20' 045 IM' 016 024 024', -'CUM m Vo9eili hr9310 pNOMiON queuilemMeneb/dpitmemelpnel Kftson 6 Associates, Inc. Synchm 8 Report 1111212015 Page 1 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 8: Table Rock Rd & Hamrick Rd Suild Year f rotall Weekend Midday Peak Hour -0 ♦ 1 ? Lane Configurations M Q A Valume (yeWh) 104 77 8 344 410 36 So Comm) Stop I'm I'm alma 0% 0% 0% PeM Har Fodor 0.92 0.92 0.92 0.92 0.92 092 Hadylowmk(vph) 113 94 9 374 448 39 Pedestoma 1 Lm vAmh(6) Izo Waling Spee(ft) 3.5 M1relnr mockup 0 Right tum bm (veh) mwmtype Nana None Me6mm etanW vah) UP*vMnal WM 1078 pY, platcon unblocked 0.81 0.81 0.81 VC,eonfiftyam 858 468 486 vC1,,w" 1 cadwl vC2. sbp 2 mdvN Vcu, mdteded vol 705 222 246 tc,1110 (0) 64 62 4.3 IC, 2 slap (a) IF (a) 3.5 33 2.4 p0 queue Bee % 55 87 99 omcw4*WA) 325 665 983 vdhmieTote 113 M 393 485 Volume Left 113 C 9 0 v41u"Uhl 0 14 0 39 cSH 325 666 983 1700 Vdume b Capacity 0.35 0.13 0.01 029 Queue Leng91958t (6) 38 11 1 0 Consul0"(a) 21.9 11.2 0.3 0.0 Lane LOS C 6 A Approach Delay (a) 17.3 0.3 00 Approach LOS C 3.3 39,6% ICULwMel6arMoa 15 KlIalson 6 Associates, Inc. Symhm 8 Report 1111212015 Pegs 2 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 13' Federal Way & Northwest Owy Build Year (TotW) Weekend Mind" Peak Hour qr 4- t 11* 4 Sign Control Grade Peak Hour Faclar Hourly6ow rale Wph) Peda9nans LAN Wkb ift) Walking Spud (IVa) PvWt BpGkepe Right tum fim (Yoh) Madlel type kleden Manse wh) llpebnn GpW OO pX, plM unblocked vo. cmoon volume vC1, Maps 1 mni vol w%2, elhpe 7aall.vol vCu, unblocked vol VC. 41,11119 (P)' tC, 2 Mepe (a) F (a) p0 queue fine % emmisss8y.(1NM) 2 131 0 2 35 36 Slop 8.7 Free 19 Free 0% 2.2 0% 67 0% 092 0.92 092 8.92 0.92 092 2 116 0 2 30 39 Now Its 1 2 Ila 1 2 8.7 6.2 19 3A 33 2.2 100 67 N 792 ION 1633 77 GSH 1083 1700 1633 ygkm IDC4WlY m1/ 0.90 0.62 (Nate Length 951h (6) 12 0 2 GaIAr e"(8) 0:8 0.0 3.7 Lane LOS A A Applofthtall 9.8 as 3,7 Approach LOS A Ufilbw Anetysls TO 261%CUL"dom" A 15 Kittalson & Associates, Inc. Synchro 8 Repan 1111212015 Pape 3 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 14. Federal Way 8 Southwest D'Ny Build Year (Total) Weekend Midday Peak Hour i t i l Lane Configurations 'f F 4 Volume (vil 2 2 0 2 35 1 Sign Control Stop Free Free Grade 0% O% 0% Peak Har Factor 0.92 0.92 0.92 0.92 0,92 0,92 Hourly flow rah (aph) 2 2 0 2 38 1 Pedestrians Lana Wdm(e) Walking Sped (Ns) Parsnt8lackapa Right turn Oars (vah) MMse typo None Nona Madhn social mA) Dpatasse signal (8) p%, platoon unblocked VG, ca MCftvplels 78 1 2 vC1, Vol i cord vol 42, at* 2confvol vCu, unblocked Yd 78 1 2 Csingle (e) 8.7 8.2 4.1 tC, 2 stage (s) IF(1) 3.8 3.3 2.2 PO ill ase % 100 100 98 emcmp *(sarhm) 833 1089 1033 vafiFFi'TuIBI. __ .4 -2 .3g _.. ... volume left 2 0 38 Volum Right 2 2 0 cGH 944 1700 1033 Volume to Ciii 0.00 0.00 002 Wene Length 9591 (8) 0 0 2 Contact Oft (sl 8,8 0A 7.1 Large LOS A A Approach Delay (a) 8,8 0.0 1.1 AOproil LOS A Avenge DWy 8.9 Inheeedllon Capacity LIVI 8ca 18.8% ICULodelBmis A Analyeia Pedal (min) 15 Kldelson 8 Aluaccimes, Inc. Synchm 8 Repack 11/1212015 Pogo HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 15West Hamrick Rd & Hamrick Rd Build Year (TotaO Weekend Midday Peak Hour 1 ~ 1 10 Lane Canfigumflons tr K ? ti P Vd— (V") 78 144 40 4 139 39 Slgn Com al Free Free Slop Grade D% 0% 0% Peg Hou Factor 0.92 0.92 0.92 0.92 0,92 0,92 Handy Borrdle(kyh) 86 157 43 4 151 42 AWN(rens LIN WIdlh (R) Waking Speed (Ns) p4rtrd01odwo %ht Wm fire (VM) Medlin We 1WLTL TWLTL Modln stamp veh) 2 2 pN, Oran unblocked vC, coal Y*NM 241 254 163 VCs, stop 1 conf vol 163 va,dhpe2osafvW 01 vCu, unblocked val 241 254 163 tc;e9Oe15) 4.4 6.4 8.2 1C, 2shge(a) 5.4 IF0) 2.5 3.5 3.3 PO queue fine% 95 61 95 aM:&Oe*(" hRI) 1103 507 N7 vlllftToW -`--' -'241 _-M-'- 4 T51 42 Volume Les 0 43 0 151 0 VokineW44 157 0 0 0 42 cSH 1700 1183 1700 607 887 vow," to Geliecy 0,14 0.01 OAO 0.11 0.05 Ouaue Length 95th (8) 0 3 0 17 4 CONYMOdlg(s) 0.0 8.2 0.0 10.5 9.3 Laos LOS A B A AaplOM GNe7(s1 0.0 7.5 10.2 ApWoach LOS B Averpe Delay 4.6 k&lvimmtiob* UB92etlen 35.7% wi w otsw Ye A Analysis k8hlaon 6 Aamcfates, Inc. Syncom 5 Report 1111212015 Page 5 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 16' East Hamrick Rd (RIR)) & Hamrick Rd Build Year (Tate)Weekend Midday peak Hour Lane Cmfigurafkns A f P Vdume(*A) 47 70 0 44 0 134 &gn Control Free Free Stop (rade 0% 0% 0% Peek Hour Facia 0.92 0.92 0.92 092 0.92 0.92 Hourly flow rate (vph) 51 78 0 48 0 148 pemIrms Lem Wider (ft) Walking Spell (1119) Percent Rktlwpe Right ten Bare (Yoh) Mitten(ype TWLTL TWLTL Median athree ah) 2 2 IlpMlem qnW (BI p%, p(dw unblocked VC, dvm*g whine 127 137 Be VC 1, alae 1 coni Vol Be 42, Mee 2=1Vol 48 vCu, unblocked wl 127 137 89 tC,ehlpe(6) 44 64 8,2 NO. 2 stege (e) 5.4 Be (1) 2.5 3.5 3.3 poq"fea% Ion 100 85 cMeyai Neral 1288 901 674 vaimidw - i21r 48 US Volume Left 0 0 0 Vol" Right 76 0 146 c8H 1700 1700 974 VGMNm Ceedt9 0.07 0,03 0,15 Ouaw Length 951A (B) 0 0 13 codw1way(s) 0.0 9.0 9;3 Lane LOS A Approeufi Delay (a) 0.0 0.0 9.3 Approach LOS A 23.0% ICU ianlef&trb A 15 kitte con 8 Aeeociates, Inc Synchro 8 Reod 111120015 Pee 6 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 17: Table Rock Rd & Northeast DWy Build Yew (Total) Waskend Midday Peak Hour Lena Confi9um0ans h r 4 A volume (am) 49 193 2N 295 403 85 Slpn Cansal Stop Fme Free Gmde 0% 0% 0% Peart Har Factor 0.92 0.92 0.92 0.92 0.92 0.92 HourtyharnY(Wh) 53 199 243 321 438 92 Pamstdra 1 Lm NO (it) 1210 Wehdnp Speed (Bis( 3.5 ftwitBkdi 0 Rot tum Na (wh) Memm" Hal. None Medlen sbxpe rel) Up48aan OWIM( ) px pligoon wbindmd vc.mllkm Mune 12k3 485 931 VC1, stop 1 cool wl 42. Maga 2mnt.wl rCu, u"I wl 129:1 495 531 1C. 811111111 (6) BA 64 4:3 iC, 2 stop (3) IF (e) 34 3.7 2A p0 quwe Bee% 80 86 74 dllbMadly(MIrn) 135 585 eN Vd1101ITOW Valuma Left 53 0 243 0 Valam MI 0 109 0 92 cSH 135 585 916 1700 VOIMW0ppgly 0.40 0.34 0.26 0.31 Cuwa III 95th (B) 42 37 26 0 cdnwicift(e) 49.3 14.3 8.2 0.0 Lena LOS E B A AppNldlDmI 215 6:2 OA ApprcO LOS C 5.6 n.3% 1CUL"O1M41aa 15 MbIlism & Aswciates, Inc Synchm 6 Report 1111212015 Pop 7 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 18'. Table Rock Rd & Southeast Dwy Buikl Year (Total) Weekend Midday Peek Hour . , t 4 Volum (am) 5 39 75 514 545 41 Sign Conhal Stop Free Free Grade 0% 0% 0% Peek Hour FacU 0.92 092 0.92 0.92 0.92 092 Hourly lbw ratio(vph) 5 42 62 559 592 46 PedesMns 1 Lm.Wldth (ft) 12,0 Walking Speed (6h) 3.5 Pernnt Blockage 0 RIpM tam Mm (wh) Median type Nona None Median sturaga veh) px, plabon unstacked VC, oomld q volume 1337 61a 636 vC1, stage 1 vont vol vC2,stage 2 cant vol vCu, unblocked vol 1337 616 636 0, aklgta(3) 6.4 6.2 4.3 tC, 2 sti (s) its (a) 3.5 3.3 2.4 p09uaae free % 96 91 91 CIA 'cals"(vi 164 494 666 V - — -49 040 037 Voluae Let 5 62 0 Volwarat It 42 0 45 cSH 395 660 1700 Vafuasfo Caprtily 0-12 0.09 0.37 Quem Length 95th (0) 10 5 0 CdrlNdi Delay (B) 151 2.4 0.0 Lane LOS C A ApprdRh Delay (a) 15.4 2.4 0.0 Approach LOS C 1.7 011% ICUl4seldSKA a 15 KiDeleon S Associates, his Synchm B Report 1111212015 Poe 8 Queuing and Blocking Report Build Year (Total) Weekend Midday Peak Hour 111122015 Intersection: 2: 1-5 NB Ramps & E Pine St OlrwbweServed L T T T T R L LT R MAI Oues 81) 73 244 180 221 200 61 119 184 235 Awrege Queue (9) 31 73 56 114 105 30 53 76 39 9ft Gew (Il) 64 188 147 205 197 81 114 134 151 Link Dotnce(9) 1153 1153 503 50.9 682 682 1pe8..e Ilik Tim (%) Queuing Penky (veh) Storagiery 17121 (ft) 150 265 335 Storage 912 Tum (%) 2 Qwuing FMsBy (wh) 1 Intersection: 8: Table Rock Rd & Hamrick Rd MBrbnU1 a ir(5) 69 35 136 AvwW Q~ (It) 40 34 5 951h Quite (1) 53 58 46 Link Detswa (8) UpeSNk ri (%I 248 364 Uph n'Ilk TMs (%) Oueuin9 PmuAy (wh) Ski &k TMs (`A) Sbflp B"�DWl(M 160 Slap eik Tim (%) Qwi Wndly(v) Intersection: 13: Federal Way & Northwest D Dincliom Served LR LT Mednwgit"'M 92 31 lel lin= 57 10 Link DiMww 16) 150 177 UpeSNk ri (%I Queuing Penally (wh) Ski &k TMs (`A) Cha ft PMnM1y (M7) Canhal Point Costco TW SknTrelSc Report KIWI &Associates, Inc. Pp 1 Queuing and Blocking Report Build Year (Total) Weekend Midday Peak Hour 1111212015 Intersection: 14: Federal Way & Southwest Dwy DlmcSons Served LR Mesimmn Queue (5) 67 Average Queue (it) 5 95th Queue (5) 29 Link Diatom (5) 163 Upai I Hine (%) 0 Queuing Poesy (veh) 0 Storage ea/ ft (Iq Storage 911k Time I%) Qunrkr9 Pei (yah) Intersection: 15: West Hamrick Rd & Hamrick Rd MWMW Gum (to 48 5s 59 55 Average Qmue(5) 2 17 42 26 95th Gaue (ft) 15 49 62 48 Link Diatom (11) 222 154 154 UpkSeem I Trim (%) Queuing poalry rwhl Se3(W byDW(5) 150 Storage ilk The, (%) 0uw41gP (Ah) Intersection: 16: East Hamrick Rd (RIRO) & Hamrick Rd Directlom S"d R Mekimum Ousue (a) 107 Average Queue (1 38 Link Diatom (5) 112 Upai91k Tim I%) 0 Queuing Penalty (seh) 0 Smr4a gy Disi Storage IM Time I%) Ouauing Penalty (veh) Central Point Cmtco TIA SlmTreSk Repot kaealwn & Asacciates, Inc. Page 2 Queuing and Blocking Report Build Year (Total) Weekend Middav Peak Hour 11112/2915 Intersection: 17: Table Rock Rd & Northeast Dwy Dirsdone Served L R LT TR Metdnam Queue (it) 96 95 2011 50 Avenge Queue (R) 43 51 99 d 9th Qum (it) 91 72 195 23 Link Dbance (R) 197 197 671 364 Mpkh M8%TIM10M Nwmeleyo") Queuing Peneey (v4h) Stange el Time (%) Qiwuln9 Pendiy (oh) Serege ilk Time l%) QueWW 11610lwhl Intersection: 18: Table Rock Rd & Southeast Dwy D'ivw8w, Swwd LR LT 7R Medlndl Queue 31 1M 22 Aveeps Queus(R) 211 39 1 999tQ2 eepl, 43 112 10 Link Dkdence (R) 102 902 571 llpelaiTe" n" I%) Queuing Pandh (vsh) Nwmeleyo") Stange el Time (%) Qiwuln9 Pendiy (oh) Zone Summary ZM VA*Qrb Peet! 1 Caned Pant Cc= TIA SimTrel9c Repot 10Reaon 6 Associates, Inc. Pepe 3 Queues Central Point Costco TIA 2. 1-5 NB Ramps & € Pine_ St Future Year (Total) Weekend Midday Peak Hour ,# a t r Lune Group Flow(vph) 84 1289 1289 377 151 150 416 vlc Ratio 0.30 0.54 0.80 0.35 0,59 0,59 0.76 Control Delay 4.3 6.7 20,2 7.4 45.7 45.4 31,9 Queue Daley 0.0 0.0 0.7 0.0 0.0 0.0 0,8 Tobi Delay 4.3 6.7 20.8 7.4 45.7 45.4 32.4 Qww Length 50th (6) 11 223 373 83 89 88 84 Queue Length 95th (8) m11 257 m482 m159 147 146 134 InluneNnk Dist (it) 1110 494 850 Tum Bay length (8( 150 265 335 380 Bees clpedty (eph) 290 2376 2146 1071 340 341 678 Star Wien Cap ReducT 0 0 480 a 0 0 0 SpBbeok Cep ReclueN 0 7 0 0 0 D 58 Slarage Cep Reductn 0 0 0 0 0 0 0 Reduced vro Rett 0.29 0,54 0.77 0.35 0.44 0.44 0.87 m-V6t"lbr98mpsr VMWAwlsr WmdkupoWiomi*d Mlson B Associates, Inc. Symfim 8 Report 1111212015 Page HCM Dnsignalized Intersection Capacity Analysis Central Point Costco TIA 13' Federal Way 8t Northwest DWy Future Year (Total) Weekend Midday Peak Hour < r I i Ire ConAguradoe M i. e voklme(V") 2 131 0 2 36 36 Sign Cannot Stop Free Free 031ee1 0% 0% 0% Peat Hour Fedor 0.92 0,92 0,92 0.92 0.92 092 Houdy Bow has (0) 2 118 0 2 38 39 Pedaslnens lar Width (p) Walking speed (Poe) PrereWkage Igght Nm We (veh) Medial Apra Noir NON kleeln Manage veh) Uphwn it lePllq PX plaamn urrhadrd eC, ea69ak10"v61driy8 110 1 2 vC1, stege 1 mnl vol 42, Mage 2 mnf val NCu, unblocked wl 116 1 2 tC. "111111 (a) 6) 6.2 /.1 1C, 2 stops (e) T (a) 3.8 3.3 2,2 POqueue a0q-RV(WA) 792 1068 1633 Vollmr 76181 1/8 2 77 Volume Let 2 0 38 volume Poght 118 2 0 GSH 1063 1700 1633 Volum to Capacity 0.11 0.00 0,02 Onus Length 96th (8) 12 0 2 Cared Delay lel 6,8 0.0 37 Lane LOS A A Approach Delay (e) 8.8 0.0 3.7 Approach LOS A Average Daley 7.0 Inlertecgmr CWKity Wlaman 28,6% YOU Law dService A Analysis Period (min) 16 IG*Iwn AAMarCulle, Inc. Synchm 6 Repot 11112J2015 Page HCM Unsignalized Intersection Capacity Analysis Central Point Costoo TIA 14: Federal Way & Southwest pwy Future Year(To al) Weekend Midday Peas Hour `- Lax Cara gureldne A' A a volume(AM) 2 2 0 2 35 1 Sign Control Slap Free Free Grade 0% 0% 0% Peak Hour Factor 0,92 0.92 0.92 0.92 0.92 0.92 Hourly now rata yph) 2 2 0 2 35 1 pedestrians Lew Wdlh (k) Walking Speed (111s) Final Bachpe Right Nm flare (Veh) Mellon type Nqw Now Median storage vi UpaVaam it (N pX, platoon unlocked VC, c0naulbg volume 18 1 2 VC1, stage 1 cant vol V32, stage 2 ooalvol VCu, uncooked vol 79 1 2 ac, single (5) 9.7 58 4.1 tC, 2 stage (s) 1F (e) 3.8 3.3 2.2 PO queue fee% 100 100 95 am Capacity(WhA) 833 100 1533 Vok!"Toell a 2 99 Volume Lea 2 0 38 Volume Right 2 2 0 cSH 991 1700 1533 volume to Capealty o 59 D 00 0.02 Queue Lwglh 95th (5) 0 0 2 Caned Delay (a) 8,8 0.0 1.1 Lace LOS A A Approach Daisy (s) 8 8 0.0 7.1 Approach LOS A I% ICULNWD($ ft 15 Kleelsan 8 Associates, Inc. Synchm 5 Repot 11112/2015 Pegs 3 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 15: West Hamrick Rd & Hamrick Rd Future year(TDW) Weekend Midday Peak Hour + ♦ ! 1 I Lena Conligundons I. i f 9 4 Volume(velri 81 144 40 7 139 39 Sign Control FM Fro, Stop Grade 0% 0% 0% Peek Hour Factor 0.92 0,92 0.92 0.92 092 0.92 Hourly Bowrsle(oph) 88 157 43 5 151 42 Ped"i Lane WMeh (N Waking Speed (ft/5) Pe centeladege Right Wm Nm (van) mien(yp Ti TWLTL Media swap M) 2 2 Upethlemelpa(e) pi plena unblocked VC, o irdift gVOklme 245 261 fee VC1, sto 1 ani WI teff eC2, Mage 2MM Ful 95 YOU, undcds,d WO 245 281 188 tC.*0(9) 44 64 6,2 tC, 2 stage (a) 5.4 R (e) 2.5 3.5 3.3 PO dukes, *"% 9a 81 95 CMOW* 1W1%) 111110 603 Bea Vdumeyodl - -- 246 43 8 161 42 Volume Left 0 43 0 151 0 Volume Right 157 0 0 0 42 cSH 1700 1160 1700 803 Bea Volume to Cepecy 0.14 0.04 SAD 0.19 0.05 Queue Lavth 951, (11) 0 3 0 17 4 Control Delay (a) 0.0 6.2 0.0 10.6 9.3 Lace LOS A S A Approach Delay (a) 00 7.0 1D.2 Approach LOS 9 46 359% IWL"dAMb 15 indelson & Associates, Inc. Synchm 8 Report 111122015 Page 4 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 16: East Hamrick Rd (RIR9) & Hamrick Rd Future Year (Total) Weekend Midday Peak Hour y -V ~ Lane Configurellons H } } Valume(veruT) 50 70 0 40 0 134 Sign Convol Free Free Stop Crede 0% 0% 0-4 Pesti Hour Factor 0.92 0.92 092 0.92 0,92 0.92 Houdy Now rale (vph) 54 76 0 50 0 140 Pedestlens Lane am (ft) Walking Spacd (ftls) Percent Owckage Right turn Nam (smh) kwon type TWLTL TWLTL Aidan nonage war) 2 2 UpaeNm eilinal (n) PX, pleloon uMlocked vC, conNkdn9 volume 130 142 92 VC1, stege 1 cont vol 92 vC2, aige 2 rmf Val 50 4,unblocked Vol 130 142 92 tC, ergo (a) 4.4 0.4 0:2 tC, 2 stye (s) 5.4 tF (e) 2.5 3.5 3.3 p0 queue tme % 100 100 85 cM CRale ty (w") 1204 097 970 VdmneTOW 130 50 110.._- VdumeLeft 0 0 D Vekaee Right 70 0 140 cSH 1700 1700 970 Vduma to Capacity 0.08 003 0,15 Ouew Length 958r (it) 0 0 13 Cannel Delays) 00 0.0 9.4 Lara LOS A Approach Delay (a) 0.0 0.0 9.4 Approach LOS A Awmge Delay 4,2 Intemem3nn Cepacily Utilization 23,2% IDU LMafSaralee Anelyais Period (min) 15 Kitlelson E Associates, Inc. SynWim 0 Report 1111212015 Page 5 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 17Table Rock Rd & Northeast Dwy Future Year (Total) Weekend Midday Peak Hour -0 ♦ 1 t 1 ydume WA) 49 183 224 383 492 95 Sign Control Stop Free Flee Grob 0% 0% 0% Peek Hour Fedor 0.92 0.92 0.92 0.92 0.92 0.92 Halely11ewn(e(vph) 53 199 243 416 836 92 Pedeeldane 1 L" Wdth 111) 12.0 We2dng SpWd lfge) 3,5 palwAa0dtpe 0 Rlphthan Slue (veh) VAd1n4YM TVVLTL TWLTL Medln donge wh) 2 2 L* - low 011 pX platoon unblocked vC, c5"Aft wpuie 1277 315 628 uCt, Alpe 1 confwl 582 Y02, oWs,2mot wl 595 41 unlaockodwl 1277 315 628 IC. *0W 8.8 5.9 4.5 IC, 2 Mqr (e) 5.6 IF (e) 3.5 3.3 2.4 PO queue kw% at 71 71 dUi IIIIII vuh5tl 296 815 631 ValowTa 63 109 243 205 208 317 371 Volum Left 53 0 243 0 0 0 0 Veto"Rlght 0 1W 0 0 0 0 92 CSH 2M 666 831 1700 1700 1700 1700 volume to NOWY 0.19 0.29 0:29 0.12 0.12 0.21 0,16 Queue Lep* 95th (11) 17 30 31 0 0 0 0 Control Dow (1) 20.3 12.4 11.1 (1.0 ac 00 0.0 Lena LOS C B 8 App olM UWglc) 14.1 4.1 0.0 Approach Los B Uww" 446% ICU LM6f8MNka IS KltMson & Associates, Inc. Synchro 8 Report 1111212015 Ppe 5 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 18: Table Rock Rd S Southeast Dwy Future Year (Total) Weekend Money Peak Hour -A Lane Ca109urellona K f} }f Volume (whin) 5 39 75 801 634 41 Sign Control Stop Free Free Grade 0% 0% 0% Peak Har Factor 0.92 0.92 0.92 0.92 0.92 0,92 Haunt tka iata(vph) 6 42 82 653 689 45 Pedestrian; 1 Wm, Width (ft) 12.0 Walking Speed (Na) 3.5 parcant Bbckoe 0 Right Wm Aare (veh) Meelan type TWLTL TWLTL Maim dorAe wh) 2 2 Upatnam Krug (ft) 726 pX, platoon unblocked VC, con81cong wWms 1202 36B 735 vC1, stop 1 cent vol 712 vC2, sloe 2wrdwl 490 vCu, undodud cel 1202 368 735 tC, single (8) 6.8 B.9 4.5 tC, 2 stage (a) 5.8 IF (a) 3.5 3.3 2.4 p0 qucw has % 99 93 09 dM capadb (*A) 306 834 751 Volum Tow 48 82 327 327 459 274 Volume Left 5 62 a 0 0 a Volune Flight 42 0 0 0 0 48 cSH 566 751 1700 1700 1700 1700 Volunste CawAy 008 0.11 0.19 0.19 ORI 0.16 Ckwua Length 95th (ft) 7 9 0 0 0 0 Conrd[Way (a) 117 10.4 0.0 0.0 00 0.0 Lane LOS B 6 Approach Ogley (a) 117 1.2 0.0 Approach LOS B Awlage Delay 0.9 Inursecdnn CapacBy, llBlization 38.3% lCUL 611110vba Analysis Period (min) 15 Kitleon 8 Assaciama, Inc. Synchm 8 Repod 11/1 212 01 5 Page 7 Queuing and Blocking Report Future Year (Total) Weekend Midday Peak Hour 1111212015 Intersection: 2: 1-5 NB Ramps & E Pine St Directors Served L T T T T R L LT R R Maleum Queue(it) 73 203 196 300 292 145 214 270 231 202 Awnpe Quece(I) 35 71 101 190 174 73 64 124 100 23 gm 0uee(it) 67 153 165 303 2613 131 176 219 2355 120 Link DIMence(it) 1152 1152 466 466 676 678 Upeheen BIN Thee (%) Qce M P"ty (wh) Sib* Bay low(Q 180 265 335 360 Stomps BIM Tone I%) 0 1 Qufft"(velQ 0 2 Intersection: 13' Federal Way & Northwest Dwy Intersection: 14: Federal Way & Southwest D DImAws Served LR Mnheumo"(6) e6 Aversp Queue (it) 6 961ADueae(6) 32 Link Distance (6) 162 UWAM ft Time (%) Dueu9p P-ORY (veh) Stompee"DwAll Stomper elk Thee (%) OMNI Peee6y("In Cenlml Point Casten TIA SimTn6lc Report Kittelson 3 Asaudaba, Inc Page 1 Queuing and Blocking Report Future Year (Total) Weekend Midday Peak Hour 11112/2015 Intersection: 15: West Hamrick Rd & Hamrick Rd M1L*W amemM 40 70 120 30 A4erge, Quem (t) 1 12 43 24 9%Ouse 91) 13 43 83 42 Link Detwe (11 222 154 154 Upseeen Blk Tne (%1 Que,uing P-* (Wah) Storage by Dist (M 150 SWW BIk Tkre (%) Qierinp Penalty (ah) Intersection: 16: East Hamrick Rd (RIRO) & Hamrick Rd calk Dwince,(R) 112 tlp*mp BM Thm(%) QOUN Pensky (40h) storp by DMI AD Storage Elk Tim �6) Ottegag Peneb (wh) Intersection: 17: Table Rock Rd & Northeast Dwy me*"Dune 9h go 75 1M 104 Average, Quetta llt) 45 41 gB 14 I"Qsew(k) 55 65 176 55 Link DleLnce(B) ITS 179 364 Upmeen BM Theme, (%) Qtteu4 PeMry (4011) 9drlgeEq DM(k) 2w Shue BIR Tlme (%) gwWnp FangM(wh) Centre( Point Cestoo TIA SimTreffic Report Kii & Associates, Inc. Page 2 Queuing rid Blodcing Report Future Yew (Tatoll Weekend Midday Peek Hour 11112/2016 Intersedon: 18: Table Rods Rd & Southeast Dwv Moffat amutpo 64 tp2 51 Avempe Wee (6) 24 70 2 ft Oa4ue p9 47 72 17 Wk DIAM(0) 144 672 upsueam BIN Tine (%) Queuing Pei aRy(veh) Storage Bey Dist (R) 260 Storage akTin (%) Waning pow"M Zone Summary Zone wide Queuing Peaity: 2 grey hmcodm TIA SIRITM6c Rpdt IOeeeon&Aronlims Ina. pop 3 Queues Central Point Costco TLA 2: 1-5 NB Ramps & E Pine St Futum Year (Tota) Weekday PM Peek Hour y ~ ` 1 Lane Group Fbw(vph) 85 1317 1639 529 794 295 546 elc R96o 0.54 0.00 0.62 0,49 0.84 0.94 0.80 Control Delay 20.6 10.2 30.1 7.5 56.5 56.3 35.6 Queue Delay 00 0.0 28.0 0,2 0,0 0.0 2.3 Total Delay 20.6 10.2 582 7.7 58,5 56.3 37,9 Dawe-Lngm 50th (a) 18 265 587 131 175 175 131 Queue Lnpth 95th (6) m30 328 m624 m121 #310 0311 200 In*mal Link Diet (it 1110 494 650 Tum Say Lerpm (ft) 150 265 335 380 Sae capq* (yp0) 157 2179 1987 1079 374 378 715 Stemdw Cep Rectum a 0 430 104 0 0 0 Som"da Cy 7ieaucb 0 a 0 0 0 0 77 Stamp, Cap Reducin 0 0 0 0 0 0 a R@OAW vk Roo 0.54 0.60 1,05 0.64 0.79 0.76 0.66 Quakes wuma I N mvva a mer pap CyGp. an Volume br95tla perpantlla @leve laike5ared 5Y upehe9m a9nal. KtWson & AsiumWes, Inc. Syn&m 5 Repo t 1111272015 Pagel HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 8: Table Rock Rd & Hamrick Rd Future Year Qotal) Weekday PM Peak Hour -A 1 1 t i Lena Conligunlione r 1 tt It Min (we") 72 80 26 MS 709 27 Sign Control Stop Free Free Snake 06 0% 0% Peak Hour Factor 092 0.92 0.92 0.92 0.92 092 Moulylow ra(%ph) 78 97 27 068 771 29 FW"tO w 1 LAW Wain (ft) 12.0 Wall Speed (ale) 3.5 PerwtBWkW Right can 9we(vwh) Medina III TWLn TWLn Medlin Wrar 04) 2 2 Lfwnwaivw (M 1076 pk, pwbm unblocked VC. oo&ft wiiaha 1176 101 Bon vC1, tape i and vol 789 vC2, kill l2penl vol 388 vCu, unblocked of 1175 401 901 VC. 11411111 (3) 6.8 6.9 4.5 a) IF (e) 3.5 3.3 2.4 PO queue fine % 79 84 96 ekAcgw*(valuh) 370 801 705 Vobur Total 78 97 27 334 384 514 286 Volume Left 78 0 27 0 0 0 0 Velums Right 0 97 0 0 0 0 29 GSH 370 604 705 1r06 1700 1700 1700 Vokmw to Cosafty 0.21 0.16 0.04 0.20 020 0.30 0.17 Queue Langrh 95th (11) 20 14 3 0 0 0 0 Control DNP (e) 17.3 12.1 10.3 0.0 0.0 0.0 0.0 Lane LOS C B B 4MWM Dft(a) 14,4 OA 0.0 Approach LOS B Average Delay 1.7 Inwrleulon Capacity 1.19lkelbn 349% ICUL"011 A Anslyeis Perlad (min) 15 Meaon A Associates, Inc. Synchs 8 Report 1111212015 Page 2 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 13: Federal Way & Northwest Dwy Future Year (Told) Weekday PM Peak Hour Lone Conrgura0ons M F 4 Volume (We") 2 91 21 2 22 22 Sign Conlml Stop Free Free Greek, 0% D% 0% Peak Hour Factor 0.91 0.92 0.92 0.92 0.92 0.92 Moudy flow nte(vph) 2 99 23 2 24 24 Pedsemans Lane W ft (6) Wdltlag Speed (Ns) Percent Soakage Rlghl tum Aero (vM) Won tape None None Median storage voh) upetem light! Im pX, platoon unblocked VC, wfflc6ng volume 96 24 25 vC1, stage 1 coni Vol VC2, Stage 2 calH vol vCu, unblocked vol 96 24 25 ic, 10,111111, (e) 6.7 6.1 4.1 VC. 2 stege (s) tP(1) 3,8 3.3 2.2 00 queue he % 100 91 99 dJcepedy("FA) 821 1058 1603 Volume%fel 101 26- - 48 Vdume Leh 2 0 24 Vouna RlgM 99 2 0 c5H 1052 1700 1603 ValumebCspac'q 0,10 0.01 0.01 Queue Length 95th (fl) 6 0 1 Control D111y(s) 6.8 0.D 3.7 Lane LOS A A Appm on Do* (a) 8.8 0.0 3.7 Appmeclt LOS A Avenge Delay 6.1 InMacNonClpacly U6lltelhn 22.1% ICUL@WcfMYb A Andym Penal (min) 15 QWson 6 Associates, Inc. Synchro 6 Report 11117/2015 Page 3 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 14' Federal Way & Southwest f]vyy Future Veer (ToteO WeeFday PM Peak Hour e' a- t r Valu" (vahm) 2 2 21 2 22 33 Sign conlml Shop Free Free Oren 0% 0% 0% Peek Hour Factor 0.92 0.92 0,92 0.92 0.92 082 ft*fiMrw(vphl 2 2 23 2 24 39 pede i dN Law am W Walking Speed M11) pi 1100109 ftw horn1n (eeh) Melt type Now Nate Medan ehnpe seh) Upe9ewn WW(R) p%, pabon unblocked vG, conk volume 109 24 29 41, steps 1 canf w1 2t&nfvdl VM1111111,11i vCu, unblocked vol t09 24 25 G,eipN(e) 0.2 92 4.1 VC, 2 hip hl F(a) 38 3.3 22 PO queen live % 100 100 99 WigioMr(Y") -809 1o9 1903 V61si964 4 25 90 --- Volume Left 2 0 24 volunieffod 2 2 0 cSH 918 1700 1803 Volume is eal 0.00 0.01 oat Oueue t.eng(h 95a (R) II 1 Oontipu0slay(o) 9.9 0.0 3,0 Lena LOS A A ApWowh Delay (a) 9.9 0.0 3.0 Appreeoh LOS A Averape Delay 2.4 InMe1E90mti1peo9ytlNlEetldn 19.9% ICU LeN1919e1Ns Analysis Perot (min) 15 IGOelson & Associate., Inc. Synchro eP Report HCM Unslgnalized Intersection Capacity Analysis Central Point Costco TIA 15: West Hamrick ❑vW & Hamrick Rd Future Year (Total) Weekday PM Peak Hour Kitelson &Associates, Inc. Synchm 8 RepM 11112/2015 Page 5 Lane Con%um8ans F } 1 Y Volume(vehrh) 87 94 27 25 96 28 Sign control Free Free Stop Grade 0% 0% 0% Peak Hour Facia 0.80 0.80 0,60 0.80 0.80 0.80 Hourly Pow rate(Vph) 109 116 34 31 120 35 Pedeethens Lane WIMM (4) Walking Stoat (iV.) Peremtelcomile Right tum Caro (weh) Medlen lope TWLTL TWLTL Median star" veh) 2 2 Upommen signal (R) pX, plaamn unblocked vC, milecIng vvwme 228 286 168 VC7, stege 1 cont vol 188 42. slope 2 mnl vol 99 vCu, unblocked vol 220 288 168 sc,&in*(a) 4.4 84 62 LG, 2 stage (s) 5.4 ff(9) 2.5 3.5 3.3 PO queue tree % 97 85 96 cmeapmtity(roNh) 1179 804 982 Volume Told 226 34 - 31 120 36 Vub m Left 0 34 0 120 0 Valume Right 116 0 0 0 35 GSH 1700 1179 1700 804 882 Volume to Capacity 0.13 0.03 0.02 0.15 0.04 Queue Length 95th (ft) 0 2 0 13 3 Control Delay (a) 0.0 8.1 0.0 10.3 9.3 Lane LOS A 8 A Approach Noy (s) 00 4.2 10.0 Approach LOS e Avenge Delay 4.1 Intemectpn Capacity U92aabon 30:3% ICV LeMA9aINsa A Anaysis Perm (min) 16 Kitelson &Associates, Inc. Synchm 8 RepM 11112/2015 Page 5 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 16: East Hamrick D"(RIRO) B Hamrick Rd Future Year (Total) Weekday PM Peak Hour y 1 l ~ 1 Lena Confpwe0ane f t r Valume(uehlh) 70 46 0 52 0 91 SO Canbol Free Free Stop Sleds 0% 0% 0% Peak Hour F=r 0.80 0.80 0A0 0.80 0.80 0,80 Hourly flow no (Vol a9 56 0 e5 0 114 Pedestrians Lola Wldei IIC Walking Speed (6h) perantelockye Right tum We (aeh) MAW type TWLTL TWLTL Median enrage veh) 2 2 Up lrev elpal (10 p16 platoon unblodnd vC, mn lldtq vdane 144 181 fie Vol, elege 1 conrval 116 VC2, auep2canival e5 vCu, unblockM vol 144 181 116 IC, pngY(a) 4.4 BA 6.2 IC, 2 Rape (a) 5.4 F (e) 215 3.8 3.3 p0 queue free% 100 100 88 CM 110i (V" 1269 972 942 VafuYnWidtel 144 66 -1`14 Volume Lelia 0 0 0 VdurmAlghl 58 0 114 CSH 1700 1700 942 Volume to Cape lty 0.08 0.04 0.12 Queue Length 95C Ill) 0 0 10 Coned Delays) 0.0 0.0 9,3 Lane LOS A AppmKh Delay(e) 0.0 0.0 9,3 Approeoh LOS A Average Delay 3.3 IM"Kem Cepay UCILAW 10.8% ICULew101111ls A Amlyeie NOW (min) 15 NKelson & Aseociohe;, tu. Synchm 5 Repand 1111212015 Page 6 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 17: Table Rack Rd 8: Northeast Dwv Futwe Year (Total) Weekday PM Peak Hour -A 1 1 1 i Lend ConSgumtlons 0 r 1 4} }t. Volum (veluh) 50 141 161 590 729 72 Sign Control Srop Free Free Grace 0% 0% 0% Peak Hour Factor 0.92 092 0.92 0.92 0.92 0.92 Hourly flow rele(vph) 54 153 175 641 789 Te PedesMans i Lane 3Vkhhft) 12,0 Walking Speed (IUa) 3.5 Pereenl Blockage 0 Right tum flare (wh) Meow We TWLTL TWLTL Median !Grape veh) 2 2 llpreamalonal(9) pl( platoon unblocked VC, conlill volume 1500 435 666 VC 1, lege 1 cont wl 829 vC2, sage 2 mnlvl 671 vCu, unbboked vol 1500 435 888 1C, rngle (a) 6.8 69 4.5 tC, 2 *Age (a) 5.8 IF (11 3.5 3.3 2A PO queue free % 80 73 74 am cWR*(we") 288 574 661 Volume TOW -34 133 715 321 321 523 341 Volume Left 54 0 175 D 0 0 0 Volume Right 0 153 0 0 0 D 78 PSH 268 574 981 1700 1700 17DO 1700 Volume to Cape* 0.20 0.27 0.26 0.19 0.19 0.31 0.20 Quake Length 95th (8) 19 27 27 0 0 0 0 Comm Dody(a) 21.8 13.5 12.4 0.0 0,0 D.0 0.0 Ltne LOS C 8 6 Approach