Loading...
HomeMy WebLinkAboutC.P. Herald 04/22/1909(SITE FOR WELL IS SELECTED Work Wiii Now ~e Pushed With the i.east PosR sibie Delay At a special moeting of the town council held Manday evening a location for the city well and pumping plant Yar I the proposed city water system was f decided upon and an order was made to j purchase the ground, The location is ~ the south half of block 34, on Ceder street between E'tfth and Sixth streets. It is about the highest ground in the town and is considered the best loca- tion available. The plat of ground is 140x22(1 feet and, with the adjoining streets, wiR make passible the cot~- struction of tunnels from the bottom of the well ¢lQ feet in length if neceaenry to secure a sufTiciont flow of water. The graund wns purchased from S. A. Pattison, the price being ;260. The water committee was instructed to advertise for bids for tha work with- out delay and it is tho intention of the mayor and council to push the work with alt possible speed. The present plnn is to sink the well to nwater-hearing gravel strata and then run tunnels east and west from the bottom, thus opening up a large surface of water-bearinggravel. Plans and specifications of the work will be prepared at once and no time will be i lost in Rotting the work started. J C.P. Herald <j<.1..L-1509 p/ Ah Attf~ctive Window.