Task Authorization No. 1
City of Central Point
Peaking Study 2015
November 2015
81-12 Project No. CPT10Ii.093
Background
8112 Engineering, Inc., (RI -12) has been requested by the Cite of Central Point (City) to evaluate peak
hour water supple demands for the "Other Cities" supplied by the lMcdford Water Commission (hd1\'C)
(TAP, Central Point, Eagle Point, and Jacksonville) in order for them to comply with limits placed in their
respective water supply agreements, and to avoid peak hour allocations in the future Cost of Service Study
(COSS). During the recent workshop, the COSS (prepared by 1 -IDR Engineering, Inc.,) was presented,
and it became apparent that NAVC is contemplating charging the "Other Cities" for the peak hour
demands they are placing on the NAVC system. Each city is limited in their water supply agreements with
i\,RN'C to a maximum peak demand. i WC has recently installed recording devices on each meter serving
the "Other Cities" and nearly every city within the "Other Cities" group has been exceeding their
prescribed limits. The "Other Cities" made a written request to I AIC for a grace period to correct this
situation and avoid die peak hour demand charges outlined in the water rate study. Tlie "Other Cities''
will need to address this issue immediately if they are to avoid being assessed this charge during next years
water rate study update.
RI12 proposes to continue working on behalf of the "Other Cities" under the General Services
Agreement, dated August 15, 201.5, with the City, as has been done to review and respond to the COSS
update. The initial report would be completed within six (G) months on a time -and -expenses basis.
Reimbursement from each of the individual cities to the City will continue as it has been throughout the
COSS process. After the completion of this report, the "Other Cities" will need to review their individual
operations to determine which steps are needed to meet their specific demand targets. 8112 is willing to
assist the "Other Cities" with this review process, or they can retain others to perform this task. That task
is outside of and not included in this Scope of Work.
Assumptions:
• Edch dtj, ni/bili /he "OlberCities " gmup nillprolide aaess to arrraa/ orprnpased MI C malersirpplj' agfreiiienls.
0 Eat b d7 , vithin the '0/her Cilies" gmnp nill provide hislorie t711b7 mptlon data and letimicallnrorn/allon abo/1l
/heir a oter supply �xlenj.
e Earb Lily within /be `101b r Ci/ier"Sroip rill prviide ota(jto pvrlitipele in the imrk grmp Airing meelioss uilb
the A11611C and to pmridr hnl acrd dinclioit regarding tIm projea.
Provided by City:
o The City will act as prime contractor for the "Other Ciries" and will organize and collect remittance
from each individual city involved.
RH2 Tasks and Deliverables:
1.1 Coordinate and hold two (2) workshops with NAVC to define targets for peak demands.
1.2 Provide a detailed review of the current demand pattern of the "Other Cities" and compare that data
with the peak hour data supplied 11111'C.
111.1"2015 I.::G,4'_PAI IT,' A -h=14- I Po -1':,!1%T, -1A,6 Ile IAC-;e:.s SUAVPe tS:u:p!
City of Central Point
Peaking Study 2015
0RIGINAL_L_PAGE•N0_j_0F� PAGES
Task Authorization No. I
Scope of Work
1.3 IN—doderation at three (3) meetings with the ,vorkshop group to share concerns and develop initial
stritegp for meetings with i RX'C.
1.4 Receive input and direction during the process and prepare a 90 -percent review draft of the report.
Provide a copy of the report to the workshop group in PDF after internal quality control/quality
assurance review.
1.5 Incorporate review comments and provide one (1) final report in PDF incorporating d -le
recommendations, which will include peak demand .allocations for the "Other Cities", and
recommended schedule for implementation.
Fee for Services
Research and development of the report will take approximately six (G) months.
The fee for services shsi11 be on a time -and -expense basis in accordance with the Professional Services
Agreement for General Services 2015, dated August 4, 2015, that has been fully -executed between the
Cih, of Central Point anti RI -I2 Engineering, Inc. The fee for services shall not exceed 521,980 (as shown
on :attached Exhibit A, Estimate of Time and Expense) without prior written authorization of City.
R142 Engineering, Inc.
Signature
12
Print Name
Tide
I I: a: 1; 1::6 PAI
Print Name
Title
2
:1•:,dL :.m4.1F_:\C•m.`..: i7` b - l: "?} ---.m'Ta AG ME 5 . WI eoi 4•dp I,�I
ORIGINALJ -PAGE NO,LOF-�-PAGES
EXHIBITA
City of Central Point
Task Authorization No. 1 • Peaking Study 2015
Estimate of Time and Expense
I Desalplkn
T.