Delay (2) 15.7 2.7 0.0 Approach LOS C Avxage Delay 2.9 lelereection Clryecihy UWindion 47.3% IC131eask67lmft A Anelyau Paced (min) 15 Kitialson 8 Assoclates, Inc. Synchro 8 Report 1111212015 Page 7 HCM Unsignalized Intersection Capacity Analysis Central Point Costco TIA 18: Table Rock Rd & Southeast Dwy Future Year (Total)'Neekday PM Peak Hour 1 t 4 I Lane Cauliguratims Y 1 4t 111. Volume Milli 5 29 50 745 838 29 Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.92 092 0.92 0.92 0.92 092 Hourly flow to%(Wi 5 32 54 810 911 32 Pedestrians 1 Lena NO 12.0 Walking Speed ill 3.5 Percenl Modpe C flight turn Aare (vehl Ml W& TWLTL TWLTL Median storage wh) 2 2 dPelmem tlgrnl00 726 p%, platoon unfll vC, CAIC a y0i 1441 472 943 VC 1. Star l wntVol 925 42, Mae 2 old id 614 vOu, uncooked vM 1441 472 943 C, single (a) 6.8 6.9 4.5 K, 2SUP (1) 5.5 IF (8) 3,5 3.3 2.4 PO queue free% 98 94 91 dd44rpMAphlehT) 601 613 9118 VolumUw 37 54 406 405 607 335 Volume Left 5 54 0 0 0 0 Val"Rlpht 32 0 0 0 0 32 cSH 488 616 1100 1700 1700 1700 volume m CWW 0.05 0.09 024 0.24 0.36 0.20 Oueue Length 95th (8) 6 7 0 0 0 0 Control Dewy (t) 130 11.4 0.0 C.0 00 0.0 Lane LOS B B ApproachOMey(Q 13,0 0.7 0.0 Appnch LOS B Avenge Oelryey menedtlm Cpeolty Ull9zMl5n 06 42.8% ICU larWdBweb A Analysis Period (mm) 15 Kdtelson 6 AsscclMes, Inc. Synchra 6 Report 11/121205 pega8 Queuing and Blocking Report Future Year (Total) Weekday PM Peak Hour 11)1212015 Intersection: 2: 1-5 NB Ramos & E Pine St Intersection: 8: Table Rock Rd & Hamrick Rd LR Magi Quwe(it) 55 A -nip Guam (it) Dhecham S"d L R L TR Mechnum Gene Oh Direc6ona Served L T T T T R L LT R R Muni Queue Oq 96 191 239 377 378 340 410 536 582 230 Aw ge Queue (ft) 47 108 126 245 235 123 239 293 179 81 95th Quaue(8) 90 190 213 396 386 290 422 508 344 236 Link Distance (11) 1152 1152 486 486 678 676 Upseewn Elk Time (%) Queuing Penally (veh) Storage 8ay Ohl (8) 150 265 335 390 Storage Elk Time (°k) 2 5 0 7 15 Queuing PaMlty(Wei 2 24 0 18 40 Intersection: 8: Table Rock Rd & Hamrick Rd Stooge Elk Thea (%) Quudng Pai (yah) Intersection: 13: Federal Way & Northwest Dwy Olnctlons Smwd LR Magi Quwe(it) 55 A -nip Guam (it) Dhecham S"d L R L TR Mechnum Gene Oh 92 69 53 22 Avenge Queue, (11) 47 39 to 1 9Nh Que ke (6) 86 58 36 10 Unk Distance (it) 236 976 Upelaw E& Tene (%) Queukp Pene&y (vert) Stage say Olet (10 166 150 Stooge Elk Thea (%) Quudng Pai (yah) Intersection: 13: Federal Way & Northwest Dwy Olnctlons Smwd LR Magi Quwe(it) 55 A -nip Guam (it) 32 9511t Qeue (e) 41 link Distance (t0 150 UpaeNe Elk Thee (%) Queung; Penalty (vii SMMP BWQM (m Storage Elk Tam (%) Queuing Pereky lwh) Central Point Costco TIA 5inTefiic Report Kldeleen & Aaaogake, Inc. Page 1 Queuing and Blocking Report Future Year (Total) Weekday PM Peak Hour 11112015 Intersection 14: Federal Way & Southwest Dwy Directions Serwd LR LT Maximum Owe (ft) 30 31 Awrage Queue (ft) 4 1 95110"(a) 20 10 Link Distance (R) 162 514 0pst eem all, Tkn (%) 19 Oueulag Penalty (wh) 36 Storage Say DM (e) M Storage 61k Time (%) Queuing Pan* (veh) 164 Intersection: 15: West Hamrick Dwy & Hamrick Rd Director, Served L L R MWIMIm Dnn(8) 8s TO 51 Average Ouaue (8) 8 32 19 96th Oueue(4) 36 48 M Lmk Distance (a) 154 164 ul a ew a Thee (%) Queuing Penally (rah) StDnVBWDMt(a) 150 6torageekTaa(%) Onukq Penalty (wh) Intersection: 16: East Hamrick Dwy (RIRO) 8 Hamrick Rd OkeWaa Served R Mealmum Ouear(1) 54 Average Oueua (A) 33 95m-Ouen(h) 44 Link Distance (n) 112 upetram Be, TkM (%) Queuing Pnalty (veh) Storage May DwM) Storage elk Time (%I ouea'ng Penalty ("h) Central Point Coelia TIA SlmTramc Report kinlson 6 Associates, Inc. Page 2 Queuing and Blocking Report Future Year (Total) Weekday PM Peak Hour 1111212015 Intersection: 17: Table Rock Rd & Northeast Dwy Dhadons Served L R L T TR MarJmum Quwa(A) 74 97 134 22 22 Awns Quem (m) 35 44 62 1 5 95th Qwa (it) 70 73 199 10 20 Wk Dlslrwa(it) 179 179 Qcwing Petty (rah) M4 394 Upaaum elk Time (%) Queuing finally (rah) Stora. flay Dist m1 250 Storage 9k Tom (%) Qwthp Pwml y (WO) Intersection: 18: Table Rock Rd & Southeast Directlone Saved LR L Made"Oum(11) 52 79 Armaga Quwe(1) 19 27 Backewem 47 65 Link DMwcn(6) iM upm mfhTimr(%) awing Pamky (rh) Storage fly Did (Iq 256 Slorapa ek Time I%) Qcwing Petty (rah) Zom Wdo Gwrka FWuly: 63 Central Point Caatca TIA SlmIrraec Report kllblwn 3 Assodatee, Inc. Page 3 Public Works Department CENTRAL-- -_ matt Samitore, Director POINT REVISED PUBLIC WORKS STAFF REPORT January 5, 2016 AGENDA ITEM(S); Costco Membership Warehouse and Four (4) Island Fuel Facility Applicant: Costco Wholesale; Agent: Steve Bullock, MG2 BACKGROUND: The applicant is requesting a Conditional Use Permit (File No. 15022) and Site Plan & Architectural Review (File No. 15028) approval for the construction of a Costco Wholesale membership warehouse, including a four (4) island fuel facility, with a scheduled opening date Fall 2016. The 18.28 acre project site is located on form (4) undeveloped lots within the Federal Way Business Park Subdivision. As a previously platted subdivision all utilities, with the exception of transportation infrastructure, aro available and adequate to service the project. The applicant has prepared a Transportation Impact Analysis (TIA) t identifying and addressing transportation impacts and mitigation measures. 'the I IN was prepared in accordance with input from the Citv of Central Point, City of Medford, Jackson County and the Oregon Department of Transportation. The TIA took into account the County's Table Rock widening project (lour travel lanes, a center tum lana bike lanes and sidewalks, and signalization of Table Rock Road and Airport Road) scheduled to begin construction one year (2017) after the opening of the Costco project. EXISTING INFRASTRUCTURE: Water: 'there are 8 -inch waterlines that exist in Hamrick Road and Federal Way. Streets: Hawick Road is a City Collector Street. The right-of-way in front of the subject property varies from 72-76 feet, which is adequate to some the proposed project. Stormwater. There is a 36 -inch storm line in Hamrick Road. TRAFFIC IMPACTS & MITIGATION: The TIA evaluated twelve (12) intersections deemed to be affected by the project. Fora of the intersections have issues at the opening of Costco (Build Yew Fall 2016). Those intersections are: 1. Table Rock Rod & Airport Road (Jackson County). Currently, this intersection operates at an unacceptable Level of Service (LOS F). This status persists at Build Year and will be resolved upon completion of the Table Rock Road Improvement project in 2017. Because of the timing between Build Year and completion of the Table Rock Road project no mitigation has been proposed or required by the County. 2. Table Rock Road d & Hamrick Road (Jackson County/City of Central Point). The applicant has requested full access movements on the two access driveways on Table Rock Road. Per the County, ''Iransportafion Impact Analysis Central Point Costco Oevelopmen4 Kitrelson & Associates, Ino, October 2015 140 South Y" Street Centrat Point, OR 97502 •541.664.3321 Fax 541.664.6384 3. access on Table Rock Road will be limited as follows: a. Prior to completion of the Table Rock Road project, both access drives will be limited to right-in/right-out movements. Median islands will need to be installed by the applicant to restrict access movements. b. Prior to the completion of the Table Rock Road project, for the Table Rock Road/Hamrick Road intersection the applicant will be required to construct a center tum lane and refuge Pane within the existing Table Rock Road right-of-way. a Upon completion of the Table Rock Road Improvement project, access movements will be limited to right-in/right-nut, and leftinmovements (no signalization) for the two access driveways on Table Rock Road. 4. Northbound 1-5 Off -Ramo (ODOT). On the opening date for Costco, the NB I-5 off -ramp will exceed the allowable volume to capacity (v/c) ratio, triggering the need for dual right tum lanes (LAMP 33 Project No. 9). The estimated project cost is $1 3M- The project cost sharing shall be as follows: ODO'f: $800,000 Costco: $377,000 (Not to exceed) City: $123,000 (Not to exceed) Per ODOT, construction will commence at the earliest possible date. The applicant's proportional share will be payable to the City of Central Point prior to issuance of a building pemut and is not SDC eligible. 5. Airport Road & Biddle Road (City of Medford). The TIA indicates that the westbound approach of Airport and Biddle Road exceeds the level of service standard for the City of Medford. Mitigation measures were not addressed in the TIA. Based on comments from the City of Medford, the Rogue Valley international Airport is opposed to a median at the intersection of Biddle Rd and Airport Road. The City of Medford recommends a condition that requires the developer to pay a proportional share toward a future traffic signal at this intersection. The estimated project cost for a traffic signal at this location is $450,000 including design, construction, and inspection. The development's contribution is 10% based on additional traffic at this intersection per the Traffic Impact Analysis, dated October 2015, prepared by Kittelson and Associates, Inc. This results in a $45,000 contribution from the developer to this future project 6. Table Rock Road & Momineside Sheet (City of Medford). At the intersection of Table Rock Road and Momingside Street the City of Medford recommends a condition that requires the developer to pay a proportional share towards a future left tum lane at [his intersection. Per the City of Medford letter dated December 24, 2015, this development will increase PM peak hour trips through the intersection by 20%. The City of Medford estimates the total cost for a left turn lane at this location to be S300,000 including design, construction and inspection. A 20% contribution would result in a $60,000 contribution from the developer to this future project. 140 South 3'° Street Central Point, OR 97502 •541.664.3321 Fax 541.664.6384 It should he noted that the TLA indicates that by 2020 additional lane configurations will be needed for the intersection of East Pine Strect/Hamrick Road. The City of Central Point is tentatively scheduled to complete these improvements by 2018, including improvements to the North-South Traffic to include a receiving lane, a thin lane, and designated right and left tum lanes on Hamrick Road North and South of the intersection. No additional improvements will be made on E. Pine Street/Diddle Road as part of this improvement project. CONDITIONS OF 1. Oregon Department of Transportation. Prior to issuance of a building permit Costco shall enter into a Cooperative Improvement Agreement with the Oregon Department of Transportation (ODOT) , of a similar agreement acceptable to the City and ODOT ("Agreement"), to fund development and construction of a dual right tum lane at the 1-5 Exit 33 northbound off -ramp. The estimated project cost is $1.3M. The Agreement shall distribute costs as follows: ODOT $ 800,000 Costco: $ 377,000 (Not to exceed) City $ 123,000 (Not to exceed) Total $1,300,000 Coster's contribution shall not exceed $377,000 and shall be paid prior to issuance of a building Permit 2. Transportation Conditions Jackson County Roads. The following addresses Jackson County Roads conditions of development only. See Jackson County Roads memo for general comments not imposed as conditions of development. A. Jackson County Roads, Condition 1—Prior to issuance of a Certificate of Occupancy, the applicant shall construct a left tum and left receiving lane on Table Rock at Hamrick Road. The tum and receiving Panes shall have adequate queuing to ensure safe and efficient operation of the intersection during the first year of opening. Applicants Engineers shall prepare plans identifying the length of improvements. Plans shall be approved by Jackson County Roads and City of Central Point prior to issuance of a building permit. This improvement is not System Development Charges (SDC) eligible as it is in exchange for the required frontage improvements. This work will require a Minor Road Improvement Permit from Jackson County. B, Jackson County Roads, Condition 2 — Prior to issuance of a Certificate of Occupancy the applicant shall construct median islands in Table Rock Road in front of the two Table Rock Road approaches. Until completion of the County's Table Rock Road project these two Table Rock Road approaches will be limited to right-in/right-out. This work may be included in either the Minor Road Improvement Permit or the Commercial Approach Permit. C. Jackson County Roads, Condition 3 —As pari of the Table Rock Road Project, the Table Rock Road approaches will be constructed as right-in/leR-nuright-out movements. The Table Rock Road Project will install the medians as part of the Table Rock Road Project's expenses. 140 South 3'd Street • Central Point, OR 97502 •541.664.3321 • Fax 541.664.6384 D. Jackson County Roads, Condition 4 -At the County's Table Rock Road Project's expense the County will install a new signal at Airport Road and Table Rock Road. E, Jackson County Roads, Condition 9 -The applicant shall submit construction drawings to Jackson County Roads and obtain county permits as required. F. Jackson County Roads, Condition 10 - Prior to the issuance of a Building Permit the applicant shall obtain Commercial Approach permits from Jackson County Roads for any new approaches or improved approaches to Hamrick Road and Table Rock Road. The paved approaches shall have a 30' radii and a 40' width. Jackson County Roads requires the removal of any existing driveways not being used on Hamrick Road and Table Rock Road. G. Jackson County Roads, Condition 13 - Utility permits are required from Jackson County Roads for any utility work within the county road right-of-way. H. Jackson County Roads, Condition 16 -Prior to issuance of a Building Permit if drainage is directed to Hamrick Road and/or Table Rock Road, plans shall be submitted to Jackson County Roads for review and comment on the hydraulic report including the calculations and drainage plan. Capacity improvements or on-site detention shall be installed at the expense of the applicant. Upon completion of the project the developer's engineer shall certify that construction of the drainage system was constructed per plan and a copy of the certification shall be sent to Jackson County Roads. 3. City cf Central Point A. Hamrick Road and Federal Way Improvements - Prior to Public Works Final Inspection, the applicant shall install sidewalks and street trees per the Public Works Department Standards and Specifications. B. Public Works Standard Specifications - The applicant shall use the 2014 revised Public Works Standards and Specifications for all new construction drawings. 4. City of Medford A. Per the City of Medford letter dated January 5, 2016, prior to issuance of a building permit, the applicant shall provide evidence that it has contributed toward the construction of signalization improvements at the intersection of Airport and Biddle Read. T'he applicant's share of the signalization improvement shall not exceed $45K, which shall be payable to the City of Medford. B. Per the City of Medford letter dated January 5, 2016, prior to issuance of a building permit, the applicant shall provide evidence that it has contributed toward the construction of left turn lane improvements at the intersection of Table Rock Road and Momingside Street. The applicant's share of the left turn lane improvement shall net exceed S60K, which shall be payable to the City of Medford. 140 South 3r0 Street - Central Point, OR 97502 •541.664.3321 • Fax 541.664.6384 JACKSON COUNTY �-� Roads December 10, 2015 Attention: Stephanie Holtey City of Central Point Planning 140 South Third Street Central Point, OR 97502 Rosas ATTACHMENT "E" Engineering M1114e Aunl; P.E. eounry engineer 200 AhlefdPa Rd. "hila CK, M 97503 Ph..:(541)714-6229 Fax: (541)7T4z2W kvn6m@;acx4wcoumy.wp wnw.pcFvonwunlyap RE: Conditional Use Permit and Site Plan $ Architectural Review for construction of a 161,992 square foot membership warehouse and four Island fuel facility, including 783 parking spaces and site landscaping off Hamrick Road and Table Rock Road — county -maintained roads. Planning File: 15022 and 15028; 37 -2W -12B Tax Lots 213, 214, 215, and 216. Dear Stephanie: Thank you for the opportunity to comment on this Conditional Use Permit and Site Plan $ Architectural Review for construction of a 161,992 square foot membership warehouse and four island fuel facility, including 783 parking spaces and site landscaping on a 18.28 acre site in the Industrial M-1 —zoning district. The project site is adjacent to Hamrick Road and Table Rock Road. Jackson County Roads has the following comments: 1. Prior to opening, Jackson County requests construction of a let turn and left receiving lane on Table Rock Road at Hamrick Road. The turn and receiving lanes shall have adequate queuing to ensure safe and efficient operation of the intersection during the "t year of opening. This work will require a Minor Road Improvement Permit from Jackson County, 2. Prior to opening, Jackson County requests construction of median islands in Table Rock Road in front of the two Table Rock Road approaches. Until the County's Table Rode Road Improvement project is complete, the Table Rock Road approaches will be limited to right-in/right-out. This work may be included in either the Minor Road Improvement Permit or the Commercial Approach Permit. 3. As part of the County's Table Rock Road Improvement Project, the Table Rock Road approaches will be constructed as right-in/left-inlright-out movements. The County's project will install these medians at the project's expense. 4. The County's Table Rock Road Improvement Project will install a new traffic signal at Airport Road at the projects expense. I:\Englrl &QkOavfapmanl\eITI ESICPRTLMIM02261508.daC December 10, 2015 Page 2 of 3 5. The East Pine/Hamrick Intersection will likely fail approximately one year after opening. Central Point should construct improvements to this intersection prior to failure. 6. Construction of the fourth leg of the Table Rock/Airport Road Intersection, with Airport Road Connecting to Federal Way, will significantly Improve traffic circulation in the project area. Jackson County would support any efforts which facilitate this Improvement. 7. Once the fourth leg of the Airport intersection is complete and connected to Federal Way, the Federal Way access paint will become a significant access for the project. The current site plan utilizes Table Rock and Hamrick Roads as the front of the project and for primary public access. Federal Way Is primarily utilized for delivery access and as a minor public access. The site plan should perhaps be modified to make Hamrick Road and Federal Way the front of the project to recognize the long term circulation. Regardless of the final "front" of the project, the public access to Federal Way should receive a major upgrade to encourage public use of this access and Improve long term circulation. 5. Jackson County estimates the value of the frontage improvements on Table Rock Road that will not be constructed by the applicant at $480,000. 9. The applicant shall submit construction drawings to Jackson County Roads and obtain county permits If required. 10.The applicant shall obtain Commercial Approach permits from Roads for any new or improved approaches to Hamrick Road and Table Rock Road. The paved approaches shall have 30' radii and a 40' width. Roads requests the removal of any existing driveways not being used on Hamrick Road and Table Rock Road. 11.The posted speed zone for Table Rock Road is 45 mph, requiring an approach sight distance minimum of 325'. 12.Homrick Road is a Basic Speed Rule road. The required approach sight distance Is 450'. 13. Utility Permits are required from Roads for any utility work within the county road right- of-way. 14. Please note Hamrick Road is a local road but the soon to be revised County TSP will designate it as a Minor Collector and is county -maintained with an Average Dally Traffic count of 799 as of 8/2014, 150' west of Table Rock Road. December 10, 2015 Page 3 of 3 15. Please note Table Rock Road is an Arterial Road with an Average Daily Traffic count of approximately 13,000 In the project area. 18.11' drainage is directed to Hamrick Road and/or Table Rock Road, Jackson County Roads would like to review and comment on the hydraulic report including the calculations and drainage plan. Capacity improvements or on wits detention, If necessary, shall be installed at the expense of the applicant. Upon completion of the project, the developer's engineer shall certify that construction of the drainage system was constructed per plan and a copy of the certification shall be sent to Jackson County Roads. 17. We would like to be notified of future development proposals, as county permits may be required. 18. We concur with any right-of-way dedicated. �Siinccerely, ) 7Z/- Mike Kuntz. P.E. County Engineer 00regon Kale Brown, G9vornar December 14, 2015 STEPHANIE HOLTEY, PLANNER CITY OF CENTRAL POINT PLANNING DEPARTMENT 140 SOUTH THIRD STREET CENTRAL POINT, OR 97502 ATTACHMENT "F" o,.e•• o.wrm.ar o.. a,w.3, DW., 9 te Mir mi 1504 White Cu'(541 ort 91503 4310 (541)77443 FAX (51l rr4d39i Re: Coatco Wholesale Conditional Use Permit: 15012 and Site Plan/Architectural Review: 15028. Thank you for the opportunity to review the Conditional Use Permit (CUP) application, Site Plan/Archiecctmal Review application and associated traffic impact analysis (T IA) fur the construction of a 161,992 square foot membership warehouse and four (4) island fuel facility, including 783 parking spaces and site landscaping. The 18,028 acre property is located at the southwest Corner of the Table Rock Road and tlanuick Road intersection. 37 -2W -12B Tax lots 213, 214, 215, and 216. ODOT is requesting that the City of Central Point include the following condition for CUP 15022: • Costco shall enter into a Cooperative Improvement Agreement with the Oregon Department of Transportation (ODOT) to fund development and construction of a dual right min lane at the 1-5 Exit 33 northbound off -ramp. Costco's share of the estimated $1.3 million improvement shalt be limited to $500,000, with ODOT funding the remaining cost of the improvement. You may contact me at 541-774-6399 if you have any further questions or iequire additional information. Thank you, n oreha� Senior Trauspotatlon Planner, Development Review Cc: Ron Hughes, Michael Wang, Cathy Harshman, Jeremiah Griffin ATTACHMENT "G" Stephanie Hoke From: Kelly A Akin<Kelly.Akin@cityofinedford.org> Sent Thursday, December 03, 201512:11 PM To: Stephanie Holley Subject: RE: Action Needed- Request for Agency Comments on Land Use Applications Stephanie — Thank you far the opportunity to comment on the Costm applications. The City of Medford Planning Department has no comments. Kelly Aldn Principal Planner City of Medford Planning Department 411 W e Street Medford OR 97501 From: Stephanie Holley, Seat: Monday, November 16, 2015 3:51 PM To: Kelly A. Akin grlJect: Action Needed: Request for Agency Comments on lard Ile Applications ImpotMroa High Kelly, The City has received the fallowing applications for Costco Wholesale: Conditional Use Permit (File No. 15022) Site Plan & Architectural Review (File No. 15028) This request for agency comments(attached) was also sent to Alm Gwfg vKdr in Public Warks. Due to the size of the appliation, the site exhibits, findings and traffic information analysis have been posted an the City's website at the following location: http-//w traigoint ego A /cd/ roiect/Costco-conditlonal-use-oe mtsite-olan- architectural-review. If you have any questions, please feel free to contact me. Sincerely, Stephanie Holtey, CFM Community Planner II City of Central Paint 140 South V Street Central Point, OR 97502 Desk: (541) 664-7602, Ext. 244 Fax:(541) 604-6384 www centreioointoregon oov ATTACHMENT"H" 4 �ayfY fEY�� a. ROGUE VALLEY SEWER SERVICES (ncelion: 158 Wat Was Raid, Cmhal Pain, OR Mailing Addn. P.O. B"" 11 30, Ccnnel Pnlnt OR 1502-0005 Tel.(541) 6666100, Fix (541) 664-]171 wnv. RVSS I, November 16, 2015 St.phmue Halter City Id(' raitral Point Ph, .udog Deparnent 155 South Steroid Street Cmmal Poinq Oregon 97502 Re: Pile 15022 CUP and 15028 SPR – Cosmo Wholesale, Tax Lon 213, 214, 215, and 216, Map 3I2w2R Sasnnry sewer seevite m the proposed development can be had by cormecting m the eaiseng 8 inch sewer main Federal Way. the cotmecdon cast. be done other as a private service lateral of a pubic main les ramaeioo. Then. is an 8 ir.ch pipe exnnded m he prooerty at the Northwest corner that would fadliure rbia comleroon. .4 prone service Iateral connection will require a penrdt from RVSS, which will be issued upon payment of related development fees. A public sewer extension most be designed by a hurried engineer and constructed in acwrdance with RVSS standards. The project is within the Phase 2 stormwater quality area said must comply with stmmstater quality requirements outlined in die Regional Stormwater Design Manual. The proposed development dnea not involve any sewer caysm,c imi Th. project does have smrmwa:., quality impacts and must comply with rhe standards established m It. re"onal Stemware, Qnaliry Dcsign M.." Rugae VAR, Sewer Services tcquesn drat approval of din develop pant be subject m rhe fod.anog coudat ons: I. Aoplicant must submit satursty amer plans to RVSS for teview and approval demonstrating compliance with RVSS standards prior Io the start of construction. 2. Applicant const submit a smrmwamr rearvgement plan demonstrating comphssa e. with the regional Stoemavatee Design Manual fon review and approval by RVSS print to the start of cons trucdon. J- Applicant mus obaln a construction sire erosion and sediment coi=n] permit from RVSS print to arty geoun8 disturbing ac c",cs. Feel fee. to esll me iffY You. 11-1-1 questions. � (/ P Cad fapperq PE Marg., K:\DATA\AGENCIES\CENTPT\PLANNG\SITEPLANREV IE W\2015\15028_COSTCO WIIOLESALE.DOC rry>ATTACHMENT 1-1" 1rsw+�til.� Continuous Improvement Customer 5ervice CITY OF MEDFORD PUELIC WORKS DEPARTMENT 200 SOUTH W STREET TELEPHONE (541) 774-2100 ENGINEERING 60EVELOPMENT DMSION MEDFORD, OREGON 07501 FAX(MI)n7 2552 a^mv cl m�Efartl.or.,n January 5, 2016 Stephanie Holtey City of Central Point Planning Department 140 So. Third St. Central Point, OR. 97502 Dear Ms. Holley: We have reviewed the Central Point Staff Report, dated January 5, 2016, for the proposed Costco Conditional Use Permit and have the following comments: 1. We understand the Rogue Valley International Airport is opposed to a median at the intersection of Biddle Rd and Airport Rd, as described in Condition No. 3. We recommend a condition that requires the developer to pay a proportional share towards a future traffic signal at this intersection. The City of Medford estimates the total cost for a traffic signal at this location to be $450,000 including design, construction, and inspection. We estimate the development's contribution at 10% from the additional traffic at this intersection shown in the Traffic Impact Analysis, dated October 2015, prepared by Kittelson and Associates, Inc. This results in a $45,000 contribution from the developer to this future project. 2. At the Intersection of Table Rock Rd. and Morningside St. we recommend a condition that requires the developer to pay a proportional share towards a future left tum lane at this intersection. See attached accident history showing an existing pattern of northbound rear -end collisions at this intersection. Per our December 24, 2015 letter, this development will Increase PM peak hour trips through the intersection by 20%. The City of Medford estimates the total cost for a lett turn lane at this location to be $500,000 including design, construction, and inspection. A 20% contribution would result In a $60,000 contribution from the developer to this future project. The City of Medford is open to discussing alternate mitigation designs, costs, and/or methodologies to calculate the developer's share of the cost of mitigating these traffic impacts to those as described above. These values are the best estimate we can make at this time with the information available. If you have questions, please contact me at (541)774-2115. Sincerely Karl MacNalr, PE Transportation Manager CC: Alex Georgevitch File Morningside St & Table Rock Rd 29 Accidents (rate: 1.32) 01/01/10 - 12/04/14 1sp I omm/1z mnv+3_ Ued fllhr, Uaddenh wlfh lneuAkkdldoftfar tlh,Ai .— Straight m Parked X Pedestrian Fixed objects: f Stopped � Erratic X Bicycle a cieneml o Pole s Unknown w Out of control Q Injury a Signal ■ Curb s Backing vt_ Right turn © Fatality • Tree 9 Animal « Overtaking Ae— Left turn Nighttime Q 3rd vehicle . Sideswipe IF7-- U-turn w DUI . Extra data FM�><am. wRVMYTES ervawL31wwg5/an6 IUOM6tlry 6Y6w16.1]/q„m6 Umiry5be98TaarNM1q SutJ MmAR1wFILCL OSFO wR TNF M1RF Mc i]R]Ll SIVEAE TIPEOF wLL V[MIMR Vd}dR VFXI MOVF VM iMOVE VFNITR VpET/If 4W R6 MYRV SFVEMR 4TN MiORRM[M NiW li SYG15f ] vanov u36 �t ]E.e19Ao5W n6NtM61un sM.Yp. xmn vmMa nmxrvn MeM W! ry wMry MY 3 oxrmMrysn. oF. vMl 16u16 nLm1F va] RRIE mSW 66MRIG81Fn nM mtl xmP xw vm M! vMMt z ; Ftllyllq[m rlma vMl ]wNo6 3/]Y]0]o nal nSdII TOME gJtq MJMN65IXn neY rM none qTl sv.'/V s RM In Tal lbM AM's tep y NMgM 0 0 BFolpdtYlwaYY YM] ]YYVw 0/]MN 1533 ]W XVN T.a01EFla p➢ MpMMfiSnLA ParmJ SrvtP SwF StrviM1t NmNR loft NpMk4e Mwry Nn GrMa U1LN VMI gJna¢ap gA/M10 ]➢m ®144Wr AM XWi is 005 p0 NeMN45Cfn Xvm! SaWI yM SbaILM S¢pgE NTN wNry Wl M[MMNn 0 0 WllnktlW VMl Nw IT51 0iA01EWIXn0 MOMM 4a wd qM Sl ralfn IwnVYLLh Ns11YM Mp1MMn 0 0 BipbdNtootlou VMt M ]1IM1093] T/.NEApRPO NORMd14MRNSMUP boN LMR 4weYM0 TumNLRln] IbNIM.WaMpq,Wt Ldtylw 0 OMpap paaM.O VMl AOi 10/]gRplO t6a6 0 nde MMdBfo[A Fna MrYOPt yvafatl Mirtl 04T@ MCAnO.Wa mbllry StF] t0tlf 1]/]/Mo P.M ]WO MnE iMYbIXROR L6oar�U HcnN SUN NriMt snyFt Mnlry Wt MwInO WI wRWR OpNIXMY waelun SIPAS VW1011163L 0 iMLL LLCOM MOMOGVOFA hateM XVN Mey SvyFl TumFl]M RMgWl.wawORd 1 1 BOxryrabeYyp]MVe VM] SNEM 5/aN]➢i] 1159 ]SNW LWf000{M MIMM6Lwn garxk NvaF MTF Sbs9Ft Lopµf lniM 1M4NNF M ALL E 1 F UMwtlra VeP] Aumi 11IMS1 NI3/IDll ]fill 505wF ly1EN5Rp AMNb161wR RNrerY XVM YpuF SlMjlt LryL6lnTr/AFavNFt MMrynN ] OFtl °VnL]^p!W VYhl IVO6(p 6/16/8111193] SO baM iNILOWtw MwXMMICEn Nu eq NqM 1qq SmpUINTtl lnlsMYm6'a¢ VMI VWNTn J660/EyAu #3l NI[15[o nnWd65II aT tev swM T .a.y RF9u64mry.vut OgYp tlIXUEn o oLia ]6S NLIDII Ifi:i SL NeM iAYER[Qm Mwaw6wR 91pwrye $uM NaT lwlltlMld 5VY0nnw, t Mon10Pw MwY.Yt 0 0 OGaknwaYY .ft VMS plttp[snp 1llMal y]yAll l] 3]yAF iANLMRO YOIIgIbSYLn N�eM NnnF Ynl04t Slq/gIMTrY 0 OSa4w0am Nae NF1 1319561 Wl/MI IIO O TAY[IOOb M06�00.F4 Boreal IFrIF HTF SvalMl TImFYIeR MOMLAN Lblrywe ] ONTe vdai waM4n I]tVIDn 153] L.SYENVp N5N662TfR baN XTP Staal9Fl SU9TtlMTtl •]Uw6y Ngbw Vali] n00R yUIDn tlSv6 TA..w algU01ASNEn INYU1 NeM Xm6 yaa'OFI l�trXryYll MMry WIM UFLNX I I ] Sllll15 JF/ RW. 0 i.LPE FT[p �FA 4tl1e 14M Ha1F svaMt TamNOYR W..ryM wUMAM 0 0 �iMwyUer'ge] lMNglw 2w ] ONmt mnp ]IllYJ4 7/LYID1i lYA 0 TNIE OC<lp RORMIMOkA �a xW TVIYrYMn SIM/Y NarM 9y YUp9Mn OiYmp4a5lOp5a31 VM1 eYmvmp 1]1561 VtyIDII lLW 0 TAPE p30p Sp00165pS5] NarmJ XTF 5VI/N SlUl�In TY Muhy Fu Va14 Wt 6fa0Wry]m abaa MS IIIlYV y/yAn ISY3 ]95uIW lut[euzv IbnmOYo Nyp NTF StYOM $ypYlniw waFORy NmIry FY iYlwlgrmab¢ 1]6861/NA]3151 Sp Nmq TO�[I656 ]YpYwf6YEn SYUtlpe NRM WPTnlNtai SMIMIV WaFn0N0 wMR LNIYML olbn VMv xtaq wn 1313115 0 MMNBIOLR LNER@p M/e 1baF TunLMYk YMn9NV raMrya+t l 1 OFiutlr9ROR9p1 NFi OMOO5ltR 1R9B3 9/l0/lli Il'.Il qM l.5MEI1'J6@ MpOMXgpSR peueN SwT 5pY6F1 .1Mk yaryrtlFTnl Vu1Y aW NpFryNY OFtivaylmaR VMS VdYdin 13II]]I tUl/A1i ]!Ia 10®NwIY 61F16(Ip MwP1YbSO5n OeYM XonF NTF SvayM 9gRtlInTM WMry Nn wXgwI pIRU6R 0 0 OSnOUiytwabx I3Na6 I]/9/A1i 1N6 MO0XIN656fA ialEIIL[II xO NnLle souM Eau iumNMiM1 SF Ta/ IIVAyM Mw4L4n 0 0 OPbr VMl 61 N eatM1er 1611616/E/1Y IF31 IDSwM iMENOQ Op ItlRVMY510E5T Uu m1 MM XTF XaMl1t YgpaO,.lnTnl Lbnq NN P451n6wt l 1 OSaYSF9lmYw VMS 0 ED asc Tapie rto;:k ----- -------- ---- - - - - .. Js O-\ Cost Es:-mate: Ao re ra{ 9 W squcre feet o of pcve�ve- nent Is/sq. `t O=30C;�OC -otal Cos* ATTACHMENT "-2" Continuous I m prove ment Customer Service CITY OF MEDFORD PUBLIC WORKS DEPARTMENT Zoo SOUTH VY STRccT TELPPHONE(541) 774-2100 ENGINEERING 80EVELOPMENT DIVISION MEDFORD, OREGON 91501 TAX(b41) 7742552 meMortl.or.us December 24, 2015 Stephanie Holtey City of Central Point Planning Department 140 So. Third St. Central Point, OR. 97502 Dear Ms. Holtey: We have reviewed the Traffic Impact Analysis, dated October 2015, for the proposed Costco Conditional Use Permit and have the following comments: 1. Mitigation is required at the intersection of Biddle Rd and Airport Rd due to project traffic degrading the level of service on the westbound approach below acceptable standards. The increase in traffic volume will increase competition for gaps in traffic for permissive movements resulting in the acceptance of smaller gaps and increase collision potential at the intersection. 2. The intersection of Table Rock Rd. and Morningside St. needs to be studied to mitigate safety effects of project trips on a decrease in safety at the intersection. The proposed increase in traffic will increase rear end pressure on northbound left turning motorists and decrease available gaps in southbound traffic. This will induce them to choose smaller gaps and increase collision potential at the intersection. The 90 P.M. peak hour project trips each way north and southbound represent a 20% increase over the 450 peak hour through trips each way counted on Table Rock in 2015. The development should contribute to a project to construct a northbound left turn lane at Morningside St and Table Rock Rd. If you have questions, please contact me at (541) 774-2121. Sincerely, Peter Mackprang Associate Traffic Engineer CC: Kim Parducci Don Burt Dan O'Connor ATTACHMENT "J" FINDINGS OF FACT & CONCLUSIONS OF LAW Costen Wholesale Conditional Use Permit File No. 15022 January 5, 2016 Applicant: ) Findings of Fact Costco Wholesale ) and 999 Lake Drive ) Conclusion of Law Issaquah, WA 98027 ) PART 1 - INTRODUCTION Costco Wholesale is requesting a Conditional Use Permit to develop 18.28 acres of vacant industrial land (M-1) zone with a membership warehouse and associated four (4) island fuel facility. The 161,992 square foot membership warehouse will he located on the southwest property boundary and the fuel facility on the southeast property boundary. It is the applicant's intent to relocate its existing facility to the proposed site with a scheduled opening date Fall 2016. The project site is located on the eastern edge of the Central Point city limits at the southeast corner of Hamrick and Table Rock Road (Figure 1). The site also has frontage on Federal Way, a local street Surrounding properties include developed and undeveloped industrial lands, including the M-1 and M-2 zoning districts. In accordance with Table 17.05.01, the Costco Conditional Use Permit application has been processed using Type III procedures as set forth in Section 17.05.400 of the Central Point Municipal Code. Including this introduction, these findings will be presented in three (3) parts as follows: 1. Introduction 2. Section 17.76.040, Conditional Use Findings & Conclusions 3. Summary Conclusion Figure t Location Map __ _nne..ncwwumra. PART 2-CONDITIONAL USE FINDINGS & CONCLUSIONS 17.48.040 Conditional Uses. The following uses and their accessory uses may be permitted in an M-1 district when authorized in accordance with Chapter 17_76. A. Business offices and commercial uses that aro compatible with and closely related in their nature of business to permitted uses in the M-1 district, or that would be established to serve primarily the uses, employees, or customers of the M-1 district; B. Rail and trucking distribution facilities. Finding 17.48.040(A): The City, by Planning Commission Resolution 764 and City Council Resoh6ion 12171, determined that membership warehouses are a commercial use compatible with and closely related to permitted uses in the M-1 zone. Conclusion 17.48.040(A): Costco Wholesale, a membership warehouse that includes wholesale automobile fuel sales, is specifically allowed as a Conditional Use- Finding I7.48.040(B): There are no rail or dru h'ng distribution facilities associated with the proposed 16e. Conclusion 17.48.040(B): Not applicable 17.76.040 Findings and Conditions The planning commission in granting a conditional use permit shall find as follows: A, That the site for the proposed use is adequate in size and shape to accommodate the use are to meet all otter development and lot requirements of the subject zoning district and all other provisions of this code. Finding 17.76.040(A): As evidenced to the applicant's site plan, the 18.28 acre project site is adequately sized to accommodate the proposed structures and off sheet parking asfollows: lj Setback Reinerements (CPMC 17.48060). The proposed structures meet the setback requirements of the M-1 zoning district as set forth in Cable 1 below: Front (North) 20-ft 275ft950-ff Side(W-f) 10-ft 60.0, 340 51-ft Side (East) 10-ft 395-ft 35-ft Rear (South) 10-ft 60-ft, 10-in. 160 -ft 1-in. - File No. 09022- M-1 Code Amendment Page 2 of 11 2) Off -Street Parking Requirements (CPAIC 17.64.0401. The applicant's parking plan proposes 783 parking spaces, which is 85 spaces in excess of the maximum 698 spaces allowed (Table 2). In accordance with Section 17.64.040(13)(2), the applicant is requesting an increase to the maximum parking standard for the proposed use. Table 3 summarizes the data provided in the applicant's parking demand analysis, which is based upon the following: • Documented parking supply and demand at existing Costco Wholesale warehouses in Oregon; and, • The Institute of Transportation Engineers (ITE) Parking Generation, 4'h Edition recommendation to maintain a maximum parking utilization of 90% during the typical peak periods to avoid illegal parking and repeating circulation.' The applicant's parking praposal for the Central Point location is slightly higher than the average minimum recommended parking ratio (Table 3) at 4.83 parking spaces per 1,000 s.f. GFA. Since the difference between the minimum recommendation and the proposed adjustment is within the range of acceptable statistical error (less than 5%) and is consistent with the ITE ° ITE Parking Generation, 4" Edition, 2010. Page 3 of 11 Table 2. Cleitco Parking Pequimment Required Proposed Building Min.7Mas. Parking Parking Costco Floor Area Parking Supply (No. Proposed Area by Use (Sq. FfL Standard Ratio Spaces) Parking Surolus7Oegcil Retail 134.064 11200 s./. 5.00 670 783 113 1/1,000 Warehouse 27,928 5.7. 1.00 26 28 TOTAL 161,992 11232 sL 4.31 698 783 85 Proposed 1 Adjustment 161,992 11207 s./. 4.83 763 783 In accordance with Section 17.64.040(13)(2), the applicant is requesting an increase to the maximum parking standard for the proposed use. Table 3 summarizes the data provided in the applicant's parking demand analysis, which is based upon the following: • Documented parking supply and demand at existing Costco Wholesale warehouses in Oregon; and, • The Institute of Transportation Engineers (ITE) Parking Generation, 4'h Edition recommendation to maintain a maximum parking utilization of 90% during the typical peak periods to avoid illegal parking and repeating circulation.' The applicant's parking praposal for the Central Point location is slightly higher than the average minimum recommended parking ratio (Table 3) at 4.83 parking spaces per 1,000 s.f. GFA. Since the difference between the minimum recommendation and the proposed adjustment is within the range of acceptable statistical error (less than 5%) and is consistent with the ITE ° ITE Parking Generation, 4" Edition, 2010. Page 3 of 11 recommendation to stay below 90% utilization for typical and seasonal peaks, the request to increase the parking standard is warranted and can be accommodated as demonstrated by the applicant's site plan. 3) Loading Requirements (Section 17 64 040). Loading required for retail buildings greater than 100, 000 sf GFA includes 3 bays plus d bay for each additional 80,000 sit. On this basis the proposed 161,992 sf, warehouse requires four (4) loading bays, which are provided on applicant site plan and arcbltectural elevations (north and west elevations). Additionally, the plans show three (3) loading areas for smaller auckhan deliveries. Conclusion 17.76.040(9) The site is sufficient in size and shape to accommodate the use and meet the development and lot requirements of M zone. B. That the site has adequate access to a public street or highway and that the street or highway is adequate in size and condition to effectively accommodate the traffic that is expected to be generated by the proposed use. Finding 17.76.040(8): The proposed Costco membership warehouse and fuel facility will generate appreciatively 10,670 new daily trips, la accordance with Section 17.05,900(A)(2)(e), the applicant prepared a Traffic Impact Analysis (TIA) for the proposed Costco membership warehouse andfuelfncilily. The scope ofworkfor the TIA was based onscopingseanions held on June 2, 2015 and August 13, 2015 with affected transportation agencies (i_e_ Oregon Department of Transportation, Jackson County, City ofMedforce, and City (or Central Point). It was agreed that the TIA would evaluate twelve (12) intersection and all propandsit. access driveways. Per the TIA Costoo membership data was utilized in conjunction with area -wide papulation, land use, employment and transportation information to determine how the transportation system will operate under build year (2016) and future year (2030) conditions with and without the proposed Costco development in place. The TIA accountedJor Jackson County's Table Rock Road widening project, which is scheduled to begin construction one year (2017) after opening of the proposed Costco project. Upon completion of the project, Table Rock Road will acting, four travel lanes, continuous center turn lane, bicycle lanes and sidewalks on both sides of the roadway frorn Biddle Road to Airport Road. The roadway will then narrow to two (2) travel lanes with a continuous center tura lane, bicycle lanes and sidewalks on both sides of the roadwayfrom Airport Road to the 1-5 crossing. Signaliaation of the Table RocklAirport Road intersection will be completed as part of this project. Asa result of the planned improvements, traffic impacts on Table Rock Road (i, e. Intersections of Table Rock and Ilamrick Road and Table Rock and Airport Road) will be resolved. Based on the TIA and comments received from affected agencies, there are traffic impacts to the following six (6) roadways: ' City of Medford did not provide any Input Into the TIA's scope of work. Page 4 w 11 1. Northbound I-5 OJf-Ramp (ODOT). 2. fable Rock Raced and Hamrick Road Intersection(Jackson County). 3. Table Rock Road and Airport Road Intersection (Jackson County). 4. Airport Road and Biddle Road Intersection(Cop ofMedbard 5. Hamrick Road/East Pine So-eetlBiddle Road (City of Central Point). Subsequent to completion oftha TIA the City ofMedfbrd noted that a sixth intersection, the intersection of Table Rock Road and Morningside Street, would also be impacted by the project The impacts and proposed mitigation for each of the above intersections are. 1 Northbmnd G5Off Rama. On the date ofopening, (he 71A indicates that the volume to capacity (v/e) ratio on the M3I-5 off -Ramp will be exceeded trigging the need for implementation of TAMP 33 Project No. 9 (dual right turn lanes from the off -romp to East Pine Street). To mitigate this condition ODOT required that Project No. 9 ofIAMP 33 be required as a condition of development, Prior to commencement of construction of the applicant's project ODOT's Project No. 9 must be fully funded and .scheduled for construction_ Recognizing that the applicant's project was not respersiblefor the total impact it utas agreed that the applicant will pay a prorated share of the costs. 2 Table RxkRoad and Hamrek Road lleragction During the inter'lm(pericdbetween completion of the applicant's project and completion of the County's Table Rock Road Project) site access an Table Rock Ruud wit be limited to right-tnfrighbout. As a result of the access restrictions, ler! turn delays at Hamrick Road and Table Rock will result unacceptable interim levels oJsen ice (LOS F). The TIA demonstrates that the idendded interim impacts to the right- in/right-out access restrictions an the FlamriddTable RockRoad intersection (non -signalized) are resolveduponcompletionofthe Table Rode Wiideningleraect. To limit access and resolve the identified interim impact to Hamrick/Table Rack Road, the County is requiring the following conditions. a Until the County's Table Rock Road project is complete, the private Table Rock Road approaches will be limited to right Wright out only. To assure this movement the applicant shall construct median islands in Table Rock Road in front of the avo Table Rock Road private approaches. b. Prior to certificate afaccupancy, the applicant shall construct a left turn and left receiving lane on Table Rock Road at Hamrick Road. the hirn and receiving Lanes shall have adequate queuing to ensure a fe and efficient operation of the intersection during the first year of opening. c. As part of the County's fable Rock Improvement Project, the Table Rock Road approaches will be censerected as right-infleft-in/right-out movements. The County's project will install these medians at the project's expense. Page 5 of 11 3. Table Reel cand Airport Road Interseelien. This intcrarmc(ion is currently at LOS F With the applicant s project and the pending improvements to the intersection s,h,duLc, 1r,20J7 as part of the Tabl¢ ROckROad Widening Project the level of service will be improved to LOS A. During the interim it is agreed that a lower level of service is acceptable. 4. Airport Road and Biddle Road. This true✓seation currently operates at a LOS C. At build year, the intersection wilt operate at a 1,OS L', The City (t,­Medford's review of the TLA, per a letter dated Janu cuy 5, 2016, indicated that the preferred mitigation would be the eventual sdgeoleopion of this intersection and recommended that the applicant pay their proportional share (10%) of the jinure (no planned date) signadlzat5on cost prior to commencement of construction of the applicant's project. 5 Hamrick Road o,d East Pine Street/Biddle Road lnter.section, With completion of the app&cant's project the intersection of Hamrick Road and Last Pine Street/Biddle Road is not expected to exceed LOS D. However, the 77d , of sol that by 2020 the City's ISP Project 4213 will be needed at this uaerswlon to avoid a,, unacceptable level of service. The city of Central Point is tentatively scheduled to complete fha necessary improvements as a Capital bnprovement Project by 2018, anch,dau; north-stuah traffic rtmm,t g lanesit in,,, lane, and designated right and left nan lanes on Hamrick Road north and stunk ofthe intersection The City isnot r,qut,iog interim notigi tion, since the idennfi d impacts do rot occur at the build ym, Tabl_e_Rock Road and Morn(rgside Sheet lnteesecfion_ Althomgh not studied in the TZA Nie Cary ofMedfard, in letters dated December 24, 2015 and January 5, 2016 stated that increased project related traffic voleme on Table Rock Road world increase collision potential to turning movements at the intersection. The Gly of Medford re^_ommends that prior to commencement of construction of the applicant's project that the applicant contribute its proportional share (0%) toward fueture (no .scheduled date) construction of left awn improvements at this in ,ov,,,urr. Conclusion 17.76.040(B): Per the Applicants 71A and the recommendations of the afj'eated agencies, traffic impact of the proposed vse on public streets and hfghways have been idem fed and wall be mingeted as noted in the above findings and as conditioned ire the Revised Staff Report dated,Lanuary 5, 2016 C. That the proposed use will have no significant adverse effect on abutting property or the permitted use thereof. In making this deeernilnatiov, the connnission shall cotuider Ere proposed location of improvements on the site; vehicular ingress, egress and internal circulation; setbacks; height of buildings and structures; wells and fences; landscaping, outdoor lighting; and signs. Finding17.76.040(C): Thefodlowing characteristics were evaluated in consideration of the proposal's impacts to abutting properties: 1. Pro00S¢d Location of Side Lmpr sssn ents. ros illustrated in the Site Plan, the location of the proposed warehouse, fuel facility, parking and landscape improvements are consistent with the site design and development requirements of the M-1 zoning district (See Finding 17.76-040(A)). Page 6 of ll 1. (vehicular Ingress Egress and Internal Circulation. The project site proposes two access drives on each of the frontage rands (i.e. Federal Way, Hamrick Road and Table Rock Road). Per tle ITA, access restrictions to private approaches on 'i'ahte Rock Road, prior to completion of the Table Rock Road widening project, cause operational and safety issues at Hamrick Road. As demonstrated in Finding 17.76640(R), access restrictions and mitigation measures resolve traffic impacts associated with ingress and egress as conditioned per the Revised Staff Report dated January 5, 2016. 3, Setbacks. The applicant's site plan identifies the location ofstructures and off street parking areas consistent with the setback requirements in the M-1 zoning district (See Finding 17.76040(.4). 4_ Building Ileig it. Per the Architectural Elevations submitted by the applicant, the warehouse wit[ have a varied roadme with a maximum height of 34 ft at the top ofthe highest parapet. The proposed building height is typical of surrounding warehouse development and within the maximum 60 ft building height allowed in the W I zone._ The top of the fiecl canopy is 17 - ft 6 -inches within the maximum height requirements of the M -I zone. 5. W 1l' d F Due to the nature of the proposed use as bulk retail sales the applicant's proposal does not include site obscuring walls orfences. This proposal is typical ofother commerelal/retail development in the city, and is consistent with other permitted uses in the W zone. As such, the no adverse impacts to adjacent properties or their permitted uses will result from the absence offences and walls 6. Landscaping. The applicant's Landscape Plan illustrates proposedstreetfrontage and off street parking area landscape, improvements consistent with site development requirements in the M -I zone. This is considered to be adequate and effective in avoiding adverse visual imparts to adjoining properties. 7. Outdoor Lighting. The applicant submitted it Site Photometric Plan that show perimeter and interior lighting throughout the site. Lighting is oriented toward the interior sire analis not deemed to anise an adverse impact to adjoining properties. 8. Ste- The Applicant has submitted a Class "C" Variance (File No. 15032) from the sign area standard ofCPMC 17.48.080(A)(1)_ The signage variance request vvouid allow wall signs that are proportional to the building scale and dimension consistent with signage permitted in other commercial (C) districts in the City. Based upon the applicant's proportionality rationale for the proposal, the variance request is deemed reasonable. However, if the variance is not approved, the applicant will he required to demonstrate compliance with the MI sign area standards prior to buildingpermit issuance. Conclusion 17.76.040(C): The applicant's project is typical of site development within the M orae. tis such, the .site development standards for permitted uses in combination with the Page 7 of 11 conditions ofapp.... 