Hoursi
(
4
Totaltabat Ie
Tout Subconsuham I Total EuportsI
TotelCost
rasbl_ ppobin3study
1
1.1 Coordinate two (2) workshops with MWC
32
S
4,440 S
S
1S9 S
4599
112 Provide current demand sottamand
24
S
84
39 S
5
143 S
4,007
1.3 Moderate three 13) work groupmentfngs
_ 20I
S
2.9441;$
- S
81 S
3A2s
1.4 Prepare 90•varcentrevfawreport: based anInput iromwork group sesdom
_
42
S
8.303 S
5
MB S
6.516
1.5 Incorporate revkw comments and prepare 9t1•parcent report to workshop group
_ _
25
S
36736 $
S
98 S
3.834
Subtotal 148
1's
2i,292I $
. 16
6661 $
2.1,980
PROJECT TOTAL
1 143 IS 21,2921$
-1 $ "$I $ 21,980'
J:DIsCPT•1DIBtla1lYlmeilad, IP,ri Sady%7eWWd�rb IFU:016Wet514y S0I61wo..f . 11.2015131 PIA
ORIGINAL-�-PAGE N04OF-PAGES
EXHIBIT B
RH2 ENGINEERING, INC.
SCHEDULE OF RATES AND CHARGES
2015 HOURLY RATES
CI.AM[FICATION RATE CLASkFICATIOV RATF
Prnfcsdonal
I\
S19-1.0(1
Tcclutician
IV
571.0)
Pnsfcssinwd
Vlll
S19 -I'M
Tcclutician
III
SSS00
ProfeWnoal
Vll
slx5.on
Technician
II
579.00
hlllca50 Current IRS Rate
,
Technician
I
571.00
Profewomil
V
5172.00
I'rofessioual
V
SI60.00
Administrativc
V
WS.00
Profesdmtw
IV
5151.00
Administrative
1V
S141.00
Adndnistrative
III
583.00
Prnfcssiacil
111
$1.11.00
Adodnistrrtive
11
57200
Pm 6siotwl
II
S135.00
Administrative
I
561.00
Professional
1
S)26.00
IN-HOUSE SERVICES
In•Imuse copies (each)
8.5".X 1 I" S0.(MJ CAD Plots burse S25,00
'
Indtnu,c copies (welt)
R. -S" X I'll, $0.61 CAD Plots Full Size S10.00
Icopies (each)
II"X17" 50.10 CAD Plots Maifsize S1.50
la-housc topics (color) (each)
R i" X III, SO -90 CAD System Per I lout S27 t0
In-hnwe topics (color) (each)
Ri" X IT' S1.20 GIS S)stent Per I lour 527.50
In-house copies (color) (ettch)
11 X 17" SIM Technology Charge 2.5Cr. or Direct Wier
hlllca50 Current IRS Rate
,
OUTSIDE SERVICES
Outside direct costs For permit lees, mparts, maps, data: seprograpliic; a --cls, ptistagd, and non -mileage micicd travel expenses that arc neecssuy
for Ore execution of O(e pmjcct and are trot specifi .y idemifted eLxwhtze,in We cutMmct wi0 be invoked at"cos[
All Subrnnv)uw services are btnled at rAstplus 1576_
CHANGES )N'RATES
Rates lista) hem arc atUttsted onmtidly. The c creat sd ithtle of rates and charges is used for bi)Ong Purposes Payttleni for work
accomplisitcd shall "used oa the hourly rates and a gxams la cifixl at Ute Orae of bil0ng as stated in ihii Exhibit..
RH2 ENGINEERING, INC.
60 North 41h Street
ENGINE"NN�A. Central Point, OR 97502
541.665.5233 or 800.720.8052
`4 Fax: 541.665.5266
TO: Chris Clayton, City Manager
City of Central Point
140 South Third Street
Central Point OR 97502
Sent Via: US Mail
Letter of 71ra s l ttal
DATE: November 5, 2015 I JOB NO.: CPT1015.093
ATTENTION: Chris Clayton
RE: 'Task Authorization No.1, Peaking Study 2015
WE ARE SENDING YOU THE FOLLOWING:
IX I Attached I I Under Separate Cover Via:
I I Shop Drawings I I Prints I I Plans
Copy of Letter i I Change Order I I Submittals
CONTENTS:
Samples I I Specifications
' COPIES I DATE I NO. I DESCRIPTION
2 111/5/2015 14 pages I Task Authorization No. 1, Peaking Study 2015
THESE ARE TRANSMITTED AS CHECKED BELOW:
X I For approval I ( Approved as submitted
For your use I I Approved as noted
I( As requested I I Returned for corrections
For your information I I Signature: I
For review and comment I I For bids due:
REMARKS:
Resubmit copies for approval
Submit _ copies for distribution
Return _ corrected prints
IPrints returned after loan to us
Enclosed are two (2) originals of Task Authorization No. 1 for the above -referenced project, which have been
signed by RH2. Please sign both originals and return one to:
RH2 Engineering, Inc.
Attn: Accounting
22722 29th Drive SE, Suite 210
Bothell, XVA 98021
F
COPY TO: File I SIGNED:
11/5/20159:24 AM Uh\m.\rf�o-=u'a„\ua,.\cri\uiisu��\co„� nr.,4n,noa..e. ir<,ksnwy\r...wcri,ym r,m m.n. 2rsir.t.es.ey�isuosa«.