1 relative to vehicle law ..s and egress (Finding 17.76.040(B)) are deemed sufficient to avoid adverse impacts to selling or permitted uses thereof. D. That the cstabhshment, maintenance or operation of the ase applied for will comply with local, state and federal health and safety regulations and therefore will not he detrimental to the health, safety or general welfare of persons residing or working in the smrounding neighborhoods and will not be detrimental or injurious to the property and improvements in the neighborhood or to the general welfare of the community based on the review of those factors listed in subsection C of this section. Finding 17.76.040(D): The issue ofsafety is regulated through the building code and in conjunction with the fire district. The proposed fueling station must be constntcled and operated in compliance with all Federal, State and local regdation and she/1 be reviewed during the hadding permit process and prior to issuance of a loathing permit The App(icant's gimd igs affirm their commitment to complying with all Paderal, State and local r tcul'boh.s. Cohetusion 17.76.040(1)): The proposed Costae Wholesale is consistent with this criterion. F. That any eondittons required for approval of the permit are dccmcd necessary to protect the public health, safety and general welfare and may include: 1. Adjustrn mn a W lot size oryard areas as needed to best accommodate the proposed use, provided the lots or yard areas conform to 'he stated minimum dimensions for the subject zoning district, unless it variance is also granted as provided far in Chapter IZ, Finding 17.76.040(E)(1): the site is ndeggaar, to accommodate the propcsed devedopment as [am .nstrated in Finding 17.76.040(A). however, as a ...dation of approval, legal lot consolidation ofthe four (4) lots comprising the site wild be required prior to buddingperm# issuance to eliminate property boundary conflicts with the Proposed smuctures. Conclusion 17.76.040(E)(1): As conditioned, the required lot consolidation is sufficient to resolve the identified property boundary conflicts with proposed structeres. 2. Increasing street widths, modifications in street designs or addition of street signs or traffic signals to accommodate the traffic generated by the proposed use, Finding 17.76.040(E)(2): See Fdndmg 17.76.040(8). Conclusion I7.76.040(E)(2): As demonstrated in 17.76.0?0(e), the transportation system is sufficient to accommodate traftic generated by the proposed use av conditioned. 3. Ad,ustments to off-street parking requirements in accordance with any unique characteristics of the proposed use, Page s of ll Finding 17.76.040(E)(3): Per the Parking Demand Assessment included in the Applicant's TIA, the proposed use has parking demands, unique to Costco, that necessitate an increase in allowable parking The applicant has proposed an increase to the City's off strove parking standard to allow 783 parking spaces, which is consistent with the minimum recommended parkingfx, Castco and maintains a utilization rate less 90% utilization per the 171's recommendation foroff-street parking areas. Conclusion I7.76.040(E)(3): Per Finding 17.76.040(4), the requested parking increase Jar the proposed use is justified. 4. Regulation of points of vehicular ingress and egress, Findingl7.76.040(E)(4): See Finding17.76.040(C). Conclusion I7.76.040(E)(4): Per Finding 17.76.040(C), the limitation of access and interim mitigation at the intersection of Table Rock Road is necessary to maintain operational standards and safety at the intersection. 5. Requiring landscaping, irrigation systems, lighting and aproperty maintenance program, Finding 17.76.040(E)(5): The applicant's project is Typical of other usrsIstructures permitted in the ld I district and as such the site development standards (ar permitted uses in the M-1 zoning district are deemed adequate to integrate the applicant's project into the u,rr, m lam neighborhood. Based upon evaluation of other Costco Wholesale locations being in good condition, no additional conditions are deemed necessary relative to maintenance. Conclusion 17.76.040(L')(5): Not applicable. 6. Regulation of signs and their locations, Finding 17.76.040(F.)(6): Nhe applicant's proposal for signs includes wall signage that exceeds the maximum area allowable in the M cone, Conclusion 17.76.040(E)(6): As a condition ofapproval, the applicant's Class "C" Variance request (File No. 15032) shall he approved prior to issuance ofa building permit. Ifthe variance is not approved, the applicant will be required to demonstrate compliance with the M-1 sign area standards prior to building permit Issuance. 7. Requiting fences, berms, walls, landscaping or other devices of organic cr artificial composition to eliminate or reduce the effects ofnoise, vibrations, odors, visual incompatibility or other undesirable effects on surrounding properties, Page 9 of ll Finding U.76.040(F)(7): L'he project proposal Ssfor 6edk retail soles_ With the e:ccepdon of the macraobilefico sates, an outright permitted use per CPMC 17.48.020(G), all business operations (Leretail sales, food preparation, tire instaldation) will occur within an entirely enclosed strachre Given the characteristics ofthe proposed ase and the compatibility )fine site development (Sec 1Ynding 17.76.040(A) and (C)), there are no noises, odors, or other adverse impacts from the proposed structures or use that would necesstMte fences, berms, wall." or additionat lanatscaping. Conclusion 17.76.040(F.)(7): Not applicable. 8. Regulation of time of operations for certain :ypes of uses if their operations may adversely affect privacy of sleep of persons residing nearby or otherwise conflict with arhei cormmnity or neighborhood functions, Finding /Z 76.04#(F)(8): The project site is within the At I industrial zone. S'arroundingproperties are zoned M-1 Industrial andM-2luduso alGeneral. Costco uses standard bwia ess hours, normally berecen !Dam and Spm Monday through Friday and 10am La Spm or bpm ar, weaker o, and its fuel station from Gam to 10prn daily_ Conclusion 17.76.040b(i)(8): based on the proposed operating hours and the zoning of surrounding properties no further regulation of operating hours is deemed necessary. 9. Establish a time period within which the subject land use must be developed, Finding 17.76.040(E)(9): Per Section 17.76.060 the applicant has one 'to obtain a bidlding permit and diligently pursue construction to completion Piescheduled opening date for the proposed Costco Wholesale is Fall 2016 per the Applicant's findings. Conclusion 17.76.040(8)(9): Aside from the building permit regrsirem"a per' Section 17.76.060, there are no issues with bis propmed development timing. 10. Requirement oft road or other adequate assurance within a specified period of time, Finding 17.76.040(F.)(10): Per the Applicant's TlA and the recommendation of the affected agencies, traffic impacts of the proposed use an pulthc streets and highways have been identified, will be mitigated and applicant will be required to warrant improvements noted in the findings 17,76040(B) and as condiaoned in the Revised Staff Report dated January 5, 2016. Conclusion 17.76.040(8)(10): As conditioned in the Revised Staff Report damd.bo,oay 5, 2016, timely completion ab warranted improvements is assured. Page 10 of 11 11. Such other conditions that are found to be necessary to protect the public health, safety and general welfare, Finding 17.76.040(E)(11): Aside from the previously discussed conditions related to the development of membership warehouse, there are no additional conditions. Conclusion 17.76.040(E)(11).: Not applicable. 12. in considering an appeal of an application for a conditional use permit for a home occupation, the planning commission shall review the criteria listed in Section 17_60.190. Finding 1Z76.040(E)(12): There is no home occupation associated with the proposed Costco Wholesale. Conclusion 17.76.040(E)(12): Not applicable. PART 3— SUMMARY CONCLUSION As conditioned, the proposed Costco Wholesale has been found to comply with the criteria set forth in Section 17.76.040 for Conditional Use Permits. Nun 11 of 11 ATTACHMENT K' PLANNING COMMISSION RESOLUTION NO. 827 A RESOLUTION APPROVING A CONDITIONAL ITSE PERMIT FOR A COSTCO WHOLESALE ON LANDS WITHIN THE M-1, INDUSTRIAL TONE (FILE NO. 15022) WHEREAS, the City, by Planning Commission Resolution No. 764 and City Council Resolution No. 1217, determined that membership warehouses are a commercial use compatible with and closely related to permitted uses in the M-1 zone and therefore authorized them as a conditional use. WHEREAS, the applicant has submitted an application for approval a Conditional Use Permit to develop an 18.28 acre site within the M-1, Industrial zone with a 161,992 square foot Costco Wholesale membership warehouse and four (4) island fuel facility; and WHEREAS, on January 5, 2016, the City of Central Point Planning Commission conducted a duly - noticed public hearing on the application, at which time it reviewed the Staff Report and heard testimony and cormorants on the application; and WHEREAS, the Planning Commission's consideration of the application is based on the standards and criteria applicable to Conditional Use Permits in accordance with Section 17.76 ofthe Central Point Municipal Code; and WHEREAS, after duly considering the proposed use, it is the Planning Commission's determination that, subject to compliance with conditions as set forth in the Staff Report (Exhibit "A") dated January 5, 2016, the application does comply with applicable standards and criteria for approval ofa conditional use permit. NOW, THEREFORE, BE IT RESOLVED, that the City of Central Point Planning Commission, by this Resolution No. 827, does hereby approve the Conditional Use Permit application for Costen Wholesale. This approval is based on the findings and conditions of approval as set forth on Exhibit "A", the Planning Department Staff Report dated January 5, 2016 and the Findings of Fact and Conclusions of Law as am forth in Exhibit "B, " including attachments incorporated herein by reference. PASSED by the Planning Commission and signed by me in authentication ofits passage this 5" day ofilanuary, 2016. Planning Commission Chair ATTEST: Representative Planning Commission Resolution No. 827 (1/5/2016) ATTACHMENT "B" CENTRAL Community Development STAFF REPORT POINT Tom Humphrey, AlCP 0, rg" Community Development Director STAFF REPORT February 2, 2016 ITEM Consideration of a Conditional Use Permit application for the construction of a 161,992 square fool Costco membership warehouse and fuel facility on an 18.28 acre site at the southwest comer of Hamrick and Table Rock Road. The project site is within the Federal Way Business Park subdivision in the Industrial (M-1) zoning district, and is identified on the Jackson County Assessor's map as 37S 2W 12B,'1ax Lots 213, 214, 215, and 216. Applicant: Costco Wholesale; Agent Steve Bullock, MG2 STAFFSOURCE Stephanie Holtey, Community Planner It BACKGROUND Costco Wholesale ("Applicant") is requesting a Conditional Use Permit to develop a 161,992 square font membership warehouse on 18.28 acres in the M-1, Industrial zone. The Conditional Use Permit application was considered at the January 5, 2016 Planning Commission meeting. At that time staff presented an evaluation of the proposal relative to its compliance with the conditional use approval criteria set forth in CPMC 17.76.040. Based on the evidence submitted, the proposal was found to comply with the applicable review criteria as conditioned. The Planning Commission heard testimony from the applicant, and proponents and opponents of the application. Due to the timing of revised comments and conditions from the City of Medford on.lanuary 5, 2016, the applicant requested that the record remain open for seven (7) days following closure of the public hearing; including a seven (7) day rebuttal period. The public hearing was closed and, per a duly seconded motion, the request to leave the record open was granted with written comments to be submitted as follows: • Open record period — January 12, 2016 at 4:30 p.m.; • Applicant's rebuttal period—January 19, 2016 at 4:30 p.m. On January 19, 2016 the applicant submitted their written rebuttal (Exhibit `94") to the City of Medford's January 5, 2016 revised conditions and comments. Staff has reviewed the applicant's rebuttal and finds that the previously written conditions 3 and 4 in the Revised Staff Report dated January 5, 2016 adequately address the situation and do not need to be modified. ISSUES During the open record period, thirteen Q3) letters were received with six (6) in favor, five (5) in opposition, and two (2) neutral. The applicant responded to opposing testimony with timely rebuttal. It should be noted that some of the issues were anecdotal and beyond the scope of the conditional use approval criteria in CPMC 17.76.040 (i.e. Costco's business policies, impacts to local businesses and associated internship and scholarship opportunities). A summary of the written comments received during the open record are: 1. Opposition. Testimony received in opposition to the proposed use primarily focused on traffic issues and includes three broad categories: 1) concerns about the TIA assumptions; 2) operations/safety; and 3) mitigation sufficiency/cost allocation. Due to the volume of the traffic generated by Costco, there is a perception that additional mitigation actions are necessary to ease operational and safety concerns. Emphasis was given to Table Rack Road widening, impacts of heavy truck traffic, and the need for the applicant to bear the cost of improvements (See Exhibits ` I" through "5"). The Applicant's Rebuttal (Exhibit "14") and the TIA (Exhibit "15") address the testimony opposing the proposed use on the fallowing basis: a. 'I he'I ]A was prepared and reviewed by affected agencies and Southern Oregon 'I ransportatiun Engineers, LLC. The analysis relied on assumptions including Costco's market demographics, area -wide papulation, employment, land use. and transportation system information including heavy trucks/ vehicles (See lFIA. Exhibit "15"); b. Per the conditions of approval, mitigation measure address safety and operational impacts necessaryto provide adequate transportation services. a Costco's cost share for the improvements are proportional to the impact generated by the proposed use and therefore sufficient to mitigate the financial cost of off-site impacts. 2. Support. Testimony in support of the proposed use counters concerns about adverse impacts to local business and further asserted support for the proposed location due to community benefits associated with economic growth stimulus and improved property values. It is further emphasized that traffic impacts have been adequately addressed and that the concerns about heavy truck traffic conflicts and congestion on Biddle/Pine Street have been adequately addressed and mitigated (See Exhibits "6" through "11"). Based on evidence in the record and the applicant's rebuttal, the testimony received during the open record period has been adequately addressed (Sec Exhibits -14 and"15" ). EXHIBITS Exhibit "1"—Letter from L. Calvin Martin, received January 12, 2016 Exhibit "2" —Letter from David Smith, received January 12, 2016. Exhibit "3"—Letter from Tanya Wilkerson, received January 12, 2016 Exhibit "4"—Letter from Kathy and Ray Wilkerson Exhibit "5"—Letter from Dennis Buri, received January 12, 2016 Exhibit "6" - Letter from Wayne and Hattie King, received January 12, 2016 Exhibit "7"—Letter from Kimberly Little, received January 11, 2016 Exhibit "It" — Letter from John Balzer, received January 11, 2016 Exhibit "9"—Letter from Glen Finley, received January 11, 2016 Exhibit "10"— Letter from Laura Vaughn, received January 8, 2016 Exhibit"I P'—Letter from Pulver & Leever, received January 8, 2016 Exhibit "12"—Letter from Vic Agnifdi, received January 12, 2016 Exhibit "13"—Letter from Vic Agnilili, received January 12, 2016 Exhibit "L4" —Applicant's Rebuttal, received January 19, 2016 Exhibit"15" —Revised Staff Report dated January 5, 2016 ACTION Consider the Conditional Use Permit application and either 1) approve; 2) approve with conditions; or 3) deny the application. RECOMMENDATION Approve the Conditional Use Permit per the Revised Staff Report dated January 5, 2016 and all conditions therein. EXHIBIT 1" L Calvin Martin, Developer's Agent P. O. Bos 445, Tevksomiffe, oreRon, 97536 (541) 779-6636 Uri., (541) 227-4262 Cell calmartinl(almsacom Design, Consimcdon Management, Consttuction Cost Estimates, Contract Negotiations Feasibility Studies, Quantity Surveys, Con ractManagement, Contract Dispute Resolutions City and Regional PlannigP Land Development, Lobbying. Wastewater Technologies Response to the Conditional Use -Permit Application of Costco to the City of Central Point, Oregon City of Central Point Oregon Planning Department and Planning Commission t55 South 2' Street Central Point, Oregon 97502 Via Band Delivery Having listened to the applicant's presentation and their consultants, it became clear that no matter the difficulty with the site and its related traffic applicants would force a fit. Certainly the most significant problem relates to the trasffic it generates and the assumptions made by the applicant's traffic consultants. The traffic consultants were hired to make it work in whatever way can produce an approval. The consultants (Kittleson and Associates) are essentially a hired gun that represents the applicant and land owners, putting together a plan that they believe will convince the City to approve the plan. It is obvious that the City and Planning Commission look favorably on the locating of Costco in Central Point. Costco is an amazing retailer/wholesaler that is loved by its customers and admired by its competitors. The problem is that this site and this business are not an appropriate fit. Costco is a "warehouse" sales/membership store. This is line but Costco generates more traffic to its "warehouse" of 130,000 square foot store in Medford than the nearly 700,000 square foot Rogue Valley Mall. Costco parking is almost always near full and traffic is very difficult and congested, hence the reason for their desire to build a new store. A leaking roof is not the reason for their move. The reason is that they are losing potential business due to older persons and busy people not being willing to fight the traffic and congestion. They we smart retailers and they need a larger store to service the market and loyal customers that they have. ae AN 19201 Page two of three Kitdeson Consultants have made many assumptions that can and should be examined, at the very least, by a neutral consultant. Clearly without questioning deeply their assumptions the T, I.A. reveals many problems that require expensive and time consuming mitigation. The cost numbers are very liberal and favor the applicant. They desperately need to be reviewed in detail by another neutral consultant. The use of Table Rock Road is necessary and that arterial is scheduled for major improvements but the acquisition of land for widening and funding of the cost has not even started. Land must be acquired, engineering completed, bids advertised for and then, depending on weather, construction begun. Based on other projects the construction could easily take a year and the other issues could take that much time or even more. The widening of Table Rock Road will only be done tojust south of its intersection with Airport Road, The road to be effective needs to be widened all the way to its intersection with Merriman Road. The bridge crossing the 1-5 is old and very narrow. The increased traffic and stress on this "elderly" bridge will require that it be replaced with a stronger and wider (at least four lanes) bridge. The cost of this bridge is far more substantial than any of the other proposed mitigation measures and likely more than all of them combined. Table Rock Road continues south into a fairly dense housing area with homes fronting directly onto the road and serves two large multifamily projects exiting only onto Table Rock Road. The proposed location of Costco will create a very dangerous mix of large heavy trucks (including triples) from adjacent and nearby businesses (Knife River Concrete and Aggregates, FedEx Ground and others)_ Table Rock Road to the north of East Pine Street and Biddle Roads serves many trucking companies and they will mix with the Costco traffic. This will create a very high likelihood of accidents and driver stress for all of East Pine Street, Hamrick Road and Table Rock Road. There is no plan, apparent or in consideration, that will eliminate or diminish this condition. If you consider the age make-up of Costco customers it becomes apparent that large portions are seniors. The mix of senior drivers with congestion and heavy trucks is not appropriate or desirable and could have disastruus results. The land around the proposed Costco has not been developed to its potential, particularly to the North and West. When that land develops the intersections will be even more stressed. The mitigation measures proposed create difficult driving and congestion all through Central Point's downtown area as well. Page three of three Traffic to Costco from western Medford, western Central Point, Jacksonville and the Applegate Valley as well as Grants Pass, Rogue River and Gold Hill will pass through Central Point. The Jacksonville and Applegate Valley traffic will come all the way through the downtown area of Central Point. If that traffic, through Central Point, becomes a problem and it is somewhat congested even now, then the traffic will reroute to the Table Rock Road option as the route of choice. The problems with that option have been previously addressed. The expenses, of thi s first set of mitigations, are likely to be much more than what has been projected by the applicant's consultant and others. There are no actual hard numbers for the projected work based on design drawings and completed land acquisition. The time frames for completing these improvements are very liberal and delays will add extra costs. In summary, this proposed conditional use -permit application, though it can legally accommodate this facility, it is a very poor and troublesome location that will affect Central Point, Medford and Jackson County in a negative way both due to traffic and expense. My clients would urge you to not approve this application or require, at the very least, another independent traffic study. Sincerely, L.Calvin Martin, Agent C.c. Garvey, Shubert, Barer Attorneys. Portland, Oregon EXHIBIT "2" January 12, 201fi Summary ofJanuary 6,2016 comments on application of .Costco Wholesalerl David Smith 241 Saginaw Drive, Medford, OR 97504 1. Co-owner of business on S. Front Street in Central Point and several apartments. 2. Lang time member of Costco and shop at present store at least twice a week. 3. Research of official records of COOT and Central Point reveal that the proposed site for Costco is located on an official freight route system within the city and in the midst of freight term Ina ls.(Reddaway, Conway, Fed Ex.) One, Reddaway Trucking already account for 600 truck trips per day. According to ODOT materials Gordon Trucking owns a large parcel directly across from the proposed entrance to Costco, and intends to build a freight terminal, adding a significant increase in trucks using the area. 4 Costco's traffic study indicates its store will add 10,670 new trips per day, the majority of which will come from Medford on Biddle and Table Rock. 5. Costco traffic will add several thousand more cars per day using Biddle and adding congestion atthe entrance to the airport. 6 ... ODOT's Freight Profile Identifies Table Rock Road as one of the local mads that "experience high volumes of freight traffic." 7. Costco's traffic study is flawed in that it does not identity the routes its members use to access the existing Medford store; information which is necessary to accurately predict how those members will re- route to the proposed location. 0. Costco tries to identify its operation as a warehouse, but indicates in Its November 3, 20125 memo to the city staff( at page 14) that its Parking Demand Study requires 783 parking stalls which is more than the city requires for a retail store the size of the proposed Costco. CONCLUSION: While the"member Warehouse" description of the Costco proposal may distinguish it from other retail stores as far as the variety of merchandise and profit margins, its impact on traffic will be greater than other retails stores of the same size, One need only note how fast the Casten parking lot fills up and remains full during store hours; much more so than other retail stores which are open longer hours which results in less traffic in any given hour. Even the entire Medford Mall appears to have less parked cars. Costco and the city staff both indicate the intention to have the store open in 2016, before the widening project on Table Rack even begins. It makes no sense to add 10,670 more vehicles traveling through a construction zone, for an undetermined period, which will create an additional problem which has not been addressed. EXHIBIT"Y January 12, 2016 City of Central Point Arm Commissioners and Plann; ng Department 140 S. Front Street Central Point, OR 97502 To Whom This May Concern I am writing this letter to share in,/ strong desire to keep Central Point a small, family friendly town. I understand that bringing a large business, such as Castro would at first appear to increase revenue flow In the town of Central Point; however, I think upon Further examination, It would be detrimental to the efforts the: Mayor, Hank Williams, has recently put into our town's downtown and local business appeal. My teoughts go immediately to the small businesses that make up the backbone of this community — businesses that would inevitably be losing some of their customer base. In turn, some local businesses— ones that faithfully give back to our schools and Community, would Possibly be faced with the layoff of staff, or In extreme cases, closure of facilities. This could change the dynamics In Central Point — affecting revenue, Crater Foundation Scholarships, local internships for h'gh school students, and housing. People pay a prime price to live in Central Point, yet one has to wonder, if the traffic appeal is similar to mat of Medford, if prices will eventually drop. I am confident that when reviewing this proposal, you will realize the detriment effect of this decision. My hope is that Central Point will continue to be a little oasis in the valley, with local bus'nesses that are booming, strong schools educating our chi dren, safe parks to play in, and a strong housing demand. Thank you for your time. Best Regards, i �:j a,6CLj', Liu) i. � Tanya Wilkerson JAN 1 2 7016 EXHIBIT "4" Kithv Lang Wilkerson Dear Central Point Planning commission, This is regarding the plans for the New Costco on Table Rock Rd. and Biddle. I live at 2524 Beebe Rd. in Central Point and I am very concerned of the traffic around my home. It's already bad to try to get out of my Central Point East subdivision. This seems to be a pretty big building they are planning and with the Pilot close by with all the trucks already from that this will be a complete nightmare. I assume that the roads around it will be widened somehow and traffic lights will be added. Who will be paying for this? I hope not us property tax players as its already 53800 a year which is higher than any city near Central Point, I am also concerned that my house value will go down in price with no one wanting to live next to this nightmare of traffic, This will make it a low desirable area to live in we believe. Thanks for your time Kathy and Ray Wilkerson 541 664 0533 Central Point East rIEUV E D 1 7 2016 EXHIBIT "5" 1/11116 To whom it may concern This letter is in regards to the consideration of allowing Costco to build at the comer of Hamrick and Table Rock roads. My only request is that you read this letter and consider the negative impact that this would cause to the current families of Villas and Table Rock roads. Three years ago my family moved to a home located on Table Rock Rd. near Ore Rd. At the time the traffic was heavy but bearable. Since then, a sizeable increase in traffic has made us regret our decision. This increase, in my opinion, was caused from the increase in business activity and growth on the Crater Lake Hwy such as the new Lithie Auto Mall. People, trying to avoid the traffic congestion on Crater Lake Hwy have begun to use alternate routes to get to the Freeway, Rogue Valley Mall, Central Point, and others via Table Rock Rd. as well as Villas Rd. Several years ago, the Jackson County Roads Dept. did a traffic count study to determine the amount of traffic using Table Rock Rd. I don't have, nor remember, the exact numbers but it was somewhere in the realm of 13,000 cars a day, on average, were passing by the intersection of Wilson and Table Rock Rd. Based on several factors, one can assume that the number has significantly increased. Getting out of my driveway and on to Table Rock Rd. has become a nightmare. Crossing to get the mail, which lies on the opposite side of Table Rack Rd. is no longer a safe option. I've approached USPS, with the numbers and hazards, asking about having the mail boxes moved and was told to that it would not be a financially feasible decision. Thus not taking the safety of the residents in to account. Two people have died, within several hundred yards of my home, within the last 3 years while walking or crossing Table Rock Rd. and countless accidents have happened, making it, in my opinion, one of the most dangerous roads in the county. If you allow the placement of Costco, at the proposed site, Table Rock Rd. and Villas Rd. will become, more than ever, a safety and logistics nightmare for the people who live there. Not to mention the possible devaluing of our property. People traveling from North of the current location will be forced to use Table Rock Rd. and Villas Rd to get to the new location. These two roads will be, undoubtedly, overwhelmed with traffic. Please give careful consideration to this when making your decision on the placement of the new Costco. Please don't be another USPS and discount the safety of the residents. Sincerely, Dennis Burt 5969 Table Rock Rd. Central Point, OR 97502 541-226-6715 January 22, 2016 Central Point City Council 2Yo P Street Central Point, OR 97502 Dear Members of the City Council, EXHIBIT "6" Wlth respect and appreciation for you as the council of Central Point, MY We and I submit to you for an approval of the proposed Costco $tore. We've been members of the Costco Stores since 1985. Their products are of high quality and within reason. Their attitude and help has always been above reproach. If You have a problem with their products, they are very quick to refund or replace the product with few exceptions (some electronic Items). As property owners in Jackson County and Cum County, Costco has always been an asset in helping us with our needs. Also, their assistance In helping small and large businesses In the Rpgue Valley in so many ways. The number of jobs have increased In the surrounding area along with other businesses. As retired teachers, we do encourage the approval of the Costco Store In Central Point. Thank you for Your time. �Yne andHattie�y ing 2909 RBgal Ave. Medford, OR 975ola P• S• Please don't forget the business coming in from California, Washington and other neighboring states from I-5. This produces growth with jobs. Kimberly Little 2467 Sunnyview Lane Medford, OR 97501 Planning Commission City of Central Point 140 S. 3" St. Central Point, OR 97502 January 7, 2016 To whom it may concern: I am writing to express my support of the proposed location of a new Costco Wholesale store at the corner of Table Rock Rd. and Hamrick Rd. Although I live in Medford, my daily place of employment is very near this location. I believe this proposed location has been well-chosen and would benefit the community of Central Point. It is just far enough away from the main part of town as to not affect traffic in the busiest areas, while at the same time, bringing people into the community who might not otherwise conduct their business in the area. I do not foresee any negative impact on traffic in the immediate area, when handled with proper planning for traffic control lights on the intersections around the facility. Thank you for your consideration of this proposal, and I hope that you will be able to approve their request to build this new store. Thank ,you, � / 4IR, Kimberly Little r EO E:1:12016 JOHN E. BATZER P.O. BOX 970 MEDFORD OR 97501 January 7, 2DI6 EXHIBIT "8" City of Central Point Planing Curemission 140 S. Third Street Central Paint, OR 97502 RE: CCSTCO Conditional Use Permit Dear Planning Commission. I, along with various partners, own pmperty in the area that Casten proposes to rc-locate We are all in iwm of the Costco development. This Castro development will help stimulate properties that have been stagnate since the recession and will give a needed linos[ to the surrounding properties. It will help to qct the necessary Infrastructure needed to develop these properties. In addition, it will help the tax base. The neighboring urea was zoned so that it could be a focal point for commerce. We think Costco will be great For the neighborhood. We hope the City will approve the Costco conditional use permit Aly, Ra[zer MPro EXHIBIT "9" January 8, 2016 Costco comments Central Point Planning Commission 140 S. 3r° St Central Point, OR 97502 To Whom it May Concern I am definitely in favor of approving the Costco store in Central Point near Table Rock Road and Hamrick. I reside in the Central Point Hast neighborhood, about 4 blocks north of the proposed Costco site. I am semi -retired and make numerous trips in the area that would be affected by traffic gcnoratcd by the proposed Costco store. Pram my frequent observations, the comments I have heard aboutthe track traffic and other alleged problems on Biddle/Pine must be from persons who have no three; knowledge of the situation or mast have some other agenda. Traffic on Biddle/Pine between fable Rock and Ifaninck is some of the lightest in the area. Central Point needs more opportunities for shopping and employment. I think the opponents oidevelopment in Central Point, particularly in the area east of 1-5, are not thinking of the best interests of the community as a whole. I would be glad to give you any more information you may need in this matter, Sincerely, I 7 4L- C, Glen Finley 358 Meadowbrook Dr. Central Point, OR 97502 541-840-9484 o IE C'E" � EA I , jos EXHIBIT "10" January 8, 2016 City of Central Point Planning Commission 140 South 3r° Street Central Point, OR 97502 Re. Planned Castro in Central Paint My name is Laura Vaughn; I live at 5085 Dobrot Way, Central Point, Oregon. I attended and spoke quickly to the meeting last week on January 5, 2016. I am following up my nervous statements with the following I have been a member of Costco, Execct've Member, since 1993. 1 am a loyal and avid fan of the quality/price of items they offer to members. I have lived in the Rogue Valley since 1996-1 have been at my present location in Central Point since 2001. 1 do not plan on moving anytime in the foreseeable future. I love Central Paint. I have been atjust about all the Costco locations up and down 1-5 from Fresno, California all the way to Abbottsford, British Columbia, Canada.... including the original locaton in Kirkland, Washington. All Costco locations generate a buzz and demand — As a traveler, you search Costco out for the best gas prices! I can truthfully say the only Costco that is a bear to get in and out of is the one in Eugene on Cohourg road — did it stop me from visiting it — NO! I am aware that shop at Costco means you need to have patience. And with the Ecgene location — it is very similar to the proposed area —you go a half mile north and it's country roads......... I am in favor of relocating the Medford Costco warehouse and fuel facility to the proposed location on Hamirck and Table Rock Roads in Central Point. I will look forward to being able to avoid the tangle and mess of highway 62 and Delta Waters Roads in Medford. As stated, the new locations will be within bicycling distance for us, but we will bring the car for the days when we stock up... ... ..Ray's and Albertson's will still be our local grocery stores for the quick in and out purchases) As I finished my nervous statement I mentioned — IT IS ONLY THROUGH CHANGE THAT YOU GROW Any change is well worth the hassle and delays that the construction will cause .... Lotral Costco members will appreciate a new facility, larger parking lot, larger warehouse and of course, more lines for the fueling station. The yearly property taxes received from Costco will be a boost to Central Point's operating budget, as well as the prospect of the additional jobs that Central Point residents could apply for........ Thank you for letting me put in writing what I was too excited to say in person at your meeting. PLEASE APPROVE THIS CONSTRUCTION AND LET COSTCO BEGIN TO HELP CENTRAL POINT GROWN COSTCO WILL RELOCATE, PLEASE LET IT BE HERE AT HAMIRCK AND TABLE ROCK ROAD! Regards, 62)"01 Ucurc D f Cif AMIE Laura Vaughn e v 2016 D City of Central Point Planning Commission 140 S. Third Street Central Point, Oregon 97502 Re: COSTCO Conditional Use Permit Dear Sirs: EXHIBIT "11" January 6, 2015 A number of us own properties in the vicinity of the proposed development and are in favor of your approval of this development. This area of Central Point has been stagnate for almost 10 years since the beginning of the recession and needs a shot in the arm to get it going again. We think the Costco development will provide that stimulus and will be beneficial to surrounding commercial and industrial properties. It will also enable some of the infrastructure improvements to get completed which would be necessary for other development. This area of the valley was once characterized as the logistical center of commerce. This is probably why it was chosen by COSTCO. We think a good choice. We hope the City will work hard to make the proposed development a reality. Sincerer f� IdTa tole EXHIBIT "12" Co4Tz'o s1�`�u`-�' iFiJG+ldr�7S� iJO z -W Zr �S � � Sf%O r'` �-'0 � �7Q•9y'� 7��' -� � 0 �.:�17%"lti�.i 0,s�ul��o,J• 7� �6dfi� ��,r-yrs.. E;�AIBIT/-)Y 0 N 2 ES -T- o ye 1 �j /?"16f4&Sr F 4FL- A� 09 `T. C o S co ! J f/ jJ7Lk �E f cos��o � I.77 �5�� �fii�K��Y Sr�66�sT Kft��f� Cosrco. EXHIBIT "14" WHOLESALE January 19, 2016 Planning Commission City of Central Point 155 S. 2nd Street Central Point, OR 97502 RE., Conditional Use Permit —Castro Rebuttal Dear Chairman Pi la nd and members of the Planning Commission: Costco would like to thank you for your thoughtful consideration of our Conditional Use Permit application. As you are aware, holding the public record open for an additional week to allow Costco to review comments submitted by the City of Medford on the day of our hearing has allowed some additional comments to be submitted into the record. Aside from the letters of support from the community for our proposed move, the overwhelming majority of testimony received at the hearing and subsequently submitted in written comments are related to traffic. Castro's traffic consultants, Kittelson & Associates, Inc., were directed to collaborate with all the agencies. Additional traffic counts and intersections were collected and analyzed to ensure the project could operate at acceptable levels of service and any safety issues could be mitigated. We are pleased to report that ODOT, Jackson Co. Roads and the City of Medford have reviewed and are in agreement with Castro's Conditional Use Permit as conditioned in the staff report. The attached letter from Kittelson & Associates is our response to each of the traffic related comments. It is our belief that the analysis provided adequately addresses the issues raised in the hearing and in written comments. Thank you for your consideration. Respectfully, lac .Frank Costco Vice -President of Real Estate 999 Lake Drive • Issaquah, WA 98027 • 425/313-8100 9 v w vcoslco.com January 19, 2016 Project k: 19046.0 Planning Commission City of Central Point 155 S. 2nd Street Central Point, OR 97502 RE: Conditional Use Permit Application Dear Chairman Piland and members of the Planning Commission This letter responds to transportation -related issues raised in written comments submitted to the City of Central Point on or before January 12, 2016 and referencing the Conditional Use Permit Application by Costco Wholesale for a warehouse and fuel facility near the Hamrick Road/Table Rock Road intersection in Central Point, Oregon. 1. Comment; "Costco's traffic study is flawed in that it does not identify the routes its members use to access the existing Medford store; information which is necessary to accurately predict how those members will re-route to the proposed location." January 12, 2016letter from David Smith. Response: To assure that the traffic analysis was based on reasonably worst-case conditions, none of the traffic associated with the existing Costco warehouse on Crater Lake Highway was subtracted from the estimated existing and future background traffic volumes, nor was any of it re-routed to the proposed new warehouse location. Instead, current market demographics were used along with area -wide population, employment, land use, and transportation system information to estimate the likely trip distribution and routing characteristics of the entirely new vehicle traffic that was assumed to be generated by the proposed new Costco warehouse. This additional traffic was then superimposed on existing and anticipated future background traffic volumes, resulting in a conservatively high estimate of the total amount of traffic the transportation system will need to be able to accommodate at all key intersections. 2. Comment: "It makes no sense to add 10,670 more vehicles traveling through a construction zone, for an undetermined period, which will create an additional problem which has not been addressed. " Jon uary 12, 2016 letter from David Smith. Response: As is normal practice in almost all road construction projects, a traffic management plan will be established and implemented for the duration ofthe road construction period for the benefit of both vehicles and workers. 3. Comment: "Costco generates more traffic to its 'warehouse' of 130,000 square foot store in Medford than the nearly 700,000 square foot Rogue Valley Mail. "January 11, 2015 letter from L. Calvin Martin. Response: We are not aware of recent traffic counts at the Rogue Valley Mall. However, a traffic analysis of a shopping center containing 700,000 square feet would be based on an assumption of near -full occupancy and would result in an estimate of about 25,000 average weekday trip ends. 4. Comment: "[sic] Kittleson Consultants have made many assumptions that can and should be examined, at the very least, by a neutral consultant." January 11, 2016 letter from L. Calvin Martin. Response: The traffic analysis and associated report that was initially prepared by Kittelson & Associates has been critically reviewed by transportation planning and engineering staff at the City of Central Point; Jackson County; City of Medford; and Oregon Department of Transportation. Additionally, the City of Central Point hired Southern Oregon Transportation Engineers, LLC to conduct a thorough review and provide comments of the transportation impact analysis. Staff from the public review agencies also participated from the outset in defining the scope and scale of the traffic analysis that was ultimately performed. The results of the critical reviews conducted by these agencies have been incorporated into the final reportand the follow- up letters and technical memoranda that are part of the record. 5. Comment: "Table Rock Road... needs to be widened all the way to its intersection with Merriman Road' January 11, 2016 letter from L. Calvin Martin. Response: Jackson County has jurisdiction over Table Rock Road in this area and has made the decision on the begin and end points of this particular widening project based on a multitude of factors that fall beyond the scope of this Conditional Use Permit Application. With respect to the adequacy of the transportation system to accommodate the proposed new Costco warehouse, the traffic analysis demonstrates that adequate transportation services can be provided without extending the Table Rock Road improvement project beyond its current boundary limits. 6. Comment: 'The bridge crossing the 1-5 [on Table Rock Road] is old and very narrow. The increased traffic... will require that it be replaced with a stronger and wider (at least four lanes) bridge. " January ll, 2016 letterfrom L. Colvin Martin. Response: The proposed new Costco warehouse does not cause the need for this bridge to be replaced or widened in order to maintain adequate transportation services. 7. Comment: 'The proposed location of Costco will create a very dangerous mix of large heavy trucks (including triples) from adjacent and nearby businesses (Knife River Concrete and Aggregates, FedEx Ground and others)." January 11, 2015 letter from L. Calvin Martin. Response: The traffic analysis conducted by Kittelson & Associates was reviewed by appropriate City, County, and State agencies and explicitly considered the safety as well as the operational effects of the proposed new Castro warehouse. The mitigation measures incorporated into the conditions of approval have been found sufficient to maintain adequate transportation services with respect to both operations and safety. 8. Comment: 'The mix of senior drivers with congestion and heavy trucks is not appropriate or desirable and could have disastrous results." January 11, 2016 letter from L. Colvin Martin. Response: The traffic analysis conducted by Kittelson & Associates was reviewed by appropriate City, County, and State agencies and explicitly considered the safety as well as the operational effects of the proposed new Costco warehouse. The mitigation measures incorporated into the conditions of approval have been found sufficient to maintain adequate transportation services with respect to both operations and safety. 9. Comment: 'The land around the proposed Costco has not been developed to its potential, particularly to the North and West. When that land develops the intersections will be even more stressed. " ]an uary 11, 2016 letter from L. Calvin Martin. Response: The projected future background traffic volumes used in the traffic analysis are based on estimates of future population and employment for Central Point and the surrounding urban areas, and therefore anticipate that growth will continue to occur throughout the urban area. Additionally, separate traffic analyses will be required of all nearby specific development applications that are expected to generate significant volumes of additional vehicular traffic. All such development applications will need to provide, as part of their own approval process, whatever mitigation is identified as being necessaryto assure continued adequate transportation services in the area. 10. Comment: "The mitigation measures proposed create difficult driving and congestion all through Central Point's downtown area."January 11, 2016letter from L. Calvin Martin. Response: The mitigation measures set forth as conditions of approval were developed in collaboration with City, County, and State engineers and planners. They have been found to adequately mitigate the off-site transportation impacts associated with the proposed new Costco warehouse without creating unacceptable side-effects elsewhere. 11. Comment: "The expenses, of this first set of mitigations, are likely to be much more than what has been projected by the applicant's consultant and others." January 11, 2016 letter from L. Calvin Martin. Response: The construction cost estimates associated with each condition of approval were developed and reviewed by registered professional engineers and are based on the most recent available unit prices from similar and/or nearby construction projects. 12. Comment: "I assume that the roads around it will be widened somehow and traffic lights will be added. Who will be paying for this?" January 12, 2016 printed email letter from Kathy and Ray Wilkerson. Response: Costco has agreed to pay its proportionate share of each mitigation measure identified in the conditions of approval, which means it will fully mitigate the financial costs of the off-site impacts associated with the proposed new Costco warehouse. See also the response to Comment 41 above: the fact that Costco's traffic analysis has conservatively overestimated the facility's off-site traffic impacts gives further assurance that Costco is fully contributing its proportionate financial share of each mitigation measure identified in the conditions of approval. 13. Comment: "I don't have, nor remember, the exact numbers but it was somewhere in the realm of 13,000 cars a day, on average, were passing by the intersection of Wilson and Table Rock Road". January 11, 2016 letter from Dennis Burt. Response: Traffic data available from Jackson County indicates that in 2008 the average daily traffic volume on Table Rock Road in the vicinity of Wilson Road was about 17,000 vehicles per day. The traffic analysis estimates the proposed new Costco warehouse will generate about 90 additional vehicle trips (45 in each direction) on Table Rock Road in the vicinity of Wilson Road during a typical weekday evening peak hour. 14. Comment: 'Table Rock Rd. and Villas Rd. will become, more than ever, a safety and logistics nightmare for the people who live there."Januory 11, 2016 letter from Dennis Burt. Response: The traffic analysis conducted by Kittelson & Associates was reviewed by appropriate City, County, and State agencies and explicitly considered the safety as well as the operational effects of the proposed new Costco warehouse. The mitigation measures incorporated into the conditions of approval have been found sufficient to maintain adequate transportation services with respect to both operations and safety. Thank you for the opportunity to provide these responses. Sincerely, Wayne Kittelson, P.E. Principal f ,17` Brett Ko\rporaal Associate IuliLVA Is] MA01PiUJi Date: January 19, 2016 Proieet a: 19046.0 To. Stephanie Holtey City of Central Point 140 South Third Street Central Point, Oregon 97502 From: Brett Korporaal and Wayne Kittelson, PE Project Central Point Costco TIA 5ubject: Response to City of Medford Comments dated January 5, 2015 This memorandum responds to comments submitted by staff from the City of Medford related to the Central Point Costco Transportation Impact Analysis (TIA). Each comment from the letter dated January 5, 2016 is summarized below and then followed by Kittelson & Associates, Inc.'s (KAI) response. COMMENT 1 FROM CITY OF MEDFORD We understand the Rogue Valley International Airport is opposed to a median at the intersection of Biddle Rd and Airport Rd, as described in Condition No. 3. We recommend a condition that requires the developer to pay a proportional share towards a future traffic signal at this intersection. The City of Medford estimates the total cost for a traffic sign at this location to be $450,000 including design, construction, and inspection. We estimate the development's contribution at 10% from the additional traffic at this intersection shown in the Traffic Impact Analysis, dated October 2015, prepared by Kittelson and Associates, Inc. This results in a $45,000 contribution from the developer to this future project. RESPONSE 1 FROM KAI Costco Wholesale and the traffic engineers it has retained respectfully disagree that signalization is the most appropriate mitigation at the Airport Road/Biddle Road intersection. We believe there are good reasons to route trucks to the airport and Airport Road via Biddle Road. Biddle Road is currently a five lane road with a jug handle connection from Interstate 5, SR 62, SR 99, and SR 238 to the south of the airport. Biddle Road also provides a direct connection to E Pine Street, which provides access to Table Rock Road and 1-5 for trucks access north of the airport. KAI would need truck origin and destination data to determine optimum truck routing into and out of the airport. However, it is clear from information already available that a raised median can be constructed that will still allow trucks to make left- and right -turns onto Airport Road via Biddle Road. With a median at the Airport Road/Biddle Road intersection trucks would be able to make right -outs onto Biddle Road or a left - turn out of the airport can be accommodated at the O'Hare Parkway/Biddle Road intersection, which is roughly a quarter -mile south of the Airport Road/Biddle Road intersection and therefore does not require out -of -direction travel. Based on the low volumes on Airport Road, Costco's traffic engineers also question whether a traffic signal would be able to meet official installation warrants. A traffic signal will disrupt and add delay to all vehicles approaching the intersection whereas a raised median will re-route only a small number of vehicles — and it will re-route them in a way that does not add travel distance or create additional safety or operational problems. For these reasons, we believe that a raised median is the most effective and most appropriate measure to mitigate the effects of the proposed new Costco warehouse at this location. A planning level cost estimate has been prepared for a raised median at this intersection, resulting in an estimated total construction cost of $35,000. AttachmentA contains KAI's planning level cost estimation spreadsheet for a raised median at the Airport Road/Biddle Road intersection. COMMENT 2 FROM CITY OF MEDFORD At the intersection of Table Rock Rd and Morningside St we recommend a condition that requires the developer to pay a proportional share towards a future left turn lane at this intersection. See attached accident history showing an existing pattern of northbound rear -end collisions at this intersection. Per our December 24, 2015 letter, this development will increase PM peak hour trips through the intersection by 20%. The City of Medford estimates the total cost for a left -turn lane at this location to be $300,000 including design, construction, and inspection. A 20% contribution would result in a $60,000 contribution from the developer to this future project. RESPONSE 2 FROM KAI The City of Medford provided KAI with crash data at the Table Rock Road/Morningside Street intersection dated 2010 through 2014. In the City of Medford's letter to the City of Central Point dated December 24, 2015, the noted concerns were focused specifically on northbound rear -end crashes. However, a review of the crash data provided by the City reveals that the total number of reported crashes has declined each year since 2010, and only one rear -end northbound crash has been reported in the past three years at this location. These observations cause KAI to question whether there is an ongoing significant northbound rear -end crash problem that warrants mitigation. Even if the City of Medford believes an intersection improvement is needed at this location, neither KAI nor Costco sees a nexus between the relatively small amount of net new site -generated traffic expected to travel through the intersection and the concern about northbound rear -end crashes: • To the extent a problem requiring correction exists, it was created by a combination of traffic volume, roadway design, and environmental factors that Costco did not affect. • To the extent a problem requiring correction exists at this intersection, it is created by northbound vehicles on Table Rock Road turning left onto Morningside Street, and this is a movement to which Costco is expected to add no additional traffic. • The City of Medford has thus far provided insufficient information to confirm the northbound rear -end crash problem, to the extent such crashes are an ongoing significant problem, can be attributed primarily to the volume of through traffic on Table Rock Road. More specifically, it is impossible at this time to rule out the possibilities that approach speed and/or intersection visibility are the primary contributing factors to a northbound rear -end crash problem. • Given that the vehicle fleet is rapidly evolving into vehicles with forward-looking radar and automated braking capabilities, it is likely that the rear -end crash problem at this intersection (to the extent it exists) will naturally decline in significance and incidence over time, simply because of the new vehicle technology that is already being deployed. The City of Medford states that Costco's proportional share for constructing a separate left turn lane should be 20%, based an the volume of additional traffic that is expected to pass through the intersection because of the presence of the Costco warehouse during a typical weekday evening peak hour. However, the City's computations do not recognize that when analyzing crash data transportation engineers use average daily traffic (ADT) data on the approaches at the intersection rather than peak hour volumes. The City of Medford provided 2014 ADT data at this location, which totals 15,416 vehicles per day. Daily site -generated trips accessing the proposed site via Table Rock Road from the south is estimated to equal 20% of total site -generated traffic. This would add an additional 2,134 daily trips to Table Rock Road south of the site for a total of 17,550 ADT when the site opens in 2016. When performed on the basis of average daily traffic, therefore, the City's computations would result in a proportionate share estimate of 12% and not 20%. In summary, neither Costco nor the traffic engineers it has retained sees a nexus between the site's generated trips and the possible need for a northbound left -turn lane on Table Rock Road at its intersection with Morningside Street. As well, Costco and its traffic engineers believe the need for and appropriateness of a northbound left -turn lane at this intersection has not yet been established, and that further investigation could reasonably conclude that traffic volume on Table Rock Road, while a contributing factor, is not the primary or the only factor contributing to northbound rear -end crashes at this intersection. Attachment R includes the crash data summary and ADT at the Table Rock Road/Morningside Road intersection. SUMMARY Costco Wholesale believes that a contribution of $35,000 will allow construction and implementation of roadway improvements in Medford appropriate to mitigate the off-site transportation impacts anticipated within the City of Medford and attributable to the proposed new Central Point Costco warehouse. Even so, Costco Wholesale is prepared to contribute up to $70,000 to the City of Medford in order to assure that sufficient funds are provided to fully mitigate the proposed Costco warehouse's off-site transportation impacts within the Medford's jurisdictional boundaries. Attachment A Raised Median Cost Estimate at Airport Rd/Biddle Rd Central Point Costco Public Improvements KITTELSON , AssocIATEs. INC Airport Rd.& Riddle Rd. Intersection ••-•-^^^• •^^^••-^^-•••^^^ Costco wtdesole Fnoineer's Prepored 9y: Fed W6meq Pl & Crones Nddcloo, PE Dote aonu-112016 MINE r bu I sante Bora xatlnv f' UNIT 3C Qu&1MIw (sce.oano T[orc p vine belowl UHff PRICE It'[PtAIL COST 1 Mobolxallan (oono) Ls ALL $4 add In $4 oco. co z Tem poor, creaser s olrenlon or Traffic ;00225) Ls ALL $2300.30 5z 002 o0 3 Eroslao Cartrol (01Hn) TO ALL 52000.00 Sz occ o0 n aemovalmso-amares and ooatrumlone m9312) Ls ALL s3po2m $3,99629 s clearing and crrAdnng(Idu2c) Ls7 A_L s?0e0.0a $z 000 oo 6 cereral Eannwmks(003301 oT zoo $zs. oo $s o3o. o0 sadgrade Consorts (00332) sT 60 5100 580.00 8 Aggregate Base (00641) CT 48 $40.00 $t 92c 00 9 1 evel 3, 1121 non Dense HMAG (00744) TONS 36 $70.00 $?520 00 10 cancrelecoms, standard cora and Gutter LF 153 $1s.2o $225000 11 ConcrelaearOa Traffic Separator (00759) LF 250 $15.00 $3,75e,00 12 concrete Islands (00759) CF no 510 In $1,70200 13 concrete Walks(2Ws9) SF 900 55.00 $4590.00 14 Truncated oomes(00759) FA 3 5460.02 $1,362.20 15 Pavemem Markinga, complete Ls ALL s 11000.00 $1000.00 16 Perdeanenl Landoopirg(010301 SF 1 900 $2.50 52250.00 Pagn 1 0l'2 Central Point Costco Public Improvements KITTELsaN & ASSOCIATES INC Airport Rd. &Biddle Rd. Intersection ^��•^^•�•• ��^�•••'•^^•••�•• centro Wholesale Scope Accuracy: Level 1: Project scope well understood and well defined. Level 3: Project scope conceptual. Scope lacks detail due to potential permit requirements; Unknown project conditions; limited knowledge of external Impacts Level Project scope Is a"vision with limited detail Engineering Effort: Level A: Preliminary engineering performed Technical Information is available, engineering calculations have been performed, clear understanding W the materials size and quantities needed to execute job. Schedule understood, staff and refmiXing is Any clear (however this element may still need refining). Project Development Construction Contingencies ranges between l0%-20%. Level B: Conceptual engineering performed. Technical Information is available, tough engineering calculations may have been performed or miler information from previous similar work is compared and used. Project Development Contingencies ranges between 15% to 25% and Construction Contingencies ranges between 20% to 30%. Level C: No engineering performed Educated guesstimating Limited technical Information available and/or analysis performed. Project Development and Construction Contingences should be selected appropriately by Project Manager Contingency may range up t0 50%. Peyc 2 of 2 Attachment B Crash Data Summary & ADT at Table Rock Rd/Morningside St Morningside St & Table Rock Rd 29 Accidents (rate: 1.32) 01/01/10 - 12/04/14 10/18/10 07110,11. 07112113- 12I0p9/1�(r 1}I R(}j1 RI}' 10 �� J� J� �q (clear filter), (0) accidents with insufficient data for dis la A Straight ra Parked x Pedestrian Fixed objects: Stopped a Erratic X Bicycle ❑ General o Pole a— Unknown � Out of control 0 Injury ® signal a Curb �-.. Backing p__ Right turn pop Fatality ® Tree � Animal e« Overtaking ie— Left tum p Nighttime 4 3rd vehicle a a Sideswipe n� U-turn w DUI ■ Extra data ,.calm wekvus.7ss Gry a141e0M2LM O]/OS/A I6 DMIMIM/M/ZOIO C-1 I]/06/]Ola MernlpyliSgiMeRohM SartM EVmgR:TWFKEI+ (A3E 10 ORR IIMF C6TP ORE 53gEETl STREET] i OF[ VEHI MR VEH2 MR VEHIM E VEH2 MOVE WHI3 WH 2l UNERl3 9W0.T SEVER" i.3TPl EH[dV MEM RT iMILi 11C. Im1N] V]3/A1015X .RaltRO MO.X .E ST 9dowlp NwW NmM1 SmMI Tumin{utt MwIRNrt 0olrldaproitlne Vehl YYAIO Ig]S OExt T161E RMlK RR MO"DDEST R,wa Mnh NOM SMRM lOFOAoaaplmdo Veh2 10161063/14AIO 1112 155mN TAW WK MOM1R(a.]T Rearmd NaM 1bRM1 SINBN L¢y d In TN MwFg.W[MMpPin 0 0 OEaIIVMRIm[Ime VM1 16®165 6//3/AA 1kZ3 3M XOM LNI.RO MOPNR4510E SL Reamd SauN SCYM1 SlMghl T—,O MUMn{AM RmriRPm 0 0 0[uakx MWng VehI DM rwlmmp VIM. HIO] SbINOM TPg1E RO[%RO MOPNINGECf SI Re—d Sau1M1 SwOh $TaIBM SmppeJN Taf Mor'vy RM Mwipgln 0 0 ORItlPhvM1d VMI 6/IS/NI. ll3 0 TAM ROM RD EWE XmM1 XmR mMR,l Tunhkleh MuwpRN Mw Aw 0 OEMwMBlmtlor VMl IOIdL4 T/1002.93] 0 iPB1E RORPO MOPPAR EST 9@mR SOIIM SaHM1 OamaSMg TmNyRigM MOAryRM MOMB.VR Rkhi SRm 0 0 Olmpmp Ga84ip VMI I.h.ON l6]6 0AMR,mM1 Mn SeY8h1 SlappN in Tn18'rydO .,Wl I ] OLreku 6irlry VMI 20169981]/]/AA OM1WONMO TAM RMKRDM MORMHOSOEST Sd¢enpe Nmh SmIM1 .-gh, .,hR A4 -M MOMR AM MRRmdR 0 O OWAIN[OM1w Vehl MhaWNm 110M65 0/19/20111" 0 Tg AOR RD M MIKIMOEST Rewend NMM1 NOM S.o Tum .wN h6k,AR Mmne Nd 1 1 0N{vR Dfftftw Vol 1108914 5/]0/Ali ll59 XNortM1 TAM WK RD MOPH814SOE SE ReaEeM NmIM1 NMh SnlO2 SoppeE n' f MMRMR MOAngRw ] 1 .IJ R,I—dme vehl Ntlmal 111MS] W13/AI116:11 SO9mM TA81E 0]Ot RD MORXOI D.ST Remmd MeM NdM 4n1/Y Slmmd MT. MwMB PW l l OFdleW p IM, VA ]SAE606/16/]0l3"7 SO SmIh TARIE ROCK RD MORNWOSAE Sl Re." NOM Nmth SOajN Sbpped In Tnl old I'.—doee VMl R.. T. 11146%8Av.11 1. ll iMROEV.RD MORNIMiSOEST Head m Smut Tm OR SlaNnary M ng4N mjf OR R -d 0 0 OGekngMp VMI 1115183 Y]WAl1 I... OR XVIM1 I.. R. RO MORMNGSI .W—R SaM XmM ..Tw.wu O m µrvipPN.'AM 0 0 04rcknpiNp VM1 Od.-Mp 111E6419/1WA1117:12 M9 hTARE RORRD MORNIHBEtlIE ST ReaEW HOM N. StEaiRll SMW.TEaI OloiMnBlm WEe Veh] 1119563 1VYAu l,OR 0 TABLE R. RO MDRMX55 m MweM NMth Nm -AOR Tm `Rft NkRR..iM Aul 1 1 0Nme VeM1] XN wd 14x l.lP ]/]W3011155] 0 TABLE ROOT RO MORKIIN49OE ST Reweel Nmh Noah S ,M Slurped MTea ofNminKlm XeM VM] U.N. 3/]/AI]IO:41 ..h TRRE 1O RD RmRXIXGS0E5T MwaM NwIR Nmh Svddn iunMguh I mAR mm Pu 1 1 VMI 1311435 7/6/201116:14 TARE ROER RO MOPNRYSIOESi YMIe H—h NMM1 wm& Tu..kft Monig AN m—g. 0 D OE nglmdmm Vehl Oidmlmllp 111]69611IRRDI] I3:A 0 TABLE 1. RD ....EST Rafe Fnl NOM TumryleX SmMI Rloniy Eu6 Mom8MA 1 1 OFYFWMI ORSRX R.Rl ddwmnp 1ZlSSR3 R/21/AI] 1610 0 T4k1EROry Rp AtlRNdG51MM .—R Mnh NOM Saaltllrt Sgq NTN Mom84R Monp RM 0 0 .10—plmdae vMl ]1/5/101]15:43 755mfh TPW ROCK. MRRW4EIDESf Mm WWo MmM fbM SbLl7Z Seppedln TEaI MOMnB AU MMRAM OEMexplmdw .1 1311166. 1/". 7S4 SJO NRM TP ROQ'RO ....MDRST 9de5WR NOM If]V iELln lel sat-, m—{. ('A/e6 WRotlL 0 0 0Rae VMI HRaWR- 13137157/1YA1311.11 WRNRRDRD5T TAW RKK R0 MOe EA NeM T—n uh T—I lek MVM.. MONpAOI l 1 OfWloaBeE STWSIGN RRh, lll.W 9/M/A13I'll 30 NmM1 TAW PAERRO MORNMRME Peaem SouM SmN IRMROR St,Rd M Tal R4Mry AOt M MMR IOEtllox"vrylmdu VMI VNnW in 13lll7 lVV 11 1a:Y 1. NnIh TARE RORM MORNINOSRIEST ReaeM Nmh Nath St Ea IgM SM,W In TnfN MM MMp Am ODRmdR 0 0 OFolwrDylm Wn VMS 131468 IMM1314:18 0 MORN,Nolm ST TAgIf RCIXPO Nyle SOVM 4A Tumintl fth' SWRd A Tai Abiry Ah Meshy AOI 0 0 OOM., VMS Weallar ]413010 6/15/Al4 16:A A4ON TAOIERM.RD MWMMGSOEST Reu and XanM1 Nath SInIRhI .,,dWTnl 1 1 OfeRUSin".. Vol Start 2814 Time Direction i Directl( 12:00 AM 52 31 01 00 50 26 0200 19 13 03'.00 34 40 0400 33 127 05 00 118 208 06'.00 197 199 0700 244 263 0800 280 194 0900 252 277 1000 318 271 11'00 275 332 12:00 PM 293 368 01:00 364 387 0200 311 417 0300 376 519 0400 372 642 0500 370 520 0600 295 304 0700 197 249 08'.00 176 180 0900 142 175 10'.00 100 135 1100 46 71 Lane 3887 4747 Day 8634 4253 AM Peak 1000 11'.00 Vat 318 332 PM Peak 1500 1600 Vol. 376 542 Comb. 8634 Total ADT ADT 11,327 CITY OF MEDFORD, OREGON TRAFFIC ENGINEERING DIVISION 24 Hr Average Weekday TRAFFIC VOLUME Tue Average Wed Direction Direction Direction 1 33 52 31 30 50 26 16 19 13 53 34 40 136 33 127 258 118 208 287 197 199 414 244 263 323 280 194 284 273 188 259 310 194 314 357 186 367 402 254 456 439 126 345 476 134 295 569 0 4974 259 625 - 000 298 587 351 205 341 410 159 260 115 232 111 205 84 134 58 tat 5159 6338 1659 11497 4253 000 11:00 0700 414 357 253 13'.00 16:00 - 456 625 Thu action Direction 1 69 37 39 32 54 177 280 467 400 337 399 363 Fn Sat Sun Direction Direction Direction Direction Direction I 2594 0 0 0 0 0 D 0 0 0 0 p 07:00 - - - - - - - 407 11497 4253 0 0 0 0 MDT 11,327 Page 1 Site Code. 33a Station ID. Latitude: 0 0.0000 South Week Average ion Direction Direction 32 a0 28 44 14 29 46 33 132 44 233 148 243 238 334 326 258 340 241 296 257 327 258 351 330 385 410 413 328 446 336 544 318 584 334 554 250 322 178 254 146 206 126 190 92 134 52 86 0 4974 6354 11328 - 000 1100 334 351 - 1300 1600 410 sed 11328 CITY OF MEDFORD, OREGON TRAFFIC ENGINEERING DIVISION 24 Hr Average Weekday TRAFFIC VOLUME Start 28 -Jul -14 Toe 0 Wed Thu Time Direction 1 Direction Direction Direction Direction Direction Direction 1 12:00 AM 46 11 10 17 9 15 ' 01:00 60 37 9 23 12 23 ' 0200 06 118 3 9 3 6 ' 0300 48 2 18 12 13 9 ' 0400 65 111 44 11 48 11 ' 0500 98 30 W 29 100 30 ' 0600 4090 124 39 133 33 ' 0700 1700 128 191 59 175 60 ' 0800 146 53 128 65 ` 0900 112 77 98 95 ' 1000 95 88 121 92 ' 11:00 105 117 106 120 ' 12:00 PM 114 140 102 140 ' 01:00 98 141 126 138 ' 02:00 111 138 108 158 ' 0300 114 198 109 222 ' 04'.00 111 217 111 236 116 248 ' 05:00 127 268 124 2A3 133 253 ' 06'.00 102 171 91 158 2 5 ' 07'.00 78 139 89 139 0 0 ' 08:00 57 100 54 103 ' 09:00 52 95 49 102 ' 10:00 33 77 28 55 ' 11 00 19 30 17 44 ' Lane 589 1089 1954 2231 1642 1723 0 Day 1678 4185 3365 0 AM Peak - - 07:00 11:00 07'.00 11'.00 - Vol - - 1.91. 147 175 t2e PM Peak 1700 1700 1700 1700 1700 17.00 - .,` "1 264 1. oat laa oaa - Comb. 1678 4185 3365 0 Total ADT ADT 4,089 AADT 4,089 Fri Sat son Direction Direction Direction Direction Direction I 0 0 0 0 0 0 0 0 0 16 0 0 3 0 Page 1 Site Code'. 000000009742 Station ID'. Week Average on Direction Direction 0 16 0 23 3 8 16 10 46 11 98 30 28 36 83 60 37 59 05 86 08 90 06 118 108 40 12 140 0 48 2 210 13 234 28 252 65 111 56 93 60 102 50 98 30 66 18 31 0 1912 2178 4090 - 0700 11:00 103 11a - 1700 1700 128 252 4090 ATI L. Calvin Martin, Consultant P. O. Box 442 Jacksonville, Oregon, 97530 Appeal to the City Council of Central Point, Oregon Regarding: Costco Store Conditional -Use Permit your file #15022 This appeal is pursuant to your Municipal Code Section 17.05.400(F) Members of the Council, I am submitting this appeal in an effort demonstrate to you that the City of Central Point Planning Dept. and Planning Commission have committed an error in their approval of the Conditional -Use Permit for the Costco Store to be located in the City of Central Point in the Table Rock Road Industrial Park. I have standing In that I spoke at the original hearing on January 61h, 2016 and appealed the decision to the Planning Commission subsequently. It is easy to understand the city's desire to have such a vibrant retail store in your City. Costco is an amazing marketer of goods and services. They have a loyal customer base and provide terrific products to their customers. The City Planning Commission has abused their discretion in allowing such a use in the industrial zone and at this location. In my previous appeal to the Planning Commission I discussed the impact of the traffic that Costco generates at any location. I demonstrated the traffic generated on a day to day basis is substantially more than is generated by the entire Rogue Val ley Mall in Medford. This fact should be an occasion for pause and contemplation. You are required to follow the rules laid out in your Development Ordinance when approving such an application. It is interesting that in your STATEMENT OF VALU ES regarding growth it is stated that "We value planned growth that will retain our small town atmosphere'. This project does not fit that statement. One of the issues is that the zone, that the store is to be located in, is Industrial. The areas all around the store are zoned industrial and much is heavy industrial. The reason that retail/commercial activities are allowed in those zones with restrictions, and not outright, and that they go through the Conditional - Use permit process is that they are not the primary use but an accessory use to the primary. It is the intent that these ancillary and non -primary uses are to allow for complimentary services and uses In the zone. These non -primary uses are allowed for convenience and efficiency. Uses such as restaurants and supply stores are allowed to keep people from leaving the general area to obtain needed services When a store like Costco is placed in that zone you have to play, and indeed did so, a very significant semantic game with what you call the store. In calling it a warehouse store the project might just seem like a fit. with that said, it is certain that the management of Costco is under no illusions, whatsoever, P., 2 of 3, APpea1 that they are the largest retailer in the area. As I previously stated, Costco generates more traffic than the Rogue Valley Mall and they are about one fifth of their building footprint. lust consider the number of parking spaces that they are illustrating in their plan. It is obvious that they don't fit in this zone. They are not the complimentary service and supply provider that is allowed in the zone. A store of this size and magnitude should not be in an industrial zone. If they are allowed to develop on this site it will become a traffic disaster. The traffic issues have far reaching effects of congestion and cost on Central Point, Jackson County, and the City of Medford as well as the Oregon Department of Transportation. Of course, that means the tax payers who support those entities. In other words, all of us will be paying a huge price for the location of a store that is not an appropriate fit. It is not a code fit and it is not a size and traffic fit all in one. Once Costco goes in there will be no way to fix this problem. The area of this store and the road servicing it are plan designated as a Freight Traffic Route. It currently experiences very heavy truck traffic and will experience more as the balance of the lands near and adjacent to the Costco site develop. It is unwise and dangerous to mix high volume heavy truck traffic with a daily vehicle traffic load approaching 11,000. Traffic congestion around the Costco store will be a mix of heavy trucks and light vehicles. Table Rock Road will see the bulk of the traffic and the measures that have been suggested will only assist but not solve the problems related to this location. The additional traffic on Table Rock Road will soon find that it is not designed to handle the load further south of this store and people will soon move their preferred approach to Biddle Road and Table Rock Road north of the site. They will start using the freeway to enter Central Point from the North and the South. This will add congestion on the freeway off -ramps north and south and a loading on Pine Street all the way to the intersection with Hamrick and Pine and Table Rock Road and Pine/Biddle Road. Anyone who travels these roads now, knows that congestion in the morning and afternoon is already critical_ Many people going to Costco do so on their way home. It will definitely be more of snarl than it already is. The improvements required in the Traffic Impact Study indicate a resultant congestion from construction that is not to be completed for as much as two years. In reality, some of these items, such as an 1-5 off ramp improvement, are not scheduled by ODOT until 2023. There is no definitive evidence that the schedule has been modified. There are no engineering studies or drawings that would support a timely upgrade of that facility. There is no indication, other than verbal at the hearing of January 6", 2016 that some concession might be made. There is no evidence that the improvements along Table Rock Road are funded or that the requisite imminent domain takings of additional land for widening and intersections have been done. There have been no bids advertised for and only estimates by the applicants traffic consultants. I n fact, all of the items that should be in place for public safety and efficient road service are only ideas and suggestions at this point. It is possible that some maybe completed within two years but at this point it is far from certain. Page 3 of3, Appeal An additional issue that has not been fully vetted is the intersection of Biddle and Airport Road. This intersection is important as persons traveling to the airport are often on short time frames and congestion creates difficulties for them. Considering the fact that Table Rock Road to the south of the site will not be able to handle the traffic The impact on all of these roads is significant and not easily solved if at all. The argument can be made that the costs for all of the improvements needed to place this major retailer in an industrial zone along Table Rock Road more than eclipses the cost of the store itself by a factor of five. Estimates for the widening of the freeway overpass on Table Rock Road exceed 20 million dollars. Further south of the overpass are single family residences that need to back out onto Table Rock Road to exit their properties. The estimate for acquiring these properties for road widening does not exist, but would be very high. Table Rock Road is designated as a freight route in the overall traffic master plan and this enormous retailer with its accompanying vehicle traffic is not an appropriate mix with the truck traffic in that area. This traffic is well documented and I am certain that all of you are more than aware of the significant truck traffic that occurs on Table Rock Road to the North and South of this site and the truck traffic that enters and exits Central Point onto Pine Street from the Interstate 5. This type of traffic mix is difficult In small amounts that will always be present but to introduce vehicle traffic that is more than the Rogue Valley Mall to these roads even with the proposed improvements should give you pause. Vehicle and truck accidents will undoubtedly increase and serious injuries will occur when Costco's large number of senior drivers are forced to mix with large truck traffic. The intersection of Vilas Road and Crater Lake Highway has been the scene of horrendous accidents and many deaths and this location and traffic load creates at least four intersections with that type of potential. It was not long ago that the City of Central Point decided to pass on a "big box" store proposed by Walmart in this general vicinity. In fact, Walmart's proposed site created fewer problems than this site. Some of the same reasons that are expressed here were used to discourage the development of the Walmart store. It should be noted that the super -sized Walmart does not generate anything close to the traffic that this Costco site will generate on a day to day / hour to hour basis. If it was not a fit for Walmart at a more appropriate site, then this location and store is certainly not a fit. I am urging you to reconsider and overturn the decision of the Planning Commission on merit Thank you for your time. Respectfully submitted this 16"' day of February, 2016 L. Calvin Martin ATTACHMENT "C-2" COSTCO WIIOLESALE CONDITIONAL USE PERMIT DRAFT FINDINGS OF FACT & CONCLUSIONS OF LAW L. Calvin Martin Filing Date. February 16, 2016 File No. 15022 City Council Appeal I [caring March 10, 2016 PART 1 - INTRODUCTION On February 2, 2016, the Planning Commission in accordance with CPMC 17.76 approved a Conditional Use Permit authorizing the development of a Costco Wholesale membership warehouse and fuel facility on 18.28 acres within the M-1 zoning district ("Costco Application"). The project site is located on the eastern edge of Central Point city limits at the southwest corner of Hamrick and Table Rock road. 'Phe site also has frontage on Federal Way, a local street. Surrounding properties include developed and undeveloped industrial lands, including the M-1 and M-2 zoning districts. On February 16, 2016, L. Calvin Martin tiled an appeal contesting the Planning Commission's decision on the basis that the City of Central Point Planning Department and Planning Commission committed an error when approving the Conditional Use Permit for the Costco Store ("Martin Appeal"). 'Phe Martin Appeal addressed several issues that focused on legitimacy of a commercial/retail use in the M-1 zone and traffic related concems, which are addressed below. 'Phe Council's scope of review on this appeal is limited to the issues and evidence presented in the record before the Planning Commission as per CPMC. 17.05.400(F)(3). As this appeal is on the record the City Council may not consider new evidence or issues that were not preserved in the record below. Council review is limited to determining whether there is substantial evidence in the record to support the findings of the Planning Commission; or whether errors of law were committed. Membership warehouses are permitted as a conditional use per the City's 2009 similar use determination under CPMC 17.48.020(W) and 17.60.140, which was adopted by the Planning Commission as Resolution No.764, and affirmed by the Council on Appeal as Resolution No. 1217. The applicable approval criteria for a Conditional Use Permit are set forth under CPMC 17.76.040, Findings and Conditions for Conditional Use Permits. PART 2 - APPEAL ISSUES There were seventeen (17) issues raised in the Martin Appeal. Though some of these issues overlap, staff has attempted to lay each issue out separately for Council consideration. The following is a summary of each issue presented in the Martin Appeal including the draft findings and conclusion pertinent to each issue. Page 1 of 11 I. Planning Commission Abuse of Discretion. "The City Planning Commission has abused their discretion in allowing such a use in the industrial zone and at this location." Finding 1: Membership warehouses, per Section 17 48.020017) and 17.60.140, are allowed as a conditional use in the M -I district per Planning Commission Resolution No. 764 and City Council Resolution No. 1217. As such, the Planning Commission considered and approved the Costco Conditional Use Permit (CLIP) application in accordance with the conditional use permit standards and criteria.set forth in CPMC 17.76. Per the Applicant's Findings ("Applicant's Findings" and the Planning Department Supplemental Findings ("Supplemental Findings) and testimony provided in the record, evidence was .submitted into the record as to each criterion under 17.76 040 and was found to comply with all such standards and criteria. Conclusian I: The Council concludes that the Planning Commission did not err in finding that membership warehouses are permitted subject to a conditional use application under CPMC 17.76 and/or that there was .substantial evidence in the record to find that all such standards and criteria were met under 17.76.040.. 2. 'rraflilc Impacts. Traffic generated by Costco on a daily basis is substantially more than is generated by the entire Rogue Valley Mal I. Finding 2: The Applicant .submitted a traf c, impact analysis CTIA') into the record prepared by Kittelson and Associates for the subject property. City. staff reviewed the 71A and there is testimony in the record as to the substance of the TIA. No other traffic reports or analysis were prepared or submitted into the record by traffic engineers or other traffic experts. Testimony from opponent was limited to opinions as to the amount oftraffic that would be generated by the subject application. There was no other traffic analysis in the record to contradict the Applicant's TLA, nor does the record contain any traffic analysis as to the amount of traffic at the Rogue Palley Mall Conclusion 2: The Council concludes there is not .substantial evidence in the record to find that traffic at the Rogue Palley Mall is relevant to this application, n or is there .sufficient evidence in the record to substantiate the amount of traffic generated by the mall. 3. Development Ordinance. "You are required to follow the rules laid out in your development ordinance when approving such an application." Finding 3: The Planning Commission's considered the subject application as a CUP under the City's authorization oil membership warehouses as a conditional use in the M -I zone as discussed in Finding I above, and Finding 17.48.040(A) of the Planning Department Supplemental Findings in the record The Planning Commission considered and approved the Conditional Use Permitfor Costco Wholesale based on the application's demonstrated compliance with the .standards and criteria for conditional use permits per CPMC 17.76 as .set forth in the Applicant's h'indings and the Planning Department Supplemental Findings (.See Resolution No. 827 and attachments thereto). Paget of 11 Conclusion 3The Council concludes that there is substantial evidence in the record to find that the Planning Commission applied the relevant standards and criteria under Resolution Nos. 764 and 1217, and CPMC 17.76 to approve a membership warehouse and fuel facility and applied the evidence in the record to find such standards and criteria were mel. 4. Statement of Values. - "Your S'I'A] EMEN'I' Of VALUES regarding growth... stated that, "We value planned growth that will retain our small town atmosphere." this project does not fit that statement" Finding 4: In considering the Conditional Use Application for the proposed Membership Warehouse and fuel facility, the Planning Commission was required to render a decision based on the proposal's demonstrated compliance with Standards and Criteria for Conditional Use Permits set forth in Central Point Municipal Code Chapter 77.76. Conclusion 4: the mission statement i.s notpart of the Municipal Code nor Comprehensive Plan. It does not serve as a standard or criteria and is merely aspirational language under the City's general Mission Statement. The Council finds the Planning Commission did not err applying the ,Standards and Criteria ofCPMC 17.76. 5. Accessory Use. "One of the issues is that the zone that the store is to be located in is Industrial. The reason that retail/commercial activities are allowed in those zones with restrictions, and not outright, and that they go through the Conditional Use permit process is that they are not the primary use but an accessory use to the primary." Finding 5: The Planning Commission found that membership warehouses were adopted by the City as conditional uses in 2009 as set forth in Finding 1748-040(A) of the Planning Department Supplemental Findings adopted by the Planning Commission. The Planning Commission found that as a result of the similar use determination, membership warehouses are not considered accessory uses but ate permitted .subject to the .standards and criteriafor Conditional Use Permits per CPMC 17.76. Conclusion 5: the Council concludes that the Planning Commission's consideration of membership warehouses as a conditional use and not as an accessory use is in conformance with the City's .similar use authorization per CPMC 77.48.020(W) and CPMC 1760140- See also Planning Commission Resolution 764 and City Council Resolution 1217. 6. Semantics- —"When a store like Costco is placed in that zone you have to play, and indeed did so, a very significant semantic game with what you call the store. In calling it a warehouse store the project mightjust seem like a fit With that said, it is certain that the management of Costco is under no illusions, whatsoever, that they are the largest retailer in the area." Finding 6: The Planning Commission's consideration of the Costco CUP to develop a membership warehouse and fuel facility is based on the City's .similar use authorization for Pngc 3 of 11 membership warehouses in the MW I zoning district per Finding 17.48.040(A) in the Planning Department Supplemental Findings and Finding 1 above.. Conclusion 6: Wenthership warehouse clubs, such as Costco Wholesale, are allowed in the iv district subject to the .standards and criteria set forth in CPMC 17.76, Conditional Use Permit Not a Fit in the Zona "As I previously stated, Casten generates more traffic than the Rogue Valley Mall and they are about one fifth of their building footprint. Just consider the number of parking spaces that they are illustrating in their plan. It is obvious that they don't ft this zone. They are not a complimentary service and supply provider that is allowed in this zona A store of this size and magnitude should not be in an industrial zone. If they are allowed to develop on this site it will become a traffic disaster." Finding 7: As noted in findings 5 and 6, membership warehouses were approved in 2009 as a conditional use in the M-1 zone. With regard to traffic, CPU(' 17.76 requires consideration of the following: A. That the site for the proposed use is adequate in size and shape to accommodate the use and to meet all other development and lot requirements of the subject zoning district and all other provisions of this code; R. "That the site has adequate access to a public street or highway and that the street or highway is adequate in size and condition to effectively accommodate the traffic that is expected to be generated by the proposed use; C. That the proposed use will have no significant adverse effect on abutting property or the permitted use thereof. In making this determination, the commission shall consider the proposed location of improvements on the site; vehicular ingress, egress and internal circulation; setbacks; height of buildings and structures; walls and fences; landscaping; outdoor lighting; and signs; D. That the establishment, maintenance or operation of the use applied for will comply with local, state and federal health and safety regulations and therefore will not be detrimental to the health, safety or general welfare of persons residing or working in the surrounding neighborhoods and will not be detrimental or injurious to the property and improvements in the neighborhood or to the general welfare of the community based on the review of those factors listed in subsection C of this section; E. That any conditions required for approval of the permit are deemed necessary to protect the public health, safety and general welfare and may include: 2. Increasing street widths, modifications in street designs or addition of street signs or traffic signals to accommodate the traffic generated by the proposed use, Page Ant 11 3. Adjustments to off-street parking requirements in accordance with any unique characteristics of the proposed use, 4. Regulation of points of vehicular ingress and egress, rr* 11. Such other conditions that are found to be necessary to protect the public health, safety and general welfare, The findings adopted by the Planning Commission reviewed the criteria for Conditional Use Permits set forth in CPMC 17.76 and made findings that the .site is adequate in size and shape to accommodate the use; the .site has adequate access to a public .street or highway; the proposed use will not have adverse effects to abutting properties or permitted uses thereof, that the use will not be detrimental to the health safety or general we fare ofpersons residing or working in the .surrounding area or the community; and that the conditions imposed are deemed necessary and sufficient to protect the public health, .safety and general welfare. See the Supplemental and Applicant's findings in the record below_ More particularly, the only traffic impact analysis or other expert evidence submitted into the record is the TIA submitted by the Applicant, and comments from the City, City of Medford, ODOT and the Airport. the Planning Commission imposed conditions of approval pursuant to the TIA and comments from other jurisdictions for traffic impact mitigation. No expert testimony was received into the record countering the TIA or agency recommendations for traffic impact mitigations. (See Finding 2 addressing tru)jtc generated by Casten compared to the Rogue Palley Mall)_ All other evidence as to traffic was conjecture or speculation. As demonstrated in Finding 17.76 040(0) in the record below, the Planning Commission considered the proposal's impacts to abutting properties, including an evaluation of the location of proposed site improvement; vehicular ingress, egress and internal circulation; setbacks; building height; walls and fences; landscaping; outdoor lighting and sigms. 7 h Planning Commission found that the proposed project is typical of site development wt(hin the M zone and that the .site development standards for permitted uses in combination with the conditions of approval relative to ingress and egress per Finding 17 76.040(13) in the record below are sufficient to avoid adverse impacts to abutting properties or permitted uses thereof. As demonstrated in Finding 17 76.040(D) in the record below, the Planning Commission considered the issue ofsafety and found that there is sufficient evidence in the Applicant's findings to demonstrate, in conjunction with the building code and fire district regulations, that the proposed use will comply with local, state and federal health and safety regulations and therefore not be a detriment to the health, safety and general welfare of the community or persons residing or working in the surrounding neighborhoods_ Conclusion 7: The proposed membership warehouse and fuel facility was evaluated against the standards and criteria for conditional use permits and found to comply. There is substantial Page 5 of 11 evidence in the recordfor the Planning commission to find that the use is compatible with the zone. 8. 1 raffic F,ffects Par Reaching. —"The traffic issues have far reaching effects of congestion and cost on Central Point, Jackson County, and the City of Medford as well as the Oregon Department of Transportation. Of course, that means the lax payers who support those entities. In other words, all of us will be paying a huge price for the location of a store that is not an appropriate lit. It is not a code til and it is not a size and traffic fit all in one. Once Cusco goes in there will be no way to fix this problem." Finding 8: Per the TIA, the proposed Costco Wholesale and fuel facility is expected to generate 10,670 new daily trips. Ileavy vehicles were evaluated in the TIA and no problems were identified with the mix of light and heavy vehicles based on volume and impacts to LOS/VC On the day of opening traffic impacts were identified at four (4) intersections: 1) Interstate 5 Northbound Off Rump, 2) Table Rock and Hamrick Road, 3) Table Rock and Airport Road; and 4) Airport and Riddle Road. Although not identified in the TIA, the City of Medford provided crash data and comments in a letter dated January 5, 2016 indicating that traffic generated by Costco would negatively impact the intersection of fable Rock Road and Worningsicle .Street south of project .site. In accordance with the TIA and comments receivedfrom affected agencies, the Planning Commission imposed conditions of approval requiring mitigation of the traffic impacts caused by the proposed Costco Wholesale (See Table 1). Intersection Interstate 5 NB Impact Volume to Capacity (v/c) Mitigation Enter into a Cooperative -Thning Priur to Off -Ramp Ratio is exceeded. Improvement Agreement building with ODOT and the City to permit develop and construct dual issuance right turn lanes per LAMP Project No. 9. Table Intersection Failure due to Construct center turn lane Prior to RocWllamrick left turn delays and refuge within existing certificate of Road Table Rock Road right -of occupancy. way at Hamrick Road. Table Existing left turn delays cause Jackson County has Jackson Rock/Airport the intersection to operate at funding to construct County Table Road a Level ofSertice (LOS) F improvements on l able Rock Road The existing status is Rock Road that includes improvement aggravated by additional signalization ofthe Project traffic generated by the intersection. The County commences in proposed use. has indicated that 2017. construction of the improvements will begin in 2017; therefore, no interim mitigation is necessary Airpori/eiddle Traffic generated by Costco Per the City ofMedford in I 'ofbf Road causes leR turn delays which a letter dated.lanuary 5. payment Page 6 of I I As demonstrated in the Applicant's Findings and the Planning Department Findings, the Planning Commission found the project as conditioned is adequate to accommodate the use (See Planning Commission Findings for 1776.040 in the record below). Conclusion 8: there is substantial evidence in the record for the Planning Commission to find that as conditioned, the application complies with CPMC 17.76 and that traffic impacts from the project will funded or constructed at the time of development. 9. I Icavy Vehicle Conflicts. - "Traffic congestion amend the Costco store will be a mix of heavy trucks and light vehicles. Table Rock Road will see the bulk of traffic and the measures that have been suggested will only assist but not solve the problems related to this location" Finding 9: The Council incorporates Finding 8w if fully set forth herein. Conclusion 9: There is substantial evidence in the record for the Planning Commission to find traffic mitigation required by this project has been satisfied as conditioned 10. Additional Traffic Impacts on Table Rock Road. - "Additional traffic on'I able Rock Road will soon find that it is not designed to handle the load further south ofthis store and people will soon move their preferred approach to Biddle Road and Table Rock Road north of the site. They will start using the freeway to enter Central Point from the North and the South. This will add congestion on the freeway off -ramps north and south and a loading on Pine Street all the way to the intersection with Hamrick and Pine and Table Rock Road and Pine/Biddle Road." Finding 10. The 77A did not identify any issues south of the project site on Table Rock Road. Although not identified in the TIA, the City of Medford submitted comments on December 24, 2016 and January 5, 2016 indicating that the intersection of Table Rock Road at Morningside Street would be adversely impacted due to left turn delays and associated safety concerns. Per the City ofMedford's request, the Planning Commission imposed a condition requiringfinancial contribution for the applicant's proportional share of traffic mitigation to the intersection prior to building permit issuance. Page 7 of 11 results in a decline in the 2016, the applicant .shall prior to LO.Sfrom C to E_ contribute its pro -rata building .share toward construction permit of a signal at the i.s.suance. intersection. Table Rock Road Traffic generuted by Costco Per the City of Medford in Proof of at Morningside aggravates an existing left a letter dated January 5, payment Street turn delay at the intersection. 2016, the applicant shall prior to contribute its pro -rata building .share toward construction permit of center left turn lane issuance. and refuge on Table Rock Road at Morningside.Sireet As demonstrated in the Applicant's Findings and the Planning Department Findings, the Planning Commission found the project as conditioned is adequate to accommodate the use (See Planning Commission Findings for 1776.040 in the record below). Conclusion 8: there is substantial evidence in the record for the Planning Commission to find that as conditioned, the application complies with CPMC 17.76 and that traffic impacts from the project will funded or constructed at the time of development. 9. I Icavy Vehicle Conflicts. - "Traffic congestion amend the Costco store will be a mix of heavy trucks and light vehicles. Table Rock Road will see the bulk of traffic and the measures that have been suggested will only assist but not solve the problems related to this location" Finding 9: The Council incorporates Finding 8w if fully set forth herein. Conclusion 9: There is substantial evidence in the record for the Planning Commission to find traffic mitigation required by this project has been satisfied as conditioned 10. Additional Traffic Impacts on Table Rock Road. - "Additional traffic on'I able Rock Road will soon find that it is not designed to handle the load further south ofthis store and people will soon move their preferred approach to Biddle Road and Table Rock Road north of the site. They will start using the freeway to enter Central Point from the North and the South. This will add congestion on the freeway off -ramps north and south and a loading on Pine Street all the way to the intersection with Hamrick and Pine and Table Rock Road and Pine/Biddle Road." Finding 10. The 77A did not identify any issues south of the project site on Table Rock Road. Although not identified in the TIA, the City of Medford submitted comments on December 24, 2016 and January 5, 2016 indicating that the intersection of Table Rock Road at Morningside Street would be adversely impacted due to left turn delays and associated safety concerns. Per the City ofMedford's request, the Planning Commission imposed a condition requiringfinancial contribution for the applicant's proportional share of traffic mitigation to the intersection prior to building permit issuance. Page 7 of 11 Conclusion 10: There is .substantial evidence in the record for the Planning Commission to find that the Applicant will improve, or make financial contributions toward traffic mitigation, that is roughly proportional to the impacts of this development. 11. Improvement Timing. - "The improvements required in the Traffic Impact Study indicate a resultant congestion from construction that is not to be completed for as much as two years. In reality, some of these items, such as an 1-5 off ramp improvement, are not scheduled by ODO'f until 2023. 'There is no definitive evidence that the schedule has been modified. There are no engineering studies or drawings that would support a timely upgrade of that facility. There is no indication, other than verbal at the hearing of January 61h, 2016 that some concession might be made. There is no evidence that the improvements along Table Rock Road are funded or that the requisite imminent domain takings of additional land for widening and intersections have been done." Finding?/There was evidence in the record that identifies traffic impacts and mitigation measures and the feasibility of imposing conditions for .such traffic mitigation which includes the TIA prepared by Kittelson & Associates, as well as comments received from affected agencies, including the Oregon Department of Transportation (ODOT), Jackson County Roads, City of Central Point Publk Works Department, and City efMedford Evidence in the record addressing traffic impacts and the timing of improvements is asfollow.e - Table Rock Road Improvement Project The traffic impact analysis prepared by Kittelson & Associates took into account planned roadway improvements, including the Jackson County Table Rock Road Improvement project, which is .scheduled to be constructed in 2017 (.See TIA, Page 32). - Interstate 5 Northbound Off -Ramp, Exit 33 Improvements. As conditioned, Costco will be required to enter into a Cooperative Improvement Agreement with ODOT and pay its proportional share of the improvement cost prior to building permit issuance (See Revised Public Works Staff Report dated January 5, 2016, Condition Na. 1). Evidence in the record essablishes that the improvements are planned to be expedited such that they will be constructed as close to opening day of the subject development as possible' a. The Revised Public Works Staff Report dated January 5, 2016.states that, 'Per ODOT; construction will commence at the earliest possible date" (See 7Yafc Impacts and Mitigation Item No. 4) h. During staff's presentation at the January 5, 2016 Planning Commission Meeting, during a discussion of traffic impacts and mitigation (26:05), staff stated that ODOT agreed to expedite construction of the off -ramp improvements as close to opening day as possible. Dan Morehouse, ODOTPlanner, concurred with the staff presentation and stated that he had nothing further to add. (Audio Recording. at 1 26.15). Page 8 or 1 I Conclusion ]/:There is .substantial evidence in the record to support the Planning Commission's decision as to the feasibility and timing of the traffic mitigation conditions. 12. Biddle Road and Airport Road Intersection. - "The intersection of Biddle Road and Airport Road has not been fully vetted. This intersection is important for travelers using the airport. Congestion will create difficulties for them." Finding 12: The applicant's TIA indicates that the westbound approach of Airport and Diddle Road exceeds the level of service standard for the City ofMedford. In a letter dated.lanuary 5, 2016, the City of Medford requested a condition that requires the developer to pay a proportional share toward gfuture traffic signal atehis intersection. The estimated project cost is $450,00Q including design, construction and inspection_ Per the TIA, Costco contributes 10% of the traffic at this intersection. As conditioned, Costco shall provide evidence it has contributed its proportionate share of the construction ofsignalization improvements in an amount not to exceed $45,000, which .shall be payable to the City ofMedford prior to building permit issuance. Conclusion 12: As conditioned, facility adequacy at this intersection is met by the Planning Commission's requirement that the Applicant contribute its pro rata .share of the signalization improvements per the City ofMedford Comments dated January 5, 2016. 13. Traffic Impacts Not Easily Solved, if at all. - "1he impact on all these roads is significant and not easily solved if at all." Finding 13: Traffic impacts and mitigations are identified in the TIA and by the City ofMedford, ODOT relative to the intersections afDiddle and Airport Road and table Rock and Morningside Street. The Planning Commission's decision to approve the CUP is subject to conditions of approval assuring timely completion of the mitigation actions outlined in the TIA and requested by the affected agencies. See also Finding 8 incorporated herein by reference. Conclusion 13: There is substantial evidence in the record that as conditioned, the project will mitigate its proportionate traffic impacts caused by this project and that such conditions are feasible_ 14. Cost of Improvements. - `"f he costs for all of the improvements needed to place this major retailer in an industrial zone along Table Rock Road more than eclipses the cost of the store itself by a factor of five. Estimates for the widening of the freeway overpass on Table Rock Road exceeds 20 million dollars. Further south ofthe overpass are single family residences that need to back out onto'I able rock Road to exit their properties. The estimate for acquiring these properties for road widening does not exist, but would be very high" Finding 14There is no evidence in the record from of agencies or traffic experts or engineers to demorutrate that the Interstate 5 overpass on Table Rock Road warrants replacement or that Table Rock Road improvements south ofblerstate 5 are required, other than Page 9 of 11 required mitigation at the intersection of Table Rock Road andlNwningside Sheet, which was addressed. See also Finding Mo. 8, incorporated herein by reference. Conclusion 14: There is substantial evidence in the record for the Planning Commission to find traffic mitigation required by this project has been .satisfied as conditioned and that such conditions are feasible. 15. Freight Route, Traffic Conflicts. - "I able Rock Road is designated as a freight route in the overall traffic master plan and this enormous retailer with its accompanying vehicle traffic is not an appropriate mix with the truck traffic in that area." Finding 15. heavy vehicle impacts were evaluated in the TIA and no problems were identified with the mix of light and heavy vehicles based on volume and LOS/hC ratios (See Synchro Reports in the TLA Appendices). No other expert testimony was presented as to the mix of vehicle traffic. Conclusion 15. There is substantial evidence in the recordfor the Planning Commission to find that the mix of light and heavy vehicles does not create problems that would warrant further hgffc mitigation or denial of thi.s application_ 16. Vehicle and Truck Accidents. - "Vehicle and truck accidents will undoubtedly increase and serious injuries will occur when Craton's large number of senior drivers are forced to mix with Targe truck traffic." Finding I6Heavy vehicle impacts were evaluated in the TIA and no problems were identified with the mix of light and heavy vehicles based on volume (See Synchro Reports in the TIA Appendices) nor was there evidence in the rccordfrom experts as to the "large number ofenior drivers_" Conclusion 16: There is substantial evidence in the record for the Planning Commission to find traffic mitigation required by this project has been satisfied as conditioned and .safety concerns do not exist as a result of'this project 17. Vilas and Crater Lake Highway. - "The intersection of Vilas and Crater Lake Highway has been the scene of horrendous accidents and many deaths and this location and traffic load creates at least four intersections with that type of potential." Finding 14. A crash analysis was conducted as part of the TIA at all .study area intersections (17 IA Page 28) to document crash types, trends and .severity_ The IN found that there were no fatality crashes and the most common crashes were turning movement and rear -end crashes accounting for approximately 82% of all crashes. There is no expert evidence in the record substantiating this allegation. Conclusion 14: There is substantial evidence in the record for the Planning Commission m find Page 10 of 11 traffic mitigation required by this project has been satisfied as conditioned and safety concerns do not exist as a result of this project. PART 3 - SUMMARY CONCLUSION Council has reviewed the evidence and issues in the record and the issues raised in the Martin appeal. The Council concludes that there was substantial evidence in the record for the Planning Commission to approve the application, and the Commission did not commit errors of law. "Chis Conclusion is based upon the findings herein, and the evidence in the record including the Applicant's findings and the Planning Staff Supplemental Findings of Fact and Conclusions of Law. Page ll of 11 ATTACHMENT "D-1" BEFORE THE CITY COUNCIL FOR THE CITY OF CENTRAL POINT. OREGON NOTICE OF APPEAL Re: Costco Conditional Use Permit (File NO. 15022) Date of Decision: February 2, 2016 Pursuant to Section 17.05.400(F) of the Central Point Municipal Code David J. Smith files this Notice of Appeal and states the following: Appellant has standing to bring this appeal in that he appeared and testified before the Central Point Planning Commission on January 6, 2016 and filed written comments on January 12, 2016 within the comment period (written comments are attached hereto. The specific issues raised on appeal which were raised during the comment period are as follows: 1. Costco's traffic study is flawed in that it does not identify the present traffic patterns for Costco's members to the present store, and, without that information it is impossible to predict the route choices of Costco members to the proposed site. The use of general population statistics is inadequate to assign predicted distribution of the 10,670 daily trips by Costco members. 2. Costco's traffic study indicates that there will be heavy traffic added to Biddle Road at the entrances to the Rogue Valley International -Medford Airport, but does not indicate that the airport master plan has been taken into consideration in the traffic study. 3. The access points for the proposed Costco site are on roads which ODOT has master planned as a Freight corridor.. ODOT's Freight Profile identifies Table Rock Road as one of the local roads that "experience high volumes and of freight traffic". The proposed location is in the midst of existing freight terminals, with more planned for the future, which will mix high volume truck traffic with 10,670 Costco member daily automobile trips. 4. There is nothing in the record to verify that COOT has funded and scheduled construction of the improvements relied upon to support the Costco application. Without that confirmation that the improvements will be completed soon after the store opens is total speculation. Considering the above issues the approval of the conditional use permit without further study has the potential to create immediate and future traffic congestion and hazards, and, the placement of Costco in the proposed location is contrary to (the attached) Central Point Statement of Values: "Growth: We value planned growth that will retain our small town atmosphere",and, "Transportation: We value a system of transportation and infrastructure that is modern, efficient and sensitive to the environment." Respectfully submitted this 16th day of February, 2016. David J. ith I,ECF,v IL F1-9 1 6 2016 January 12, 2016 Summary of January6,2016 comments on application of .Costco Wholesale David Smith 241 Saginaw Drive, Medford, OR 97504 1. Co-owner of business on S. Front Street in Central Point and several apartments 2. Longtime member of Costoo and shop at present store at least twice a week. 3. Research of official records of ODOT and Central Point reveal that the proposed she for Costco is located on an official freight route system within the city and in the midst of freight terminals.(Reddaway, Conway, Fed Ex.) One, Reddaway Trucking already account for 600 truck trips per day. According to ODOT materials Gordon Trucking owns a large parcel directly across from the proposed entrance to Costco, and Intends to build a freight terminal, adding a significant increase in trucks using the area. 4 Costco's traffic study indicates its store will add 10,670 new trips per day, the majority of which will come from Medford on Biddle and Table Rock. S. Costco traffic will add several thousand more cars per day using Biddle and adding congestion at the entrance to the airport. 6 ... ODOPs Freight Profile identifies Table Rock Road as one of the local roads that "experience high volumes of freight traf0c." 7. Costco's traffic study is flawed In that It does not identify the routes Its members use to access the existing Medford store; information which is necessary to accurately predict how those members will re- route to the proposed location. 8. Costm tries to Identify Its operation as a warehouse, but indicates In Its November 3, 20125�memo to the city staff( at page 14) that Its Parking Demand Study requires 783 parking stalls which is more than the city requires for a retail store the size of the proposed Costco. CONCLUSION: While the "member Warehouse" description of the Costco proposal may distinguish it from other retail stores as far as the variety of merchandise and profit margins, Its Impact on trafflcwill be greater than other retails stores of the same size. One need only note how fast the Costco parking lot fills up and remains full during store hours; much more so than other retail stores which are open longer hours which results In less traffic in any given hour. Even the entire Medford Mall appears to have less parked cars. Costco and the city staff both Indicate the Intention to have the store open in 2016, before the widening project on Table Rock even begins. It makes no sense to add 10,670 more vehicles traveling through a construction zone, for an undetermined period, which will create an additional problem which has not been addressed. %w - CENTRAL POINT /t is theMissiOn mission of the City fCent al Point to build and maintain a highly livable community by working in harmony and being a catalyst for partnership with all the members of the community, public and private. Statement of Values Growth: We valueplanned growth that will retain aur small town atmosphere. Public Safety: We value a professional, service-oriented public safety Policy that promotes a sense of safety and security in our city. Transportation: We value a.systmn 0/transportation and infrastructure that is modern, eftclent and.sensitive to the environment. Community: We value a clean and attractive city with parks, open space e and recreational opportunities. Service: We provide the highest level Orservice possible in the most efficient and responsible manner. City Hall 140 S. 3rd Street Central Point, OR 97502 (541) 664-3321 ATTACHMENT "D-2" COSTCO WHOLESALE CONDITIONAL USE PERMIT DRAFT FINDINGS OF FACT AND CONCLUSIONS OF LAW Appellant: David J. Smith Notice of Appeal Date: February 16, 2016 File No. 15022 City Council Appeal Hearing March 10, 2016 PART 1 -INTRODUCTION On February 2, 2016, the Planning Commission in accordance with CPMC 17.76 approved a Conditional Use Permit authorizing the development of a Costco Wholesale membership warehouse and fuel facility on 18.28 acres within the M-1 zoning district ("Costco Application"). 'Che project site is located on the eastern edge of Central Point city limits at the southwest corner of Hamrick and "fable Rock road. The site also has frontage on Federal Way, a local street. Surrounding properties include developed and undeveloped industrial lands, including the M-1 and M-2 zoning districts. On February 16, 2016, David I. Smith filed an appeal ("Smith Appeal") contesting the Planning Commission's decision on grounds that the Planning Commission erred in approving the application as: I. Costco's traffic study is flawed because it does not accurately identify trip distribution patterns. 2. Coster's traffic study does not indicate that the airport master plan has been taken into consideration. 3. Site access on an ODO'Idesignated bright Corridor will mix existing and future high volume truck traffic with Costco generated traffic. 4. There is nothing in the record to verify that ODOT has funded and scheduled construction of the improvements relied upon to support the Costco application. 5. As a result of specific issues identified above, approval of the Costco CIDP without further study will create immediate and future traffic congestion and hazards. 6. Approval of the CUP is contrary to the Central Paint Statement of Values relative to growth and transportation. The Council's scope orreview on this appeal is limited to the issues and evidence presented in the record before the Planning Commission as per CPMC 17.05.400(F')(3). As this appeal is on the record the City Council may not consider new evidence or issues that were not preserved in the record below. Council Page 1 of 6 review is limited to determining whether there is substantial evidence in the record to support the findings of the Planning Commission; or whether errors of law were committed. Membership warehouses are permitted as a conditional use per the City's 2009 similar use determination under CPMC 17.48.020(W) and 17.60.140, which was adopted by the Planning Commission as Resolution No.764, and affirmed by the Council on Appeal as Resolution No. 1217. The applicable approval criteria for a Conditional Use Permit are set forth under CPMC 17.76.040, Findings and Conditions for Conditional [Jae Permits. PART 2 - APPEAL ISSUES There were six (6) issues raised in the Smith Appeal. The following is a summary of each issue in the Smith Appeal, including the findings and conclusions pertinent to each issue. 1. "traffic Study Flawed. - "Costco's traffic study is flawed in that it does not identify the present traffic patterns for Costco's members to the present store and, without that information, it is impossible to predict the route choices of Costco members to the proposed site. The use of general population statistics in inadequate to assign predicted distribution of the 10,670 daily trips by Custom Members." Finding l: The Applicant submitted a traffic impact analysis ("TIA) by Kittelson and Associates for the .subject property into the record City staff reviewed the TLA and there is testimony in the record as to the substance of the TIA from City staff. Na other traffic reports or analysis were prepared or submitted into the record, by traffic engineers or other traffic experts_ According to the TIA, "the trip distribution pattern for site generated trips was developed using zip code data from current memberships at the existing Costco warehouse located on OR 62 (Crater Lake Highway) in Medford, Oregon, as well as from the existing traffic patterns and major trip origins and destinations within the .study area."' Trip distribution was ver fed by regional travel demand models provided by ODOTfor the base year (2006) and,future year (2038). There was no tragic analysis supporting the allegation that the trip distribution methodology utilized in the TIA is flawed. Conclusion 1: The City Council concludes there is substantial evidence in the record to find that the TIA is valid and contained adequate trip distribution methodology for the subject property. 2. Custom's traffic study indicates that there will be heavy traffic added to Biddle Road at the entrances to the Rogue Valley International -Medford Airport, but does not indicate that the airport master plan has been taken into consideration in the traffic study. Finding 2: The Planning Commission's consideration of the Costco CUP application relied upon the Applicant's 7[A and agency comments (i.e. the City of Medford) relative to the identified traffic impacts and mitigation measures at the intersection ofBiddle Road and Airport Road (See I IIndf e Impact Analysis: Central Point Costco Development, Central Point, Oregon. Kittelson & Associates. Octobcr2015. Page37 Page 2 of 6 Finding 17 70 040(B)(4) in the Planning Department Supplemental Findings ("Supplemental Windings" in the record below.) The airport was identified as an agency entitled to notice, but did not submit comments into the record requiring additional traffic mitigation. The TIA identified impacts to the intersection. 7'he City of Medford recommended a condition of approval to include a median to resolve the impact. Ina letter dated January 5, 2016, the City ofMedford indicated that the airport was opposed to the proposed mitigation measure because it was in conflict with the airport master plan. As an alternative, the City ofMedford requested a condition that requires the applicant to pay a proportional. share toward a future traffic signal at this intersection in conformance with the airport master plan. The City (if Medford indicated this contribution would he .sufficient to mitigate the impacts of this project. The estimated project cost is $450, 000, including design, construction and inspection. Per the TIA, Costco contributes 10% of the traffic at this intersection. As conditioned, Costco shall provide evidence it has contributed its proportionate share of the construction ofsignalization improvements in an amount not to exceed $45,000, which shall be payable to the City ofMedford prior to building permit issuance. No other traffic reports or analysis were prepared or submitted into the record by traffic engineers or other traffic experts. Conclusion 2: The City Council concludes there is substantial evidence in the record to find that, as conditioned, the application complies with CPMC 17 76 and that the applicant will have contributed its proportional share toward traffic mitigation to the intersection of Biddle Road and Airport Road at the time of development The Council further concludes there is sufficient evidence in the record to determine that the airport did not request any mitigation for the airport master plan, but that consideration to such master plan was given 3. The access points for the proposed Costco site are on roads which ODOT has master planned as a freight corridor. ODOT's freight Profile identifies Table Rock Road as one of the local roads that "experience high volumes and of freight traffic." The proposed location is in the midst of existing freight terminals, with more planned for the future, which will mix high volume truck traffic with 10,670 Coster, member daily automobile trips. Finding 3: Heavy vehicles were evaluated in the Applicant's TIA at all study intersection and site driveways, including Table Rock Road. No problems were identified with the mix of light and heavy vehicle traffic based on volume and impacts to LOSIVC. An ODOI representative was present at the January 5, 2016 hearing and did not identify safety concerns during his testimony. (Audio Recording at 1:26). The Planning Commission considered in Finding 17 76.040(B) and 17 76.040(C)(2) the operational and safety conditions of ingress and egress on Table Rock Road, as well as all study intersections. Per the TIA and agency comments, the Planning Commission imposed conditions of approval requiring access restriction and mitigation measures to resolve traffic impacts associated with ingress and egress on Table Rock Road No other traffic reports or analysis was prepared or submitted into the record by traffic engineers or other traffic experts. Conclusion 3. The Council concludes there is .sufficient evidence in the record for the Planning Page 3 of 6 Commission to find traffic mitigation required by this project has been satisfied as conditioned and that the mix of truck traffic with the proposed development will not create additional safety concerns requiring further mitigation, except at identified and conditioned herein_ 4. '1 here is nothing in the record to verify that ODO'Ihas funded and scheduled construction of the improvements relied upon to support the Costco application. Without that confirmation that the improvements will he completed soon after the store opens is total speculation. Finding 4: Evidence in the record addressing traffic impacts and the timing of the Interstate 5 Northbound Off -Ramp, Exit 33 Improvements, and the feasibility of Imposing conditions for such traffic mitigation includes the 71A prepared by Kittelson & Associates, as well as comments received from the Oregon Department of Transportation (ODOT). As conditioned, Costco will be required to enter into a Cooperative Improvement Agreement with ODOT and pay its proportional share of the improvement cost prior to building permit issuance (See Revised Public Works SupReport dated January 5, 2016, Condition No 1). Evidence in the record establishes that the improvements are planned to be expedited .such that they will be constructed as close to opening day of the subject development as passible; a. The Revised Public Works Staff Report dated January 5, 2016 states that, 'Per ODOT construction will commence at the earliest possible date_" (See Traffic Impacts and Mitigation Item No 4) b. During staff's presentation at the.lanuary 5, 2016 Planning Commission Meeting, during a discussion of traffic impacts and mitigation (26.05), staffstated that ODOT agreed to expedite construction of the off ramp improvements as close to opening day as possible. Don Morehouse, ODOT Planner, concurred with the staff presentation and stated that he had nothingfurther to add (Audio Recordingat l; 26' IS)_ Conclusion 4' There is substantial evidence in the record to .support the Planning Commission's decision as to the feasibility and timing of the traffic mitigation conditions. 5. Without further .study, Costco has the potential to create immediate and future traffic congestion and hazards_ Finding 5: Per the TIA, the proposed CmYco Wholesale and fuel facility is expected to generate 10,,670 new daily nips. Heavy vehicles were evaluated in the TIA and no problems were identified with the mix of light and heavy vehicles based on volume and impacts to LOSIVC On the day ofopening traffic impacts were identified at four (4) intersections' l) Interstate 5 Norlhbound Off -Ramp; 2) Table Rock and Hamrick Road, 3) Table Rock and Airport Road; and 4) Airport and Biddle Road. Although not idenlified in the TIA, the City ofMedford provided crash data and comments in a letter dated January 5, 2016 indicating that traffic generated by Costco would negatively impact the intersection of Table Rock Road and Morningside Street .south of the pre jest site. In accordance with the TIA and comments received from affected agencies, the Planning Commission imposed conditions of approval requiring mitigation of the. traffic impacts caused by the proposed Costco Wholesale (See Table l below)_ Page 4 n(6 Interstate 5 NR Volume to Capacity (v/c) linter into a Cooperative Prior to Off-Ramp Ratio is exceeded Improvement Agreement building with ODOT and the City to permit develop and construct dual issuance right turn lanes per IAMP Protect No. 9. Table Intersection Failure due to Construct center turn lane Prior to RocklHamriek left turn delays and refuge within existing certificate of Road Table Rack Road right-of occupancy. way at Hamrick Road. Table Existing left turn delays cause Jackson County has Jackson Rock/Airport the intersection to operate at funding to construct County Table Road a Level of Service (LOS) E: improvements on Table Rock Road The existing status is Rock Road that includes Improvement aggravated by additional signalizalam of the Project traffic generated by the intersection. The County commences in proposed use has indicated that 2017 construction of the improvements will begin in 2017, therefore, no interim mitigation is necessary. AirportBiddle Traffic generated by Costco Per the City of Medford in Proof of Road causes left turn delays which a letter dated January 5, payment results in a decline in the 2016, the applicant .shall prior to LOS from C to E. contribute its pro-rata building share toward construction permit of a signal at the issuance. intersection. Table Rock Road Traffic generated by Costco Per the City of Medford in Proof of at Morningside aggravates an existing left a letter dated January 5, payment Street turn delay at the intersection. 2016, the applicant shall prior to contribute its pro-rata building share toward construction permit of center left turn lane issuance_ and refuge on Table Rock Road al Mornin .side .Street Per the TIA, conditions of approval were established to address idemified traffic impacts as set forth in Finding 17.76.040(H), 1776.040(C)(2), and 17.76.040(E)(2) in the record below. No other traffic studies or testimonyfrom a traffic engineer or other traffic expert was received as to the substance of the TIA. As demonstrated in the Applicant's Findings and the Planning Department Findings, the Planning Commission found the project as conditioned is adequate to accommodate the use (See Planning Commission Findings for 7776.040 in the record below). Yagc 5 of 6 Conclusion 5: The City Council concludes that there is substantial evidence in the record to support the Planning Commission's decision that, as conditioned, the project will mitigate the traffic impacts generated by this project. 6. The placement of Costco in the proposed location is contrary to the Central Point Statement of Values: "Growth: We Value planned growth that will retain our small town atmosphere," and "'1'ransponation: We value a system of transportation and infrastructure that is modern, efficient and sensitive to the environment" Finding 6. In considering the Conditional Use Application for the proposed Membership Warehouse and fuel facility, the Planning Commission was required to render a decision based on the proposal's demonstrated compliance with Standards and Criteria for Conditional L se Permits .set forth in Central Point Municipal Code Chapter 17.76 Conclusion 6: The mission statement is not part of the Municipal Code nor Comprehensive Plan. It does not serve as a.standard or criteria and is merely aspirational language under the City's general Mission Statement. The Planning Commission did not err in applying the Standards and Criteria set forth in CPMC 17.76. t. PART 3 — SUMMARY CONCLUSION Council has reviewed the evidence and issues in the record and the issues raised in the Smith appeal. The Council concludes that there was substantial evidence in the record for the Planning Commission to approve the application, and the Commission did not commit errors of law. This Conclusion is based upon the findings herein, and the evidence in the record including the Applicant's findings and the Planning Staff Supplemental Findings of Pact and Conclusions of Law. Pege 6 of 6